Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
HINZ CORPORATION ENGINEERS & CONTRACTORS
❖ HVAC & R ❖ MECHANICAL ❖ ELECTRICAL ❖ PLUMBING ❖ ESCALATORS &
ELEVATORS ❖ SOLAR SYSTEM
Office # FF-01, DIVINE CENTER, New Airport Road Lahore- Cantt LAHORE- PAKISTAN Email: [email protected] Web: www.hinzcorp.pk
HINZ CORPORATION is well renowned for its capability to execute
"Turnkey " projects in variety of HVAC & MEP Applications. Elevators &
Escalators, Solar Power Systems & Solar water Pumps. We have complete
in house facilities for Detail Design, Equipment Procurement and Installation,
followed by strong after sales services. We have competent staff comprising
of qualified Engineers and skilled Technicians who execute each and every
project with great devotion. We enjoy a long list of satisfied clients from all
sectors of life
NAME: HINZ CORPORATION
ADDRESS:
Office # FF-01, Divine Centre, New Airport Road Lahore- Cantt Lahore-Pakistan
E-mail: [email protected] Website: www.hinzcorp.pk STATUS PROPRIETORSHIP NAME OF PROPRIETOR:
• ABDUL HAMID TABASSUM Cell: 0321-4461244
BANK REFERENCE: MEEZAN BANK LIMITED Q-BLOCK,DEFENCE BRANCH LAHORE
INCOM TAX NO. 7559808-6
Sales Tax No. 32-7787-616895-9 L.C.C.I MEMBERSHIP NO. 100602-A ASHRAE MEMBERSHIP NO. 8373978 PAKISTAN HVACR SOCIETY MEMBERSHIP NO. 042-2-0873 (LIFE MEMBER)
Turnkey " projects in variety of SUPPLY AND INSTALLATION OF
HEATING VENTILATION AIR CONDITIONING SYSTEM, MECHANICAL,
ELECTRICAL and PLUMBING Applications, Escalators, Elevators &
Travellators. Solar Power systems (Domestic, commercial to Industrial
levels). Solar Water Pumps
What we Offer HINZ CORPORATION offers single a source responsibility for design and installation of HVAC projects. Our
professional engineering staff works closely with architects, consultants, building managers, general
contractors and building owners to evaluate their specific needs for each project.
General Maintenance / Trouble Shooting Our engineering staff utilizes their experience and expertise to analyze the existing mechanical system, identify problems and provide effective solution. Our staff also provides energy analysis and retrofits and
work with building owners on indoor air quality to provide a healthy working environment.
Turnkey Projects & Services HINZ CORPORATION is a team of professional managers, supervisors and technicians who are fully trained
to complete your HVAC projects, test and commission, operate and maintained it. After project completion
we provide a preventive maintenance program to meet your needs. Our preventive maintenance program
provides scheduled maintenance to protect your investment help preventive costly breakdown, extend the life of equipment and save energy cost. Fact: People can thank Air-conditioning for prolonged life
expectancy and the world changing advances in medicine. Without cool, controllable environments, certain medicines could never have been created and certain illnesses could never have been cured.
Why Choose us?
Complete Peace of Mind Our service includes complete system status checkup, fault tracing, calibration & maintenance, the
replacement of wearing parts & maintaining all the necessary data for reference to be used by the client in
future. The service is available on-site. We ensure that it lowers life-cycle costs of equipment by increasing
the quality of measurement data.
Preventive Maintenance During the annual Preventive Maintenance our qualified technician will perform complete maintenance in accordance with the latest procedures and value added recommendations and suggestions will be provided
for upgrading and enhancing system performance.
Customize able Contractual Services AMOC (Annual Maintenance / Operational Contracts) – customized annual contracts for better care of the
your HVAC Equipment at economical price. The Preventive Maintenance requires a service contract. Tasks
and schedule can be agreed beforehand, because every customers need is different. We can structure our
offer in order to help each customer according to his requirement. It helps the customer to plan his possible downtime and lets MIA manage its capacity.
What you gain?
