Report Huia Site Selection: Ancillary Structures Summary Report Prepared for Watercare Services Ltd (Client) By CH2M Beca Limited 20 September 2016 © CH2M Beca 2016 (unless CH2M Beca has expressly agreed otherwise with the Client in writing). This report has been prepared by CH2M Beca on the specific instructions of our Client. It is solely for our Client’s use for the purpose for which it is intended in accordance with the agreed scope of work. Any use or reliance by any person contrary to the above, to which CH2M Beca has not given its prior written consent, is at that person's own risk.

Huia Site Selection: Ancillary Structures Summary Report · 2019. 12. 16. · Huia Site Selection: Ancillary Structures Summary Report CH2M Beca // 20 September 2016 // Page 2 6511164

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Huia Site Selection: Ancillary Structures Summary Report · 2019. 12. 16. · Huia Site Selection: Ancillary Structures Summary Report CH2M Beca // 20 September 2016 // Page 2 6511164

Report

Huia Site Selection: Ancillary Structures Summary Report

Prepared for Watercare Services Ltd (Client)

By CH2M Beca Limited

20 September 2016

© CH2M Beca 2016 (unless CH2M Beca has expressly agreed otherwise with the Client in writing). This report has been prepared by CH2M Beca on the specific instructions of our Client. It is solely for our Client’s use for the purpose for which it is intended in accordance with the agreed scope of work. Any use or reliance by any person contrary to the above, to which CH2M Beca has not given its prior written consent, is at that person's own risk.

Page 2: Huia Site Selection: Ancillary Structures Summary Report · 2019. 12. 16. · Huia Site Selection: Ancillary Structures Summary Report CH2M Beca // 20 September 2016 // Page 2 6511164
Page 3: Huia Site Selection: Ancillary Structures Summary Report · 2019. 12. 16. · Huia Site Selection: Ancillary Structures Summary Report CH2M Beca // 20 September 2016 // Page 2 6511164

Huia Site Selection: Ancillary Structures Summary Report

CH2M Beca // 20 September 2016 // Page ii

6511164 // NZ1-13085657-6 0.6

Table of Contents

1 Introduction .......................................................................................................... 1

2 Woodlands Park Road ......................................................................................... 1

2.1 Raw Water Infrastructure ............................................................................................. 1

2.2 Treated Water Infrastructure ....................................................................................... 1

2.3 Other Ancillary Infrastructure ....................................................................................... 2

3 Parker Road ......................................................................................................... 3

3.1 Raw Water Infrastructure ............................................................................................. 3

3.2 Treated Water Infrastructure ....................................................................................... 3

3.3 Other Ancillary Infrastructure ....................................................................................... 4

4 Summary .............................................................................................................. 4

Appendices

Appendix A - Overview plans

A1 – Existing Site

A2 – Manuka Road

A3 – Parker North

A4 – Parker South

Appendix B - Parker Scheme Tunnel Details

B1 – Parker North Tunnel

B2 – Parker South Tunnel

B3 – Jacking Pit Locations (Parker Sites)

Appendix C - Raw Water Upgrades

Page 4: Huia Site Selection: Ancillary Structures Summary Report · 2019. 12. 16. · Huia Site Selection: Ancillary Structures Summary Report CH2M Beca // 20 September 2016 // Page 2 6511164

Huia Site Selection: Ancillary Structures Summary Report

CH2M Beca // 20 September 2016 // Page 1

6511164 // NZ1-13085657-6 0.6

1 Introduction

This report summarises the ancillary structures requirements for the two schemes that were

assessed as the shortlist for the Huia site selection. The two schemes were located in Woodlands

Park Road and Parker Road with two site locations assessed under each scheme. The sites

assessed were:

� Woodlands Park Road – Manuka Road

� Woodlands Park Road – Existing Site

� Parker Road – Parker North

� Parker Road – Parker South

For the remainder of this report the descriptions will be provided at the scheme level, with site

specific details provided where relevant. The site specifics are covered in more detail in the Shortlist

Site Development Report1.

