5/2/2013 1 Copyright Industrial Automation Networks Inc. - 2013 How Good Are Your Numbers? Ian Verhappen Director, Industrial Automation Networks Inc. About the Presenter – Ian Verhappen P.Eng. ISA Fellow, ISA CAP Industrial Automation Networks Inc Field level networks (buses & wireless) and process analyser engineering consulting firm MTL (2006 – 2009) Responsible for all digital communications products Responsible for all digital communications products 20 years in the oil sands /mining industry with Syncrude Canada Ltd. Past Vice-President ISA Standards & Practices Dept. Vice- President Strategic Planning Dept. Past Director ISA Analysis and ISA Communications Divisions IEC TC65, SC65B, SC65E Chair for Canada

How Good Are Your Numbers? · A1.3 – Asset Configuration, Calibration & Repair / Replace A1.2 – Asset Condition Monitoring & Sample / Test / Diagnostic & Quality Monitoring A1.1

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: How Good Are Your Numbers? · A1.3 – Asset Configuration, Calibration & Repair / Replace A1.2 – Asset Condition Monitoring & Sample / Test / Diagnostic & Quality Monitoring A1.1

5/2/2013

1

Copyright Industrial Automation Networks Inc. - 2013

How Good Are Your Numbers?

Ian Verhappen

Director, Industrial AutomationNetworks Inc.

About the Presenter – Ian Verhappen

• P.Eng. ISA Fellow, ISA CAP

• Industrial Automation Networks Inc

– Field level networks (buses & wireless) and process analyserengineering consulting firm

• MTL (2006 – 2009)

– Responsible for all digital communications products– Responsible for all digital communications products

• 20 years in the oil sands /mining industry with SyncrudeCanada Ltd.

• Past Vice-President ISA Standards & Practices Dept. Vice-President Strategic Planning Dept.– Past Director ISA Analysis and ISA Communications Divisions

• IEC TC65, SC65B, SC65E Chair for Canada

Page 2: How Good Are Your Numbers? · A1.3 – Asset Configuration, Calibration & Repair / Replace A1.2 – Asset Condition Monitoring & Sample / Test / Diagnostic & Quality Monitoring A1.1

5/2/2013

2

The Problem

Too much data No information

Where do we want to be?

Page 3: How Good Are Your Numbers? · A1.3 – Asset Configuration, Calibration & Repair / Replace A1.2 – Asset Condition Monitoring & Sample / Test / Diagnostic & Quality Monitoring A1.1

5/2/2013

3

Getting from Problem to Solution

Real Time EquipmentHealth DataHealth Data

Page 4: How Good Are Your Numbers? · A1.3 – Asset Configuration, Calibration & Repair / Replace A1.2 – Asset Condition Monitoring & Sample / Test / Diagnostic & Quality Monitoring A1.1

5/2/2013

4

MicroprocessorsMicroprocessors

MobileInfo

Devices

Static InfoAppliances

1.4billion*

1.0billion*

Mobile ITAppliances,Telephony &Terminal DevicesWill BecomeIntegrate IntoSystems ThatInclude Signals &Data FromSensors, Machines

Mobile Phones,Smart Phones,Notebooks MobileTerminals Tablets,Media Players

Desktop PCsServers/StorageRouters/Switches/GatewaysPrinters/ImagingGame/Media Equipment & Players

Intelligent Device Hierarchy - 2010

Source: Harbor Research, Inc.

