32
MMF 52 Hydrotest Monitoring: Adapting Oceanographic Instrumentation to Subsea Pipeline Testing Andy Smerdon Managing Director

Hydrotest Monitoring: Adapting Oceanographic ...mmf-uk.org/mmf/wp-content/uploads/2012/11/aquatec-mmf52-hydro…• Carried out in the ‘Pre-Commissioning’ phase of newly installed

Embed Size (px)

Citation preview

Page 1: Hydrotest Monitoring: Adapting Oceanographic ...mmf-uk.org/mmf/wp-content/uploads/2012/11/aquatec-mmf52-hydro…• Carried out in the ‘Pre-Commissioning’ phase of newly installed

MMF 52 Hydrotest Monitoring:

Adapting Oceanographic Instrumentation to

Subsea Pipeline Testing

Andy Smerdon

Managing Director

Page 2: Hydrotest Monitoring: Adapting Oceanographic ...mmf-uk.org/mmf/wp-content/uploads/2012/11/aquatec-mmf52-hydro…• Carried out in the ‘Pre-Commissioning’ phase of newly installed

Overview • Aquatec Group Ltd

• What is Hydrotesting?

• From Oceanographic to Industrial: 1

• Cost Drivers

• From Oceanographic to Industrial: 2

• When A Hydrotest Fails…

01/05/2013

Slide 1

MMF52: Hydrotest Monitoring

Page 3: Hydrotest Monitoring: Adapting Oceanographic ...mmf-uk.org/mmf/wp-content/uploads/2012/11/aquatec-mmf52-hydro…• Carried out in the ‘Pre-Commissioning’ phase of newly installed

Overview • Aquatec Group Ltd

• What is Hydrotesting?

• From Oceanographic to Industrial: 1

• Cost Drivers

• From Oceanographic to Industrial: 2

• When A Hydrotest Fails…

01/05/2013

Slide 2

MMF52: Hydrotest Monitoring

Page 4: Hydrotest Monitoring: Adapting Oceanographic ...mmf-uk.org/mmf/wp-content/uploads/2012/11/aquatec-mmf52-hydro…• Carried out in the ‘Pre-Commissioning’ phase of newly installed

Aquatec Group Ltd

01/05/2013

Slide 3

MMF52: Hydrotest Monitoring

Customers in the offshore market

Creators of innovative INSTRUMENTS, SERVICES,

and SOLUTIONS for your MEASUREMENT,

MONITORING, and COMMUNICATION needs

UNDERWATER

Providing instrumentation solutions for all water

environments including:

Offshore Energy & Marine Renewables

Ocean Science

Fisheries and Marine Wildlife

Page 5: Hydrotest Monitoring: Adapting Oceanographic ...mmf-uk.org/mmf/wp-content/uploads/2012/11/aquatec-mmf52-hydro…• Carried out in the ‘Pre-Commissioning’ phase of newly installed

Aquatec Group Ltd

01/05/2013

Slide 4

MMF52: Hydrotest Monitoring

• Founded in 1990

• Based in Hampshire, UK

• Primary expertise:

• Subsea instrumentation: to 4000m & beyond

• Long life autonomous systems: 10+ years design life

• Underwater acoustics and optics

• Design and manufacture all products and engineered solutions

• Products sold worldwide: >75% export

• ISO 9001:2008

Page 6: Hydrotest Monitoring: Adapting Oceanographic ...mmf-uk.org/mmf/wp-content/uploads/2012/11/aquatec-mmf52-hydro…• Carried out in the ‘Pre-Commissioning’ phase of newly installed

Overview • Aquatec Group Ltd

• What is Hydrotesting?