Trouble-free Operation and Performance Regular preventive maintenance is the best way to endure trouble-free operation and peak performance of
your HVAC equipment. Pre-season maintenance is also important. It can help to avoid a system failure in
severe hot or cold weather when you need it most and provide a quality installation by experienced
craftsmen.
Improvement in Product Life Cycle Both life cycle and product uptime can be improved with Safe operation & regular preventive maintenance,
decreasing the need for unforeseen repairs and use of spare parts. Our Preventive maintenance service also
alleviates the customer’s need to invest in competent staff or equipment, and it ensures a continual supply
of high quality after Sales Services.
Complete System Replacement If you’re thinking about replacing an aging system, your MIA Comfort Specialist can advise you a cost
effective and Energy efficient HVAC product an alternate solution to meet your requirement. He can also
provide you detail preventative maintenance, annual maintenance services. You’ll also want to inquire about MIA’s Optional Extended Warranties.
Scope of Maintenance
Maintenance Cycles Our round the clock service & Customized AMOC (Annual Maintenance / Operational Contracts) for better
care of your HVAC Equipment at economical price plan will ensure that your system runs as efficiently as
possible. We provide this AMOC on short term/long term plans as per your need such as On call basis, Weekly basis, Fortnightly, Monthly, Quarterly as well as 24 Hrs. Operation & General Maintenance Services.
Bi-annual Maintenance & Operational Cycle Our HVAC Comfort Specialist shall:
1. Do a complete system’s operation check on both cooling and heating modes.
2. Check the equipment efficiency.
3. Check all other major components and safety devices.
4. Service both indoor and outdoor air conditioner coils.
1- MR. ZEESHAN MANZOOR B.Sc Mechanical Engineer (MECH/31068) 3 Years experience
2- MR. HANAN HAMID B.Sc (ELECT) ENGINEER 3 Year Experience 4- Mr. NAVEED SHAHZAD B. Tech (HON)HVAC ENGINEER 6 YEARS EXPERIENCE 5- MR. BABAR AHMED B. TECH (PASS) HVAC ENGINEER 21 YEARS EXPERIENCE 6- M. HASSAN KHAWAR B.TECH PASS ENGINEER 4 YEARS EXPERIENCE 7- MR. SHAHZAD AKRAM ASSOCIATE ENGINEER 7 YEARS EXPERIENCE 8- MR. MUHAMMAD NAEEM ASSOCIATE ENGINEER 3 YEARS EXPERIENCE 9- MR. MEHTAB TAJ DUCT FOREMAN 12 YEARS EXPERIENCE 10- MR.MOHAMMAD IQBAL DUCT FOREMAN 15 YEARS EXPERIENCE 11- MR.ABID HUSSAIN PIPE SUPERVISOR 12 YEARS EXPERIENCE 12- DUCT FABRICATORS 6 NOS. 13- PIPE FITTER 6 NOS. 14- ELECTRICIANS 4 NOS. 15- A/C MECHANICS 4 NOS. 16- ASSTTS. & HELPERS 10 NOS. 17- PURCHASER 02 NOS. 18- LABOUR FOR DUCTING ETC. SUFFICIENT.
