15
A Forestry Corporat ion FORESTRY CORPORATION OF NSW, HARDWOOD FORESTS DIVISION HARVEST PLAN LOCALITY MAP Plan Name: HP_ED_1325_17 BOMBALA State Forest ·':,H l! l,l,·1 1:100.000 NO. 130 Plan No: 56872 Cpt No: 1325 v GDA_1994_MGA_Zone_55 Management Area: EDEN VERSION: 1 Mapsheet: COOLUMBOOKA (8724-2S) Date Printed: 4/01/2018 Emergency Meeting Point 113 & Helicopter Landing Site Intersection Coolangubra Forest Way X Burrimbucco Road Sealed General Management (Zone 4) -+ Evacuation Route - Major Forest Road Hardwood Plantations (Zone 5) -+ Haulage Route Compartment of Interest Softwood Plantations (Zone 6) + Emergency Meeting Point & Helicopter Landing Site Special Management (Zone 2) Non Forestry Use (Zone 7) Harvesting Exclusion (Zone 3A) D National Park Estate Special Prescription (Zone 3B) Vacant Crown Land Kilometres 2 3

Hl! v Cpt - Forestry Corporation€¦ · Area covered by Australian Forestry Standard AS4708:2013 Certificate 604224 Prepared by ; Planner Date: 30 /08 2018 Melanie Dyne ; Approved

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Hl! v Cpt - Forestry Corporation€¦ · Area covered by Australian Forestry Standard AS4708:2013 Certificate 604224 Prepared by ; Planner Date: 30 /08 2018 Melanie Dyne ; Approved

AForestryCorporat ion

FORESTRY CORPORATION OF NSW, HARDWOOD FORESTS DIVISION HARVEST PLAN LOCALITY MAP

Plan Name: HP_ED_1325_17BOMBALA State Forest ·':,Hl! l,l,·1

1:100.000 NO. 130 Plan No: 56872 Cpt No: 1325

v GDA_1994_MGA_Zone_55 Management Area: EDEN VERSION: 1 Mapsheet: COOLUMBOOKA (8724-2S) Date Printed: 4/01/2018

Emergency Meeting Point 113 & Helicopter Landing Site Intersection Coolangubra Forest Way X Burrimbucco Road

~ Sealed General Management (Zone 4) -+ Evacuation Route

- Major Forest Road Hardwood Plantations (Zone 5) -+ Haulage Route

Compartment of Interest • Softwood Plantations (Zone 6) + Emergency Meeting Point & Helicopter Landing Site

• Special Management (Zone 2) Non Forestry Use (Zone 7)

• Harvesting Exclusion (Zone 3A) D National Park Estate

Special Prescription (Zone 3B) Vacant Crown Land

Kilometres 2 3

Page 2: Hl! v Cpt - Forestry Corporation€¦ · Area covered by Australian Forestry Standard AS4708:2013 Certificate 604224 Prepared by ; Planner Date: 30 /08 2018 Melanie Dyne ; Approved

0 0

~

ForestryCorporation

1:15,906

Contour Interval 1 Orn

GDA 1994 MGA Zone 55

.,,,.-- .... I '

- I' I/ .......... ., , \ \ \ \

' '

FORESTRY CORPORATION OF NSW, HARDWOOD FORESTS DIVISION

HARVEST PLAN OPERATIONAL MAP BOMBALA Forest NO. 130 Plan Name:HP_ED_1325_17 Cpt No:1325

Plan No:56872 Management Area:EDEN VERSION: 1 Mapsheet:COOLUMBOOKA(8724-2S)

Date Printed: 30/08/2018

713000 714000

\ \ _L..,- ..... ;, ''................... I ', ;

, .. ..._ - ''

'\\,-.., - I ~ -""!6 --,)~

I ,,, --.:- ---." ~--' '.;., \ ,~" ' - -- ' ....._..- ~ ,- .... .... ,, .,-~

".... ,._ - - -i - -I

\

' ,, ' I , ' ' ' ' \ \ ' ' \\ I ' \ II I \

I I \ ' I I( .,,,. - -~:.: -___/.,. 1-- -r I I ' -- -- ) •,

,' , ---

; ( I

' '

I I

\ -

• •

---

---------

• • • •/'""',

I \ \

; ;

;

I I

;

'- ..... --'' ....

