Hospital Management
System
Project Guide:-Project Guide:-
Prof. Manisha Jadhav.Prof. Manisha Jadhav.
Project Developed By:-Project Developed By:-
Vinod JadhavVinod Jadhav
MCA V Roll No. 1205MCA V Roll No. 1205
PROJECT DESCRIPTION
•Type Of Project: Stand-Alone Type Of Project: Stand-Alone Application.Application.
•Duration: 30 days.Duration: 30 days.
System Life cycle DevelopmentSystem Life cycle DevelopmentSystem Investigation
Requirement Analysis
Design
Coding
Testing
Implementation
Maintenanace
Project progresses through the first 3 phases of “SDLC”
PRE-ANALYSISPRE-ANALYSIS
Client Requirement
• Good user friendly graphical Good user friendly graphical interfaceinterface
• Security should be providedSecurity should be provided
• Easy retrieve the DatabaseEasy retrieve the Database
• Easy payment optionsEasy payment options
• Fast and easy delivery of productsFast and easy delivery of products
Requirement Determination Techniques
• Structured Analysis.Structured Analysis.
• Technical Feasibility.Technical Feasibility.
• Economical Feasibility.Economical Feasibility.
• Fact Finding Methods.Fact Finding Methods.
Existing System With Drawback
• There is no Stand-alone Application dedicated for Hospital Management System.• Everything is happened manually.• Easy payment options are not available
OPERATINGOPERATING ENVIRONMENTENVIRONMENT
Client Side
•HARDWARE:HARDWARE: Pentium III or Higher,10GB HDD,128RAM.Pentium III or Higher,10GB HDD,128RAM.
•SOFTWARE:SOFTWARE:
Visual Studio 2005, SQL Server Visual Studio 2005, SQL Server
Developer’s Side
•Hardware:Hardware:
Pentium IV,256RAM,20GB HDD.Pentium IV,256RAM,20GB HDD.
•SoftwareSoftware::
Visual Studio 2005, Visual Studio 2005,
Windows Server 2003, SQL ServerWindows Server 2003, SQL Server
Types Of Users
•Administrator Level.Administrator Level.
Scope
•The System gives the details of patient.The System gives the details of patient.
•It shows the daily check up of all patient and It shows the daily check up of all patient and gives details about the doctors visiting timing gives details about the doctors visiting timing etc.etc.
•This shows all details of doctors that are This shows all details of doctors that are available.available.
•This shows all stock of medicen.This shows all stock of medicen.
Modules
•Registration and authentication Registration and authentication module for new Patient.module for new Patient.
•Doctors detailsDoctors details
• Bill PaymentBill Payment
SYSTEM REQUIREMENTS
Project Schedule
ActivityActivity Act. NameAct. Name PredecessorPredecessor No. of daysNo. of days
A Preliminary investigation A Preliminary investigation Nil Nil 6 6
BB Requirement analysis Nil 9 Requirement analysis Nil 9
CC Designing Designing A,B A,B 15 15
Future ScheduleFuture Schedule
DD Coding Coding C C 11 11
EE Testing Testing D D 5 5
FF Implementation Implementation E E 3 3
GG Maintenance Maintenance F F 2 2
Total DaysTotal Days 4545
Risk ManagementRisk Management
•Project Risk.Project Risk.
•Technical Risk.Technical Risk.
•Non Technical Risk.Non Technical Risk.
Feasibility StudyFeasibility Study
•Operational Feasibility.Operational Feasibility.
•Technical Feasibility.Technical Feasibility.
•Economical Feasibility.Economical Feasibility.
