· 2016-07-17National Highways Authority of India --0 (Ministry of Road Transport & Highways New Delhi, India ) Draft Final Consolidated Resettlement Action Plan for

Embed Size (px)

Citation preview

National Highways Authority of India --0(Ministry of Road Transport & HighwaysNew Delhi, India )Draft Final Consolidated Resettlement Action Plan forLucknow-Ayodhya Section on NH-28 and Gorakhpur Bypass.RP228VOL.6.... ~~A, , L- dPackagI.5~~~~~~%L ~ -~ --'Y \) CA~Package 11DHV~ ~ ~~ Loslat in7itetrwt DPCnutnsPt t1WLT, Pack gell~~~~~~~~-~~ ,~ .,-4-~~J'i~'1Gorakhpur Bypass DHV Consultants in joint venturs wit MDP Consultants Pvt. Ltd

DHV ConsultantsShri V.K. Sharma Branch OfficeGeneral Manager C-154, Greater Kailash-lSocial & Environmental Development Unit New Delhi - 110 048National Highway Authority of India Telephone +91-11-646 6433/6455/5744Plot No. G 5 & G 6 Fax +91-11-622 6543Sector - 10, Dwarka E-mail: [email protected] DelhiNew Delhi, I 9th January 2003Our Ref. MSP/DHV/0401.0012Subject Submission of Draft Final Consolidated Resettlement Action Plan for Lucknow-Ayodhya section on NH-28 and Gorakhpur BypassDear Sir,Please find enclosed herewith the Draft Final Consolidated Resettlement Action Plan forLucknow-Ayodhya section on NH-28 and Gorakhpur Bypass for your kind considerations.Our project team have made several trips to the project site to verify the data as well as intensivelyinteracted and discussed with the DPR consultants on various issues related to Resettlement ActionPlan (RAP) for the above mentioned road sections.On the basis of the same DHV Consultants in joint venture with MDP Consultants Pvt Ltd haveendeavoured to consolidate the RAP for Lucknow-Ayodhya section on NH-28 and Gorakhpur Bypassand hope you would appreciate our efforts in carrying out the assignment.We look forward to receive your feedback on the above and would incorporate the comments in theFinal Consolidated Resettlement Action Plan report.Thanking you,Yours sincerelyDHV Consultants4, M.S. Prakash (Dr.)T eam LeaderEncl.: As above(I X | > DHV Consultants is part of the DHV Group.-( . X.,,, Bahn-ma Bangladesh, Belgium, Bolswana, Orazil, Chma. Czech Republic, Ecuador, Egypt. Gernany, Guatemala, Hungary, liong Kong. India, Indonesia, Isracl, Kenya, Laos. Mozambique.Nanibha, Nepal, the Netherlands, Nigena, Pakistan, Poland, Ponugal, Qatar, Russia, South Afnca, Spain, Sri Lanka, Taiwan, Tanzania. Thailand, Tunisia, United Kingdom, Vienam., Zimbab,eThe qua ly managemcnt system ofDliV Consultants has been approsed against NEN ISO 9001.

Independent Review and Consolidaton of EIA, EMP & RAP for Lucknow-Ayodhya section on NH-28 and Gorakhpur BypassDraft Final Consolidated Resettlement Action PlanUndese t {ev e ai CorSdao of EMP & RAP forA id llhd=akhpur Bypass3; ifl! ^ s a fflaeResettlement Action PlanTABLE OF CONTENTSCONTENTS PAGE NO1.1 Introduction 1-11.2 Project Description 1-21.3 Approach and Methodology 1-31.4 World Bank Guidelines & R&R Policy Framework 1-31.5 Minimizing Negative Social Impacts 1-31.6 People affected Families Titleholders & Non Titleholders 1-31.6.1 Titleholder 141.6.2 Non Titleholder 1-41.7 Profile of the Project Affected Households (PAHs) 1-51.8 Loss of Livelihood 1-61.9 Resettlement Sites 1-71.10 Estimates Of Land Requirement 1-71.11 Common Property Resources 1-81.12 Entitlement Framework 1-81.13 Participation Of Stakeholders 1-91.14 Institutonal Arrangement 1-91.15 Implementation And Arrangement Schedule 1-91.16 Monitoring And Evaluation (M&E) 1-101.17 CostAnd Budget 1-102.1 Approaches and Methodology 2-12.2 The Methodological Framework 2-12.3 Primary Data Collection And Analysis 2-22.3.1 Preliminary Social Screening Survey 2-22.3.2 Census Survey 2-22.3.3 Socio-economic Survey 2-32.3.4 Data collection of Land records 2-32.4 Secondary Data Collection And Analysis 2-32.5 Public Consultations 24I3.1 Introduction 3-13.2 Minimize Negatlve Social Impacts in the Project Area 3-13.2.1 Concentric widening 3-23.2.2 One side widening 3-23.2.3 Realignment 3-23.2.4 Raised Carriageway (RCW) 3-2

Independent Review and Consolidation of EIA, EMP & RAP for Lucknow-Ayodhya secion on NH-28 and Gorakhpur BypassDraft Final Consolidated Resettlement Action Plan3.3 Amenities And Facilities 3-33.3.1 Underpass 3-33.3.2 ROB 3-33.3.3 Service Road 3-34.1 Background 4-14.2 Regional Setting of the Project Area 4-14.3 Socio- Economic Profile of the project area 4-14.3.1 Demographic Profile 4-14.3.1.1 Category of Loss 4-34.3.2 Economic Profile 4-54.3.2.1 Work Force participation Rate of the Project Districts 4-54.3.2.2 Occupational structure of the Project Area 4-64.3.3 Social Profile 4-64.3.3.1 Overview of Family types in the project area 4-74.3.3.2 Lan