1- MR. ABDUL HAMID TABASSUM C.E.O 31 years Experience 2- MR. ABID USMAN MANAGER ACCOUNTS 27 years Experience 3- Mr. ABDUL QUDOOS Admn Officer 8 years Experience 4- Mr. Ali Asad Purchaser 7 Years Experience 5- Mr. FAYSAL KHAN Accountant 6- Mr. M. MUMRAIZ Office Assistant 7- IJAZ AHMED Office Assistant
S.NO. MACHNIERY / EQUIPMENT QUANTITY
1 AUTOMATIC DUCT FABRICATION MACHINE AUTOLINE III 1 SET
2 AUTOMATIC FLANGE TDF MAKING MACHINE 1
3 PITSBURG LOCK FORMING MACHINE 1
4 CORNER PLATE MAKING DIES AND POWER PRESS MACHINE 1
5 DIFFERENT TYPE DRILLING MACHINES 2
6 GAS/SPOT ELECTRIC WELDING PLANTS 5
7 SHEET CUTTER AND SHEET BENDING MACHINE 3
8 HYDRAULIC PRESS 1
9 VACUUM PUMPS
1
10 REFRIGERANT CHARGING & TESTING KITS 4
11 LEAK DETECTOR 1
12 ELECTRICAL TESTING EQUIPMENT 2
13 AIR VELOCITY METERS 2
14 PRESSURE GAUGES 3
15 FLOW METER 2
16 TONG TESTER 3
17 TOOL BOXES COMPLETE 3
18 TIN/SHEET CUTTERS 4
19 HOIST TACKLE 2
20 MENO METERS 2
21 RPM METER 2
22 WATT METER 1
23 BELT TENSION TESTER 1
24 SOUND METER 1
25 SMOKE TEST MACHINE 1
26 FREON GAS CYLINDERS NITROGEN GAS CYLINDER AND OTHER
NECESSARY TOOLS
1
PROJECT SUPPLY & INSTALLATION OF HVAC SYSTEM AT REGIONAL
DISTRIBUTION OFFICE SUI NORTHERN GAS PIPE LINES LTD,
HAYATABAD PESHAWAR
CLIENT: SUI NORTHERN GAS PIPELINES LTD, 21-KASHMIR ROAD, LAHORE
CONSULTANT: ACS ENGINEERING CONCERN – LAHORE
CAPACITY: 300 TONS
SYSTEM: GAS FIRED ABSORPTION TYPE HVAC SYSTEM COMPRISING OF:-
• 2 X 150 ABSORPTION TYPE CHILLERS (BROAD-CHINA)
• 6 NOS. AIR HANDLING UNITS (FYROGENIS 0- GREECE_
• 1 NO. COOLING TOWER OF MATCHING CAPACITY
(ROYWO – HONG KONG)
• 6 NOS. HUMIDIFIERS (CONDAIR – SWITZERLAND)
• 6 NOS. KSB PUMPS
• SCHEDULE 40 M.S PIPING
• G.I. SHEET METAL DUCTING
• AIR DEVICES
• AUTOMATIC CONTROLS SYSTEM
STATUS: SUCCESSFULLY COMPLETED, COMISSIONED, OPERATED AND
MAINTAINED FOR ONE YEAR.
PROJECT SUPPLY & INSTALLATION OF HVAC SYSTEM AT McDONALDS,
RESTAURANT, F-9 PARK, ISLAMABAD
CLIENT: SIZA FOODS (PVT) LTD-KARACHI
CONSULTANT: S. MEHBOOB & COMPANY – KARACHI
CAPACITY: 120 TONS
SYSTEM: SELF CONTAINED PACKAGED TYPE UNITS:-
• 8 NOS. PACKAGED TYPE UNITS OF DIFFERENT CAPACITIES
(MAKE: YORK)
• COPPER PIPING (REFRIGERANT PIPING)
• G.I. SHEET METAL DUCTING
• AIR DEVICES
STATUS: SUCCESSFULLY COMPLETED, AND COMISSIONED,
PROJECT SUPPLY & INSTALLATION OF HVAC SYSTEM AT 2ND ADDITIOANL
FLOOR OVER EXISTING 1ST FLOOR OF NIBAF (NATIONAL
INSTITUTE OF BANKING AND FINANC) H-8 SECTOR, ISLAMABAD
CLIENT: STATE BANK OF PAKISTAN, KARACHI
CAPACITY: 160 TONS
SYSTEM: GAS FIRED ABSORPTION TYPE HVAC SYSTEM COMPRISING OF:-
• 2 X 80 ABSORPTION MODULAR TYPE CHILLERS WITH
BUILTIN COOLING TOWERS AND PUMPS ETC. (SANYO-
