I-94 Corridor Safety Review Project...Corridor Safety Review Findings • 101.2 crashes /MVMT • 43.8 per MVMT (winter) • Eastbound had 16 percent higher frequency • 65 percent

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: I-94 Corridor Safety Review Project...Corridor Safety Review Findings • 101.2 crashes /MVMT • 43.8 per MVMT (winter) • Eastbound had 16 percent higher frequency • 65 percent
Page 2: I-94 Corridor Safety Review Project...Corridor Safety Review Findings • 101.2 crashes /MVMT • 43.8 per MVMT (winter) • Eastbound had 16 percent higher frequency • 65 percent

• I-94 Corridor Safety Review Project

• I-94 in Berrien County

• I-94/40th Street Interchange

• M-86 Historic Bridge Relocation

• 2017 Project Preview in Albion

OVERVIEW

Page 3: I-94 Corridor Safety Review Project...Corridor Safety Review Findings • 101.2 crashes /MVMT • 43.8 per MVMT (winter) • Eastbound had 16 percent higher frequency • 65 percent

www.michigan.gov/mdot

I-94 Corridor

Corridor Safety Review

Region Traffic, Safety and Operations EngineerSteve Brink

Page 4: I-94 Corridor Safety Review Project...Corridor Safety Review Findings • 101.2 crashes /MVMT • 43.8 per MVMT (winter) • Eastbound had 16 percent higher frequency • 65 percent

Corridor Safety Review

Crash Summary

I-94 at MM 90.5

193 vehicles

(76 trucks)

58 citations

Study Details

Indiana to Jackson

MDOT/MSP staff survey

Detailed data analyses

Field reviews

Page 5: I-94 Corridor Safety Review Project...Corridor Safety Review Findings • 101.2 crashes /MVMT • 43.8 per MVMT (winter) • Eastbound had 16 percent higher frequency • 65 percent

Corridor Safety Review

Findings

• 101.2 crashes /MVMT

• 43.8 per MVMT (winter)

• Eastbound had 16 percent

higher frequency

• 65 percent of winter

crashes involved “too fast

for conditions”

• Van Buren County has

highest winter crash rate

Report Details

• Data summaries

• Crash evaluation

• Site reviews

• Operational initiatives

• Planned and possible

improvements

• Recommendations

• Data tables

• Crash concentration

maps

Page 6: I-94 Corridor Safety Review Project...Corridor Safety Review Findings • 101.2 crashes /MVMT • 43.8 per MVMT (winter) • Eastbound had 16 percent higher frequency • 65 percent

Corridor Safety Review

• Recommendations• Continue data-driven crash

mitigation efforts

• Continue improving operational and roadway maintenance

• Continue improving driver behavior

• Site-Specific Recommendations and Options

• Upcoming Related Projects This Year

• Environmental sensor stations• Resurfacing and super

correction MM 16-23• Resurfacing MM 81-88• 40th Street interchange

(Exit 88)• High-friction treatments

• US-131 interchange

• Mile 92-93

• Signing upgrades in Kalamazoo and Calhoun counties

Page 7: I-94 Corridor Safety Review Project...Corridor Safety Review Findings • 101.2 crashes /MVMT • 43.8 per MVMT (winter) • Eastbound had 16 percent higher frequency • 65 percent

www.michigan.gov/mdot

Berrien County

Westbound I-94 from MM 16 to 23

Coloma Business Office Pete Pfeiffer

Page 8: I-94 Corridor Safety Review Project...Corridor Safety Review Findings • 101.2 crashes /MVMT • 43.8 per MVMT (winter) • Eastbound had 16 percent higher frequency • 65 percent

I-94 over Puetz Road

I-94 Puetz Road Curve

Typical Road Deficiency

Westbound I-94 from MM 16 to 23

Page 9: I-94 Corridor Safety Review Project...Corridor Safety Review Findings • 101.2 crashes /MVMT • 43.8 per MVMT (winter) • Eastbound had 16 percent higher frequency • 65 percent

Bid price: $13.9 millionStart date: March 2016

Completion: October 2016

7.36 miles of HMA cold milling and overlay

Geometric improvement at Puetz Road curve

Puetz Road and Lost Dunes structure widening and rehabilitation

Five-year materials and workmanship pavement warranty

Traffic volume

Westbound I-94: 22,675 ADT

I-94 WB from MM16 to MM23

Page 10: I-94 Corridor Safety Review Project...Corridor Safety Review Findings • 101.2 crashes /MVMT • 43.8 per MVMT (winter) • Eastbound had 16 percent higher frequency • 65 percent

www.michigan.gov/mdot

Traffic ImpactsRamps closed and detoured

Maintain two lanes on I-94 (except at night)