2 Woodlands Park Road

2.1 Raw Water Infrastructure

The Woodlands Park Scheme connects to the end of the existing raw water aqueduct with a gravity

supply to the existing site and a new raw water pump station to supply the Manuka Road site (Refer

to Appendix A). Significant upgrades and maintenance will be needed to the aqueduct over the next

20 years due to the age and condition of this asset (refer to Appendix C).

The Upper Nihotupu Raw Watermain connection will differ between the two sites to meet the project

principle of a gravity supply from this source. The Manuka Road site will require a bypass of the

Raw Water Aqueduct by the upper Nihotupu raw watermain along Exhibition Drive (refer to

Appendix A2). This follows the original route of this watermain, which is currently abandoned. The

existing site will maintain the current connection of the Upper Nihotupu main to the Raw Water

Aqueduct at Torren’s Taper.

It is anticipated that the raw water system will be controlled at the sources, which is the same as

current operational procedures. The system cannot be pressurised because of the gravity sections

at Smiths Tunnel and the raw water aqueduct.

2.2 Treated Water Infrastructure

The treated water from both sites will flow to the treated water reservoirs on the site to the north of

Woodlands Park Road. Two 25Ml reservoirs will be located at this site as per the drawings in the

Shortlist Site Development Report1. The top water level (TWL) of the reservoirs has been set as

120m but further transmission network modelling is recommended to optimise the final level.

The reservoirs will flow into a pressurised and lined tunnel, which passes under the Scenic Drive

ridge (refer to appendix A). The route of this tunnel follows the route identified as part of the North

Harbour No.2 Watermain preliminary design work. This also applies to the route of the treated

watermain from the outlet of the tunnel to the junction with Parrs Cross Road. A treated watermain

1 GHD, Shortlist Site Development Report (September 2016)

Page 5: Huia Site Selection: Ancillary Structures Summary Report · 2019. 12. 16. · Huia Site Selection: Ancillary Structures Summary Report CH2M Beca // 20 September 2016 // Page 2 6511164

Huia Site Selection: Ancillary Structures Summary Report

CH2M Beca // 20 September 2016 // Page 2

6511164 // NZ1-13085657-6 0.6

has also been shown along West Coast Road, providing a cross-connection between the North

Harbour No.1 and No.2 watermains.

The replacement of treated water aqueduct has been shown for the two Woodland Park Road Sites

(Appendix C). This will provide increased resilience to the treated water network, allowing a direct

supply to Titirangi Reservoirs. It is assumed that this will be pressurised as part of the replacement

works. The connection configuration to the Treated Water Aqueduct has not be addressed as part

of this project and will need to be considered at later stages of design.

2.3 Other Ancillary Infrastructure

2.3.1 Overflow/Off Spec Discharges

The layout for building on the existing site results in no overflow lagoon on the site. As a result, a

direct discharge to the Little Muddy Creek Pipeline will be required. This is detailed in previous work

by MWH.

The Manuka Road site has a short overflow discharge to the lagoon on the existing treatment plant.

This lagoon will need to be extended, once the existing site has been demolished, to provide

sufficient attenuation in an overflow event.

The overflow arrangements are covered in more detail in the off-specification water discharges

report2.

2.3.2 Wastewater Connection

The existing Huia Water Treatment Plant has a connection to the wastewater network and it has

been assumed that both Woodlands Park Sites can maintain this arrangement.

The discharge of filtrate arrangements are covered in more detail in the off-specification water

discharges report2.

2.3.3 Power Supply

Watercare has already been in discussions with Vector regarding power supply to the site. A variety

of options are available with differing levels of redundancy. It has been assumed that for the

Woodlands Park Road schemes a new direct power supply will be provided from Atkinson Road

Sub-station. Should this fail there is some capacity in the existing network plus an emergency

generator on site.