* 2010 IT-Centric Device Shipments ** 2010 Machine-Centric Device Enablement Potential

Appliances Sensors, Machines& Equipment

Consumer/CommercialVehicles Off-Highway VehiclesAir/Rail/Transit/MarineNavigation SystemsMobile Healthcare Devices

Building EquipmentRetail/Vending/POS/ATMsIndustrial MachineryHealthcare EquipmentPower Distribution EquipInfrastructureEquipmentControllersSensors,InstrumentsMetersMicroprocessorsMicrocontrollers

Approximately 130Million Machine-Centric DevicesExpected To BeIntegrated in 2010

20 billion To Avoid DoubleCounting, EmbeddedComponents Are A Sub-Set Of The OverallOpportunity

MobileDevices

StaticDevices

EmbeddedDevices

.25Billion**

5billion**

Game/Media Equipment & Players

Page 5: How Good Are Your Numbers? · A1.3 – Asset Configuration, Calibration & Repair / Replace A1.2 – Asset Condition Monitoring & Sample / Test / Diagnostic & Quality Monitoring A1.1

5/2/2013

5

Diagnostics Examples

Generic

• Watchdog timer

• Temperature

• BIOS check on startup

Automation Specific

• Sensor failure– Thermocouple failure

– Impulse line plugging• BIOS check on startup

• Battery

• Memory

– pH probe fouled

• Communications Error– No acknowledgment from

“next” device

Ambient ConditionsAmbient Conditions

Page 6: How Good Are Your Numbers? · A1.3 – Asset Configuration, Calibration & Repair / Replace A1.2 – Asset Condition Monitoring & Sample / Test / Diagnostic & Quality Monitoring A1.1

5/2/2013

6

Power Quality

• Ground loop errors

• ‘Noise’

– ElectromotiveInterfence (EMI)Interfence (EMI)

• Cable spacing

– Radio FrequencyInterference (RFI)

• Low voltage orCurrent

– Too long cables

Temperature

• Maximumtemperature ≈60 oC

– Heating effect ofelectronicselectronics

• Minimumtemperature (- 50oC)

– Cold start-up

Page 7: How Good Are Your Numbers? · A1.3 – Asset Configuration, Calibration & Repair / Replace A1.2 – Asset Condition Monitoring & Sample / Test / Diagnostic & Quality Monitoring A1.1

5/2/2013

7

Humidity

• Condensation

– Plugged vents &drains in enclosure

– Improperly poured– Improperly pouredseals

• Instrument Air

– Ambient temperaturechanges

Status InformationStatus Information

Page 8: How Good Are Your Numbers? · A1.3 – Asset Configuration, Calibration & Repair / Replace A1.2 – Asset Condition Monitoring & Sample / Test / Diagnostic & Quality Monitoring A1.1

5/2/2013

8

Maintenance Alerts

• Valves

– Cycles, distancetravelled, air supplypressurepressure

• Estimate ofremaining time tofailure

– Schedule repairappropriately

Control Loops

• Status signal

– Good, bad,uncertain,maintenancemaintenance

• Only control offgood / validinformation

Page 9: How Good Are Your Numbers? · A1.3 – Asset Configuration, Calibration & Repair / Replace A1.2 – Asset Condition Monitoring & Sample / Test / Diagnostic & Quality Monitoring A1.1

5/2/2013

9

Electronic Device DescriptionLanguage (EDDL)

• Basis for smart devices in process industryHART

HARTCommunicationsFoundation

IEC 61804-3IEC 61804-4

FDI work beginswith IEC

19

90

19

93

Foundation

19

96

FoundationFieldbus

20

00

Profibus

20

04

20

11

20

14

FDI Specification& Products

Data IntegrationData Integration

Page 10: How Good Are Your Numbers? · A1.3 – Asset Configuration, Calibration & Repair / Replace A1.2 – Asset Condition Monitoring & Sample / Test / Diagnostic & Quality Monitoring A1.1

5/2/2013

10

StandardsStandards

ISA-95.00.03 4-Layer Model

Business Planning &Logistics

Plant Production, Scheduling,Operational Management, etc.

Level 4 4 – Establishing the basic plant schedule –production, material use, delivery, andshipping. Determining inventory levels.

Time frame: Months, weeks, days

Manufacturing OperationsManagement

Dispatching Production, DetailedProduction Scheduling, Reliability

Assurance

Level 3 3 – Work flow / recipe control to produce thedesired end products. Maintainingrecords and optimizing the productionprocess

Time frame: Hours, Minutes, SecondsAssurance

Time frame: Hours, Minutes, Seconds

2 – Monitoring, supervisory control andautomated control of the productionprocess.

