ASEW 2015 – panel session Expectations on SE scaling practices at TfNSW
Richard Fullalove, Manager, Systems Engineering Process, ASA ,TfNSW
Oct 2015
Expectation on SE scaling practices at TfNSW | 28 Oct 2015 | 2
Scaling and tailoring SE: Caution! • The story of Goldilocks; getting it just right • Do not over-engineer a simple project/system (car park) • Do not under-engineer a complex project/system (Sydney Metro) • Generic guidance on scaling, however every project is unique • Two seemingly identical projects may have significant hidden
differences in complexity, novelty and risk • Use engineering judgement to scale SE appropriately • Do not blindly “engineer by template”
Expectation on SE scaling practices at TfNSW | 28 Oct 2015 | 3
Scaling of systems engineering Level Project Example Scale
($/time) Complex Novel Risk
HFI
EMC
RAM
S
Sys Arch
V&V SE Effort
Interface
ReqM
At-grade car park (away from corridor) Small Low Low Low Light L L L
L L - L Overhead Wiring (new/altered) Small Low Low Low Light L L L L L L -
HV Feeder 132/66/33/11kV (new/altered) Small Low Low Medium Light L L L L L M - Multi-story car park (adjacent to corridor) Medium Medium Low Medium Medium M M M L L - M
Project Traction Substation (single) Medium Medium Low Medium Medium M M H M M M M Junction Upgrade (single) Medium Medium Low Medium Medium M M H M H M M
Station (small to medium, new/altered, single) Medium Medium Medium Medium Medium M M M M H M M Transport Interchange (major, single) Large High Medium Medium Medium H H H M H M H
Stabling Yard (single) Large High Low Medium Medium H H H M H M H Major Track Renewals (corridor/network) Large Low Low Medium Light L M M L M - -
Transport Access Program (network) Large Medium Medium Medium Medium M H H M M L H Automatic Train Protection (network) Large High High High Heavy H H H H H H H
Digital Train Radio System (network) Large High High High Heavy H H H H H H H Program New Fleet Procurement (network/line) Large High High High Heavy H H H H H H H
Power Supply Upgrade (network) Large High Medium High Heavy H H H H H H M Signalling Technology Upgrade (network) Variable High High High Heavy H H H H H H H
Corridor/Line Upgrade (brown field) V Large High High High Heavy H H H H H H H Corridor/Line New Build (green field) V Large High High High Heavy H H H H H H H
Sydney's Rail Future (whole network/multiple programs) V Large V High V High V High Heavy H H H H H H H Portfolio Sydney's Light Rail Future (SLR, Newcastle, Parramatta) V Large V High V High V High Heavy H H H H H H H
Sydney's Ferry Future (Wharves and Fleet) V Large V High V High V High Heavy H H H H H H H
Scaling of requirements management • Low
• How: Scope management process as part of DM • Plan: Scope management section of DM Plan (e.g. OHW project) • Who: DM can manage limited/simple requirements • Tool: Simple contract work scope d ocument into RATM
• Medium • How: Simple requirements management process as part of DM process • Plan: Section of design/engineering management plan • Who: DM/SE can manage requirements • Tool: Manage i n Requirements Allocation & T raceability Matrix (RATM)
• High • How: Comprehensive, dedicated, integrated requirements process • Plan: Dedicated requirements management plan • Who: Dedicated requirements manager • Tool: Dedicated enterprise-level requirements tool
Expectation on SE scaling practices at TfNSW | 28 Oct 2015 | 4
Expectation on SE scaling practices at TfNSW | 28 Oct 2015 | 5
Scaling of interface/integration management • Low
• How: Part of interface management process as part of PM • Plan: Interface management section of PM/DM Plan • Who: DM can manage limited/simple interfaces • Tool: Simple interface register
• Medium • How: Simple interface management process as part of DM process • Plan: Interfaces section of design/engineering management plan • Who: DM/EM can manage system interfaces • Tool: Interface register
• High • How: Comprehensive, dedicated, integrated IfM process • Plan: Dedicated interface management plan • Who: Dedicated interface/integration manager • Tool: Dedicated architecture management tool/BIM/interface register
Expectation on SE scaling practices at TfNSW | 28 Oct 2015 | 6
Scaling of Verification & Validation • Low
• How: Assurance/acceptance management process as part of EM • Plan: V&V management section of EM Plan • Who: EM/DM can manage limited/simple V&V activities • Tool: Simple RVTM spread sheet
• Medium • How: Simple V&V process as part of DM/AM process • Plan: V&V section of design/engineering management plan • Who: Assurance Manager can m anage V&V • Tool: Larger RVTM spread sheet
• High • How: Comprehensive, dedicated, integrated V&V process • Plan: Dedicated V&V management plan • Who: Dedicated V&V manager • Tool: Dedicated enterprise-level requirement/ V&V tool
Expectation on SE scaling practices at TfNSW | 28 Oct 2015 | 7
Scaling of system architecture management • Low
• How: Part of concept design process as part of DM • Plan: Concept design s ection of design plan • Who: DM can manage limited/simple architectures • Tool: Simple general arrangement, concept sketches