2 Tonkin and Taylor (June 2016) Huia WTP Site Selection Study- Off-Specification Water Discharges

Page 6: Huia Site Selection: Ancillary Structures Summary Report · 2019. 12. 16. · Huia Site Selection: Ancillary Structures Summary Report CH2M Beca // 20 September 2016 // Page 2 6511164

Huia Site Selection: Ancillary Structures Summary Report

CH2M Beca // 20 September 2016 // Page 3

6511164 // NZ1-13085657-6 0.6

3 Parker Road

3.1 Raw Water Infrastructure

The Parker Road Sites are not located adjacent to existing raw water infrastructure (refer to

Appendix A3 and A4). To provide a raw water supply to the sites requires a tunnel from Mackies

Rest. This tunnel is 1.8km to 2km in length and is on the limit of the maximum length for this size of

tunnelling equipment (refer to Appendix B1 and B2). It has therefore been assumed that the tunnel

will require an intermediate shaft during construction (refer to Appendix B3). The intermediate shaft

will be closer to the treatment plant than it will be to Mackies Rest due to the nature of the terrain;

this can be seen on the long-sections in Appendix B1 and B2.

It has been assumed that the tunnel will be jacked from the Mackies Road end. The working area is

restricted at this location due to the terrain and the surrounding vegetation (refer to appendix B3). A

review of the Mackies Rest was carried out with Adam Cato from March Cato Civil Engineering

Contractors. Adam stated that with a small amount of vegetation clearing, the site will be

appropriate for tunnel jacking. During the construction period it is likely that temporary bypass works

will be required to maintain supply to the raw water aqueduct and the existing treatment plant.

It has been assumed that the tunnel will not require lining because although it will be pressurised, it

will operate at a low head.

The Upper Nihotupu Watermain will need to be extended to connect to the tunnel inlet at Mackies

Rest. This will involve a connection at the end of Jacobson’s Tunnel. It has been assumed that the

watermain will follow Exhibition Drive to the south and then Mackies Rest access track to the tunnel

inlet. A more direct cross-country route should be considered at the next stage of design. A head

dissipation device will be need to on the Upper Nihotupu Raw Watermain prior to the connection to

the raw water tunnel.

The raw water aqueduct will not be required for this scheme and therefore will be abandoned. This

also applies to the Upper Nihotupu Raw Watermain after Jacobson’s Tunnel. This can be seen on

Appendix C.

It is anticipated that the raw water system will be controlled at the sources, which is the same as

current operational procedures. The system cannot be pressurised because of the gravity section at

Smiths Tunnel.

3.2 Treated Water Infrastructure

The two Parker Road sites will have treated water pump stations that pump to the treated water

reservoirs. The TWL of the reservoirs has been set at 120m. The reservoir elevation is relatively

flexible at these two sites and further analysis is required to determine the optimal top water level.

The treated watermain passes down Parker Road and West Coast Road before connecting to the

proposed North Harbour No.2 Watermain route at the junction of Parrs Cross Road. The watermain

continues along West Coast Road to provide a cross connection with the North Harbour No.1

Watermain (refer to Appendix A3 and A4). This is necessary to provide supply to the east because

this scheme has no direct connection to Titirangi Reservoirs. The treated water aqueduct will be

abandoned (refer to appendix C).

Page 7: Huia Site Selection: Ancillary Structures Summary Report · 2019. 12. 16. · Huia Site Selection: Ancillary Structures Summary Report CH2M Beca // 20 September 2016 // Page 2 6511164

Huia Site Selection: Ancillary Structures Summary Report

CH2M Beca // 20 September 2016 // Page 4

6511164 // NZ1-13085657-6 0.6

3.3 Other Ancillary Infrastructure

3.3.1 Overflow/Off Spec Discharges

The Parker Road Sites both have available space to construct lagoons with appropriate attenuation

times. Discharge from the lagoons will be via short gravity pipelines to the neighbouring Allen

Swamp. The overflow arrangements are covered in more detail in the off-specification water

discharges report2.

3.3.2 Wastewater Connection

There is no wastewater network in Parker Road. It has been assumed that a new 150mm gravity

pipeline, 3km in length, will need to connect to the closest wastewater network in Glen Eden. At the

next stage of design a more comprehensive review of this pipeline will be needed to check the pipe

size and long-section implications.

