Monthly Safety Meeting for January 2012 Habshan 5 IGD Project, Abu Dhabi JGC-Tecnimont Joint Venture

HSEJan2012

Embed Size (px)

DESCRIPTION

http://www.h5jvhse.com/Safety/Documents/HSEJan2012.pdf

Citation preview

Page 1: HSEJan2012

Monthly Safety Meeting for January 2012

Habshan 5 IGD Project, Abu Dhabi JGC-Tecnimont Joint Venture

Page 2: HSEJan2012

Presentation Agenda Project Lost Time Injury Frequency Rate & Recordable Frequency Rate;

Days and Man-hours without LTI and Days and Man-hours without RI;

Total Cases Up to January 2012;

FAC Body Part for the Month of January 2012;

Recordable Incidents for the Month of January 2012;

JV Observation Chart January 2012;

Noncompliance with safe work Issues for the Month of January 2012;

Poor Housekeeping Issues for the Month of January 2012;

PPE Issues for the Month of January 2012;

Equipment & Tool Issues for the Month of January 2012;

JV Observation Comparison Table, High Medium & Low Risk Analysis;

NM, UC & UA Observation Report and Trend Analysis for JV;

Area Violation by Issues for the Month of January 2012;

Safety Moment, Toolbox Meeting, and Safety Alert;

Manpower & Observation Up to January 2012;

Training Man-Hours Up to January 2012;

Monthly KPI and Target 2010 – 2012;

HSE Objectives 2012;

Page 3: HSEJan2012

0.00

0.01

0.02

20102011 2012 PTD

0.003 0.003 0.003

LOST TIME INJURY

FREQUNCY RATE - PROJECT

YEARLY STATISTICS

0.00

0.05

0.10

0.15

0.20

2010 2011 2012 PTD

0.13 0.10 0.09 0.09

TOTAL RECORDABLE INJURY RATE

- PROJECT YEARLY STATISTICS

05

101520 16

11 10

FIRST AID CASE

COMPARISON TABLE

Lost Time Injury Frequency Rate

Construction Period To Date

Man-Hours 4,865,443 63,494,192

LTI 0 1

LTIR 0.00 0.003

Days w/o LTI 192 Up to 27/01/2012

Date of Last LTI Case 19-Jul-11

Man-Hours Worked Since Last LTI 28,873,531

Total Recordable Injury Rate

Construction Period To Date

Man-Hours 4,865,443 63,494,192

Recorable Case 2 30

TRIR 0.08 0.09

Days w/o Rec.

Case 10

Up to

27/01/2012

Date of Last Rec. Case 17-Jan-12

Man-Hours Worked Since Last RI 1,801,936

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.005 0.004 0.004 0.003 0.003

0.00

0.02

0.04

0.06

0.08

LT

IR

MONTH

Lost Time Injury Frequency Rate Target LTIR = 0.02

0.00 0.00 0.00 0.00 0.00

0.13

0.07

0.21

0.16

0.10

0.15 0.13

0.10 0.10 0.11 0.09 0.09 0.09

0.11 0.11 0.11 0.10 0.10 0.10 0.09

0.00

0.05

0.10

0.15

0.20

0.25

RIR

MONTH

Total Recordable Injury Rate Target TRIR = 0.20

Page 4: HSEJan2012

0

0

10,000,000

20,000,000

30,000,000

40,000,000

JV Days & Man-Hours without LTI

Up to January 2012

January 7, 2010

Starting Project

up to

Jan. 27, 2012

28,873,531

Date of Last LTI Case : 19th July 2011

Page 5: HSEJan2012

0

0

2,000,000

4,000,000

6,000,000

8,000,000

JV Days & Man-Hours without Recordable

Up to January 2012

January 7, 2010

Starting Project

up to

Jan. 27, 2012

1,801,936

Date of Last RI Case : 17th Jan. 2012

Page 6: HSEJan2012
Page 7: HSEJan2012

JV Monthly Medical Consultation

For the Month of January 2012

1,451

67

407

18

451

306

6

0

0

1,027

653

36

224

40

200

264

4

2

0

836

0 200 400 600 800 1000120014001600

Respiratory Problem (Cold,Cough etc.)

Urinary Tract Infection

Gastro-Intestinal Disorder (Diarrhea Abdominal Pain)

Etc.

Systemic Problem Hypertension Etc.

EENT (Eyes, Ear, Nose and Throat)

Skin Infection / Allergy

First Aid Minor Scratches, Bruises, Laceration,

Abrassions, Insect Bites, Etc.

Major Accident/Injury

Heat Stress

Others, Backache, Muscular Pain, Toothache, Etc.