0 0 0 0 0 0 g g [1l [1l

712000 713000 714000

Telecommunication Tower Masked Owl (NesURoost) Minor Roads (EPL Standard) FMZ 3A- Harvesting Exclusion .. • -Major Roads ( other) Ridge and Headwater Habitat EZ (40m & 80m)0 Temporary Dry Weather Dump • Yellow-bellied Glider (Feed Tree)

Minor Roads ( other) Stream PZ 1st Order (15m) ----X Proposed Control Line -Temporary Wet Weather Dump 0

YBG - 100m Tree Marking Boundary Stream PZ 2nd Order (20m) D --State Forest Boundary ~ •,-., Existing Crossing

YBG - 200m Tree Marking Boundary Softwood Plantations (FMZ 6)

"- • D -Compartment Boundary Rocky Terrain (to be verified)

• MAF (verified) Vacant Crown Land

+ Coupe Boundary Emergency Meeting Point

FMZ4 & FMZ3B- MSW South East Forest National Park -LiDAR Corrected Drainage • Yellow-bellied Glider

Excluded Forest Indicative Unmapped Drainage Features

Yellow-bellied Glider (Heard) • /// Owl Landscape Major Roads (EPL Standard)

Prepared By melanie,dyne Date: 30/04/201 B

Kilometres © Crown Copyright 2013. The information and data contained in this map is to the best of Forestry Corporation's belief, true and correct at the time of 0,5 publication. However, changes in circumstances after the publication may impact upon the accuracy of the material. No warranty or guarantee is provided I bv the State of New South Wales. Forestrv Corooration and its emolovees and aaents and no liabilitv is acceoted for anv loss or damaae. costs or exoense

Page 3: Hl! v Cpt - Forestry Corporation€¦ · Area covered by Australian Forestry Standard AS4708:2013 Certificate 604224 Prepared by ; Planner Date: 30 /08 2018 Melanie Dyne ; Approved

V

FORESTRY CORPORATION OF NSW, HARDWOOD FORESTS DIVISION Forestry HARVEST PLAN FOREST TYPE MAP BOMBALA Forest

NO. 130 Plan Name:HP_ED_1325_18 Corporation

1 :15,000 Cpt No:1325

Plan No:56872 Contour Interval 1 Orn Management Area:EDEN VERSION: 1 GDA 1994 MGA Zone 55 Mapsheet:COOLUMBOOKA(8724-2S)

Date Printed: 30/08/2018

712000 713000 714000

\ \ \ \

' \ \ I

✓ )

', - ... ;,I ...... } --- --- ...- ' I , __ .,.. ............ _J,l;i . '

... I

I_, I

' ' !:;.. - - ,; \ ' .... - • I .,- .... ...., ................. , -..... I ' ~ - ..,.I "I - ,.... '

--- .,...... ... 'r I .

,,>\'~, '--- ...,< , ... '' ' ' ''"-........ .;

' :::~---.- --.

0 0 0

~ fll

\\ ,, I \. -+-- -1

~ __J 1''

'-°' ..... _,' ...

0 0 0

~ fll

!~'i--+-~~x=-----~$G.~- ~~~--'=-c-+-==+- .':::::=:::::;~~-...._"'..-_1__:-_--="-=====----::::::.-k----Jb~'.__;_7;---rl--~~-~/~#~~~:~1-/~-----2lb--"+---l----~!

~- : ~

.... " ,-. .. .\

....,_ ~- ' ~,:,,--1. ,,.,,.

I

,. , , ...

;

..... ' ;

,. ...• I ', ...