The discharge of filtrate arrangements are covered in more detail in the off-specification water

discharges report2.

3.3.3 Power Supply

It has been assumed that for the Parker Road schemes a new direct power supply will be provided

from Oratia Sub-station. Should this fail there is some capacity in the existing network plus an

emergency generator on site.

4 Summary

A summary of the ancillary infrastructure requirements for the four short-listed sites is provided in

Table 1.

Page 8: Huia Site Selection: Ancillary Structures Summary Report · 2019. 12. 16. · Huia Site Selection: Ancillary Structures Summary Report CH2M Beca // 20 September 2016 // Page 2 6511164

Huia Site Selection: Ancillary Structures Summary Report

CH2M Beca // 20 September 2016 // Page 5

6511164 // NZ1-13085657-6 0.6

Table 1 - Site Summary Table

Scheme PARKER ROAD WOODLANDS PARK ROAD

Site Parker North Site Parker South Site Manuka Road Site Existing Plant Site

Raw Water Infrastructure

Connection to Aqueduct At Mackies Rest prior to the start of the aqueduct At the outlet of the aqueduct into a new pump station. 400m

of rising main in Woodlands Park Rd

At the outlet of the aqueduct directly into the plant

Upper Nihotupu Raw Watermain connection

550mm watermain along Exhibition Drive and the Mackies Rest Access Track

550mm watermain along Exhibition Drive from Torren’s Taper to Woodlands Park Rd

No change required

Raw Water Tunnel 2km, 2m diameter tunnel with intermediate access shaft

1.8km, 2m diameter tunnel with intermediate access shaft

N/A

Treated Water Infrastructure

Pipeline: WTP to Reservoirs Pumped main 165m long Pumped main 140m long Falling main 550m long Pumped main 530m long

Treated Water Tunnel N/A 800m tunnel as per North Harbour No.2 Watermain

Pipeline: Reservoirs to Network Parker Road and West Coast Rd, 5.3km long

Parker Road and West Coast Rd, 5km long

Follows North Harbour No.2 Watermain route (4km)

Power Supply

Connection to grid Single dedicated line from Oratia sub-station plus connection to local network

Single dedicated line from Atkinson Road sub-station plus connection to local network

Off-Spec Water

Overflow Lagoon and discharge pipe to Allen Swamp Extend existing lagoon Little Muddy Creek pipeline

Wastewater 150mm sewer, 3km long connecting to closest network on West Coast Road

Connection to existing sewer network. Minimal additional infrastructure required

Upgrades to existing infrastructure

Upper Nihotupu Raw Watermain

Replacement of the pipeline between the dam and the end of Jacobson’s Tunnel

Replacement of the pipeline between the dam and Torren’s Taper

Raw Water Aqueduct Not required Maintenance/upgrades required

Treated Water Aqueduct Not required Optional: new connection and relining

Page 9: Huia Site Selection: Ancillary Structures Summary Report · 2019. 12. 16. · Huia Site Selection: Ancillary Structures Summary Report CH2M Beca // 20 September 2016 // Page 2 6511164

Appendix A

Overview Plans

Page 10: Huia Site Selection: Ancillary Structures Summary Report · 2019. 12. 16. · Huia Site Selection: Ancillary Structures Summary Report CH2M Beca // 20 September 2016 // Page 2 6511164

A1 – Existing Site

Page 11: Huia Site Selection: Ancillary Structures Summary Report · 2019. 12. 16. · Huia Site Selection: Ancillary Structures Summary Report CH2M Beca // 20 September 2016 // Page 2 6511164

GIS@b

eca.co

mFile

: \\beca

.net\pr

ojects

\777\7

77-GIS

-CHC\6

511164

(Huia

)\55_W

orkspa

ces\01

_mxd\

AGIS-

651116

4-042_

01_Ov

erview

.mxd

Auth

or: Be

ca D

ate: 8/

07/201

6

FOR INTERNAL PURPOSES ONLY.YET TO BE VERIFIED.

