BIM There & Done That:
Using Integrated Design & Procurement Information Systems
to Manage EPC Projects with Certainty
FIATECH ANNUAL CONFERENCE April 2009
John R. FishInformation Management Systems
2 in the Room“Managing with certainty, all the way to the end”
BIM does NOT work as
advertised.
Not ALL Owners want
Intelligence.
OUR OWNER Requirements
Electronic Filing Systems for PAPER
Dumb Down Drawings
No ability to accept a model
ZERO clients using ANY intelligence
“Managing with certainty, all the way to the end”
TODAY
BIM: How we use it
OBJECTIVE: Use of Integrated Systems
to feed downstream users
CHALLENGES: Fragmentation/Silos
Overview of the systems
“Managing with certainty,
all the way to the end”
GUIDING PRINCIPLES
Information & Materials must FLOW
To engineering
To procurement
To the jobsite
PULL what they need
Enter ONCE – Use by MANY
“Managing with certainty, all the way to the end”
ELIMINATE SEARCHING
“Managing with certainty, all the way to the end”
30 to 50%
INFORMATION &/or MATERIALS
INFORMATION
MANAGEMENT
The act of planning and controlling the
receipt, production, distribution, storage,
and retrieval of information
“Managing with certainty, all the way to the end”
OBJECTIVE
Get the right information to the right people
in the form and time required
to support a process or a decision.
2 SYSTEMS
“Managing with certainty, all the way to the end”
Safety Injury Reports
Needs & Action Lists
Letter & FAX Logs
PROJECT
ADMINISTRATION
Client Tracings
Document Issues
Drawing Status
DOCUMENT
CONTROL
TIC Scope Changes
Definitive
Conceptual
ESTIMATING
Cost Trending
Estimates
Requisition Control
ENGINEERED
EQUIPMENT
Tie-In Control
Spool Status
Iso Status
LINE LIST
ISO CONTROL
Invoice Approvals
Sub-Contracts
Engineered Equipment
VENDOR
INFORMATION
Labor Distr ibution
F T S (Field)
E T S (Home Office)
LABOR
DISTRIBUTION
Subcontracts
Inquiry & Purchase
Expediting
PROCUREMENT
Financial Reporting
Invoicing
Decision Support
ORACLE
FINANCIALS
Analysis/Forecasts
Cost & Schedule
Planning
PROJECT
CONTROLS
SHARED
Services
Allocations
Warehousing
Mater ial Take-Off
MATERIALS
MANAGEMENT
Procedures
Field QA/QC
Source Inspections
QUALITY
ASSURANCE
Weld Track
Compensation
Craft Certification
Job Matching
FIELD
STAFFING
CONSTRUCTION
Field Support
F C O
R F I
FIELD
PRODUCTIVITY MGT
Craft Planning
Field Audits
iPIMS
-3D®iPIMS-3D
s
to manage
BIM, Field Planning
& Progress
to manage
Documents &
Information FLOW
Safety Injury ReportsNeeds & Action Lists
Letter & FAX Logs
PROJECT
ADMINISTRATION
Client TracingsDocument Issues
Drawing Status
DOCUMENT
CONTROL
TIC Scope ChangesDefinitive
Conceptual
ESTIMATING
Cost TrendingEstimates
Requisition Control
ENGINEERED
EQUIPMENT
Tie-In Control
Spool Status
Iso Status
LINE LIST
ISO CONTROL
Invoice ApprovalsSub-Contracts
Engineered Equipment
VENDOR
INFORMATION
ENGINEERING
Feed Forward to
Construction
Labor Distribution
F T S (Field)
E T S (Home Office)
LABOR
DISTRIBUTION
Subcontracts
Inquiry & Purchase
Expediting
PROCUREMENT
Financial Reporting
Invoicing
Decision Support
ORACLE
FINANCIALS
Analysis/Forecasts
Cost & Schedule
Planning
PROJECT
CONTROLS
SHARED
Services
AllocationsWarehousing
Material Take-Off
MATERIALS
MANAGEMENT
Procedures
Field QA/QC
Source Inspections
QUALITY
ASSURANCE
Weld Track
Compensation
Craft CertificationJob Matching
FIELD
STAFFING
CONSTRUCTION
Field Support
F C O
R F I
FIELD
PRODUCTIVITY MGT
Craft Planning
Field Audits
iPIMS®
BIM in Engineering
“Managing with certainty, all the way to the end”
Safety Injury Reports
Needs & Action Lists
Letter & FAX Logs
PROJECT
ADMINISTRATION
Client Tracings
Document Issues
Drawing Status
DOCUMENT
CONTROL
TIC Scope Changes