Time frame: Hours, Minutes, Seconds, subseconds

Level 2

1 – Sensing the production process,manipulating the production process

Level 1

0 – The actual production processLevel 0

BatchControl

Continuous

ControlDiscreteControl

Page 11: How Good Are Your Numbers? · A1.3 – Asset Configuration, Calibration & Repair / Replace A1.2 – Asset Condition Monitoring & Sample / Test / Diagnostic & Quality Monitoring A1.1

5/2/2013

11

ISO 18435 Application DomainIntegration Diagram

A4.2 – Inter-enterprise activities: Supply ChainPlanning, Logistics Strategy

A3.1 – Operations Planning& Scheduling

A3.2 – CapabilityAssessment & Order

Fulfillment

A3.3 – MaintenancePlanning & Scheduling

A2.1 – Supervisory Control A2.2 – Asset Prognostics andA2.3 – Maintenance

Level R4Enterprise/Site

Level R3Area

Level R2

A4.1 – Intra-enterprise activities: BusinessPlanning, Orders & Production and

Maintenance

Assets(Equipment/Facilities, Serialized

components / Sensors / Transducers / Software /Documents)Resources (Material /Personnel)

A2.1 – Supervisory Control& Human Machine

Interface

A2.2 – Asset Prognostics andHealth, Quality, Safety &

Environment Management

A2.3 – MaintenanceExecution & Tracking

A1.3 – AssetConfiguration, Calibration

& Repair / Replace

A1.2 – Asset ConditionMonitoring & Sample / Test /

Diagnostic & Quality Monitoring

A1.1 – Control, I/O DataAcquisition, Data Historian,Asset Utilization & Displays

A0.1 – Resource Identification and Location A0.2 – Asset Identification and Location

Level R2Work Center

Level R1Work Unit

Level R1Asset

Intelligent Device Management Interactions

CMMS

Intelligent Devices

Work Orders

DCS Host

CMMS

Plant AssetManagement System

EventHistorian

Alarm ManagementSystem

ConfigurationDatabase Reporting &

Analysis

Page 12: How Good Are Your Numbers? · A1.3 – Asset Configuration, Calibration & Repair / Replace A1.2 – Asset Condition Monitoring & Sample / Test / Diagnostic & Quality Monitoring A1.1

5/2/2013

12

Data FlowData Flow

Alarm Management Lifecycle• ANSI/ISA-18.2-2009

• Includes practices for newfacilities and existingplants

• Includes practices to solvethe common alarm

Philosophy

Rationalization

Identification

Detailed Design

Managementof Change

D

C

A J

B I

Philosophy

Rationalization

Identification

Detailed Design

Managementof Change

D

C

A J

B I

the common alarmproblems

• Builds on the work of ASMand EEMUA

• Documents what isrequired andrecommended , but nothow to do it.

ASM = Abnormal Situation Management Consortium

EEMUA = Engineering Equipment and Materials Users’ Association

Monitoring &Assessment

AuditDetailed Design

Implementation

Maintenance

Operation

E

G

HF

Monitoring &Assessment

AuditDetailed Design

Implementation

Maintenance

Operation

E

G

HF

Page 13: How Good Are Your Numbers? · A1.3 – Asset Configuration, Calibration & Repair / Replace A1.2 – Asset Condition Monitoring & Sample / Test / Diagnostic & Quality Monitoring A1.1

5/2/2013

13

Industrial Ethernet Application Protocols

Protocol SponsoringOrganizations

TargetApplications

TransportLayer

ApplicationLayer

EtherNet/IP ODVA, Control-NetInternational, RockwellAutomation, Omron,

Any discreteor hybridmanufacturing

TCP and UDP Control andInformation Protocol(CIP)