Title: Client:

Project:

Discipline:GIS

Drawing No:Existing Site

Revision Author Verified Approved Date

1 CP DRAFT DRAFT 7/07/2016Alignment Overview

Watercare Services Ltd

Huia WTP Upgrade GIS-6511164-042-01

This map contains data derived in part or wholly from sources other than Beca, and therefore, no representations orwarranties are made by Beca as to the accuracy or completeness of this information.

Map intended for distribution as a PDF document. Scale may be incorrect when printed.Service Layer Credits: Sourced from the LINZ Data Service and licensed for re-use under the Creative CommonsAttribution 3.0 New Zealand licence

0 250125

Meters

Map Scale @ A3: 1:10,000

-250

255075

100125150175

0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 5500

±

TunnelTunnel ExtentAlignment Extent

Cross-Section Scale @ A3: 1:15,000

WTPTunnelTreated Watermain

2000mm diametertunnel with 1200mm

diameter pipe

1200mm diametertrenched watermain

Page 12: Huia Site Selection: Ancillary Structures Summary Report · 2019. 12. 16. · Huia Site Selection: Ancillary Structures Summary Report CH2M Beca // 20 September 2016 // Page 2 6511164

A2 – Manuka Road

Page 13: Huia Site Selection: Ancillary Structures Summary Report · 2019. 12. 16. · Huia Site Selection: Ancillary Structures Summary Report CH2M Beca // 20 September 2016 // Page 2 6511164

GIS@b

eca.co

mFile

: \\beca

.net\pr

ojects

\777\7

77-GIS

-CHC\6

511164

(Huia

)\55_W

orkspa

ces\01

_mxd\

GIS-65

11164-

043_01

_Over

viewW

ithNiho

tupu.m

xd A

uthor:

Beca

Date

: 14/07

/2016

FOR INTERNAL PURPOSES ONLY.YET TO BE VERIFIED.

Title: Client:

Project:

Discipline:GIS

Drawing No:Manuka Site

Revision Author Verified Approved Date

1 CP JF JB 7/07/2016Alignment Overview

Watercare Services Ltd

Huia WTP Upgrade GIS-6511164-043-01

This map contains data derived in part or wholly from sources other than Beca, and therefore, no representations orwarranties are made by Beca as to the accuracy or completeness of this information.

Map intended for distribution as a PDF document. Scale may be incorrect when printed.Service Layer Credits: Sourced from the LINZ Data Service and licensed for re-use under the Creative CommonsAttribution 3.0 New Zealand licence

0 250125

Meters

Map Scale @ A3: 1:15,000

0255075

100125150175200225

0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000 5500 6000 6500 7000 7500

±

TunnelHGLTunnel ExtentAlignment ExtentNihotupu Extent

Cross-Section Scale @ A3: 1:20,000

Raw Water Pump StationWTPNihotupu WatermainTreated WatermainTunnelRaw Watermain

2 CP JF JB 14/07/2016

1200mm diametertrenched watermain

2000mm diametertunnel with 1200mm

diameter pipe

550mm diametertrenched

watermain

Page 14: Huia Site Selection: Ancillary Structures Summary Report · 2019. 12. 16. · Huia Site Selection: Ancillary Structures Summary Report CH2M Beca // 20 September 2016 // Page 2 6511164

A3 – Parker North

Page 15: Huia Site Selection: Ancillary Structures Summary Report · 2019. 12. 16. · Huia Site Selection: Ancillary Structures Summary Report CH2M Beca // 20 September 2016 // Page 2 6511164

GIS@b

eca.co

mFile

: \\beca

.net\pr

ojects

\777\7

77-GIS

-CHC\6

511164

(Huia

)\55_W

orkspa

ces\01

_mxd\

GIS-65

11164-

033A_

01_Ov

erview

.mxd

Auth

or: Be

ca D

ate: 11

/07/20

16

FOR INTERNAL PURPOSES ONLY.YET TO BE VERIFIED.