Definitive
Conceptual
ESTIMATING
Cost Trending
Estimates
Requisition Control
ENGINEERED
EQUIPMENT
Tie-In Control
Spool Status
Iso Status
LINE LIST
ISO CONTROL
Invoice Approvals
Sub-Contracts
Engineered Equipment
VENDOR
INFORMATION
Labor Distr ibution
F T S (Field)
E T S (Home Office)
LABOR
DISTRIBUTION
Subcontracts
Inquiry & Purchase
Expediting
PROCUREMENT
Financial Reporting
Invoicing
Decision Support
ORACLE
FINANCIALS
Analysis/Forecasts
Cost & Schedule
Planning
PROJECT
CONTROLS
SHARED
Services
Allocations
Warehousing
Mater ial Take-Off
MATERIALS
MANAGEMENT
Procedures
Field QA/QC
Source Inspections
QUALITY
ASSURANCE
Weld Track
Compensation
Craft Certification
Job Matching
FIELD
STAFFING
CONSTRUCTION
Field Support
F C O
R F I
FIELD
PRODUCTIVITY MGT
Craft Planning
Field Audits
P&ID’s
Extract from P&ID, Model & iPIMS
COMPARE & Highlight Differences
BIM Linking
“Managing with certainty, all the way to the end”
Safety Injury Reports
Needs & Action Lists
Letter & FAX Logs
PROJECT
ADMINISTRATION
Client Tracings
Document Issues
Drawing Status
DOCUMENT
CONTROL
TIC Scope Changes
Definitive
Conceptual
ESTIMATING
Cost Trending
Estimates
Requisition Control
ENGINEERED
EQUIPMENT
Tie-In Control
Spool Status
Iso Status
LINE LIST
ISO CONTROL
Invoice Approvals
Sub-Contracts
Engineered Equipment
VENDOR
INFORMATION
Labor Distr ibution
F T S (Field)
E T S (Home Office)
LABOR
DISTRIBUTION
Subcontracts
Inquiry & Purchase
Expediting
PROCUREMENT
Financial Reporting
Invoicing
Decision Support
ORACLE
FINANCIALS
Analysis/Forecasts
Cost & Schedule
Planning
PROJECT
CONTROLS
SHARED
Services
Allocations
Warehousing
Mater ial Take-Off
MATERIALS
MANAGEMENT
Procedures
Field QA/QC
Source Inspections
QUALITY
ASSURANCE
Weld Track
Compensation
Craft Certification
Job Matching
FIELD
STAFFING
CONSTRUCTION
Field Support
F C O
R F I
FIELD
PRODUCTIVITY MGT
Craft Planning
Field Audits
All Asset Related
Data & Status
Stored in iPIMS
Link for Meta-
Data/Status/Cost
BIM in Engineering
5D Estimate Quantities
Quantity Trending (Estm vs Actual)
Pipe Spec integrity
Progress Line Routings
Materials Extraction via IsoGen
Pcf Files to Fabricators
Steel Model Views to Orthos
Abilities: Construct, Operate, Maintain
“Managing with certainty, all the way to the end”
iPIMS-3D®
iPIMS-3D®
iPIMS-3D®
P3
Schedule
Test
Packages
Material Control
Warehouse
Trial
Allocation
Weld
Tracker
Spool/Equip
Status
CRAFT PLANNER
Engineering Model
Field
Audits
System
Turnover
BIM in Construction
“Managing with certainty, all the way to the end”
Load Spools, Weld
Track, Steel Piece
marks, Budget Hrs
Assembly Drawings & Work Packaging
Load Engineering Model
into
ConstructSim/iPIMS 3D
iPIMS-3D®
Select Lines/Structures
BIM in Construction
Walk throughs
Work Packaging
System Turnover Planning
Test Packages
Spool tracking
Simulations
Heavy/Complex Lifts
Complex Extractions
Sequential Equipment placement Light 4D
Scaffolding
“Managing with certainty, all the way to the end”
INTEGRATION is the
CHALLENGE
Joint Ventures
Document Management Systems
XL Spreadsheets
Security
VERSIONS
3D Model Systems
Procurement
Schedules
Cost Systems
Owner ERP Systems
“Managing with certainty, all the way to the end”
PROJECT MIX
60% REVAMP WORK
Small to Large
Some EPC
Some PC
Some CM
Some C
Systems must work for ALL“Managing with certainty, all the way to the end”
E C
Owner Stole
the P
OVER-THE-WALL Execution
Owner/Others perform FEP
Multiple Engineering Firms
Owner places orders in SAP
Network Security
Multiple Contractors
FEP Design Procure CONSTRUCT
“Managing with certainty, all the way to the end”
OUR MISSION:
Connect the ISLANDS – Promote
FREE ACCESS & EXCHANGE OF
INFORMATION across the enterprise.
