1
Hospital Ludwigsburg Extension and conversion of central A&E department Involved divisions Architecture and Engineering Architectural services from feasibility study to practical completion Project Management Project control services from project initiation to project completion; Client's representative Management Consultancy and Operational Planning Functions and room program Medical and Laboratory Engineering Engineering services for medical equipment from feasibility study to construction supervision Client ............................................................................ Kliniken Ludwigsburg-Bietigheim gGmbH ..................................................... within hospital group Regionale Kliniken Holding RKH GmbH Location ........................................................................................................................... Ludwigsburg Duration ........................................................................................................................... 2012 to 2018 Description ................................. Extension, conversion and modernisation of building No. 13 ................................ combined with modifications in buildings No. 4 and No. 5 for central A&E .................................. department, OPD of trauma surgery, ambulance hangar with emergency ............................... access as well as neuro suite with MRI in 4 stages during ongling hospital .................................... operation including conversion of CT scan unit as preliminary measure Kenndaten ................................................................. EA 1,837 m², GFA 4,245 m², GV 14,100 m³ Costs .......................................................................... CC 200-700 (gross) approx. 25.17 Mill. EUR

Hospital Ludwigsburg Extension and conversion of central A ... · Hospital Ludwigsburg Extension and conversion of central A&E department Involved divisions Architecture and Engineering

  • Upload
    doananh

  • View
    225

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Hospital Ludwigsburg Extension and conversion of central A ... · Hospital Ludwigsburg Extension and conversion of central A&E department Involved divisions Architecture and Engineering

Hospital Ludwigsburg Extension and conversion of central A&E department

Involved divisions

Architecture and Engineering Architectural services from feasibility study to practical completion Project Management Project control services from project initiation to project completion; Client's representative Management Consultancy and Operational Planning Functions and room program Medical and Laboratory Engineering Engineering services for medical equipment from feasibility study to construction supervision

Client ............................................................................ Kliniken Ludwigsburg-Bietigheim gGmbH ..................................................... within hospital group Regionale Kliniken Holding RKH GmbHLocation ........................................................................................................................... LudwigsburgDuration ........................................................................................................................... 2012 to 2018Description ................................. Extension, conversion and modernisation of building No. 13 ................................ combined with modifications in buildings No. 4 and No. 5 for central A&E .................................. department, OPD of trauma surgery, ambulance hangar with emergency ............................... access as well as neuro suite with MRI in 4 stages during ongling hospital .................................... operation including conversion of CT scan unit as preliminary measureKenndaten ................................................................. EA 1,837 m², GFA 4,245 m², GV 14,100 m³ Costs .......................................................................... CC 200-700 (gross) approx. 25.17 Mill. EUR