41
HPC Project Module (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018

HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

HPC Project Module (former Online Project System (OPS))

Training for HRP partners in Kyiv, 8 October 2018

Page 2: HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

Humanitarian Planning Cycle

Project Module

(new OPS)

Monthly and Quarterly reporting,

Humanitarian Dashboards

Page 3: HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

What is Collective Outcome?

A collective outcome is a jointly envisioned result with the aim of addressing needs and reducing risks and vulnerabilities, requiring the combined effort of both humanitarian and development communities and other actors as appropriate (IASC)

Page 4: HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

Collective Outcomes for the HRP 2019-2020

Peace

Humanitarian(HRP)

Development(UNPF/SDGs)

CO 1: Affected people have access to adequate protection and means of livelihoods.

CO 2: Affected people have improved access to quality and affordable services.

CO 3: Affected people have consistent access to critical civilian structures.

Page 5: HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

Strategic Priorities

1. Life-saving/core humanitarian¹ priority (including seasonality);

Priority Critical High Medium/low

Score 3 2 1

Criteria Time- and/or season-critical actions that: • Remedy, mitigate, avert immediate loss of

life, physical and psychological harm or threats to people directly affected by the conflict.

Actions that contribute to the prevention of adverse effects of the conflict on vulnerable populations.

Actions that contribute to the prevention of further degradation of the humanitarian situation, which are not necessarily time critical.

[1] These criteria will be used by all Clusters to vet projects for inclusion in the HRP 2019-2020. Projects will be scored individually against each of these four specific prioritisation criteria through a three-point scoring system – three being critical, two being high, and one being medium/low priority.

Page 6: HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

Strategic Priorities (cont.)2. Geographical priority

Priority Critical High Medium/low

Score 3 2 1

Criteria Actions in:• NGCA• Area within 5 KM on both sides of the

‘contact line’• GCA area within 5-20 KM of the ‘contact line’,

only when the following conditions are met: Without action, gaps will exist. Action is required to adhere to ‘do no

harm’ approach [e.g. necessity to provide essential services in ‘safe’ locations, avoiding unintended pull factors or returns to unsafe locations.]

Communication with Government and non-humanitarian entities.

Actions in:• GCA of Donetska and Luhanska

oblasts beyond 20 KM of the ‘contact line’

N/A

Page 7: HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

Geographical Priority :

Non-Government Controlled Areas (NGCA)

Government Controlled Areas (GCA) (excluding 20 km area along the ‘contact line’ )

GCA(0-5 km area along the ‘contact line’)

GCA(5-20km area along the ‘contact line’)

‘Contact line’ as of August 2018

Luhanska (GCA)

Luhanska (NGCA)

Donetska (NGCA)

Donetska (GCA)

Dnipropetrovska

Zaporizka

Kharkivska

Page 8: HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

Strategic Priorities (cont.)

3. Vulnerability priorityPriority Critical High Medium/low

Score 3 2 1

Criteria Actions that specifically respond to the critical humanitarian needs of highly vulnerable people, particularly elderly, people with disabilities, female-headed households, IDPs, etc.

Actions that target moderately vulnerable people

Actions that target less vulnerable people

9-8 Critical priority 7-6 High priority 5 and below

Medium/low

Overall scoring:

Page 9: HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

Mandatory requirements of all HRP projects

Inter-Agency Standing Committee (IASC) Gender & Age Marker (GAM) • Actions will be marked according to the code system of the GAM.• Gender-blind activities will be disqualified.

Accountability to Affected Population (AAP)• Actions should adhere to the HCT AAP Framework.• Actions should have AAP mechanisms.

Page 10: HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

Multi-Year Humanitarian Response Plan (MYHRP) 2019-2020

Innovative steps: Project submission on rolling basis & updated every 6 months; HC-led Cluster project vetting; Consolidated IM capacity across Humanitarian-Development Nexus (HDN).