E & P SILOS of EXCELLENCE
MT
LS
MG
MT
CO
NS
TR
UC
TIO
N
PR
OJE
CT
MG
MT
CO
NT
RO
LS
PR
OC
ES
S
ME
CH
AN
ICA
L
PIP
ING
INS
TR
UM
EN
T
EL
EC
TR
ICA
L
PR
OC
UR
EM
EN
T
Feedback to
Engineering
COMMUNICATE/SHARE
All in the 3D Model
In Our Office Today
3 Versions
5 Clients
7 dictionaries/data structures
Inconsistent use of UDF’s
INTOOLS®
ISO 15926
Where Are You?
Safety Injury ReportsNeeds & Action Lists
Letter & FAX Logs
PROJECT
ADMINISTRATION
Client TracingsDocument Issues
Drawing Status
DOCUMENT
CONTROL
TIC Scope ChangesDefinitive
Conceptual
ESTIMATING
Cost TrendingEstimates
Requisition Control
ENGINEERED
EQUIPMENT
Tie-In Control
Spool Status
Iso Status
LINE LIST
ISO CONTROL
Invoice ApprovalsSub-Contracts
Engineered Equipment
VENDOR
INFORMATION
ENGINEERING
Feed Forward to
Construction
Labor Distribution
F T S (Field)
E T S (Home Office)
LABOR
DISTRIBUTION
Subcontracts
Inquiry & Purchase
Expediting
PROCUREMENT
Financial Reporting
Invoicing
Decision Support
ORACLE
FINANCIALS
Analysis/Forecasts
Cost & Schedule
Planning
PROJECT
CONTROLS
SHARED
Services
AllocationsWarehousing
Material Take-Off
MATERIALS
MANAGEMENT
Procedures
Field QA/QC
Source Inspections
QUALITY
ASSURANCE
Weld Track
Compensation
Craft CertificationJob Matching
FIELD
STAFFING
CONSTRUCTION
Field Support
F C O
R F I
FIELD
PRODUCTIVITY MGT
Craft Planning
Field Audits
OVERVIEW
FELDetailed
Engineering
PROCUREMENT
Estimating, Cost Reporting/Forecasting
Schedule
Fabrication
Construction
Test &
Turn Over
Commission
Start Up
Life
Cycle
Systems
Management of Change
FULL ELECTRONIC
PROJECT ARCHIVE
“Managing with certainty, all the way to the end”
The Engineering/Procurement/Construction Assembly Line
FEED FORWARDiPIMS®
COST & SCHEDULE SYSTEMENGINEERING and CONSTRUCTION EARNED VALUE AGAINST THE ESTIMATE SCHEDULE FOR ENGINEERING, FABRICATION AND CONSTRUCTION AND CONSTRUCTION SCHEDULE
ENGINEERING AND CONSTRUCTION ESTIMATE
INTEGRATION & FEED FORWARD
INTELLIGENTP&ID
ISOS
3DMODEL
ORTHOSPlans &Sections
ISO GENPROGRAM
MaterialListings
GREEN DENOTES 3D MODELING SYSENGINEERING
ENGINEERING FEEDS FORWARD TO CONSTRUCTION
MANAGEMENTMATERIALS
YELLOW DENOTES EXISTING iPIMS
Title
AUTO
Feed
Blocks
PipingFabricator
ALL ENGRDEQUIPMENT LISTS
LINE LIST
VALVE
DATA SHEETS
ENGINEEREDEQUIPMENT LIST
ISSUES&
View/Print
PIPESPECSPIPESPECS
TIE-IN LISTTIE-IN LIST
DOCUMENT
CONTROL
ISO STATUS SPOOL STATUS
PO SYSTEM
Loads Receiving Date
“Managing with certainty, all the way to the end”
iPIMS®
Owner
Life-Cycle
Systems
WAREHOUSE
SYSTEM
FIELD AUDIT(Project Measurement Module)
Receive at
Jobsite
Issue
MaterialsErect
Mech
CompleteTEST Turnover
Trial
Allocation
System
Schedule &
Field Plan
PHASED SYSTEM
TURNOVER
Field Auditor Enters Status of every Line into
the PMM System for Earned Value Creditagainst the budget
CONSTRUCTION
QUALITY ASSURANCE