JGC TCM

Page 8: HSEJan2012

Cumulative

Up to January 2012

MTC,

22

RWC, 7

LTI, 1

Recordable

FAC

395

Reportable

FAC-First Aid Case | MTC-Medical Treatment | RWC-Restricted Work Case

LTI-Lost Injury Incident

Page 9: HSEJan2012

FAC by Body Part

For the Month of January 2012

Chest, 2,

20%

Eye, 1,

10%

Fingers, 2,

20% Thigh, 1,

10%

Hands, 2,

20%

Legs, 2,

20%

Page 10: HSEJan2012

Recordable Incidents by Body Part

For the Month of January 2012

MTC-Middle Finger

January 12, 2012

MTC-Medical Treatment

MTC-Head

January 17, 2012

Page 11: HSEJan2012
Page 12: HSEJan2012

JV Observation Table

for January 2012

Equipment & Tool

PPE

Poor House Keeping

Noncompliance

with safe work

Page 13: HSEJan2012

Noncompliance with safe work (B) – 935

55

174

244

10

214

130

38

0

572

0 200 400 600 800

Excavation Safety

Lifting and rigging

Work at height

PTW

Fire Prevention

Electrical Safety rule

Traffic rule

No JSA

Others

75

170

219

30

151

227

56

7

493

0 200 400 600

Excavation Safety

Lifting and rigging

Work at height

PTW

Fire Prevention

Electrical Safety rule

Traffic rule

No JSA

Others

Fire Prevention | Coaching of P.A.S.S. and Poster

Work at Height| Monitoring of Worker working at height

Lifting and Rigging| Lifting Audit Commence

December 2011 January 2012

Page 14: HSEJan2012

78

99 45

8

38

39

12

17 16

20

6

13

29

9

72

0

13

8

37

9

4

0 50 100 150

Access and egress

Barricade

Cable Management

Confined Space

Environmental

Grating

Health

Hot Work

Hygiene

illumination

No Banksman

No Flagman

Open Hole

Restricted Area

Scaffolding

Security

Signage

Trip/Slip/Fall

Worker Behavior

Falling Object

Positive Observation

Noncompliance with safe work (B) – Others, 493

December 2011 January 2012

51

85 35

18

33

13

9

9 18

46

9

14

29

3

65

2

10

7

31

3

3

0 50 100

Access and egress

Barricade

Cable Management

Confined Space

Environmental

Grating

Health

Hot Work

Hygiene

illumination

No Banksman

No Flagman

Open Hole

Restricted Area

Scaffolding

Security

Signage

Trip/Slip/Fall

Worker Behavior

Falling Object

Positive Observation

Page 15: HSEJan2012

Poor House Keeping (D) – 657

244

19

77

106

108

19

20

0 100 200 300

Cleaning of rubbish

on site

Segregation of waste

Material on access

Material arrangement

Waste disposal

Hazardous material

storage

Protruding Nails

December 2011 January 2012

219

38

97

126

112

37

28

0 100 200 300

Cleaning of rubbish

on site

Segregation of waste

Material on access

Material arrangement

Waste disposal

Hazardous material

storage

Protruding Nails

Page 16: HSEJan2012

PPE (A) - 475

41

4

55

129

147

36

17

38

0 50 100 150 200

No Hard Hat

No Safety Shoes

No Ear Protection

No Hand Protections

No Eyes/Face Protections

No Body

Harness/Lanyard

No Respiratory Protection

Inappropriate Clothes

December 2011 January 2012

62

8

57

87

101

92

21

47

0 50 100 150

No Hard Hat

No Safety Shoes

No Ear Protection

No Hand Protections

No Eyes/Face Protections

No Body

Harness/Lanyard

No Respiratory Protection

Inappropriate Clothes

Page 17: HSEJan2012

Equipment & Tool (C) - 366

41

59

56

51

60

31

26

14

0 20 40 60 80

No/wrong colour code

No Inspection with

tag/sticker

Poor Maintenance

Unauthorized Operation

Incorrect Usage

Wrong equipment/tool

Inappropriate safety

device

Unauthorized

equipment/tool

December 2011 January 2012

123

5

57

2

40

52

29

58

0 50 100 150

No/wrong colour code

No Inspection with

tag/sticker

Poor Maintenance

Unauthorized Operation

Incorrect Usage

Wrong equipment/tool

Inappropriate safety

device

Unauthorized

equipment/tool

Page 18: HSEJan2012

730

1185