FoundationFieldbus-HSE

Fieldbus Foundation Process control UDP Fieldbus FunctionBlocks

IDA-Modbus IDA Group, Schneider, Discrete TCP IDA Object modelIDA-Modbus IDA Group, Schneider,Jetter, Sick, Kuka,Phoenix Contact

Discretemanufacturingespecially motioncontrol

TCP IDA Object model

(Modbus/TCP)

PROFInet Profibus International ComplexMachinery

UDP, TCPplusproprietary

DCOM, PROFI-netObject Model

Source: ARC Advisory Group 2003

eXtensible Markup Language (XML)

• Language used totransfer betweenbusiness systems

– Used by ISA95– Used by ISA95(B2MML)

– Mimosa

Page 14: How Good Are Your Numbers? · A1.3 – Asset Configuration, Calibration & Repair / Replace A1.2 – Asset Condition Monitoring & Sample / Test / Diagnostic & Quality Monitoring A1.1

5/2/2013

14

CybersecurityCybersecurity

Open Systems

Risks

• Easier to ‘attack’– Same vulnerabilities as

office environment

Rewards

• Lower cost

• Increased supportavailableavailable

Page 15: How Good Are Your Numbers? · A1.3 – Asset Configuration, Calibration & Repair / Replace A1.2 – Asset Condition Monitoring & Sample / Test / Diagnostic & Quality Monitoring A1.1

5/2/2013

15

Regulations

• NERC

– North AmericanElectric ReliabilityCouncilCouncil

• ISA99/IEC 62443

– Cybersecuritystandards

• DHS

– Useful links and tools

Defence in Depth - Zones and Conduits

Copyright © ISA

Page 16: How Good Are Your Numbers? · A1.3 – Asset Configuration, Calibration & Repair / Replace A1.2 – Asset Condition Monitoring & Sample / Test / Diagnostic & Quality Monitoring A1.1

5/2/2013

16

ProactiveMaintenanceMaintenance

Asset ManagementAsset Management

Page 17: How Good Are Your Numbers? · A1.3 – Asset Configuration, Calibration & Repair / Replace A1.2 – Asset Condition Monitoring & Sample / Test / Diagnostic & Quality Monitoring A1.1

5/2/2013

17

Standalone systems

• Most commonlyused

– Stranded data

Instrument Management Systems

• Real time datacollection fromsmart devices

• Heuristics to aid in• Heuristics to aid ininterpretation,generate workorders

• “Island” of expertise

Page 18: How Good Are Your Numbers? · A1.3 – Asset Configuration, Calibration & Repair / Replace A1.2 – Asset Condition Monitoring & Sample / Test / Diagnostic & Quality Monitoring A1.1

5/2/2013

18

System Information ArchitectureSupply ChainManagement

Supply ChainManagement

Enterprise ResourcePlanning (ERP) System

E-commerceMaintenance

Repair &Operations

(MRO)

EnterpriseAsset

Maintenance (EAM)System

Plant AssetManagement

(PAM)System

PlantAutomation

System

Process Control &Process Management

Maintenance Work &Parts Management

Asset AdvisoryManagement

MaintenanceAdvisories

PurchaseorderProcess Advisories

(MRO)Procurement

System

SystemCMMS

SystemSystem(PAS)