Title: Client:

Project:

Discipline:GIS

Drawing No:Parker - North

Revision Author Verified Approved Date

1 CP DRAFT DRAFT 7/07/2016Alignment Overview

Watercare Services Ltd

Huia WTP Upgrade GIS-6511164-033A-01

This map contains data derived in part or wholly from sources other than Beca, and therefore, no representations orwarranties are made by Beca as to the accuracy or completeness of this information.

Map intended for distribution as a PDF document. Scale may be incorrect when printed.Service Layer Credits: Sourced from the LINZ Data Service and licensed for re-use under the Creative CommonsAttribution 3.0 New Zealand licence

0 250 500125

Meters

Map Scale @ A3: 1:20,000

-75-50-25

0255075

100125150175200225

0 1000 2000 3000 4000 5000 6000 7000 8000 9000

±

TunnelShaftHGLTunnel ExtentAlignment Extent

Cross-Section Scale @ A3: 1:24,000

WTPUpper Nihotupu RWMTunnelTreated Watermain

2 CP JG JG 8/07/2016

550mm diametertrenched

watermain

1200mm/1500mmdiameter trenched

watermain

2000mm diameterconcrete lined tunnel

MackiesRest

Page 16: Huia Site Selection: Ancillary Structures Summary Report · 2019. 12. 16. · Huia Site Selection: Ancillary Structures Summary Report CH2M Beca // 20 September 2016 // Page 2 6511164

A4 – Parker South

Page 17: Huia Site Selection: Ancillary Structures Summary Report · 2019. 12. 16. · Huia Site Selection: Ancillary Structures Summary Report CH2M Beca // 20 September 2016 // Page 2 6511164

GIS@b

eca.co

mFile

: \\beca

.net\pr

ojects

\777\7

77-GIS

-CHC\6

511164

(Huia

)\55_W

orkspa

ces\01

_mxd\

GIS-65

11164-

033B_

01_Ov

erview

.mxd

Auth

or: Be

ca D

ate: 8/

07/201

6

FOR INTERNAL PURPOSES ONLY.YET TO BE VERIFIED.

Title: Client:

Project:

Discipline:GIS

Drawing No:Parker - South

Revision Author Verified Approved Date

1 CP DRAFT DRAFT 7/07/2016Alignment Overview

Watercare Services Ltd

Huia WTP Upgrade GIS-6511164-033B-01

This map contains data derived in part or wholly from sources other than Beca, and therefore, no representations orwarranties are made by Beca as to the accuracy or completeness of this information.

Map intended for distribution as a PDF document. Scale may be incorrect when printed.Service Layer Credits: Sourced from the LINZ Data Service and licensed for re-use under the Creative CommonsAttribution 3.0 New Zealand licence

0 250 500125

Meters

Map Scale @ A3: 1:20,000

-75-252575

125175225

0 1000 2000 3000 4000 5000 6000 7000 8000 9000

±

TunnelShaftHGLTunnel ExtentAlignment Extent

Cross-Section Scale @ A3: 1:24,000

WTPUpper Nihotupu RWMTunnelTreated Watermain

2 CP JG JG 8/07/2016

550mm diametertrenched

watermain

1200mm/1500mmdiameter trenched

watermain2000mm diameter

concrete lined tunnel

MackiesRest

Page 18: Huia Site Selection: Ancillary Structures Summary Report · 2019. 12. 16. · Huia Site Selection: Ancillary Structures Summary Report CH2M Beca // 20 September 2016 // Page 2 6511164

Appendix B

Parker Scheme Tunnel Details

Page 19: Huia Site Selection: Ancillary Structures Summary Report · 2019. 12. 16. · Huia Site Selection: Ancillary Structures Summary Report CH2M Beca // 20 September 2016 // Page 2 6511164

B1 – Parker North Tunnel

Page 20: Huia Site Selection: Ancillary Structures Summary Report · 2019. 12. 16. · Huia Site Selection: Ancillary Structures Summary Report CH2M Beca // 20 September 2016 // Page 2 6511164

GIS@b

eca.co

mFile

: \\beca

.net\pr

ojects

\777\7

77-GIS

-CHC\6

511164

(Huia

)\55_W

orkspa

ces\01

_mxd\

AGIS-

651116

4-033A

_02_Tu

nnel.m

xd A

uthor:

Beca

Date

: 11/07

/2016

FOR INTERNAL PURPOSES ONLY.YET TO BE VERIFIED.

