29
February 26, 2009 I-35 South Environmental Assessment I-35 South Environmental Assessment 3 rd Public Meeting 3 rd Public Meeting

I-35 South Environmental Assessment › meetings › a2009 › 090226 › presentation.pdf · I-35 South Environmental Assessment Project Status Update – Key Comments from 2. nd

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: I-35 South Environmental Assessment › meetings › a2009 › 090226 › presentation.pdf · I-35 South Environmental Assessment Project Status Update – Key Comments from 2. nd

February 26, 2009

I-35 SouthEnvironmental Assessment

I-35 SouthEnvironmental Assessment

3rd Public Meeting3rd Public Meeting

Page 2: I-35 South Environmental Assessment › meetings › a2009 › 090226 › presentation.pdf · I-35 South Environmental Assessment Project Status Update – Key Comments from 2. nd

ODOTBenhamFHWA

I-35 South Environmental AssessmentIntroductions

Page 3: I-35 South Environmental Assessment › meetings › a2009 › 090226 › presentation.pdf · I-35 South Environmental Assessment Project Status Update – Key Comments from 2. nd

I-35 South Environmental AssessmentProject Team I-35 SOUTH

PROJECT CONTACT LIST

ODOT Environmental: Scott Stegmann, 405-522-8014, [email protected] Siv Sundaram, 405-522-3791, [email protected] Public Involvement: Craig Moody, (405) 522-1465, [email protected] Roadway: Tim Tegeler, 405-521-2695, [email protected] Kirk Goins, 405-521-2695, [email protected] Eduardo Elder, 405-521-2695, [email protected] Bridge: Annie Lombardo, 405-521-2606, [email protected] Survey: Larry Reser, 405-521-2621, [email protected] Traffic: Daryl Johnson, 405-522-6376, [email protected] Reza Amini, 405-521-6779, [email protected] Harold Smart, 405-521-2861, [email protected] Right-of-Way: Kurt Harms, 405-521-2661, [email protected] Diana Barlow, 405-521-2648, [email protected] Utilities: Marvin Bright, 405-521-2641, [email protected] Project Management: Kevin Bryan, 405-522-7605, [email protected] Division 3: Paul Rachel, 580-332-1526, [email protected] Ron Brown, 580-332-1526, [email protected] Bruce Jeffcoat, 580-332-1526, [email protected]

BENHAM Engineering: Ron Weltzheimer, 405-478-5353, [email protected] Duane Kranz, 405-478-5353, [email protected] Environmental: Diane Abernathy, 405-701-3167, [email protected] Terry McFall, 405-794-3531, 405-361-3531, [email protected] Renee’ Ellis, 918-492-1600, x398, [email protected], [email protected] Traffic: Ken Morris, 405-478-5353, [email protected]

Aruna Mathuranayagam, 405-478-5353, [email protected]

Page 4: I-35 South Environmental Assessment › meetings › a2009 › 090226 › presentation.pdf · I-35 South Environmental Assessment Project Status Update – Key Comments from 2. nd

Expand I-35 to 6 Lanes North of Canadian River BridgeReconstruct SH 9E, Lindsey, & Main Interchanges

I-35 South Environmental AssessmentProposed Improvements

Page 5: I-35 South Environmental Assessment › meetings › a2009 › 090226 › presentation.pdf · I-35 South Environmental Assessment Project Status Update – Key Comments from 2. nd

Increase SafetyProvide Additional CapacityImplement OCART Study Recommendations

I-35 South Environmental AssessmentProject Purpose & Need

Page 6: I-35 South Environmental Assessment › meetings › a2009 › 090226 › presentation.pdf · I-35 South Environmental Assessment Project Status Update – Key Comments from 2. nd

I-35 South Environmental AssessmentStudy Area

Page 7: I-35 South Environmental Assessment › meetings › a2009 › 090226 › presentation.pdf · I-35 South Environmental Assessment Project Status Update – Key Comments from 2. nd

Establish Project within ODOTComplete Environmental ProcessDesign ProjectAcquire Right-of-WayRelocate UtilitiesConstruct Project

