    Arabtec (United Arab Emirates) built the worlds highest building the Burj Khalifa together with Sam-sung (Korea), Besix (Belgium) and Turner Corporation (USA), relying on MEVA formwork to do so.

    More than just FormworkKnow-how for your building successFrom the beginning, it has been MEVAs philosophy to offer added value in the form of know-how and expertise beyond supply-ing high-quality formwork. This far-reaching promise has been redeemed impressively for many years.

    Leaders in the fieldCommittee and industry standards work has a high priority because it is essential to further expertise in concrete works. This is where qual-ity and safety standards are defined and imple-mented. The German quality control association (GSV) nominated MEVA to chair the technology committee; MEVA ist part of the influential, internationally active American Concrete Institute and its formwork committee and were a member of the ASCC (American Society of Concrete Contractors) to name only a few.

  • MEVA MEVA

    3

    High-Rise Construction: Contents

    In the client satisfaction rankingconducted by the professional

    building magazine SOLID among50 leading formerwork suppliers

    Client Winner2012

    No 1

    Leading the way in concrete standardsMEVA has been instrumental in redefining the European DIN 18218 Standard for concrete load to take account of new concrete mixtures such as self-compacting and flowable concrete. A new procedure to determine how concrete pressure will develop during each pour is based on MEVA know-how and will be part of the new standard.

    Expertise in architectural concreteMEVA is active part of the research consortium investigating the interaction between concrete, release agent and forming face. Its findings are the basis for the industrys definitive publication on achieving top concrete finish: The Guide to Architectural Concrete.

    MEVA is acclaimed as an innovative leader in the formwork industry, underlined by several awards, distinctions and commendations for quality and service.

    MEVA

    MEVA: More than just formwork .................................................................................................... 2Solutions in High-Rise Construction ................................................................................................. 4Technology in High-Rise Construction ............................................................................................. 6Quality Concrete Finish ................................................................................................................... 8MEVA International / Addresses and contacts ................................................................................ 26

    More London Business Tower, Great Britain ...................................................................................10Mirax Federation Tower, Moscow, Russia .......................................................................................11Ardmore Park, Singapore ..............................................................................................................12Palais Royale, Mumbai, India .........................................................................................................13Soul Tower, Surfers Paradise, Australia ..........................................................................................14Burj Khalifa, Dubai, United Arab Emirates .....................................................................................15Al Nadha Tower, Sharjah, United Arab Emirates.............................................................................16Grass Residence, Manila, Philippines .............................................................................................17Jazz Residence, Manila, Philippines ................................................................................................18One Rockwell, Manila, Philippines .................................................................................................19Al Manara Tower, Dubai, United Arab Emirates .............................................................................20Burswood Tower 5, Perth, Australia ...............................................................................................21Al Attar Tower, Dubai, United Arab Emirates .................................................................................22Barwa Financial District, Doha, Qatar ............................................................................................23Maze Tower, Dubai, United Arab Emirates .....................................................................................24Allianz Tower, Wallisellen, Switzerland ...........................................................................................25

    REFERENCES

  • 4

    Cost Efficiency, Safety, QualityWith what and how?Requirements in high-rise construction are com-plex and demand expertise far beyond standard formwork applications. Where crane time and availablity is limited, site space is cramped and work flow is tight, it is the intelligent solution that makes the dif-ference. How you work is what determines suc-cess, not just with what you work. MEVA offers you a comprehensive product and technology programme plus the know-how and support that makes your project a success from A to Z.

    Logistics, inventory, handlingHandling formwork material is often as impor-tant as the formwork itself. How much material needs to be moved from

    one level to the next? Are the panels light enough to be lifted and

    set up by hand? What is the best cycle? Can the formwork be stripped early to save

    40 % inventory? Which climbing methods fits and how can

    they combine for the interlocking work flows for walls, shafts and slabs?

    What about worker protection?