928 891

1023 1012

0

200

400

600

800

1000

1200

1400

Low Medium High

December 2011 January 2012

December 2011 – 2,835

January 2012 – 2,926

JV Risk Assessment Graph

Page 19: HSEJan2012

Near Miss, Unsafe Act and Unsafe Condition Observation Report

and Trend Analysis for January 2012

990

1,845

928

11 1 0 0 0 0

972

1,939

1,012

10 2 0 0 0 0 0

500

1000

1500

2000

2500December 2011

January 2012

FAC-First Aid Case | MTC-Medical Treatment

| RWC-Restricted Work Case LWC-Lost Work

Case | FAT – Fatality LTI-Lost Time Injury

Page 20: HSEJan2012

Area Violation by Issues

for the Month of January 2012

3*

5 Near Miss

1

822 Observation Issues

1007 Observation Issues

47 Observation Issues

146 Observation Issues

8 Near Miss

5

901 Observation Issues

2 MTC

1 Near Miss

1

1 Near Miss

3 Observation Issues

Page 21: HSEJan2012

Dec-31-2011

Electrical Cable

Damaged @ Unit 531

Jan-05-2012

Confined Space

Violation @ Unit 552

Jan-08-2012

Cable Management @

Unit 530

Jan-12-2012

Grating Violation @

Unit 556

Jan-12-2012

Grating Violation @

Unit 550

Jan-19-2012

Grating Violation @

Unit 551

Jan-26-2012

Falling Object @ Unit

532

1st

2nd

3rd 4th

5th

6th

7th

Jan-10-2012

Grating Violation @

C200

Jan-19-2011

Falling Object @ A300

Jan-17-2012

Falling Object @ A200

Jan-05-2012

Falling Object @ A200

PR211

Jan-02-2012

Falling Object @ A200

PR241

1st

2nd

4th

3rd

1st

Incident Violation Indicator Area Focus

for the Month of January 2012

Page 22: HSEJan2012

Safety Moment for January 2012

Page 23: HSEJan2012

Toolbox Meeting for January 2012

Page 24: HSEJan2012

Safety Alert for January 2012

Page 25: HSEJan2012

26 27 143 219 1238

2,896 3,647 3,697

6,241

8,128 8,239 8,973

11,915 11,329

11,896

13,495 14,107 14,334

14,655 15,051

16,763

19,525

21,257 21,306 21,316

320 500 584 860 990 1,099 1,077 1,104 1,288 1,293 1,389 1,616

1,263 1,310 1,804 2,498 2,743 2,835 2,926

Manpower Observation

Manpower and Observation

for January 2012

Page 26: HSEJan2012

- 54 103 142 229 653

4,169 5,207

8,561

14,662

3,915

17,682

8,130

11,937 11,924

19,072 17,816

19,225

8,130 7,770

22,181 23,747

23,818

21,032

43,114 Training Man-Hours

Up to January 2012

Page 27: HSEJan2012
Page 28: HSEJan2012

Monthly KPI and Target 2010 – 2012 Up to January 2012

0

1Fatality Rate

Actual Fatality Target Fatality

0

0.01

0.02Lost time Injury Frequency Rate

Actual LTIR Target LTIR

0

0.05

0.1

0.15

0.2

0.25

Total Recordable Injuries Rate

Actual RIR Target RIR

0

500

1000

1500

2000

2500

3000

Observation + Near Misses Cases

Actual (Observation + Near Misses)

Target (Observation + Near Misses)

Target 0

Target 0.02

Target 0.20

Target >1000

1

0.003

0.09

2,926

Page 29: HSEJan2012
Page 30: HSEJan2012

IIF Patrol

Signage

Good Behavior

Awarding

Encouragement

Motivation

STARRT Talk

Relationship

Coaching

Appreciation

Knowledge

Win a Friend

Page 31: HSEJan2012
Page 32: HSEJan2012

HSE Golden Rules

Comply with

Permit to Work

Comply with

Working at

height rules

Report all the

Incident &

accidents

Do not modify

scaffolding

Do not cross the

barricade

without checking

or permission

Do not temper or

bypass Safety

Device

No alcohol or

drugs without

prescription

No smoking

except in

designated

areas

No fighting

No Unauthorized

Possession or theft

Page 33: HSEJan2012

HSE Posters and Banners

Page 34: HSEJan2012

Target 40 Million Safe Man-hours

30 Million Safe Man-hours Achieved February 3, 2012

20 Million Safe Man-hours Achieved December 09, 2011

10 Million Safe Man-hours Achieved October 07, 2011

Safe Man-hours Target

2011 - 2012

192 Days without Lost Time Injury

Page 35: HSEJan2012

SAFETY FOR LIFE