Data Flow DiagramData Flow Diagram
Entity Relationship Entity Relationship DiagramDiagram
Use Case Diagram Use Case Diagram
Class DiagramClass Diagram
Object DiagramObject Diagram
Sequence DiagramSequence Diagram
Activity DiagramActivity Diagram
Table DesignTable Design
Patient TablePatient Table
FieldsFields Data type Data type Size Size ConstraintsConstraints
pat_idpat_id CharChar 1010 Primary KeyPrimary Key
pat_namepat_name CharChar 3030 Not NullNot Null
AddressAddress VarCharVarChar 100100 Not NullNot Null
PinCodePinCode NumericNumeric 1010 Not NullNot Null
Mob_noMob_no NumericNumeric 1212 Not NullNot Null
DateDate DateDate -- Not NullNot Null
Inquiry Table
FieldsFields DatatypeDatatype SizeSize ConstraitsConstraits
Enq_idEnq_id CharChar 1010 Primary KeyPrimary Key
pat_idpat_id CharChar 1010 Foreign keyForeign key
TreatmentTable
FieldsFields DatatypeDatatype SizeSize ConstraintsConstraints
tret_idtret_id CharChar 1010 Primary KeyPrimary Key
Pat_idPat_id CharChar 3030 Foreign keyForeign key
doc_iddoc_id CharChar 3030 Foreign keyForeign key
Doctor TableDoctor Table
FieldsFields Data type Data type Size Size ConstraintsConstraints
Doc_idDoc_id CharChar 1010 Primary KeyPrimary Key
Doc_nameDoc_name CharChar 3030 Not NullNot Null
AddressAddress VarCharVarChar 100100 Not NullNot Null
PinCodePinCode NumericNumeric 1010 Not NullNot Null
Mob_noMob_no NumericNumeric 1212 Not NullNot Null
J_DateJ_Date DateDate -- Not NullNot Null
FieldsFields Data typeData type SizeSize ConstraintsConstraints
P_idP_id CharChar 1010 Primary KeyPrimary Key
pat_idpat_id CharChar 3030 Foreign keyForeign key
Q_amtQ_amt NumericNumeric 1010 Not NullNot Null
Disc_amtDisc_amt NumericNumeric 1010 Not NullNot Null
Final_amtFinal_amt NumericNumeric 1010 Not NullNot Null
Payment TablePayment Table
FieldsFields Data typeData type SizeSize ConstraintsConstraints
Rec_idRec_id CharChar 1010 Primary KeyPrimary Key
P_idP_id charchar 1010 foreignforeign
Pur_amtPur_amt NumericNumeric 1010 Not NullNot Null
Receipt TableReceipt Table
User TableUser Table
FieldsFields Data typeData type SizeSize ConstraintsConstraints
Us_idUs_id CharChar 1010 Primary KeyPrimary Key
PassPass charchar 1010 Not NullNot Null
Con_passCon_pass charchar 1010 Not NullNot Null
FieldsFields Data typeData type SizeSize ConstraintsConstraints
Dep_idDep_id CharChar 1010 Primary KeyPrimary Key
Dep_nameDep_name charchar 2020 Not NullNot Null
doc_iddoc_id CharChar 1010 Foreign KeyForeign Key
Department TableDepartment Table
TEST PROCEDURES
Testing :
Testing software is operating the software under controlled conditions to :
1. Verify that it behaves “as specified” ,2. To detect errors , and3. To validate that what has been specified is what the user actually wanted.
(1) VERIFICATION : It is the checking or testing of items, including software for performance and consistency by evaluating the results against pre-specified requirements. In short, verification means: Are we building the system right ?
(2) ERROR DETECTION : Testing should intentionally attempt to make things go wrong to determine if things happen when they should not or things don’t happen when they should.
(3) VALIDATION : looks at the system correctness – i.e. the process of checking that what has been specified is what the user actually wanted. Validation means: Are we building the right system ?
Test CasesTest Cases Expected ResultsExpected Results
1.If Administrator enters correct 1.If Administrator enters correct username and invalid password username and invalid password or vice versaor vice versa
Msg: ”Invalid Username or Msg: ”Invalid Username or Password”Password”
2. If the password field is blank2. If the password field is blank Msg: ”Please Enter Password”Msg: ”Please Enter Password”
3. If the administrator adds, 3. If the administrator adds, update any recordupdate any record
Changes made must be Changes made must be correspondingly reflect in the correspondingly reflect in the databasedatabase
4. If input given to the field say 4. If input given to the field say Name is numericName is numeric
Msg: ”Enter Only Alphabets”Msg: ”Enter Only Alphabets”
5. If In case user wants to delete5. If In case user wants to delete Msg: ”Are you sure you want to Msg: ”Are you sure you want to delete”delete”
Test Cases
CONCLUSION
The objective of this project was to satisfy user’s requirements, successful implementation of the system, design a user-friendly and easy to operate the system.
The proposed requirements of the system have been fulfilled.
Speed and accuracy are satisfactory.
The project was very useful in case of acquiring practical knowledge
REFERENCES
1. [PRE01] Pressman, R.S., “Software Engineering”, A Practitioner’s Approach, Tata McGraw Hill, 6th Edition,2005.
3 www.google.com