    Engineering

    Work flow planning

    Formwork design

  • MEVA MEVAMEVA

    5

    Solutions in High-Rise Construction

    Contractor Benefit through ExpertiseMEVA engineers are committed to answering your questions with solu-tions and to assisting you in making the project a success through: Formwork design and planning Application consultation Customised solutions and design Work flow, cycles and early stripping Training for site managers and foremen Technical documentation

    On-site project support Instruction of workers on site Supervision of work flows Forming and assembly services Support during concrete pours

    Based on MEVAs comprehensive prod-uct range for high-rise construction, the best solution for your project will be found. We are at your side to develop clever answers and support you in all formwork challenges.

    On site support

    Project management

    Customised designs

    Logistics

  • 1 2

    3 4

    5 5

    6

    Wall formwork Mammut 350 Support Frame STB 450

    Slab formwork MevaDec Shoring System MEP

    MEVA Guided Climbing MGC MEVA Guided Climbing MGC

  • MEVA MEVAMEVA

    6 7

    8

    7

    Technology in High-Rise Construction

    Leading the Way

    MEVA Guided Screens MGS Climbing scaffold KLK 230

    MEVA Automatic Climbing MAC

    Mammut 350: heavy-duty wall formwork for higher, faster, bigger pours

    Support Frame STB: single-sided formwork for wall heights up to 13.50 m

    Slab Formwork System MevaDec: fastest cycle, simple assembly, early stripping, less labour

    Shoring System MEP for flexibility in heights and loads

    MEVA Guided Climbing MGC: crane-lifted rail-guided wall climbing solution

    MEVA Guided Screens MGS: crane or hydraulic-lifted rail-guided safety system for optimum edge protection

    Climbing Scaffold KLK 230: scaffold platform for single and double-sided formwork

    MEVA Automatic Climbing MAC: automatic hydraulic climbing system for fast precision-climbing in a single platform.

    1

    2

    3

    4

    5

    6

    7

    8

  • 12321

    1 2

    3

    21

    8

    Warranty aga

    inst rotting

    Warranty aga

    inst ripplings

    Warranty on

    exural rigidit

    y

    Warranty aga

    inst discolor

    ation

    Warranty on U

    V resistance

    7 Year unlimi

    ted usage

    The All-Plastic Facing for Unlimited Cycles

    The patented all-plastic facing sheet is made of polypropylene (1 and 3), reinforced by an aluminium foil (2). The facing is resistent to UV rays, shrinking, swelling, rotting, building chemicals and fungal decay. It remains stable in any climate or temperature.

    The Serwator Hotel in Warsaw, Poland: superb concrete finish with every pour.

    The all-plastic facing puts an end to plywood waste in formworkThe introduction of the worlds first 100% wood-free facing started a new age in form-work. Replacing worn-out plywood sheets is now a thing of the past. No more waste. Get your job done without interruptions. No more unnecessary freight costs, no down-times and no hassles in work flow. No more chemical coat-ings that make disposal dangerous and expen-sive. Less waste means fewer C02 emissions. Besides offering better quality, the all-plastic innovation saves time and money.

    Your advantages No swelling and shrinking Nailable like plywood No re-facing no hidden costs Easy and quick to clean Repairable using the same material Better concrete finish

  • MEVA

    9

    Quality Concrete Finish

  • 10

    More London Business Tower, United Kingdom

    ProjectOffice tower in Londons CBD

    MEVA SystemsMammut formwork on climbing scaffold KLK 230

    Contractor Laing ORourke

    Formwork engineeringMEVA Formwork Systems, Tamworth

    Combination of safety, cost-effectiveness and speed for climbing the cores.

  • Mammut, KLK 230

    11

    Mirax Federation Tower, Moscow, Russia

    Walls and Cores

    ProjectCommercial tower and Europes highest build-ing

    MEVA Systems Wall formwork Mammut Climbing scaffold KLK 230

    Formwork engineeringZAO MosMeva, Moscow

    High concrete pres-sure, robust on-site use over several years; no re-facing.