• From Oceanographic to Industrial: 1

• Cost Drivers

• From Oceanographic to Industrial: 2

• When A Hydrotest Fails…

01/05/2013

Slide 5

MMF52: Hydrotest Monitoring

Page 7: Hydrotest Monitoring: Adapting Oceanographic ...mmf-uk.org/mmf/wp-content/uploads/2012/11/aquatec-mmf52-hydro…• Carried out in the ‘Pre-Commissioning’ phase of newly installed

What is Hydrotesting? • Hydrostatic Pressure Testing

• Carried out in the ‘Pre-Commissioning’ phase of newly installed subsea pressure vessels:

– Pipelines

– Subsea manifolds

– Risers

– Flowlines

• After installation, subsea pressure vessel is:

– Flooded with seawater

– Pumped to an internal test pressure

– Sealed off for between 6 and 48 hours

01/05/2013

Slide 6

MMF52: Hydrotest Monitoring

Page 8: Hydrotest Monitoring: Adapting Oceanographic ...mmf-uk.org/mmf/wp-content/uploads/2012/11/aquatec-mmf52-hydro…• Carried out in the ‘Pre-Commissioning’ phase of newly installed

What is Hydrotesting? • Pressure must remain steady during hold

period

• A successful pressure hold signals the sign off for the subsea installer

• Standards & requirements – DNV, ANSI, API

– Require measurement of pressure AND temperature

– ‘Continuous pressure record’

• Temperature is measured to identify pressure variations caused by environmental changes during test

01/05/2013

Slide 7

MMF52: Hydrotest Monitoring

Page 9: Hydrotest Monitoring: Adapting Oceanographic ...mmf-uk.org/mmf/wp-content/uploads/2012/11/aquatec-mmf52-hydro…• Carried out in the ‘Pre-Commissioning’ phase of newly installed

Overview • Aquatec Group Ltd

• What is Hydrotesting?

• From Oceanographic to Industrial: 1

• Cost Drivers

• From Oceanographic to Industrial: 2

• When A Hydrotest Fails…

01/05/2013

Slide 8

MMF52: Hydrotest Monitoring

Page 10: Hydrotest Monitoring: Adapting Oceanographic ...mmf-uk.org/mmf/wp-content/uploads/2012/11/aquatec-mmf52-hydro…• Carried out in the ‘Pre-Commissioning’ phase of newly installed

01/05/2013

Slide 9

MMF52: Hydrotest Monitoring

AQUAlogger 520 • AQUAlogger : self recording, multi-channel

data logging instruments, usually incorporating sensors

• 520 series: Key characteristics are – Connectorless communication via custom USB

reader

– Large data storage memory

– Versatile programming

• 520PT Instruments: Measure Temperature & Pressure – -2°C to +30°C Standard, other ranges possible

– 1.6 (6m) to 100 bar (1000m)

– Used for water level, tide, or depth

Page 11: Hydrotest Monitoring: Adapting Oceanographic ...mmf-uk.org/mmf/wp-content/uploads/2012/11/aquatec-mmf52-hydro…• Carried out in the ‘Pre-Commissioning’ phase of newly installed

Product Application • From Oceanographic…

– AQUAlogger 520 PT

… with the addition of a pressure connector & higher range

pressure sensor

• To Industrial…

– HYDROlog 1100

– Up to 600 bar

• A hydraulic hose links the pipeline

under test to the data logger

01/05/2013

Slide 10

MMF52: Hydrotest Monitoring

Page 12: Hydrotest Monitoring: Adapting Oceanographic ...mmf-uk.org/mmf/wp-content/uploads/2012/11/aquatec-mmf52-hydro…• Carried out in the ‘Pre-Commissioning’ phase of newly installed

Product Application

01/05/2013

Slide 11

MMF52: Hydrotest Monitoring

Page 13: Hydrotest Monitoring: Adapting Oceanographic ...mmf-uk.org/mmf/wp-content/uploads/2012/11/aquatec-mmf52-hydro…• Carried out in the ‘Pre-Commissioning’ phase of newly installed

Product Application

01/05/2013

Slide 12

MMF52: Hydrotest Monitoring

Page 14: Hydrotest Monitoring: Adapting Oceanographic ...mmf-uk.org/mmf/wp-content/uploads/2012/11/aquatec-mmf52-hydro…• Carried out in the ‘Pre-Commissioning’ phase of newly installed

Overview • Aquatec Group Ltd

• What is Hydrotesting?

• From Oceanographic to Industrial: 1

• Cost Drivers

• From Oceanographic to Industrial: 2

• When A Hydrotest Fails…

01/05/2013

Slide 13

MMF52: Hydrotest Monitoring

Page 15: Hydrotest Monitoring: Adapting Oceanographic ...mmf-uk.org/mmf/wp-content/uploads/2012/11/aquatec-mmf52-hydro…• Carried out in the ‘Pre-Commissioning’ phase of newly installed

How to Reduce Cost? • A dynamically positioned diving support

vessel can cost £100-200k per day

• Time = Money!