FIELD
DOCUMENT
CONTROL
ISSUES&
View/Print
Electronic
Issues
RFI
System
FCO
System
CRAFT
PLANNER
TIMELINE
81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 00 01 02 03 04 05 06 07 08 09
Focus on Internal UsersFOCUS ON ALL
STAKEHOLDERS
Develop Key Modules
Early Years
“Managing with certainty, all the way to the end”
iPIMS®
TRANSACTIONS
Milestones Captured
All Electronic Distribution
TRANSMITTALS Opened: 6,000/Wk
TRANSMITTALS GENERATED: 1,500+/Wk
WE ARE IN BUSINESS OF GENERATING
AND DISTRIBUTING INFORMATION.
Average Transmittal Accessed by 5 people
“Managing with certainty, all the way to the end”
iPIMS®
CONTROL LISTS
Deliverables
Mechanical Equipment
Electrical Equipment
Instrument Index
Line List
Tie-In List
Specialty Items
Purchase Orders
Vendor Data
Functionality
P.O.’s
Data
Sheets
Schedules
Vendor Data
Cost
Reports
Memos
Excel
WORD
eMails
Reports
Scopes of Work
YOUR PROJECT
e-Book on DVD’s
ALL Data & Docs
Indexed
ISSUE PROGRAMS
Issue Program
Posts e-DOCS &
Creates Dynamic
Electronic Links
DRAWINGS
IN PROGRESS MODELConstruction Integrated Model (CIC)
Email Transmittals
-
Internet AccessView/Print/
Redline/
Collaborate
iPIMS®
TAG is the TREE
All Engineered Equipment
assigned a TAG
What Tags do we have to:
Identify Specify
Prioritize Estimate
Inquire Bid Tab Purchase
Status Review Vendor Info Inspect
Receive Issue Store/Maintain
Install Align Paint/Insulate
Clean Inspect Test
Turnover
“Managing with certainty, all the way to the end”
ASSET CENTRIC
Click on a tag & it will take you to related
information, documents, & other tags.
Model View
OrthosLine List
Isometrics
Spool Status
Bill Materials
Foundation
DrawingsElectrical
One Lines
Vendor Data
Data Sheet
P&ID
Schedule
Field Work
Plans
Trial Allocation
Labor Estimate
P.O.
Equipment Status
& Expediting
Report
Inspection Schedule
Reports Field
QA/QC
“Managing with certainty, all the way to the end”
QUANTITY TRENDING
Commodity ESTM ACTUAL VARIANCE
Drawings (Disc, type/#) 234 256 +22
Isos (Quantity)
Lines (Qty, Spec, Size)
Engr Equip (Qty,Type)
Instr Tags (Qty,Type)
Pipe (Size,Spec,LF)
Steel (Tons)
Concrete (CY)
Cable Tray (Size,LF)
Cables (Size,Type,LF)
Extracted from Model/Control Lists
“Managing with certainty, all the way to the end”
INTEGRATED PROJECT
PROCUREMENT
Integrated
Automated
Procurement andSupply Network
Automated
Design
Intelligent
Job Site
Real-time Project and FacilityManagement, Coordination and Control
Life Cycle Data Management and
Information Integration
Eng
Reqmts
Eval
Select
Materials /
Labor /
Tracking
Controls / Schedule / Status
Information Architecture
Figure 1. Relationships to other Vision Elements, FIATECH Integrated, Automated Procurement and Supply Network
Element 3 Tactical Plan for the Capital Projects Technology Roadmap, Preliminary Draft, January 2005.