\ , - .... ' .. ... ....._______ , \ I ' ' I ' '1 I ' I

0 0 0 ..., 0 0

, \ 0 g I I gI ,

fll ,I _ 4 ,, ' ' '

fll I Ii

I ~ . • - I ' \ , , I

I ' ' S,: .... ,.. J

.... - - - - ' .... -,,,✓ _.,,,,,' ,'ff I,'--r{_,.. '

.... ___ _ \ ' \ •

'I ' \ ' 712000 713000 714000

• Yellow-bellied Glider Giant Burrowing Frog c::::J Type 150 Brown Barrel - Messmate - 3.6ha •

c::::J Type 151 Brown Barrel-Messmate-35.1ha• Yellow-bellied Glider (Heard) LiDAR Corrected Drainage

c::::J Type 152 Messmate - Gum - 57.Sha Indicative Unmapped Drainage Features -$- Powerful Owl

• D Type 152/155 Messmate - Gum 19.1 ha

•Masked Owl D Type 154 Brown Barrel - 84.2ha

• State Forest Boundary

• Compartment Boundary Masked Owl (NesURoost) c::::J Type 154/158N Brown Barrel - Blue Gum - 1.8• Coupe Boundary

Yellow-bellied Glider (Feed Tree) • c::::J Type 155 Brown Barrel - Gum - 0.1 haMajor Roads (EPL Standard)

* Gang-9ang Cockatoo - Type 158 Southern Blue Gum 0.2ha Minor Roads (EPL Standard)

• Greater Glider Major Roads (other)

... Flame Robin Minor Roads (other)

... Olive Whistler c::::J Type 143 Swamp Gum I Black Gum/ Broadleaved Sallee-1.3ha

Prepared By melanie.dyne Date: 30/04/201 B

Kilometres © Crown Copyright 2013. The information and data contained in this map is to the best of Forestry Corporation's belief, true and correct at the time of 0.5 publication. However, changes in circumstances after the publication may impact upon the accuracy of the material. No warranty or guarantee is provided I bv the State of New South Wales. Forestrv Corooration and its emolovees and aaents and no liabilitv is accented for anv loss or damaae. costs or exoense

Page 4: Hl! v Cpt - Forestry Corporation€¦ · Area covered by Australian Forestry Standard AS4708:2013 Certificate 604224 Prepared by ; Planner Date: 30 /08 2018 Melanie Dyne ; Approved

--___ ; _,..--.... ------) v :;./¥~-fY,..,___

1.__,_ .·y .,/·

.c::.£,L__,

Forestry Corporation

Hardwood Forests Division

Harvest and Haul Plan

State Forest Bombala Compartments 1325

Management Area Eden IFOA Region Eden

Harvest Plan No. 56872 Coupes 1 (part), & 3

Legal Conditions Native Forest Harvesting in accordance with IFOA conditions.

Harvesting and Roading activities must have EPL coverage.

To implement this plan, you must hold a current Contractors Licence.

Standard Harvest Plan Conditions and Operating Procedures apply.

Survey expiry date for this plan is 15/12/2020.

Certification Timber products removed from the plan area are within the Defined Forest Area covered by Australian Forestry Standard AS4708:2013 Certificate 604224

Prepared by Planner Date: 30/08/2018 Melanie Dyne

Approved by Operation Planning Mgr Date: 30/08/2018 Shane Clohesy

Abbreviations PA = Production Assistant, PS = Production Supervisor, RC = Roading Coordinator, Crew = Harvest Contractor/Forest Operators, IFOA = Integrated Forestry Operations Approval, TSL = Threatened Species Licence, EPL = Environment Protection Licence, FL = Fisheries Licence, CH = Cultural Heritage, SOP = Standard Operating Procedure, HPOM = Harvest Plan Operational Map.

1. Harvest Area Details Plan Compartment ID 126358

Gross Area (ha) 199.4

Harvest Area (ha) 73.6 Yield/ha (m3/ha) 2.7

Estimated Yield (m3) 200

Yield/ha (t/ha) 44

Estimated Yield (t) 3,000

Slope (% 0-20 degrees) 96.7

Slope (% 20-25 degrees) 3.3

Slope (% 25-30 degrees) 0

Document title: HP_ED_1325_17 Version No.: 1 Page 1 of 12 Harvest Plan no.: 56872 Approval Date: 30/08/2018 Expiry Date: 15/12/2020

Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use.

Page 5: Hl! v Cpt - Forestry Corporation€¦ · Area covered by Australian Forestry Standard AS4708:2013 Certificate 604224 Prepared by ; Planner Date: 30 /08 2018 Melanie Dyne ; Approved

I I I I I I

Contractor must ensure timber removed is allocated to the correct compartment when entered onto Delivery Docket.