Title: Client:

Project:

Discipline:GIS

Drawing No:Parker - North

Revision Author Verified Approved Date

1 CP JF JB 11/07/2016Tunnel Detail

Watercare Services Ltd

Huia WTP Upgrade GIS-6511164-033A-02

This map contains data derived in part or wholly from sources other than Beca, and therefore, no representations orwarranties are made by Beca as to the accuracy or completeness of this information.

Map intended for distribution as a PDF document. Scale may be incorrect when printed.Service Layer Credits: Sourced from the LINZ Data Service and licensed for re-use under the Creative CommonsAttribution 3.0 New Zealand licence

90 0 9045

Metres

Map Scale @ A3: 1:6,000

75

100

125

150

175

1500 2000 2500 3000 3500

±

TunnelShaftHGLTunnel ExtentAlignment Extent

Cross-Section Scale @ A3: 1:6,000

Working AreaWTPUpper Nihotupu RWMTunnelTreated Watermain

Vertical Exaggeration = 2

Page 21: Huia Site Selection: Ancillary Structures Summary Report · 2019. 12. 16. · Huia Site Selection: Ancillary Structures Summary Report CH2M Beca // 20 September 2016 // Page 2 6511164

B2 – Parker South Tunnel

Page 22: Huia Site Selection: Ancillary Structures Summary Report · 2019. 12. 16. · Huia Site Selection: Ancillary Structures Summary Report CH2M Beca // 20 September 2016 // Page 2 6511164

GIS@b

eca.co

mFile

: \\beca

.net\pr

ojects

\777\7

77-GIS

-CHC\6

511164

(Huia

)\55_W

orkspa

ces\01

_mxd\

GIS-65

11164-

033B_

02_Tun

nel.mx

d Au

thor: B

eca

Date:

11/07/

2016

FOR INTERNAL PURPOSES ONLY.YET TO BE VERIFIED.

Title: Client:

Project:

Discipline:GIS

Drawing No:Parker - South

Revision Author Verified Approved Date

1 CP JF JB 7/07/2016Alignment Overview

Watercare Services Ltd

Huia WTP Upgrade GIS-6511164-033B-02

This map contains data derived in part or wholly from sources other than Beca, and therefore, no representations orwarranties are made by Beca as to the accuracy or completeness of this information.

Map intended for distribution as a PDF document. Scale may be incorrect when printed.Service Layer Credits: Sourced from the LINZ Data Service and licensed for re-use under the Creative CommonsAttribution 3.0 New Zealand licence

Map Scale @ A3: 1:6,000

100

125

150

175

1500 2000 2500 3000 3500

±

TunnelShaftHGLTunnel ExtentAlignment Extent

Cross-Section Scale @ A3: 1:6,000

Working AreaWTPUpper Nihotupu RWMTreated WatermainTunnel

Vertical Exaggeration = 2

0 40 80 120 16020

Metres

Page 23: Huia Site Selection: Ancillary Structures Summary Report · 2019. 12. 16. · Huia Site Selection: Ancillary Structures Summary Report CH2M Beca // 20 September 2016 // Page 2 6511164

B3 – Jacking Pit Locations (Parker Sites)

Page 24: Huia Site Selection: Ancillary Structures Summary Report · 2019. 12. 16. · Huia Site Selection: Ancillary Structures Summary Report CH2M Beca // 20 September 2016 // Page 2 6511164