ControlParameters Control

Data

Asset Collaboration /Tolerances

Transducer Config.Monitoring Set-upInspection Routes

Asset UsageData

Asset MonitoringVariablesAsset Calibration /Tolerance Data

Control DeviceMonitoring

Portable DeviceMonitoring

Survey On-Line Monitors

ProtectionOn-LineMonitors

TransientOn-Line Monitors

SampleMonitoring

Smartvalves& FieldDevices

PLC /DCS

Vib

rati

on

Pro

ce

ss

Oil

Th

erm

al

Ele

ctr

ica

lS

ha

ftD

isp

lace

me

nt

Ca

sin

gV

ibra

tio

n

Pro

ce

ss

Ele

ctr

ica

l

Sh

aft

Dis

pla

ce

me

nt

Sh

aft

Po

sit

ion

Ca

sin

gvib

rati

on

Pro

ce

ss

Sh

aft

Dis

pla

ce

me

nt

Ca

sin

gvib

rati

on

Pro

ce

ss

Oil

Pa

rtic

le

Oil

Ch

em

ica

l

Oil

Pro

pe

rtie

sOperationField

Report

SmartMachines &Transducers

Plant Measurements / Inspections

OrderTrackingWork HistoriesProcess Events

& Data

Data MiningData Mining

Page 19: How Good Are Your Numbers? · A1.3 – Asset Configuration, Calibration & Repair / Replace A1.2 – Asset Condition Monitoring & Sample / Test / Diagnostic & Quality Monitoring A1.1

5/2/2013

19

Data Capture

• What to capture and where

• Experience is retiring

– Fewer ‘experts’ available

Inferential Data

• Information frompatterns in datareceived

– Identify anomaly not– Identify anomaly notmeasured directly

• Bad sensor

• Vessel fouling

• Loop tuning

Page 20: How Good Are Your Numbers? · A1.3 – Asset Configuration, Calibration & Repair / Replace A1.2 – Asset Condition Monitoring & Sample / Test / Diagnostic & Quality Monitoring A1.1

5/2/2013

20

Trends Tell All

• Need forMaintenance isbased on changesover timeover time

Work PracticesWork Practices

Page 21: How Good Are Your Numbers? · A1.3 – Asset Configuration, Calibration & Repair / Replace A1.2 – Asset Condition Monitoring & Sample / Test / Diagnostic & Quality Monitoring A1.1

5/2/2013

21

Culture Change

• Knowledge = Power

– Difficult to release

• Big Brother

– Watching /spying– Watching /spying

• Fewer ‘Smarter’workers

Getting Help

• Outsource

– Remote assistance• ‘Dial in’

• Send formatted files• Send formatted files

• Training

Page 22: How Good Are Your Numbers? · A1.3 – Asset Configuration, Calibration & Repair / Replace A1.2 – Asset Condition Monitoring & Sample / Test / Diagnostic & Quality Monitoring A1.1

5/2/2013

22

NAMUR NE 129: The Asset HealthTriangle

StrategicAsset

Management

EquipmentStandardization

RAM

Life CycleAnalysis

VendorReliability

RCM

Stage 4

Reliability Engineering

Stage 5

Operational Excellence

CraftFlexibility

OPM

Maintenance /Operations Integration

ExternalBenchmarking

Asset Strategies/ SRCM

FailureAnalysis

Asset Integrity

Craft SkillsEnhancement

EquipmentHistory

Condition BasedMaintenance

ManagingSystem

CMMS /Metrics

PreventativeMaintenance

Planning &Scheduling

TurnaroundManagement

Work Identification/ Prioritization

Work ExecutionReview

Stage 3

Organizational Excellence

Stage 2

Proactive Maintenance

Stage 1

Planned Maintenance

There is Incentive to Change.

Are you ready to invest in the future?

Page 23: How Good Are Your Numbers? · A1.3 – Asset Configuration, Calibration & Repair / Replace A1.2 – Asset Condition Monitoring & Sample / Test / Diagnostic & Quality Monitoring A1.1

5/2/2013

23

Useful Reference Documents

“Foundation Fieldbus” 4th EditionIan Verhappen & Augusto PerieraPaper:http://www.isa.org/Template.cfm?Section=Find_Books1&template=/Ecommerce/ProductDisplay.cfm&ProductID=11959E-pub:http://www.isa.org/Template.cfm?Section=Find_Books1&template=/Ecommerce/ProductDisplay.cfm&ProductID=12461Mobi:Mobi:http://www.isa.org/Template.cfm?Section=Find_Books1&template=/Ecommerce/ProductDisplay.cfm&ProductID=12451

Questions & Contact Information