2. Management Conditions on Boundaries Boundary Conditions

FMZ FMZ 3A – Harvesting Excluded, FMZ 3B – special Prescriptions (visual), and FMZ 4 – General Management occur within the compartment and are shown on the HPOM.

FMZ 3A – Harvesting and harvesting machinery are not permitted in these areas. The crew must protect all areas of FMZ 3A.

FMZ 3B (Visual) – A visual protection zone exists adjacent the South East Forests National Park. The PA is not required to mark this boundary but must supervise implementation of harvesting prescriptions (see table 7).

National Park National Park forms the eastern boundary of the compartment and is shown on the HPOM. The PA must mark the boundary as mapped. The crew must ensure access roads to the National Park are not impeded by forestry activities and the roads condition is maintained.

Cultural Heritage Surveys have been conducted.

3. Expected Yields

Product Estimates Volume

Sawlog (m3) 200

Pulp (t) 3,000

Total (t) 3,240

Species Species Mix (Sawlog)

E. fastigata 70%

E. cypellocarpa 15%

E. elata 15%

4. Haulage Haul Route West on New Trig Road. South on Coolangubra Forest Way. East on Imlay Road.

North on Princes Highway.

5. Community Issue Detail Conditions

Notifications Required Nil All relevant notifications have been conducted. A notification list for FCNSW staff is available from the planner.

Neighbours National Parks & Wildlife Service (South East Forests National Park)

Nil

Pests/Weeds Myrtle Rust, Serrated Tussock and African Lovegrass

Is known to occur in Bega Valley and Cooma-Monaro Shires. To prevent further spread the crew/haulage operators must ensure all harvesting machinery,

Document title: HP_ED_1325_17 Version No.: 1 Page 2 of 12 Harvest Plan no.: 56872 Approval Date: 30/08/2018 Expiry Date: 15/12/2020

Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use.

Page 6: Hl! v Cpt - Forestry Corporation€¦ · Area covered by Australian Forestry Standard AS4708:2013 Certificate 604224 Prepared by ; Planner Date: 30 /08 2018 Melanie Dyne ; Approved

equipment and vehicles heading east from Cooma-Monaro Shire and Bega Valley Shire are checked and all infected vegetation removed.

Forest Permits

6. Infrastructure Infrastructure Conditions

Utilities Underground Nil

Transmission lines Nil

Radio Tower A telecommunications tower is located on the eastern edge of coupe 5 in National Park. Tower not adjacent to harvesting operations. Road access to tower to remain open.

Control Lines for Post Log Burning

In this compartment, post log burning must be prevented from entering the National Park.

Control lines to be constructed by the crew are indicatively mapped on HPOM, however final location will depend on snig tracks and areas harvested.

The PA must liaise with the Protection Coordinator during harvesting to more accurately plan where control lines are required.

Existing Fire Trails Existing fire trails and through access should be left in a trafficable condition, free of harvesting debris and any installed rollovers must be trafficable.

7. Harvesting Conditions

Silviculture Type Harvesting Objectives and Condition for each stand condition

FMZ 4 & FMZ 3B – MAF (Modified Shelter Wood)

Coupes 1 (part), & 3

The harvest area is predominately mature to over mature E. fastigata (Brown Barrel), E. cypellocarpa (Monkey Gum), E. elata (River Peppermint) and E. nitens (Shining Gum), in mixed aged stands. The objective is to harvest all commercially available trees to create canopy openings and ensure mechanical disturbance creates a suitable seed bed for regeneration of the stands.

Crew to target sawlogs, pulpwood and other miscellaneous products as markets allow.

Crew to remove all merchantable stems not marked for retention.

The crew is responsible for protecting retained seed trees and retaining patches of advanced regeneration.

IFOA Limits MSW Net Harvestable Area (ha) 175.9 Harvest Area (ha) 73.6 Planned Removal (%) 37.4%

Document title: HP_ED_1325_17 Version No.: 1 Page 3 of 12 Harvest Plan no.: 56872 Approval Date: 30/08/2018 Expiry Date: 15/12/2020

Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use.