Page 11: HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

Collective Outcomes, Cluster Objectives, Project Objectives

Collective Outcomes

Cluster objectives

Project objectives

Page 12: HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

Timeline

11–28 Oct

- HRP partners upload summary sheets into the Project Module;- Cluster vetting committee review;- Communication between Clusters and partners in case of clarification, correction, etc. - Clusters approve or reject projects

29 Oct

Clusters communicate to OCHA their four ballpark figures; - # people affected- # people in need - # people targeted- Financial requirements

1 Nov

Global deadline for submission of four ballpark figures for Ukraine for inclusion in the Global Humanitarian Overview (GHO)

early Dec

Finalization of the HRP narrative & printing

HC-led board to review project prioritisation

30/31 Oct

Page 13: HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

What is Global Humanitarian Overview (GHO)?https://interactive.unocha.org/publication/globalhumanitarianoverview/• Most comprehensive,

authoritative and evidence-based assessment of world humanitarian needs.

• Country-level HNO and HRP contributes to it.

• Launched globally in December by the Under Secretary-General (USG)/Emergency Relief Coordinator (ERC)

Page 14: HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

Available on http://ops.unocha.org

OLD ‘Online Project System’ (OPS)

Page 15: HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

Humanitarian Programme Cycle (HPC) Project Module

What is the HPC Project Module?• Includes all the humanitarian projects that are part of the Humanitarian Response Plan (HRP)• Planning tool for the 2019 HPC

Objectives of the Session:• How to register in the HPC Project Module using Humanitarian ID (HID)?• How to create your HID profile?• How to add your organisation?• How to add your projects to the HPC Project Module?

Page 16: HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

How to register in the HPC Project Module?

• Create Humanitarian ID profile;

• Check your e-mail. To activate your account, click on the access link;

• Complete your User Profile online;

• Access HPC Project Module with Humanitarian ID.

Page 17: HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

Humanitarian ID registration

Page 18: HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

How to access in HPC Project Module?

• You have created a Humanitarian ID account

• You will now see the “User profile screen”

• You must fill out your organization and the country in which you are working in

• Сlick next and you will be directed to the map screen

Page 19: HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

How to register your organization in HPC Project Module?

• Your submission will be reviewed by OCHA team within 24-48 hours.

• You will not be able to proceed until you have added this organization

• You will have to return to the HPC projects module after you have received this confirmation

Better to indicate general working contact data, which do not change with the rotation of staff

Page 20: HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

Map Screen

This is the standard screen that you will see when you have registered and logged in successfully to the HPC projects module.

Page 21: HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

Map Screen (search & selection)The left hand navigation side bar allows you to specify a range of parameters to search for projects. The parameters are:

• Type a project id or code if known to quickly search for a specific project.

• Select a year. The default is the current year, but additional years can be selected.

• Plans. For each plan you can also select additional fields to filter by, which are unique to that plan only

• Countries.• Global sectors you want to filter by. Note that this is different

from the plan’s clusters, which can be found inside each plan by clicking on the plan first.

• Organizations.

Page 22: HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

Map Screen (search & selection)

The left hand navigation side bar allows you to specify a range of parameters to search for projects.

Page 23: HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

How to add your project?

Click on “New project” to begin creating a project.

Page 24: HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

New Project (basic information)

• The first step of the project creation process contains basic project information such as title, description, dates, organization and contact.

• Any required fields are highlighted with a red left hand border. The save buttons will not be available until all required fields have been filled out.

• Click “Save and next” to proceed to the next section.

• After clicking save, a project code will be assigned to the project and displayed in the toolbar.

Page 25: HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

New Project (select a response plan)

After selecting a plan, the plan’s specific fields will be displayed:• Cluster’s list. • Plan fields (required fields are marked with a red border on

the left hand side of the field)

Support multi-cluster or multi-organization approach

Page 26: HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

New Project (overview)

This section is critical. The “heart” of your project. Make sure the Needs, Activities, and Indicators all make sense together. The Activities you plan should respond to the Needs identified. The Indicators should measure the Activities you are planning, and be within your capacity to achieve.

Page 27: HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

New Project (cash based intervention)

If your Project provides Cash Assistance than choose Restrictions and Estimated percentage of project requirements to be use for cash

Page 28: HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

New Project (project area, GAM)

Gender and Age Marker (GAM), is an indicator that shows how well your project incorporates gendermainstreaming.