CHINA)
• 2 NOS. AIR HANDLING UNITS (INTERKALIMA - GREECE_
• SCHEDULE 40 M.S PIPING
• G.I. SHEET METAL DUCTING
• AIR DEVICES
• AUTOMATIC CONTROLS SYSTEM
STATUS: SUCCESSFULLY COMPLETED AND COMISSIONED, OPERATATION
AND MAINTENANCE IN PROGRESS TILL JULY 2009
PROJECT SUPPLY & INSTALLATION OF HVAC SYSTEM AT REKO
PHARMCALS (PVT) LTD LAHORE
CLIENT: REKO PHARMACALS (PVT) LTD, 13-K.M, MULTAN ROAD, LAHORE
CAPACITY: 200 TONS
SYSTEM: GAS FIRED ABSORPTION TYPE HVAC SYSTEM COMPRISING OF:-
• 1 X 200 ABSORPTION TYPE CHILLER (SANYO-CHINA)
• 12 NOS. AIR HANDLING UNITS (McQUAY-MALAYSIA)
• 1 NO. COOLING TOWER OF MATCHING CAPACITY (MARLEY
MALAYSIA)
• 6 NOS DUST COLLECTORS
• 4 NOS. KSB PUMPS
• SCHEDULE 40 M.S PIPING
• G.I. SHEET METAL DUCTING
• AIR DEVICES
STATUS: SUCCESSFULLY COMPLETED AND COMISSIONED, OPERATATION
BY CLIENT HIMSELF.
PROJECT SUPPLY & INSTALLATION OF HVAC SYSTEM AT STANLEY
PHARMACEUTICAL (PVT) LTD, PESHAWAR
CLIENT: STANLEY PHARMACEUTICALS (PVT) LTD, 82-B, INDUSTRIAL
ESTATE, JAMRUD ROAD, PESHAWAR
CONSULTANT: A.A. CONSULTANTS, LAHORE
CAPACITY: 200 TONS
SYSTEM: GAS FIRED ABSORPTION TYPE HVAC SYSTEM COMPRISING OF:-
• 1 X 200 ABSORPTION TYPE CHILLER (CENTURY - KOREA)
• 12 NOS. AIR HANDLING UNITS (SABRO – PAKISTAN)
• 1 NO. COOLING TOWER OF MATCHING CAPACITY (MARLEY
MALAYSIA)
• 6 NOS DUST COLLECTORS (AEROTEK – PAKISTAN)
• 4 NOS. KSB PUMPS
• SCHEDULE 40 M.S PIPING
• G.I. SHEET METAL DUCING
• AIR DEVICES
STATUS: SUCCESSFULLY COMPLETED AND COMISSIONED, OPERATATION
BY CLIENT HIMSELF.
PROJECT SUPPLY & INSTALLATION OF HVAC SYSTEM AT NORTHWEST
GENERAL HOSPITAL, HAYATABAD - PESHAWAR
CLIENT: ALLIANCE HEALTHCARE (PVT) LTD, HAYATABAD, PHASE-V,
PESHAWAR
CAPACITY: 720 TONS + 120 TONS + 35 TONS +30 TONS ( TOTAL 905 TONS)
CONTD…….P/2
SYSTEM: GAS FIRED ABSORPTION TYPE HVAC SYSTEM COMPRISING OF:-
• 3 X 240 ABSORPTION TYPE CHILLER (SANYO-CHINA)
• 12 NOS. AIR HANDLING UNITS (McQUAY-MALAYSIA)
• 2 NOS. COOLING TOWERS OF MATCHING CAPACITIES
(EBARA- CHINA)
• 11 NOS ENERGY RECOVERY VENTILATORS (ERV) BRYAIR-
MALAYSIA
• 112 NOS. FAN COIL UNITS (McQUAY- MALAYSIA)
• 30 NOS. SPLIT TYPE UNITS OF DIFFERENT CAPACITIES
(ACSON – MALAYSIA
• 05 NOS. DUCT CONNECT SPLIT UNITS
• 6 NOS. KSB PUMPS
• 8 TERMINAL FILTERATION SYSTEM (TMFS) FOR OPERATION
THEATORS (FCR – ITALY)
• EXHAUST AND FRESH AIR FANS OF DIFFERENT CAPACITIES
• 2 NOS. HOT WATER GENERATORS
• FAN FIILTRATION UNITS
• SCHEDULE 40 M.S PIPING
• G.I. SHEET METAL DUCTING
• AIR DEVICES
• COMPLETE BMS (AUTOMATIC CONTOLS) SYSTEM
(JONHONSON CONTROLS)
STATUS: SUCCESSFULLY COMPLETED AND COMISSIONED, OPERATATION
& MAINTENANCE IN PROGRESS UPTILL AUGUST 2009.