  • 12

    Ardmore Park, Singapore

    ProjectLuxury comdominium tower in Singapores central business district

    MEVA Systems MEVA Automatic Climbing MAC Slab formwork MevaDec Wall formwork Mammut 350

    DeveloperSC Global Development

    Contractors Dragages / BBI Bouygues Batimat International

    Formwork engineeringMEVA Formwork Systems, Singapore

    Precision and speed: each level completed in 6 days including one climbing lift.

  • MAC, Mammut 350, MevaDec

    REPROPPING

    13

    Cores, Walls and Slabs

    Palais Royale, Mumbai, India

    ProjectHotel and commercial tower the largest and most innovative building project on the Indian subcontinent with: Underground parking garage Hotel complex Office tower Shopping mall

    MEVA Systems MEVA Automatic Climbing MAC MEVA Guided Climbing MGC MEVA Guided Screens MGS Wall formwork Mammut 350 Wall formwork AluFix Slab formwork MevaDec Shoring system MEP

    Formwork engineeringMEVA Formwork Systems, Mumbai

    Safe overall solution with five systems for climbing, cores, walls and slabs.

  • 14

    Soul Tower, Surfers Paradise, Australia

    ProjectCondominium tower with 77 levels on the Gold Coast in Quensland, Australia

    MEVA SystemSlab formwork MevaDec

    Contractor Grocon Pty Ltd., Melbourne, Australia

    Formwork engineeringMEVA Formwork Systems, Singapore

    Crane-independent slab formwork; 40 % less inventory due to early stripping.

  • MevaDec

    15

    Burj Khalifa, Dubai, United Arab Emirates

    Slabs

    Project The Burj Khalifa is the worlds highest building at 818 m and 206 levels. It was built with MEVA formwork technology. Seen here in December 2008: MEVAs Tarc Froehlich and SAMSUNG Construction Manager Martin Kang on level 154.

    MEVA SystemSlab formwork MevaDec with early stripping achieved record-breaking 3-day cycle no interruptions for re-facing in 28 month building period

    ContractorJV Samsung, Besix, Arabtec

    Project managementTurner Corporation (issued official recommendation for MevaDec as preferred slab formwork method in high-rise buildings)

    Formwork engineering MEVA Schalungs-Systeme, Haiterbach

    224,808 m slabs on 154 levels: 0 re-facing. 3 dasy per slab. Tight schedule fulfilled.

  • 16

    Al Nadha Tower, Sharjah, United Arab Emirates

    ProjectResidential and commercial complex MEVA Systems MEVA Automatic Climbing MAC Slab formwork MevaDec Wall formwork Mammut 350

    DeveloperSaef Abdullah Al Noman

    ContractorUnited Engineering Construction

    Formwork engineeringMEVA Schalungs-Systeme, Haiterbach, Germany

    Combined safety and climbing solution for shafts, slabs and walls.

  • MAC ,MGC, Mammut 350

    17

    Walls, Cores and Slabs

    Grass Residence, Manila, Philippines

    ProjectFour residential high-rise buildings

    MEVA Systems MEVA Guided Climbing MGC Wall formwork Mammut Slab formwork MevaDec

    ContractorMegawide Construction Corp.

    Customised climbing and safety work flow for all cores, walls and slabs.

    Formwork engineeringMEVA Formwork Systems, Singapore

  • 18

    Jazz Residence, Manila, Phillipines

    Project4 residential towers with up to 45 levels. Fast tracking was applied: Using AluFix, the inner walls were poured after the slabs had been poured.

    MEVA Systems Wall formwork AluFix Slab formwork MevaDec

    ContractorMegawide Construction Corporation

    Formwork engineeringMEVA Formwork Systems, Singapore

    Crane-independent hand-set formwork for slabs and walls. High safety requirements.