LAST PLANNER
Identify Constraints
Weekly Work Plans
Daily Progress
Corrective Actions
“Managing with certainty, all the way to the end”
iPIMS-3D®
iPIMS-3D®
iPIMS-3D®
P3
Schedule
Test
Packages
Material Control
Warehouse
Trial
Allocation
Weld
Tracker
Spool/Equip
Status
Engineering Model
CRAFT PLANNER
Field
Audits
System
Turnover
CRAFT PLANNER
“Managing with certainty, all the way to the end”
SELECTS LINES
Work Pkg: 400-1,000 Hrs
Creates Erection Views
Consults P3 Schedule
“Managing with certainty, all the way to the end”
CRAFT PLANNER
Pulls the Isos
from iPIMS
Assembles Field
Work Plan BookDrawings, Materials,
Weld Info, Line List,
Vendor Data, Budgets
Validates
Material
Availability
Instructs
Ware to BAG
& Tag
Superintendent
Plans supporting
Equip,
Scaffolding, etc
Assigns to
Foreman
“Managing with certainty, all the way to the end”
Trial Allocation
System brings up
the Isos
Craft Planner
Selects Lines
Ware Bags
& Tags
TRIAL
ALLOCATION
System Pulls Labor Hrs
from PMM system
Provides
GO/NO GO
Status
Looks into warehouse for
receiving status of
Materials: spools, field
Mtls, Tagged items
RUNS TRIAL
ALLOCATION
ALLOCATES
MATERIALS
for that
Work
Package
First 2 S’s - Last Planner
SORTING
SIMPLIFYING
“Managing with certainty, all the way to the end”
Craft Planner sorts and
sifts info, documents,
Mtls, budgets via iPIMS
Erection Views
Everything in PLACE
RESULTS
Productivity Increases of 15%
Improved Quality
Reduction in FIELD PURCHASING
of erection materials and valves.
Improved MORALE
“Managing with certainty, all the way to the end”
BIM FLOW
to
PLANNING
WORKS
“Managing with certainty, all the way to the end”
Safety Injury Reports
Needs & Action Lists
Letter & FAX Logs
PROJECT
ADMINISTRATION
Client Tracings
Document Issues
Drawing Status
DOCUMENT
CONTROL
TIC Scope Changes
Definitive
Conceptual
ESTIMATING
Cost Trending
Estimates
Requisition Control
ENGINEERED
EQUIPMENT
Tie-In Control
Spool Status
Iso Status
LINE LIST
ISO CONTROL
Invoice Approvals
Sub-Contracts
Engineered Equipment
VENDOR
INFORMATION
Labor Distr ibution
F T S (Field)
E T S (Home Office)
LABOR
DISTRIBUTION
Subcontracts
Inquiry & Purchase
Expediting
PROCUREMENT
Financial Reporting
Invoicing
Decision Support
ORACLE
FINANCIALS
Analysis/Forecasts
Cost & Schedule
Planning
PROJECT
CONTROLS
SHARED
Services
Allocations
Warehousing
Mater ial Take-Off
MATERIALS
MANAGEMENT
Procedures
Field QA/QC
Source Inspections
QUALITY
ASSURANCE
Weld Track
Compensation
Craft Certification
Job Matching
FIELD
STAFFING
CONSTRUCTION
Field Support
F C O
R F I
FIELD
PRODUCTIVITY MGT
Craft Planning
Field Audits
iPIM
S-
3D®
iPIMS-
3D
s
S & B Engineers and Constructors, Ltd.
7825 Park Place Boulevard Houston, Texas 77087
www.sbec.com
Presented to 2009 FIATECH Annual Conference
By
John R. Fish