HiRadMat safety preparation
Follow-up meeting24/06/2011
Processes
• See Marion’s talk
Alarms• Instruction meeting for CCC operators on Monday June 20th• https://edms.cern.ch/document/1149524/1• List of alarms consolidated • Lot of them not yet operational• Operational procedure in being written
Beam commissioning low intensity
• Operational procedure approved• https://edms.cern.ch/document/1149525/2• Dry run outcome• https://edms.cern.ch/document/1149523/1• Additional DSO tests on Tuesday• First shot hit the dump !
First protons through TT60-TT66
DSO tests
B.846 works during next TS
• Met L. Colly• 2 x 2 lifting points• Load specification by FB• Will be installed during next TS
Evacuation hardware
• Met GS-ASE• Cable extension during next TS• Evacuation buttons and sirens will be installed
during the August TS.
Safety file descriptive part
• Still in work.