Page 7: Hl! v Cpt - Forestry Corporation€¦ · Area covered by Australian Forestry Standard AS4708:2013 Certificate 604224 Prepared by ; Planner Date: 30 /08 2018 Melanie Dyne ; Approved

I I I I

I I I I

8. Tree Retention - refer to TSL booklet for full conditions

Prescription Condition/Responsibility

Mark-Up – the PA is responsible for marking up the forest ahead of harvesting operations consistent with Forest Mark Up and Tree Retention SOP

Compartment Mark-Up Survey

(5.1, 5.2)

Compartment mark-up surveys must be conducted at least 100m in advance of operations. The survey must search for threatened and protected species features listed in conditions 5.1 and 5.2 of the TSL.

Hollow-bearing and Recruitment tree retention (H and R)

Non-Regrowth Zone - 5.6, conditions apply.

Additional H trees for Greater Glider condition does apply.

PA must verify the habitat quality and record on the habitat quality map. PA must select and mark H and R trees as per the habitat quality.

Habitat Quality H Trees/2ha R Trees/2ha High 12 12 Moderate 8 8 Low 4 4

Significant Food Resources PA must mark for retention - 6 Eucalypt feed trees/2 ha where they

(5.6 k) occur, glider sap feed trees, stands of forest oak and forest oak feed trees.

Species Coordinate Comments

YBG Feed Tree 712978E/5905082N New record, flagged orange tape

E. viminalis (Ribbon/Manna Gum) is a suitable E tree species present in this compartment.

Harvesting - crew and PA responsibilities

Protection of Retained Trees Trees marked or selected for retention must not be felled. (5.6g) The crew must minimise damage to H, R and E trees by using directional

felling.

Harvesting debris should not accumulate within 5 m of retained trees. Where debris does accumulate the crew must remove or flatten to < 1m high.

The PA must be notified of any badly damaged retained trees and they must assess and record if a replacement retained tree is required.

Stag Retention (Dead standing trees 5.6e)

The crew should retain stags where safe to do so.

The crew must record the date, DBH, risk and location of unsafe stags removed

Significant food resources The crew should avoid damaging flowering or fruiting banksias or grass trees.

Document title: HP_ED_1325_17 Version No.: 1 Page 4 of 12 Harvest Plan no.: 56872 Approval Date: 30/08/2018 Expiry Date: 15/12/2020

Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use.

Page 8: Hl! v Cpt - Forestry Corporation€¦ · Area covered by Australian Forestry Standard AS4708:2013 Certificate 604224 Prepared by ; Planner Date: 30 /08 2018 Melanie Dyne ; Approved

In areas mapped by the PA as Impenetrable Understory procedures for harvesting in un-marked forest must be implemented by the PA and Crew.

Impenetrable Understory

9. Site-Specific Flora and Fauna

Condition Boundary Type

Prescription

Riparian Habitat Protection (5.7)

(Lidar Corrected)

Pink Tape Implement filter strip/stream exclusion zone around drainage features as shown on the HPOM. Refer to SOP1.

PA must mark the location of all mapped 1st order drainage lines and UMDL.

The crew will locate and protect all 2nd order and above streams with GPS.

Ridge & Headwater Habitat (RHH) (5.8)

N/A RHH is mapped in the compartment.

The crew must protect all areas of mapped RHH.

Rocky Outcrops and Cliffs (5.11)

Pink Tape Rocky Terrain (to be verified) is mapped in the compartment.

The PA must mark as an exclusion the rocky outcrop + relevant exclusion zone as it occurs on the ground.

The crew must protect all areas of marked rocky outcrop.

Feed trees for Yellow Bellied Glider

Pink Tape and paint

PA must ensure mapped feed trees are marked prior to harvesting.

Crew must protect all marked feed trees.

Owl Landscape

(6.3.2)

N/A Owl Landscape is mapped within the compartment, away from proposed operations, and adjacent the compartment in the National Park.

The crew must protect areas of Owl Landscape.

Yellow-bellied Glider (Heard)

Pink Tape and paint

PA must mark trees for retention as per TSL conditions 6.13.

Fish N/A Compartment contains Class 2 Aquatic Habitat. All streams, drainage lines, wetlands and other water bodies within the compartment are Class 2 Aquatic Habitat. Only crossings shown on the HPOM can be used.