• Time is wasted if a hydrotest failure due to a leak is not detected until the end of the test

• ROV dive and surface rates mean deep water return transits can take hours

• Time is wasted recovering the logger to the surface

• The solution: Real-Time Data

01/05/2013

Slide 14

MMF52: Hydrotest Monitoring

Page 16: Hydrotest Monitoring: Adapting Oceanographic ...mmf-uk.org/mmf/wp-content/uploads/2012/11/aquatec-mmf52-hydro…• Carried out in the ‘Pre-Commissioning’ phase of newly installed

Overview • Aquatec Group Ltd

• What is Hydrotesting?

• From Oceanographic to Industrial: 1

• Cost Drivers

• From Oceanographic to Industrial: 2

• When A Hydrotest Fails…

01/05/2013

Slide 15

MMF52: Hydrotest Monitoring

Page 17: Hydrotest Monitoring: Adapting Oceanographic ...mmf-uk.org/mmf/wp-content/uploads/2012/11/aquatec-mmf52-hydro…• Carried out in the ‘Pre-Commissioning’ phase of newly installed

01/05/2013

Slide 16

MMF52: Hydrotest Monitoring

AQUAlogger 210PT • AQUAlogger : self recording, multi-channel

data logging instruments, usually incorporating sensors

• 210 series: Key characteristics are – RS232 and USB communication via waterproof

connector

– Large data storage memory

– Versatile programming

– Real-Time Data Output

• 210PT Instrument: Also measure Temperature & Pressure: – -2°C to +30°C Standard, other ranges possible

– 1.6 (6m) to 100 bar (1000m)

– Used for water level, tide, or depth

Page 18: Hydrotest Monitoring: Adapting Oceanographic ...mmf-uk.org/mmf/wp-content/uploads/2012/11/aquatec-mmf52-hydro…• Carried out in the ‘Pre-Commissioning’ phase of newly installed

Product Application • From Oceanographic…

– AQUAlogger 210 PT

… with the addition of a pressure connector & higher range

pressure sensor

• To Industrial…

– HYDROlog 2000

– Up to 1400 bar

• A hydraulic hose can link the pipeline

under test to the data logger, or…

01/05/2013

Slide 17

MMF52: Hydrotest Monitoring

Page 19: Hydrotest Monitoring: Adapting Oceanographic ...mmf-uk.org/mmf/wp-content/uploads/2012/11/aquatec-mmf52-hydro…• Carried out in the ‘Pre-Commissioning’ phase of newly installed

Product Application

01/05/2013

Slide 18

MMF52: Hydrotest Monitoring

Hot Stab Pressure

Connector

Page 20: Hydrotest Monitoring: Adapting Oceanographic ...mmf-uk.org/mmf/wp-content/uploads/2012/11/aquatec-mmf52-hydro…• Carried out in the ‘Pre-Commissioning’ phase of newly installed

Instantaneous Real-Time Values

01/05/2013

Slide 19

MMF52: Hydrotest Monitoring

Page 21: Hydrotest Monitoring: Adapting Oceanographic ...mmf-uk.org/mmf/wp-content/uploads/2012/11/aquatec-mmf52-hydro…• Carried out in the ‘Pre-Commissioning’ phase of newly installed

Real-Time Test Data Upload

• Optical Communications

• Seamless interface

between subsea

instruments & surface

operator

• Transparent RS232

communication link

01/05/2013

Slide 20

MMF52: Hydrotest Monitoring

Page 22: Hydrotest Monitoring: Adapting Oceanographic ...mmf-uk.org/mmf/wp-content/uploads/2012/11/aquatec-mmf52-hydro…• Carried out in the ‘Pre-Commissioning’ phase of newly installed

Complete Systems

01/05/2013

Slide 21

MMF52: Hydrotest Monitoring

Page 23: Hydrotest Monitoring: Adapting Oceanographic ...mmf-uk.org/mmf/wp-content/uploads/2012/11/aquatec-mmf52-hydro…• Carried out in the ‘Pre-Commissioning’ phase of newly installed