I-35 South Environmental AssessmentThe Roadway Improvement Process

Page 8: I-35 South Environmental Assessment › meetings › a2009 › 090226 › presentation.pdf · I-35 South Environmental Assessment Project Status Update – Key Comments from 2. nd

National Environmental Policy ActDecision Making Process

NEPA Process

Community Impacts

Wetlands Endangered Species

Safety

All Applicable Federal Laws

FlexibleDesign

State & Local Law

Transportation Enhancements Traditional

Cultural Properties

Environmental Justice

Parklands

Air Quality

Historic

NEPA Process

Community Impacts

Wetlands Endangered Species

Safety

All Applicable Federal Laws

FlexibleDesign

State & Local Law

Transportation Enhancements Traditional

Cultural Properties

Environmental Justice

Parklands

Air Quality

Historic

I-35 South Environmental AssessmentNEPA Process

Page 9: I-35 South Environmental Assessment › meetings › a2009 › 090226 › presentation.pdf · I-35 South Environmental Assessment Project Status Update – Key Comments from 2. nd

Minimize Social, Environmental, & Economic Impacts of the ProjectSolicit Input from Federal, Tribal, State, Local Agencies, & PublicCollect Environmental DataEstimate Construction, Right-of-Way, & Utility CostsEvaluate Data & Costs to Select Preferred Improvements

I-35 South Environmental AssessmentNEPA Process

Page 10: I-35 South Environmental Assessment › meetings › a2009 › 090226 › presentation.pdf · I-35 South Environmental Assessment Project Status Update – Key Comments from 2. nd

Meeting Purpose

I-35 South Environmental Assessment

Project Status Update– Key Comments from 2nd Public Meeting

• Keep All Lindsey Street Ramps• Complete Noise Wall Prior to Construction• Aesthetic Enhancements • Impacts to New Auto Dealership• Consider Existing Stormwater Drainage Problems• SH 9 Connection to Ed Noble Parkway• 24th Avenue Overpass (EB SH 9)• Compatible with One Way Frontage Roads & Texas

Turnaround

Page 11: I-35 South Environmental Assessment › meetings › a2009 › 090226 › presentation.pdf · I-35 South Environmental Assessment Project Status Update – Key Comments from 2. nd
Page 12: I-35 South Environmental Assessment › meetings › a2009 › 090226 › presentation.pdf · I-35 South Environmental Assessment Project Status Update – Key Comments from 2. nd

Meeting Purpose

I-35 South Environmental AssessmentProject Status Update

– Key Comments from 2nd Public Meeting• Keep All Lindsey Street Ramps• Complete Noise Wall Prior to Construction• Aesthetic Enhancements • Impacts to New Auto Dealership• Consider Existing Stormwater Drainage Problems• SH 9 Connection to Ed Noble Parkway• 24th Avenue Overpass (EB SH 9)• Compatible with One Way Frontage Roads & Texas

Turnaround• Pedestrian & Bicycle Crossing

Page 13: I-35 South Environmental Assessment › meetings › a2009 › 090226 › presentation.pdf · I-35 South Environmental Assessment Project Status Update – Key Comments from 2. nd

I-35 South Environmental Assessment

Norman Bicycle Master Plan

Page 14: I-35 South Environmental Assessment › meetings › a2009 › 090226 › presentation.pdf · I-35 South Environmental Assessment Project Status Update – Key Comments from 2. nd

Meeting Purpose

I-35 South Environmental AssessmentProject Status Update

– Key Comments from 2nd Public Meeting• Keep All Lindsey Street Ramps• Complete Noise Wall Prior to Construction• Aesthetic Enhancements • Impacts to New Auto Dealership• Consider Existing Stormwater Drainage Problems• SH 9 Connection to Ed Noble Parkway• 24th Avenue Overpass (EB SH 9)• Compatible with One Way Frontage Roads & Texas

Turnaround• Pedestrian & Bicycle Crossing• Fixed Guideway Study

Page 15: I-35 South Environmental Assessment › meetings › a2009 › 090226 › presentation.pdf · I-35 South Environmental Assessment Project Status Update – Key Comments from 2. nd