10. Soil & Water – Refer to EPL Booklet for full conditions

Issue Assessment Conditions

EPL Scheduled Activity Yes Nil

Inherent hazard level 2 Nil

Dispersible Soils No Nil

Document title: HP_ED_1325_17 Version No.: 1 Page 5 of 12 Harvest Plan no.: 56872 Approval Date: 30/08/2018 Expiry Date: 15/12/2020

Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use.

Page 9: Hl! v Cpt - Forestry Corporation€¦ · Area covered by Australian Forestry Standard AS4708:2013 Certificate 604224 Prepared by ; Planner Date: 30 /08 2018 Melanie Dyne ; Approved

Mass Movement / Instability No Nil

Seasonality conditions No Nil

Historical or existing erosion No Nil

Ground cover >70% Nil

Seasonal Burning conditions No Nil

Log Dumps SOP 5 PA is responsible for authorising moving the location of a log dump.

Roading management during harvesting

SOP 6 Refer to SOP 6.

PA is responsible for monitoring road and crossing drainage during haulage.

Wet Weather and Rutting SOP 6 Crew is responsible for implementing automatic closures and following notified closures.

PA is responsible for ensuring crew notified when notified closure is lifted.

Snigging SOP 8 Crew is responsible for progressive drainage of snig tracks

Snig Track Crossings SOP 8 PA is responsible to ensure snig track crossings are approved prior to use and rehabilitated upon completion.

11. Operational Plan Briefing: A briefing of this operational plan was conducted by

Person Role Nature of Briefing Date

12. Acknowledgement of Briefing: I acknowledge that I have received a copy of the plan documents and that I have been briefed on the conditions of the Plan. I understand the operational control requirements as outlined in the plan and take responsibility for the implementation of plan conditions relevant to my responsibilities

Name Role Signature Date

Document title: HP_ED_1325_17 Version No.: 1 Page 6 of 12 Harvest Plan no.: 56872 Approval Date: 30/08/2018 Expiry Date: 15/12/2020

Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use.

Page 10: Hl! v Cpt - Forestry Corporation€¦ · Area covered by Australian Forestry Standard AS4708:2013 Certificate 604224 Prepared by ; Planner Date: 30 /08 2018 Melanie Dyne ; Approved

Document title: HP_ED_1325_17 Version No.: 1 Page 7 of 12 Harvest Plan no.: 56872 Approval Date: 30/08/2018 Expiry Date: 15/12/2020

Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use.

Page 11: Hl! v Cpt - Forestry Corporation€¦ · Area covered by Australian Forestry Standard AS4708:2013 Certificate 604224 Prepared by ; Planner Date: 30 /08 2018 Melanie Dyne ; Approved

13. Standard Operating Procedures: The following SOP’s apply to this plan. FCNSW staff and the crew must hold a copy on site whilst operating and comply with the conditions set out in each SOP.

Procedure Number

Title

1 Drainage Feature Protection

2 Exclusion Zone Boundary Management

3 Forest Mark-Up

4 Operating in Inherent Hazard Level 3 Areas

5 Log Dump Operation and Use

6 Road and Crossing Management and Wet Weather Controls

7 Safety Requirements

8 Snigging and Snig Track Crossing

9 Documentation and approvals

Document title: HP_ED_1325_17 Version No.: 1 Page 8 of 12 Harvest Plan no.: 56872 Approval Date: 30/08/2018 Expiry Date: 15/12/2020

Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use.

Page 12: Hl! v Cpt - Forestry Corporation€¦ · Area covered by Australian Forestry Standard AS4708:2013 Certificate 604224 Prepared by ; Planner Date: 30 /08 2018 Melanie Dyne ; Approved

Operational Diary: Action Action Date Issue Initials Required Completed

Record: Daily activities (eg tree marking, dump 2); Condition 5.2 of TSL items - EEC locations, rocky outcrops, koala scats, feed tree identification etc), discussions with stakeholders/neighbours/ site visitors; areas of impenetrable understorey; unviable areas not marked, non-conformances; harvesting issues identified, twice weekly road and crossing drainage checks

Document title: HP_ED_1325_17 Version No.: 1 Page 9 of 12 Harvest Plan no.: 56872 Approval Date: 30/08/2018 Expiry Date: 15/12/2020

Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use.