20km

Page 29: HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

New Project (select specific locations)

After selecting a plan in step 2, the country will be preselected. Use this step to specify admin 2 and 4 level.

Page 30: HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

New Project (linking the project to a clusters’ framework)

If more than one cluster was selected in step 2, then you can switch between the selected clusters to add the caseload and cluster activities and targets.

If the logical framework consists of activities and indicators, then in this step you can select which activities this project will be contribute to by selecting the relevant indicators on the logical framework, and specifying the project’s target value.

Page 31: HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

New Project (linking the project to a clusters’ framework)

In addition, if the indicator has a disaggregation model defined at the cluster level, then you can also specify how the project’s target is broken down according to the same disaggregation model.

Page 32: HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

New Project (project costing)

The sum total amounts of the rows must equal the total project cost. If it is not equal, it will be highlighted in red, and you will not be allowed to proceed to save.

Type the amount for each budget line in the “cost” column and the % total will be calculated for you. Alternatively, type into the % column and the cost amount will be calculated for you.

Type the total project cost of the project.

Page 33: HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

Type the amount for each budget line in the “cost” column and the % total will be calculated for you. Alternatively, type into the % column and the cost amount will be calculated for you.

New Project (budget by multiple organizations or multiple clusters)

If you have selected multiple clusters or multiple organizations as part of your project, then the budget breakdown based on the combination of all of them will be required.

Page 34: HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

If you have selected multiple clusters and multiple organizations as part of your project, then the budget breakdown based on the combination of all of them will be required.

The total for the clusters must add up to 100% for each organization.

New Project (budget by multiple organizations or multiple clusters)

Page 35: HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

Type the amount for each budget line in the “cost” column and the % total will be calculated for you. Alternatively, type into the % column and the cost amount will be calculated for you.

Review project before submitting

In the final step, all the data you have entered for this project can be viewed together. Click “previous” to go back and make further modifications if needed.

When the project is ready, click “Submit project for review” for the cluster leads to review.

Page 36: HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

Process of submitting projects:

Partners submit projects

Project review by Cluster Coordinators;

External GAM check of projects

Partners make changes to the projects according to

received comments

The Cluster Coordinators submit

the projects to the Humanitarian Coordinator for approval

Opening of HPC Project

Module

Some projectscan be rejected

Some projectscan be rejected

Page 37: HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

Frequently Asked Questions (FAQs)

1. What if my org. is not in the list?2. What if I do not have a Humanitarian ID?3. Multi-year project or one year project?4. Annual budget or two-year budget?5. Annual target or two-year target?6. Process for multi-cluster projects? –

require approval from all. 7. Geographical focus?8. GAM – who will check it externally?9. What happens in case of different scoring

of GAM?10. Will I have a chance to revise my project

before final approval?

11. Rolling basis – what does it mean?

12. How do I know whether my project is approved or rejected?

13. How can I report funding received for my project?

14. How often do I have to report about the progress of my project?

Page 38: HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

Financial Tracking Service (FTS)

www.fts.unocha.org

Page 39: HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

HPC Project Module

11 to 28 October 2018

will be open:

Presenter
Presentation Notes
Two main process stages Field process HQ process
Page 40: HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

Additional Resources• Humanitarian Response Info—Ukraine

https://www.humanitarianresponse.info/en/operations/ukraine• Quarterly Dashboard, Humanitarian Snapshot, Humanitarian Bulletin• Cluster Contact list• Maps• HNO/HRP

• HPC Project Module https://projects.hpc.tools

• Financial Tracking System (FTS) http://fts.unocha.org

• Humanitarian ID https://humanitarian.id

• OLD Online Project System (OPS)http://ops.unocha.org

• Humanitarian Data Exchange https://data.humdata.org/

• Skype group Ukraine HPC Tools

Page 41: HPC Project Module - HumanitarianResponse · (former Online Project System (OPS)) Training for HRP partners in Kyiv, 8 October 2018. Humanitarian Planning Cycle Project ... • The

Darya SagaydakIM Associate (Web/Database)

Tel: +380503095752E-mail: [email protected]