  • AluFix, MevaDec

    19

    One Rockwell, Manila, Philippines

    Walls and Slabs

    ProjectResidential & commercial tower

    MEVA SystemSlab formwork MevaDec

    ContractorDatem Inc.

    Formwork engineeringMEVA Formwork Systems, Singapore

    Slab work flow with hand-set formwork; less material required due to early stripping.

  • 20

    Project Commercial office tower

    MEVA Systems MEVA Automatic Climbing MAC Wall formwork Mammut 350 Slab formwork MevaDec

    Formwork engineeringMEVA KHK

    Climbing in one short lift. Adjustment of form panels with +/- 3 mm precision.

    Al Manara Tower, Dubai, United Arab Emirates

  • MAC, Mammut 350

    21

    Walls, Cores and Slabs

    Burswood Tower 5, Perth, Australia

    ProjectResidential high-rise building in Burswood Park, Perth

    MEVA Systems MEVA Automatic Climbing MAC Wall formwork Mammut 350 Slab formwork MevaDec Shoring system MEP

    ContractorCrown Construction (Pty) Ltd.

    Formwork engineeringMEVA Formwork Systems, Singapore

    Highest safety demands. Closed hous-ing. Fast, safe climb in a single lift.

  • 22

    Al Attar Tower, Dubai, United Arab Emirates

    Labour and material handling reduced through crane-free work with MevaDec.

    ProjectCommercial high-rise building

    MEVA SystemSlab formwork MevaDec

    ContractorAl Faraa

    Formwork engineeringMEVA KHK

  • MevaDec

    23

    Barwa Financial District, Doha, Qatar

    Slabs

    Project9 residential and commercial high-rise buildings and a mosque

    MEVA SystemsSlab formwork MevaDec with3 days per slab pouring schedule

    ContractorBouygues Construction, Qatar

    Formwork engineeringMEVA KHK, Dubai

    Fast, zero error work with hand-set slab sys-tem. Optimum work flow. No down times.

  • 24

    Maze Tower, Dubai, United Arab Emirates

    ProjectCommercial high-rise building

    MEVA Systems Wall formwork Mammut 350 Slab formwork MevaDec MEVA Guided Climbing MGC MEVA Guided Screens MGS

    Work flow optimised in cycles: guided climbing plus hand-set system for slabs.

    ContractorAl Rostamani Pegel

    Formwork engineeringMEVA KHK

  • MGC / MGS

    25

    Allianz Tower, Wallisellen, Switzerland

    Walls, Slabs, Guided Climbing & Screens

    Strict safety super-vision by SUVA; complete enclosure for worker protection.

    ProjectOffice tower for the Allianz Suisse insurance in the urban district Richti-Areal of the town of Wallisellen near Zurich. All safety precau-tions and equipment had to be planned and installed following the strict safety guideline of the national Swiss accident insurance SUVA. The MEVA Guided Screens system was a key factor for the required safety.

    MEVA Systems MEVA Guided Screens MGS MEP shoring towers Wall formwork Mammut Working scaffold KAB 190 Slab formwork MevaDec

    ContractorAllreal Generalunternehmung AG, Zurich

    Formwork engineeringMEVA Schalungs-Systeme, Seon

  • MEVA SchalungsSysteme Pfaffsttten, A - sterreich

    Novatec Construction SystemsAdelaide, AUS - Australia

    N.V. van HautKruibeke, B - Belgi/Belgique

    MEVA Formwork SystemsToronto, CDN - Canada

    MEVA SchalungsSystemeSeon, CH - Schweiz/Suisse/Svizzera

    MEVA Sistemas de EncofradoBogot, CO - Colombia

    MEVA SchalungsSystemeHaiterbach, D - Deutschland

    MEVA Systmes de CoffrageSarreguemines, F - France

    MEVA Formwork SystemsTamworth, GB - United Kingdom

    MEVA Zsalurendszerek Budapest, H - Magyarorszg

    VIBAU Gradevinska TehnikaBestovje, HR - Hrvatska

    MEVA Formwork SystemsMumbai, IND - India

    MEVA Formwork Systems, Mumbai, India

    MEVA Schalungs-Systeme, Seon, Schweiz

    MEVA Bekistingssystemen, Gouda, Nederland MEVA Sisteme de Cofraje, Bucuresti, Romania