Meeting Purpose

I-35 South Environmental Assessment

COTPA Fixed Guideway Study

Page 16: I-35 South Environmental Assessment › meetings › a2009 › 090226 › presentation.pdf · I-35 South Environmental Assessment Project Status Update – Key Comments from 2. nd

I-35 South Environmental AssessmentInterchange Alternatives

Page 17: I-35 South Environmental Assessment › meetings › a2009 › 090226 › presentation.pdf · I-35 South Environmental Assessment Project Status Update – Key Comments from 2. nd

Existing I-35SH 9 to Main Street

(NO BUILD)

Page 18: I-35 South Environmental Assessment › meetings › a2009 › 090226 › presentation.pdf · I-35 South Environmental Assessment Project Status Update – Key Comments from 2. nd

LOS = D/E

LOS = C/F

Page 19: I-35 South Environmental Assessment › meetings › a2009 › 090226 › presentation.pdf · I-35 South Environmental Assessment Project Status Update – Key Comments from 2. nd

LOS = D/E

LOS = C/F

Page 20: I-35 South Environmental Assessment › meetings › a2009 › 090226 › presentation.pdf · I-35 South Environmental Assessment Project Status Update – Key Comments from 2. nd
Page 21: I-35 South Environmental Assessment › meetings › a2009 › 090226 › presentation.pdf · I-35 South Environmental Assessment Project Status Update – Key Comments from 2. nd
Page 22: I-35 South Environmental Assessment › meetings › a2009 › 090226 › presentation.pdf · I-35 South Environmental Assessment Project Status Update – Key Comments from 2. nd

LOS = D/E

LOS = C/F

Page 23: I-35 South Environmental Assessment › meetings › a2009 › 090226 › presentation.pdf · I-35 South Environmental Assessment Project Status Update – Key Comments from 2. nd

LOS = D/E

LOS = C/F

Page 24: I-35 South Environmental Assessment › meetings › a2009 › 090226 › presentation.pdf · I-35 South Environmental Assessment Project Status Update – Key Comments from 2. nd

(SPUI)

Page 25: I-35 South Environmental Assessment › meetings › a2009 › 090226 › presentation.pdf · I-35 South Environmental Assessment Project Status Update – Key Comments from 2. nd

Provide continuous sidewalksBreak up crossings into several small stepsUse good geometry to improve sight distance Provide adequate advance warning devices at pedestrian crosswalk locations with day time and night time visibility properties including, but not limited to warning signs with flashersLED crosswalk flashing lights operated with push button, etc.Likely to take more than one signal cycle to cross entire SPUI

SPUI – Pedestrian Crossing Features

Page 26: I-35 South Environmental Assessment › meetings › a2009 › 090226 › presentation.pdf · I-35 South Environmental Assessment Project Status Update – Key Comments from 2. nd
Page 27: I-35 South Environmental Assessment › meetings › a2009 › 090226 › presentation.pdf · I-35 South Environmental Assessment Project Status Update – Key Comments from 2. nd

1st Public Meeting September 24, 20072nd Public Meeting September 18, 20083rd Public Meeting February 26, 2009Public Hearing Summer/Fall 2009

I-35 South Environmental AssessmentPublic Participation Opportunities

Page 28: I-35 South Environmental Assessment › meetings › a2009 › 090226 › presentation.pdf · I-35 South Environmental Assessment Project Status Update – Key Comments from 2. nd

Web Address:http://www.okladot.state.ok.us/meetings/index.htm

Scott Stegmann – ODOTPhone: 405.522.8014200 NE 21st StreetOklahoma City, OK 73105E-mail: [email protected]

Diane Abernathy – BenhamPhone: 405.701.31673700 W. Robinson, Ste. 200Norman, OK 73072E-mail: [email protected]

I-35 South Environmental AssessmentInformation Sources

Page 29: I-35 South Environmental Assessment › meetings › a2009 › 090226 › presentation.pdf · I-35 South Environmental Assessment Project Status Update – Key Comments from 2. nd

Thank you!

Questions &

Answers