PROJECT SUPPLY & INSTALLATION OF HVAC SYSTEM AT TRICON CORPORATE CENTER, GULBERG, LAHORE
CONSULTANT: ACS ENGINEERING CONCERN - LAHORE
CLIENT: TRICON DEVELOPERS , 8-K, MAIN BOULEVAR, GULBERG, LAHORE
VALUE: Rs:91.7 Million (MAJOR EQUIPMENT WILL BE SUPPLIED BY
CLIENT)
CAPACITY: 2450 TONS
SYSTEM: WATER COLLED PACAKGED TYPE AIRCONDITIONING UNITS AND
SCREW CHILLERS COMPRISING OF:-
• 2 X 60 TR WATER COOLED SCREW TYPE WATER CHILLERS
• 74 NOS. WATER COOLED PACKAGED UNITS OF DIFFERENT
CAPACITIES
• 3 NOS. COOLING TOWERS OF MATCHING CAPACITIES
• 57 NOS FAN COIL UNITS OF DIFFERENT CAPACITIES
• 13 NOS. CENTRIFUGAL WATER PUMPS
• 17 NOS. EXHAUST FANS OF SYSTEM AIR- BRAND
TRICON CORPORATE
CENTER
LAHORE
• G.I.SHEET METAL DUCT WORKS OF APPROXIMATELY
265761 SQFT
• CONDENSER WATER PIPING FROM 2” TO 18” DIA
• AIR DISTRIBUTION SYSTEM (AIR DEVICES)
• GATE, GLOBE VALVES, STRAINERS ETC. COMPLETE IN ALL
RESPECTS
• PRESSRUE GAUGES, TEMPERATURE GUAGES ETC.
• AIR SEPARATOR
• EXPANSION TANK
• CHEMICAL FEEDERS AND CHEMICAL
PROJECT INSTALLATION OF HVAC SYSTEM AT SHALAMAR MEDICAL & DENTAL COLLEGE, SHALAMAR HOSPITAL, LAHORE
CONSULTANT: ACS ENGINEERING CONCERN - LAHORE
CLIENT: BUSINESSMEN HOSPITALTRUST (SHALAMAR HOSPITAL) LAHORE
VALUE: Rs:39.97 Million (Installation work only. (Equipment supplied by
others)
CAPACITY: 620 TONS
SYSTEM: DIRECT GAS FIRED ABSORPTION TYPE SYSTEM COMPRISING OF:-
• 2 X 310 TR DIRECT GAS FIRED ABSORPTION CHILLERS
• 3 NOS. MATCHING CAPACITIES COOLING TOWERS
• 20 NOS. MINI AIR HANDLING UNITS OF DIFFERENT
CAPACITIES
• 151 NOS. FAN COIL UNITS OF DIFFERENT CAPACITIES
• 06 NOS. CENTRIFUGAL PUMPS
• EXPANSION TANK
• AIR SEPARATOR
• 2 NOS. EVAPORATIVE COOLING UNITS
• 03 NOS. ENERGY RECOVERY VENTILATORS
• EXHAUST AND FRESH AIR FANS
• CHEMICAL FEEDERS AND WATER SOFTENING CHEMICALS
• G.I. SHEET METAL DUCT WORKS
• M.S. SCHEDULE 40 CHILLED/HOT AND CONDENSER WATER
PIPING WORKS
• AIR DEVICES
• GATE, GLOBE & CHECK VALVES
• STRAINERS
• CIRCUIT SETTER TYPE BALANCING VALVES
• ELECTRICAL PANELS
• ELECTRICAL CABLING
• AUTOMATIC CONTROLS
STATUS: COMPLETED
PROJECT SUPPLY & INSTALLATION OF HVAC SYSTEM AT DIN TOWER
RAIWIND ROAD, LAHORE
CLIENT: DIN GROUP, 16 M, MODEL TOWN , LAHORE
CAPACITY: 240 TONS
SYSTEM: WATER COOLED PACKAGED A/C UNITS SYSTEM COMPRISING OF:-
• 8 X 30 TONS WATER COOLED PACAKAGED TYPE A./C
UNITS (McQUAY-MALAYSIA)
• 2 NOS. COOLING TOWER OF MACHING CAPACITIES (BKK –
THAILAND)
• 1 NO. HOT WATER GENERATOR
• 2 NOS. GRUNDFOSS PUMPS
• SCHEDULE 40 M.S PIPING
• PRE-INSULATED DUCTILE SYSTEM (PIRALU – SPAIN)
(Newly introduced pre-insulated duct system comprising of
