GENERAL NOTES 1. ALL MECHANICAL WORKS SHALL BE DONE IN ACCORDANCE WITH THE LATEST REQUIREMENTS OF THE PHILIPPINE NATIONAL BUILDING CODE AND REGULATION OF THE LOCAL MUNICIPALITY 2. THE TOTAL SCOPE OF WORK SHALL INCLUDE ALL WORKS DESCRIBED IN PLANS AND LISTED IN THE TECHNICAL SPECIFICATION FOR MECHANICAL WORKS. 3. THE WORK SHALL BE EXECUTED IN CLOSE COORDINATION WITH ALL TRADES. 4. ALL AIR CONDITIONED SPACES SHALL BE MAINTAINED AT 27 o C AND 19 o WB. 5. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS, MANUFACTURES EQUIPMENT SPECIFICATION AND MATERIAL SAMPLES TO INCLUDE VIBRATION ISOLATORS, INSULATION, DAMPERS, ETC. 6. CONTRACTORS/SUPPLIER SHALL INSTALL ALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATION. 7. ALL POWER WIRINGS UP TO SPLICE BOX SHALL BE BY ELECTRICAL CONTRACTOR AND FROM SPLICE BOX TO EQUIPMENT BY MECHANICAL CONTRACTOR. 8. VERIFY LOCATION OF CONTROLLERS AND SWITCHES IN THE ELECTRICAL PLANS. 9. ALL PIPE EQUIPMENT CONDENSATE DRAIN LINE TO THE NEAREST FLOOR DRAIN STUB-OUT PROVIDED BY THE PLUMBING CONTRACTOR. AIR CONDITIONING AND VENTILATION EQUIPMENT SCHEDULE FAN SCHEDULE EQUIPMENT QTY LOCATION TSP IN H20 CAPACITY CFM MOTOR DRIVE TYPE REMARKS EXHAUST FAN 12 ALL TOILETS WATTS/HP VOLTS PH HZ WALL MOUNTED EXHAUST FAN PENN OR APPROVED EQUAL 0.2 5 110 50 230 1 60 WINDOW TYPE AIR CONDITIONING UNIT SCHEDULE

HVAC

Embed Size (px)

DESCRIPTION

General Notes for HVAC

Citation preview

Page 1: HVAC

GENERAL NOTES

1. ALL MECHANICAL WORKS SHALL BE DONE IN ACCORDANCE WITH THE LATEST REQUIREMENTS OF THE PHILIPPINE NATIONAL BUILDING CODE AND REGULATION OF THE LOCAL MUNICIPALITY

2. THE TOTAL SCOPE OF WORK SHALL INCLUDE ALL WORKS DESCRIBED IN PLANS AND LISTED IN THE TECHNICAL SPECIFICATION FOR MECHANICAL WORKS.

3. THE WORK SHALL BE EXECUTED IN CLOSE COORDINATION WITH ALL TRADES.

4. ALL AIR CONDITIONED SPACES SHALL BE MAINTAINED AT 27oC AND 19oWB.

5. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS, MANUFACTURES EQUIPMENT SPECIFICATION AND MATERIAL SAMPLES TO INCLUDE VIBRATION ISOLATORS, INSULATION, DAMPERS, ETC.

6. CONTRACTORS/SUPPLIER SHALL INSTALL ALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATION.

7. ALL POWER WIRINGS UP TO SPLICE BOX SHALL BE BY ELECTRICAL CONTRACTOR AND FROM SPLICE BOX TO EQUIPMENT BY MECHANICAL CONTRACTOR.

8. VERIFY LOCATION OF CONTROLLERS AND SWITCHES IN THE ELECTRICAL PLANS.

9. ALL PIPE EQUIPMENT CONDENSATE DRAIN LINE TO THE NEAREST FLOOR DRAIN STUB-OUT PROVIDED BY THE PLUMBING CONTRACTOR.

AIR CONDITIONING AND VENTILATION EQUIPMENT SCHEDULE

FAN SCHEDULE

EQUIPMENT QTY LOCATION TSP IN

H20

CAPACITYCFM

MOTOR DRIVE TYPE REMARKS

EXHAUST FAN 12 ALL

TOILETS

WATTS/HP VOLTS PH HZ WALL MOUNTED EXHAUST

FAN

PENN OR APPROVED EQUAL0.25 110 50 230 1 60

WINDOW TYPE AIR CONDITIONING UNIT SCHEDULE

EQUIPMENT LOCATION CAPACITYKJ/HR

VOLTAGE/PHASE/HZ

AIRFLOW

CM/MINWATTS STARTING

CURRENTOPERATING CURRENT REMARKS

WAC-1HP ALL BEDROOM 9,280 230/1/60 8 750 15 4 CARRIER OR

APPROVED EQUAL

WAC-1.5 HP OFFICES 13,000 230/1/60 9.60 1210 21.5 5.4 CARRIER OR APPROVED EQUAL