Lost Dunes Road signalized

Puetz Road detoured

Westbound I-94 from MM 16 to 23

Page 11: I-94 Corridor Safety Review Project...Corridor Safety Review Findings • 101.2 crashes /MVMT • 43.8 per MVMT (winter) • Eastbound had 16 percent higher frequency • 65 percent

www.michigan.gov/mdot

Community Impacts

Stevensville Bridgman

Westbound I-94 from MM 16 to 23

Page 12: I-94 Corridor Safety Review Project...Corridor Safety Review Findings • 101.2 crashes /MVMT • 43.8 per MVMT (winter) • Eastbound had 16 percent higher frequency • 65 percent

www.michigan.gov/mdot

Business Relations

Prior to project start: Distribute construction brochures

Answer business questions during brochure handout

Westbound I-94 from MM 16 to 23

Page 13: I-94 Corridor Safety Review Project...Corridor Safety Review Findings • 101.2 crashes /MVMT • 43.8 per MVMT (winter) • Eastbound had 16 percent higher frequency • 65 percent

www.michigan.gov/mdot

Communication Plan

News releases/milestone news releases

Mi Drive/LCAR

Westbound I-94 from MM 16 to 23

Page 14: I-94 Corridor Safety Review Project...Corridor Safety Review Findings • 101.2 crashes /MVMT • 43.8 per MVMT (winter) • Eastbound had 16 percent higher frequency • 65 percent

www.michigan.gov/mdot

40th Street (E. Michigan Avenue) over I-94

Kalamazoo TSCPete Pfeiffer

Page 15: I-94 Corridor Safety Review Project...Corridor Safety Review Findings • 101.2 crashes /MVMT • 43.8 per MVMT (winter) • Eastbound had 16 percent higher frequency • 65 percent

Bid price: $12.2 millionStart date: March 2016

Completion: Sept. 30, 2016

DBE 5 percent

Traffic volume

I-94: 56,100 ADT

E. Michigan Avenue: 3,000 ADT

Westbound I-94 from MM 16 to 23

Page 16: I-94 Corridor Safety Review Project...Corridor Safety Review Findings • 101.2 crashes /MVMT • 43.8 per MVMT (winter) • Eastbound had 16 percent higher frequency • 65 percent

40th Street (E. Michigan Avenue) over I-94

Page 17: I-94 Corridor Safety Review Project...Corridor Safety Review Findings • 101.2 crashes /MVMT • 43.8 per MVMT (winter) • Eastbound had 16 percent higher frequency • 65 percent

Community Impacts

Local detours for ramps

East Open throughout project

40th Street (E. Michigan Avenue) over I-94

Page 18: I-94 Corridor Safety Review Project...Corridor Safety Review Findings • 101.2 crashes /MVMT • 43.8 per MVMT (winter) • Eastbound had 16 percent higher frequency • 65 percent

Business and Public Relations

Meetings with local businesses

E-mail network for information

Social media updates

Construction brochures

Page 19: I-94 Corridor Safety Review Project...Corridor Safety Review Findings • 101.2 crashes /MVMT • 43.8 per MVMT (winter) • Eastbound had 16 percent higher frequency • 65 percent

Public Benefits

Improve traffic flow

Improve safety

Improve ride quality

Page 20: I-94 Corridor Safety Review Project...Corridor Safety Review Findings • 101.2 crashes /MVMT • 43.8 per MVMT (winter) • Eastbound had 16 percent higher frequency • 65 percent

Innovations

Precast bridge elements

Military security clearance for workers near Fort Custer

Page 21: I-94 Corridor Safety Review Project...Corridor Safety Review Findings • 101.2 crashes /MVMT • 43.8 per MVMT (winter) • Eastbound had 16 percent higher frequency • 65 percent

www.michigan.gov/mdot

Cass and St. Joseph Counties

M-86 Historic Bridge Relocation

Southwest Region Construction EngineerAndy Stamm

Page 22: I-94 Corridor Safety Review Project...Corridor Safety Review Findings • 101.2 crashes /MVMT • 43.8 per MVMT (winter) • Eastbound had 16 percent higher frequency • 65 percent

www.michigan.gov/mdot

Historic Pony Truss

Built in 1923National Register

M-86 Historic Bridge Relocation

Page 23: I-94 Corridor Safety Review Project...Corridor Safety Review Findings • 101.2 crashes /MVMT • 43.8 per MVMT (winter) • Eastbound had 16 percent higher frequency • 65 percent

Bid price: $13.9 millionStart date: March 2016

Completion: October 2016

7.36 miles of HMA cold milling and overlay

Geometric improvement at Puetz Road curve

Puetz Road and Lost Dunes structure widening and rehabilitation

Five-year materials and workmanship pavement warranty

Traffic volume

Westbound I-94: 22,675 ADT

Page 24: I-94 Corridor Safety Review Project...Corridor Safety Review Findings • 101.2 crashes /MVMT • 43.8 per MVMT (winter) • Eastbound had 16 percent higher frequency • 65 percent

Innovations

Bulb T beams with carbon fiber composite cables

Pile-supported bridge approaches

Page 25: I-94 Corridor Safety Review Project...Corridor Safety Review Findings • 101.2 crashes /MVMT • 43.8 per MVMT (winter) • Eastbound had 16 percent higher frequency • 65 percent

www.michigan.gov/mdot

M-99 (Superior Street) Reconstruction

Marshall TSCMark Dionise

Page 26: I-94 Corridor Safety Review Project...Corridor Safety Review Findings • 101.2 crashes /MVMT • 43.8 per MVMT (winter) • Eastbound had 16 percent higher frequency • 65 percent

www.michigan.gov/mdot

M-99 (Superior Street) Reconstruction

Page 27: I-94 Corridor Safety Review Project...Corridor Safety Review Findings • 101.2 crashes /MVMT • 43.8 per MVMT (winter) • Eastbound had 16 percent higher frequency • 65 percent

Construction: 2017

Cost estimate: $4 million (0.37 Miles)

Key items:

Historic brick paver replacement = SHPO!!Municipal water main replacement

Four-lane to three-lane conversion

ADT = 5,800Project collaboration

City of Albion and Albion College

New hotel development