• Medium • How: Simple Architecture Management process as part of DM • Plan: SysArc or Concept section of design management plan • Who: DM/SEM can manage system architecture • Tool: BIM/CAD/Visio/CASE tools
• High • How: Comprehensive, dedicated, integrated SysArc process • Plan: Dedicated system architecture management plan • Who: Dedicated system architect or systems engineer • Tool: Dedicated architecture management tool/BIM
Expectation on SE scaling practices at TfNSW | 28 Oct 2015 | 8
Scaling of RAM management • Low
• How: Durability management process as part of EM/DM • Plan: Simple RAM management section of EM/DM Plan • Who: DM can manage limited/simple RAM activities & decisions • Tool: Simple material durability spreadsheet
• Medium • How: RAM process as part of DM/EM process • Plan: RAM section of design/engineering management plan • Who: Design Manager can m anage RAM with RAM expert support • Tool: Simple RAM models, basic reliability analysis, FMEA
• High • How: Comprehensive, dedicated, integrated RAM process • Plan: Dedicated RAM management plan(s) • Who: Dedicated RAM manager/engineer
• Tool: Dedicated RAM modelling & analysis tools (RBD, FTA, FMECA)
Expectation on SE scaling practices at TfNSW | 28 Oct 2015 | 9
Scaling of EMC management • Low
• How: Part of interface management process as part of EM/DM • Plan: Interface management section of engineering/design plan • Who: DM can manage limited/simple EMI interfaces • Tool: Simple EMI interface register
• Medium • How: Simple EMC process as part of DM/EM process • Plan: EMC section of design/engineering management plan • Who: DM can m anage EM interfaces with some EMC expert support • Tool: EMC Threat Matrix, E&B and immunisation analysis tool
• High • How: Comprehensive, dedicated, integrated EMC process • Plan: Dedicated EMC management plan • Who: Dedicated EMC manager/engineer • Tool: EMC Threat Matrix, comprehensive suite of EMC analysis tools
Expectation on SE scaling practices at TfNSW | 28 Oct 2015 | 10
Scaling of human factors integration • Low
• How: Part of interface management process as part of DM • Plan: Interface management section of design plan • Who: DM can manage limited/simple human interface d esign • Tool: Simple interface register
• Medium • How: Simple HFI process as part of DM process • Plan: HFI section of design management plan • Who: DM can m anage HF interfaces with s ome HFI expert support • Tool: HFI register
• High • How: Comprehensive, dedicated, integrated HFI process • Plan: Dedicated HFI management plan • Who: Dedicated HFI manager • Tool: Dedicated HF modelling & analysis tools
Expectation on SE scaling practices at TfNSW | 28 Oct 2015 | 11
Example 1: Low SE effort
Ignore this spike used to calibrate the RADAR plot!
Expectation on SE scaling practices at TfNSW | 28 Oct 2015 | 12
Example 2: Medium SE effort
Ignore this spike used to calibrate the RADAR plot!
Expectation on SE scaling practices at TfNSW | 28 Oct 2015 | 13
Example 3: High SE effort
Ignore this spike used to calibrate the RADAR plot!
Expectation on SE scaling practices at TfNSW | 28 Oct 2015 | 14
Example 4: SE effort - all project types SE scaling - all project types
At-Grade Commuter Car Park
Ncw/Upg1adc Rail Conidor T1action Substation bingle)
--Full-sale c.alibrition
--interface Management
--verification & V.11id.1tion
Novel Signal~ng Technol<>t!Y Junction RemodelNpgrade --RAM Management
--CMC M.Jn.Jgement
--Human Factors Integrat ion
--systems Architecture Traction Power Supply Upgrade Stat ion (small to medium)
Tr.Jnsport lnterch.Jnge {l.lrge)
Tran!opor t AcCes$. Progr:im
Expectation on SE scaling practices at TfNSW | 28 Oct 2015 | 15
Example 4: SE effort - all project types At-Grade Commuter Car Park
--Overhead W iring (Traction)
'"" --HV A e r ial Feeder
Multi Story Commuter Car Park 1 .............
G M..o,~ ..........
Traction Sub Station
Junction Remode l/Upgrade
-----..................
Station (Sma ll/Medium)
Transport Interchange (large)
Stabl ing Yard
Major Track Renewal Program
..... --Transport Ac.cess Program
.... --Automatic Train Protection
·~::~~u\r·· .. ~=· lr'llrtl'Mill,)R MMw ... ...-NI
(M( 11 .... l(MIOO't f. M:tftafemet'lt V-.UtlOl'I .....
Digital Train Radio System
~t-" llleqolif-fl
O ~
~hr,c.c,,,.,. M .... .--1
Hu:~~ '"'~' 11 .... 1 .. ..c-• c ... c ,,,_....,_,.. v•~1ilMI
New Fleet Procurement
.... _o'::"~ .......... _ .. Al<t--"'• <t .... ~ M ............. rl
.~,...:taf~ 0
MC•rf~L .. ..w ... ~to:in M ........ .._
I M<"M• .. ....,.N \Or'~::.:=&
Traction Network Power Upgrade
-~-tl
U ....... ~
M .... ~I
~t'K•
"".l>Nll ........ '
lilHlr .-1..,,..A v•cUOOfl
Novel Signalling Technology
O~t"-
,....,,_ ..... . _.h "1~ N,....-rt
Hv...,.,,.,~ WIW"K• ........ tli)n "".l>Nll-~I
rMr ""_......,_,.. ~~~':;';':"
New/Upgrade Rall Corridor
O',-:;"'·'~
~- .. .--nu. ... ,..,.fttu<• ........ _....
H ... m~fMtoM. lrt'"1Ke llr'l!•WOH• M.JN~
£MC ~N.p-N ~=:.:~= «.
Sydney's Ferry Future
--~:~~~o .. :···- ~~~ . •l•O.M~ M~-
1 MC: M--- "'~!i:'~'=& .... ---Sydney's light Rail Future
--~:~=7a .. ~···- ~=. W'U'·.M~ 0 M~""""'
rMCM~- \l~:;:::.g. .... ... ............ Sydney's Rail Future
--
........
Expectation on SE scaling practices at TfNSW | 28 Oct 2015 | 16