Polysocynorate insulated sandwiched with aluminum layers)
• AIR DEVICES
• AUTOMATIC CONTROLS
STATUS: COMPLETED.
PTA LOTTE, PROJECT, KARACHI WITH DESCON ENGINEERING LIMITED
Execution of the Project meeting all HSE standards according to Client’s requirements successfully.
➢ Installation of owner supplied HVAC units ➢ Supply, fabrication and installation of SS Duct ➢ Supply & installation of Air Devices ➢ Installation of Controls with Dampers ➢ Installation of Exhaust Fans
PROCTER & GAMBLE PAKISTAN (PVT) LTD
HVAC WORKS AT DRY LAUNDRY UNIT, KARACHI
Execution of the Project meeting all HSE standards according to P & G requirements successfully.
➢ Supply & Installation of Fan coil Units ➢ Supply & Installation of Centrifugal Pumps ➢ Supply and installation of M.S Sch. 40 Piping ➢ Supply & Installation of Valves and strainers ➢ Supply & Installation of Split type units ➢ Supply, & installation of machine made G.I & S.S Duct ➢ Supply & installation of Air Devices ➢ Installation of Controls with Dampers ➢ Installation of Exhaust Fans
ALFATAH SHOPPING MALL, LAHORE
HVAC WORKS
CAPACITY: 640 TR (Rs:110.23 million)
TONY & GUY – ISLAMABAD
HEATING AND AIR CONTIOING AT TONY & GUY
SALOON – ISLAMABAD (Rs:7.85 million)
S.NO DESCRIPTION CAPACITY TONS
VALUE IN MILLIONS
1 Supply, Installation, testing and commissioning of HVAC works at PIA Flight Kitchen Karachi Airport KARACHI
450 70.00
2 Supply, Installation, Testing & commissioning of HVAC works Highnoon Laboratores, Multan Road Lahore
320 5.50
3 Supply, Installation, Testing & commission of HVAC SYSTEM at STATE CEMENT RESEARCH INSTITUTE BUILDING, KOT LAKHPAT, LAHORE
240 6.30
4 Supply, installation, testing and commissioning Gas fired Chiller at Sui Northern Gas pipelines, Gurumangat, Lahore
300 9.30
5 Supply, installation, Testing Commission of Cooling Towers at SNGPL, Faisalabad
120 0.63
6 Supply, Installation, Testing and commissioning of HVAC works at SNGPL, Gurumangat, Lahore
160 1.73
7 Supply, Installation, Testing and commissioning of split type Air Conditioners SNGPL, Gurumangat, Lahore
30 0.73
8 Supply, Installation, Testing and Commissioning of HVAC System at H. KARIM BUKHSH, Liberty Branch, Lahore
80 1.70
9 Supply of Airconditioning Equipment, and spares Including compressors of 60 H.P and other plant Equipment and spares to KOT ADDU POWER COMPANY KAPCO, KOT ADDU
(list of Purchase orders available on request)
YEARS 1991-1998
32.70
10 Supply, Installation, testing and commissioning of Air-conditioning system at Auditorium and theater Building of LAHORE AMERICAN SCHOOL, Lahore