Page 13: Hl! v Cpt - Forestry Corporation€¦ · Area covered by Australian Forestry Standard AS4708:2013 Certificate 604224 Prepared by ; Planner Date: 30 /08 2018 Melanie Dyne ; Approved

14. Roading Plan: Maintenance works not completed by RC must be recorded and passed onto the PA for completion and documentation. The start and finish dates of all maintenance and construction must be recorded on the individual roading sheets along with other relevant changes or explanations. All rubber flaps on minor forest roads must be removed and replaced with trafficable rollover banks on completion of operation.

Summary of roading requirements Feature Details Works Required Existing roads to be used. 3505m/6 Yes New roads to be constructed 0 NA Existing crossings used 2 Yes New crossings to be constructed 0 NA Length of road >10° 70m NA Borrow pits and gravel pits 0 NA Mass movement prescriptions apply No NA Dispersible soil conditions apply No NA Seasonality provisions apply No NA

Checklist of works required on roads & crossings Road/Crossing Name Works Required Date

Started Date Finished Initials

New Trig Road Reopen road and scrub roadside vegetation up to 3m either side of road prism.

Length = 905m Reinstate existing mitre drains.

FCNSW Clean out pipe culverts. responsibility

RC/PA Comments:

1325/1 Trail Road:

Length = 260m Clear & reshape entire length.

Clear up to 3m either side of road prism where Contractor required to facilitate truck movements. responsibility Install drainage as per EPL requirements.

Crossing: (C1, existing mapped 1st order DD – natural surface causeway)

Clear up to 3m either side of road prism where required to facilitate truck movements.

Install 5m & 30m drainage at C1 on both approaches.

Patch gravelling may be required if operating during wet conditions – RC/PA to monitor.

RC/PA Comments:

Document title: HP_ED_1325_17 Version No.: 1 Page 10 of 12 Harvest Plan no.: 56872 Approval Date: 30/08/2018 Expiry Date: 15/12/2020

Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use.

Page 14: Hl! v Cpt - Forestry Corporation€¦ · Area covered by Australian Forestry Standard AS4708:2013 Certificate 604224 Prepared by ; Planner Date: 30 /08 2018 Melanie Dyne ; Approved

I I I I

1325/2 Trail Clear & reshape entire length.

Length = 445m Clear up to 3m either side of road prism where required to facilitate truck movements.

Contractor Install drainage as per EPL requirements. responsibility

RC/PA Comments:

1325/3 Trail Clear & reshape entire length.

Length = 1060m

Clear up to 3m either side of road prism where required to facilitate truck movements.

Install drainage as per EPL requirements. Contractor responsibility RC/PA Comments:

1325/4 Trail Clear & reshape entire length.

Length = 95m Clear up to 3m either side of road prism where required to facilitate truck movements.

Contractor Install drainage as per EPL requirements. responsibility

RC/PA Comments:

1325/5 Trail Road:

Length = 740m Clear & reshape entire length.

Clear up to 3m either side of road prism where Contractor required to facilitate truck movements. responsibility Install drainage as per EPL requirements.

Crossing: (C2, existing mapped 2nd order DL - bridge)

Remove scrub over C2 without disturbing bed and banks.

Document title: HP_ED_1325_17 Version No.: 1 Page 11 of 12 Harvest Plan no.: 56872 Approval Date: 30/08/2018 Expiry Date: 15/12/2020

Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use.

Page 15: Hl! v Cpt - Forestry Corporation€¦ · Area covered by Australian Forestry Standard AS4708:2013 Certificate 604224 Prepared by ; Planner Date: 30 /08 2018 Melanie Dyne ; Approved

Build up pavement over C2 to remove potholing.

Replace roll overs with rubber flaps; or reduce height of roll overs that are still capable of conveying water off the road, at 5m & 30m.

Patch gravelling may be required if operating during wet conditions – RC/PA to monitor.

RC/PA Comments:

Document title: HP_ED_1325_17 Version No.: 1 Page 12 of 12 Harvest Plan no.: 56872 Approval Date: 30/08/2018 Expiry Date: 15/12/2020

Warning: a printed copy of this document may be uncontrolled. Please verify this is the latest version prior to use.