144

146

148

142

150

144.5

142.5

148.5146.5

140

138

150.5

152

140.5136

138.5

136.5

152.5

154150.5 150

Sourced from the LINZ Data Service and licensed for re-use under the

GIS@b

eca.co

mFile

: \\beca

.net\pr

ojects

\777\7

77-GIS

-CHC\6

511164

(Huia

)\55_W

orkspa

ces\01

_mxd\

GIS-65

11164-

033_02

_Work

ingAre

a.mxd

Auth

or: Be

ca GIS

Da

te: 11/

07/201

6

FOR INTERNAL PURPOSES ONLY.YET TO BE VERIFIED.0 8 164

Metres ±Client:

Project:

Discipline:GIS

Drawing No:

This map contains data derived in part or wholly from sources other than Beca, and therefore, no representations or warranties are made by Beca as to the accuracy or completeness of this information.

Contains Crown Copyright Data. Crown Copyright Reserved. Aerials images sourced from Auckland Council.

Map intended for distribution as a PDF document. Scale may be incorrect when printed.

DRAFT

Revision Author Verified Approved Date

1 CP JF JB 08/07/2016

1:300Map Scale @ A3: Watercare Services Ltd

Huia WTP Upgrade GIS-6511164-033-02

118

122

120

116

124

126

114

128

110112

118.5

122.5

120.5

116.5

124.5

126.5

130

114.5

110.5112.5

128.5

108108.5

130.5

132134

132.5

136134.5

136.5

138

106.5

138.5

140

Sourced from the LINZ Data Service and licensed for re-use under the

Mackies Rest Intermediate Shaft

Upper Nihotupu RWMTunnelJacking PitWork Area

Sourced from the LINZ DataSourced from the LINZ Data

Work Area - 700m2 Work Area - 700m2

Parker - Work Area Detail

Page 25: Huia Site Selection: Ancillary Structures Summary Report · 2019. 12. 16. · Huia Site Selection: Ancillary Structures Summary Report CH2M Beca // 20 September 2016 // Page 2 6511164

Appendix C

Raw Water Upgrades

Page 26: Huia Site Selection: Ancillary Structures Summary Report · 2019. 12. 16. · Huia Site Selection: Ancillary Structures Summary Report CH2M Beca // 20 September 2016 // Page 2 6511164

GIS@b

eca.co

mFile

: \\beca

.net\pr

ojects

\777\7

77-GIS

-CHC\6

511164

(Huia

)\55_W

orkspa

ces\01

_mxd\

GIS-65

11164-

090_01

_Netw

orkOv

erview

.mxd

Autho

r: Beca

Da

te: 28/

07/201

6

FOR INTERNAL PURPOSES ONLY.YET TO BE VERIFIED.

Title: Client:

Project:

Discipline:GIS

Drawing No:Raw Water Infrastructure Upgrades

Revision Author Verified Approved Date

1 CP DRAFT DRAFT 28/07/2016

Watercare Services Ltd

Huia WTP Upgrade GIS-6511164-090-01

!

!

M a c k i e sM a c k i e sR e s tR e s t

T i t i r a n g iT i t i r a n g iR e s e r v o i r sR e s e r v o i r s

This map contains data derived in part or wholly from sourcesother than Beca, and therefore, no representations orwarranties are made by Beca as to the accuracy or completenessof this information.Map intended for distribution as a PDF document. Scale may beincorrect when printed.Service Layer Credits: Sourced from the LINZ Data Service and

0 250125

Meters

Map Scale @ A3: 1:15,000

±

Upper Nihotupu Raw Watermain

From Dam to end of Jacobson’s TunnelConstruction period: 2029-2034Required for all sitesUpper Nihotupu Raw Watermain

From Jacobson’s Tunnel to Torrens TaperConstruction period: 2029-2034Required for:• Existing Site• Manuka RoadRaw Water Aqueduct

Construction period: 2017-2035Required for:• Existing Site• Manuka RoadTreated Water AqueductTreated Water AqueductConstruction period: 2023-2024Required for:• Existing Site• Manuka RoadWater Wholesale Watermain

Treated BuiltProposedRaw BuiltOut of ServiceTunnelWTPReservoirWater Source