    MEVA Formwork Systems, Tamworth, Great Britain

    26

    MEVA in Haiterbach in the Black Forest, Ger-many. It is the home of the MEVA group of companies with its 40 locations in around 30 countries and 10 logistics centers all over the world. The headquarters are also home to research and development, engineering, production, rental logistics, detailing and sales. Cost-effective, lean logistics, transparent work flow, cost-saving rental concepts, technical sup-port for better concrete results: client benefit is in focus, everywhere. All the time. All over the world.

  • MEVA

    MEVA Asia PacificSingapore, SGP - Singapore

    VIBAPetrovce, SLO - Slovenija

    MEVA KHKDubai, UAE - United Arab Emirates

    MEVA Formwork SystemsSpringfield, Ohio USA - United States of America

    UAB MuramedaKaunas, LT - Lietuva

    Waiko Engineering WorksPerak, MAL - Malaysia

    TeknikkOslo, N - Norge

    MEVA BekistingssystemenGouda, NL - Nederland

    CorpinsaCuidad de Panam, PA - Panam

    PPU PalisanderBialystok, PL - Polska

    MEVA Sisteme de cofrajeBucuresti, RO - Romania

    ZAO MosMevaMoskva, Sankt-Peterburg, RUS - Rossija

    MEVA

    MEVA Schalungs-Systeme, Haiterbach, Deutschland

    MEVA Formwork Systems, Springfield, Ohio, USA

    27

    International

  • Headquarters (Germany) International Sales & ServiceLogistic Centers

    2458

    GB 10

    00 3/13 M, P

    rinted in German

    y

    MEVA Schalungs-Systeme GmbH

    Industriestrasse 5

    D-72221 Haiterbach

    Tel. +49 7456 692-01

    Fax +49 7456 692-66

    [email protected]

    www.meva-international.com

    A-Pfaffsttten, Tel. 02252 20900-0

    D-Berlin, Tel. 03375 90300

    D-Haiterbach, Tel. 07456 692-01

    D-Hannover, Tel. 0511 949930

    GB-Tamworth, Tel. 01827 60217

    H-Budapest, Tel. 01 2722222

    RO-Bucuresti, Tel. 021 2066460

    RUS-Moskva, Tel. 495 7813737

    USA-Springfield, Tel. 937 3280022

    A-Pfaffsttten, Tel. 02252 20900-0

    AUS-Adelaide 08 82634377

    B-Kruibeke, Tel. 03 250 11 11

    CHSeon, Tel. 062 7697100

    CDN-Toronto, Tel. 416 5766397

    CO-Bogot, Tel. 01 5204236

    FSarreguemines, Tel. 0387 959938

    GBTamworth, Tel. 01827 60217

    HBudapest, Tel. 01 2722222

    HR-Bestovje, Tel 013 323 666

    IND-Mumbai, Tel. 022 27563430

    LT-Kaunas, Tel. 0684 82795

    MAL-Perak, Tel. 12 5209337

    N-Oslo, Tel. 067 154200

    NLGouda, Tel. 0182 570770

    PA-Panama City 507 2372222

    PL-Bialystok, Tel. 085 6768159

    ROBucuresti, Tel. 0 21 2066460

    RUSMoskva, Tel. 495 7813737

    RUSSankt-Peterburg, Tel. 812 6802890

    SGP-Singapore, Tel. 67354459

    SLO-Petrovce, Tel. 03 7131500

    UAEDubai, Tel. 04 3411180

    USASpringfield, Tel. 937 3280022