160 3.24
11 Supply & Installation of HVAC System and Plumbing works of MCDONALD’S Bank Square, The Mall, LAHORE
60 3.40
12 Supply, installation, testing and commissioning of HVAC system at DMC CENTER KHARIAN – CANTT
60 0.65
13 Supply, Installation, Testing and commission of HVAC works at Medipak Limited, Kot Lakhpat Lahore
240 6.40
14 Supply, installation, testing and commissioning of HVAC system at Jamia Mosque Kharian – Cantt
60 5.63
15 Supply of HVAC Equipment to PMO (ADVANCE COMPUTING SOLUTIONS) –Rawalpindi
80 6.60
16 Supply & installation of HAVC system at SNGPL, GURUMANGAT Gulberg-Lahore
YEAR 2003 1.50
17 Supply of spare part of 132 KV circuit breakers to LESCO, WPADA Lahore.
180 24.14
18 Supply, Installation, Testing and commissioning of HVAC System at NANDO’S RESTAURANT, GULBERG LAHORE.
120 2.50
19 Supply of various Mechanical, Electrical, Instrumentation, Electronics etc. equipment and spares for Power Generation sector like KPACO, WAPDA, RAILWAYS, and other private as well as public sector industry
YEAR 2002-2004
70.00
20 SUPPLY INSTALLATION , TESTING & COMMISSIONING OF HVAC SYSTEM AT SNGPL, REGIONAL DISTRIBUTION OFFICE BUILDING, HAYATABAD, PESHAWAR
300 29.20
21 Supply of spare parts of 132 KV circuit breaker to LESCO, WAPDA LAHORE
YEAR 2004 15.14
22 SUPPLY, INSTALLATION AND COMMISSIONING OF HVAC SYSTEM AT DFID BUILDING, BRITISH EMBASSY, ISLAMABAD
120 15.20
23 SUPPLY INSTALLATION, TESTING AND COMMISSIONING OF HVAC SYSTEM AT ALLIANCE HEALTH CARE HOSPITAL, HYATABAD, PESHAWER + ADDITIONAL HVAC WORKS AT EXTENSION
905 78.25
24 SUPPLY AND INSTALLATION OF HVAC SYSTEM AT NIBAF BUILDING, STATE BANK OF PAKISATN – ISLAMABAD
160 21.62
25 SUPPLY INSTALLATION, TESTING AND COMMISSIONING OF HVAC SSYTEM AT STANLEY PHARMACEUTICALS (PVT) LTD, JAMRUD ROAD, PESHAWAR
