15
HYDROMETRIC SITE SELECTION Training for PNG Power Port Moresby July 2012

HYDROMETRIC SITE SELECTION Training for PNG Power Port Moresby July 2012

Embed Size (px)

Citation preview

Page 1: HYDROMETRIC SITE SELECTION Training for PNG Power Port Moresby July 2012

HYDROMETRIC SITE SELECTION

Training for PNG PowerPort Moresby

July 2012

Page 2: HYDROMETRIC SITE SELECTION Training for PNG Power Port Moresby July 2012

SITE SELECTION CRITERIA (GENERAL)• Occupational Health and Safety

• Purpose

• Vandalism

• Power requirements

• Telemetry requirements

• Permissive occupancy

• Accessibility

Page 3: HYDROMETRIC SITE SELECTION Training for PNG Power Port Moresby July 2012

SITE SELECTION CRITERIA (METEOROLOGICAL)

• Minimal effects from wind

X √

Page 4: HYDROMETRIC SITE SELECTION Training for PNG Power Port Moresby July 2012

SITE SELECTION CRITERIA (METEOROLOGICAL)

• Even ground

X √

Page 5: HYDROMETRIC SITE SELECTION Training for PNG Power Port Moresby July 2012

SITE SELECTION CRITERIA (METEOROLOGICAL)

• 1:4 ratio of surrounding features

X

Minimum 4x

Page 6: HYDROMETRIC SITE SELECTION Training for PNG Power Port Moresby July 2012

SITE SELECTION CRITERIA (METEOROLOGICAL)

• Height of rim above GL (30-100cm)

Standard Rain Gauge (Daily Read)

Tipping Bucket Rain Gauge

300mm

1000mm

Page 7: HYDROMETRIC SITE SELECTION Training for PNG Power Port Moresby July 2012

Typical Meteorological Installations

Page 8: HYDROMETRIC SITE SELECTION Training for PNG Power Port Moresby July 2012

‘Vandalism’- Meteorological

Page 9: HYDROMETRIC SITE SELECTION Training for PNG Power Port Moresby July 2012

SITE SELECTION CRITERIA (STREAM)• Control (stable & sensitive)• Straight section (min.100m upstream & downstream)• ‘Contained’ flow (no side channels)• Subterranean flow• Stable bed and banks• Gauge pool (aquatic growth, depth, negligible approach

velocities)• Location of instrumentation• Survey marks• Downstream effects (tidal, water storages)• Low, Medium and High flow gauging sections• Water quality considerations

Page 10: HYDROMETRIC SITE SELECTION Training for PNG Power Port Moresby July 2012

Typical Stream Gauging Station Installations

Page 11: HYDROMETRIC SITE SELECTION Training for PNG Power Port Moresby July 2012

Typical Stream Gauging Station Installations

Page 12: HYDROMETRIC SITE SELECTION Training for PNG Power Port Moresby July 2012

‘Vandalism’- Stream

Page 13: HYDROMETRIC SITE SELECTION Training for PNG Power Port Moresby July 2012

‘Vandalism’- Stream

Page 14: HYDROMETRIC SITE SELECTION Training for PNG Power Port Moresby July 2012

References

• World Meteorological Organisation – Guide to Hydrological Practices (WMO No.168)

• Snowy Mountains Hydro-Electric Authority – Hydrographic Course (September 1966)

• AS3778 ‘ Measurement of water flow in open channels’

Page 15: HYDROMETRIC SITE SELECTION Training for PNG Power Port Moresby July 2012

Questions ?