Complete Systems

01/05/2013

Slide 22

MMF52: Hydrotest Monitoring

Page 24: Hydrotest Monitoring: Adapting Oceanographic ...mmf-uk.org/mmf/wp-content/uploads/2012/11/aquatec-mmf52-hydro…• Carried out in the ‘Pre-Commissioning’ phase of newly installed

Remote Pressure Indication

01/05/2013

Slide 23

MMF52: Hydrotest Monitoring

Page 25: Hydrotest Monitoring: Adapting Oceanographic ...mmf-uk.org/mmf/wp-content/uploads/2012/11/aquatec-mmf52-hydro…• Carried out in the ‘Pre-Commissioning’ phase of newly installed

Real-Time Acoustic Transfer • Pressure telemetry

system

– Integral pressure

transducer

– Measures pressure and

transmits as acoustic signal

– Signal received and

decoded at surface

01/05/2013

Slide 24

MMF52: Hydrotest Monitoring

Page 26: Hydrotest Monitoring: Adapting Oceanographic ...mmf-uk.org/mmf/wp-content/uploads/2012/11/aquatec-mmf52-hydro…• Carried out in the ‘Pre-Commissioning’ phase of newly installed

Acoustics • ‘Send and forget’ principle

• Update every n minutes

• Message collision avoidance:

– Two transmissions every update period

– Separated by random interval

• Message includes error checking and correction

• Decoding includes multiple validation stages to minimise false alarms

01/05/2013

Slide 25

MMF52: Hydrotest Monitoring

Page 27: Hydrotest Monitoring: Adapting Oceanographic ...mmf-uk.org/mmf/wp-content/uploads/2012/11/aquatec-mmf52-hydro…• Carried out in the ‘Pre-Commissioning’ phase of newly installed

Multiple Unit Application

01/05/2013

Slide 26

MMF52: Hydrotest Monitoring

Page 28: Hydrotest Monitoring: Adapting Oceanographic ...mmf-uk.org/mmf/wp-content/uploads/2012/11/aquatec-mmf52-hydro…• Carried out in the ‘Pre-Commissioning’ phase of newly installed

Theory of Operation

01/05/2013

Slide 27

MMF52: Hydrotest Monitoring

Page 29: Hydrotest Monitoring: Adapting Oceanographic ...mmf-uk.org/mmf/wp-content/uploads/2012/11/aquatec-mmf52-hydro…• Carried out in the ‘Pre-Commissioning’ phase of newly installed

Theory of Operation

01/05/2013

Slide 28

MMF52: Hydrotest Monitoring

Page 30: Hydrotest Monitoring: Adapting Oceanographic ...mmf-uk.org/mmf/wp-content/uploads/2012/11/aquatec-mmf52-hydro…• Carried out in the ‘Pre-Commissioning’ phase of newly installed

Overview • Aquatec Group Ltd

• What is Hydrotesting?

• From Oceanographic to Industrial: 1

• Cost Drivers

• From Oceanographic to Industrial: 2

• When A Hydrotest Fails…

01/05/2013

Slide 29

MMF52: Hydrotest Monitoring

Page 31: Hydrotest Monitoring: Adapting Oceanographic ...mmf-uk.org/mmf/wp-content/uploads/2012/11/aquatec-mmf52-hydro…• Carried out in the ‘Pre-Commissioning’ phase of newly installed

Subsea Leak Detection

• Integrated systems for sensing leaks

• ROV-deployed or stand-alone with

acoustic data transfer options

• Range of sensors:

– Passive acoustic

– Temperature

– Fluorescence

01/05/2013

Slide 30

MMF52: Hydrotest Monitoring

Page 32: Hydrotest Monitoring: Adapting Oceanographic ...mmf-uk.org/mmf/wp-content/uploads/2012/11/aquatec-mmf52-hydro…• Carried out in the ‘Pre-Commissioning’ phase of newly installed

Aquatec provides subsea data acquisition solutions through the design and manufacture of

standard and custom instrumentation for subsea process and condition monitoring,

including through water data transmission to retrieve remote data.

www.AquatecGroup.com

Any Questions?

01/05/2013

Slide 31

MMF52: Hydrotest Monitoring