200 11.70
26 SUPPLY, INSTALLATION, TESTING COMMISSIONING OF HVAC SYSTEM AT REKO PHARMA, MULTAN ROAD, LAHORE
200 12.07
27 SUPPLY & INSTALLATION OF HVAC SYSTEM AT McDONALDS RESTAURANT, F-9 PARK, ISLAMABAD
YEAR 2009-10
5.20
28 DESIGN, SUPPLY, INSTALLATION AND COMMISIONG OF HVAC SYSTEM AT EDEN CITY BOOKING OFFICE BUILDING, LAHORE.
120 14.12
29 SUPPLY OF SPARES FOR PNEUMATICE DRIVE SF-6 CIRCUIT BREAKERS FOR LESCO LTD, LAHORE
YEAR 2011 19.54
30 TONY & GUY – ISLAMABAD HEATING AND AIR CONTIOING AT TONY & GUY SALOON – ISLAMABAD
60 6.68
31 Installation of HVAC system at Alfatah Shopping Mall, Gulberg- Lahore
640 42.17
32 HVAC works at McDonlad’s Restaurant , Garrision Club, Peshawar
125 6.5 (Equipment supplied by
owner)
33 Supply & Installation of HVAC system at Headoffice Building DIN Group, Lahore
240 35.91
34 Supply & installation of HVAC works at New Power House control building LOTTE PTA, Bin Qasim, Karachi
300 78.2
35 Supply & Installation of HVAC system at Dry Laundry Area Proctor & Gamble Pakistan, Bin Qasim, Karachi
160 32.62
36 HVAC Works at New Benazir Bhutto International Airport, Islamabad (Installation of equipment and allied works only)
6000
NEW BENAZIR BHUTTO INTERNATIONAL AIRPORT,
ISLAMABAD (Rs:213.42 million)
VARIOLINE INTERCOOL, KAHNA KACCHA,
LAHORE (Rs:40.12 million)
AHMED PHARMA GRAH MORE, KHANEWAL
CAPACITY 1040 TONS (Rs: 91.35 millions)
CINEPAX
11 Cinemas at Packages Mall, Lahore
Capacity: 800 Tons
➢ Installation of Air Handling Units
➢ Supply and Installation of M.S Piping for chilled water lines to AHUs, and FCU
➢ Supply and Installation of Sheet Metal machine made Ducting with Air devices,
➢ Supply and Installation of Sound Attenuators
➢ Supply and Installation of Dehumidifires
➢ Supply and installation of complete BMS control system
➢ Supply and installation of smoke exhaust Fan and complete auto system.
➢ Supply & installation of Kitchen Exhaust Hoods,
CINEPAX
06 Cinemas at WTC GIGA MALL, ISLAMABAD
Capacity: 580 Tons
➢ Supply and installation of Air Handling Units
➢ Supply and Installation of M.S Piping for chilled water lines to AHUs, and FCU
➢ Supply and Installation of Sheet Metal machine made Ducting with Air devices,
➢ Supply and Installation of Dehumidifires
➢ Supply and installation of complete BMS control system
➢ Supply & installation of Kitchen Exhaust Hoods
We represent
( Top Elevator of china)
WELLIFT ELEVATORS / ESCALATORS IN PAKISTAN
S. # PROJECT NAME LOCATION/CITY TYPE FLOORS CAPACITY
1 Hallay Tower D.H.A LAHORE PASSENGER ELEVATOR 19 1600 Kgs
2 Hallay Tower D.H.A LAHORE PASSENGER ELEVATOR 19 1600 Kgs
3 Hallay Tower D.H.A LAHORE PASSENGER ELEVATOR 17 1250 Kgs
4 Hallay Tower D.H.A LAHORE PASSENGER ELEVATOR 17 1250 Kgs
5 Hallay Tower D.H.A LAHORE PASSENGER ELEVATOR 17 1250 Kgs
6 Hallay Tower D.H.A LAHORE PASSENGER ELEVATOR 17 1250 Kgs
7 Hallay Tower D.H.A LAHORE PASSENGER ELEVATOR 17 1000 Kgs
8 Hallay Tower D.H.A LAHORE PASSENGER ELEVATOR 15 1000 Kgs
9 Hallay Tower D.H.A LAHORE PASSENGER ELEVATOR 19 800 Kgs
10 Hallay Tower D.H.A LAHORE ESCALATORS 10 Nos.
11 S.T PLAZA, BAHRIA TOWN RAWALPINDI ESCALATORS 02 Nos.
12 ALFLAH TOWER Bahria Town
KARACHI PASSENGER ELEVATOR 16 1000 Kgs
13 ALFLAH TOWER Bahria Town
KARACHI PASSENGER ELEVATOR 17 1150 Kgs
14 UMT LAHORE PASSENGER ELEVATORS 6 1000 KGS
15 UMT LAHORE PASSENGER ELEVATORS 6 1000 KGS
16 UMT LAHORE PASSENGER ELEVATORS 6 1000 KGS
17 Mr. Azhar Bhatti D.H.A LAHORE PASSENGER ELEVATOR 6 650 KGS
18 Midway Plaza, Bahria Town KARACHI PASSENGER ELEVATOR 12 1000 KGS
FROM DOMESTIC TO INDUSTRIAL LEVEL, SOLAR PUMPS