TOUR FIRST - FRANCE
BOUYGUES CONSTRUCTIONHIGH RISE BUILDINGS MAIN REFERENCES 3
CHAPTER 1HIGH RISE BUILDINGS MAIN REFERENCES
BOUYGUES CONSTRUCTION l RELEVANT EXPERIENCE
General description
Construction, in the City, the business district of Singa-pore, situated on reclaimed land facing the sea, of a res-idential complex with two towers of 63 and 71 storeys (245 m high), comprising 1111 apartments and a 7-leved, 700-space parking building. The Clubhouse, swimming pools, and tennis courts are on the carpark roof.
The project is constructed above an MRT(metro) tunnel and is linked to the neighbouring area by a pedestrian tunnel and a footbridge.
ContractorDRAGAGES SINGAPORE
ClientCITY DEVELOPMENT
Key Data
• Gross area: 162 400 m² • Diaphram wall: 37 000 m²• Very deep foundations (up to
80m) through marine clay lay-ers (25m).
• Construction dates: 2004-2008• Completion time : 40 months
THE SAIL @ MARINA BAYSingapore
BOUYGUES CONSTRUCTIONHIGH RISE BUILDINGS MAIN REFERENCES 4
CHAPTER 1HIGH RISE BUILDINGS MAIN REFERENCES
BOUYGUES CONSTRUCTION l RELEVANT EXPERIENCE
General description
Construction of a 6 star luxury hotel in the heart of the entertainment complex “City of Dreams”. “City of Dreams” is a unique entertainment venue that offers live enter-tainment and activities, including the largest water show in the world, a large contemporary space dedicated to games, shopping trends, many lodging and restaurants and most prestigious night- club Macao. The hotel 6 star will become the new symbol of this unique complex.
The work includes the design and construction over an area of nearly 151,000 square meters on 39 floors, 783 rooms, 10 villas, a casino, restaurants, conference rooms and a rooftop pool. Dragages Macao is responsible for the construction of closed-canopy, including the reinforced concrete structure, the steel exoskeleton, the facade and the cladding.
ContractorDRAGAGES MACAU
ClientMELCO CROWN
Key Data
• Construction dates: 2014-2017• Completion time : 36 months
CITY OF DREAMSMacau
BOUYGUES CONSTRUCTIONHIGH RISE BUILDINGS MAIN REFERENCES 5
CHAPTER 1HIGH RISE BUILDINGS MAIN REFERENCES
General description
Main contractor for construction of 2 towers of 66 and 37 storeys, totalizing 834 high end luxury units on a gross area of 188 000 m².
The works are carried out in 2 phases: Phase 1 : infrastructure – 11 monthsPhase 2 : superstructure – 36 months
ContractorBOUYGUES THAI
ClientRAIMON LAND
Key Data
• Concrete : 100.000 m3• Formwork : 342 000 m²• Internal partition:180 000m²• Construction dates: 2008-2012• Completion time: 47 months
THE RIVERBangkok, Thailand
BOUYGUES CONSTRUCTION l RELEVANT EXPERIENCE
BOUYGUES CONSTRUCTIONHIGH RISE BUILDINGS MAIN REFERENCES 6
CHAPTER 1HIGH RISE BUILDINGS MAIN REFERENCES
General description
Design-and-build contract for construction of two housing towers, with podium and carpark basement:
• Cube 8: 36 levels, 177 apartments,• Concord Condominium: 36 levels, 157 apartments.
ContractorDRAGAGES SINGAPORE
ClientCITY DEVELOPMENT
Key Data
• Apartments: 334• Gross area: 71 000 m²• Construction dates: 2010-2013• Completion time: 28 months
CUBE 8 & THOMSON 368Singapore
BOUYGUES CONSTRUCTION l RELEVANT EXPERIENCE
BOUYGUES CONSTRUCTIONHIGH RISE BUILDINGS MAIN REFERENCES 7
CHAPTER 1HIGH RISE BUILDINGS MAIN REFERENCES
General description
Main contract for the construction of a 77-storey and 314 meter-high tower, designed to house:
• a CUBE Lifestyle Retail Center (completed by end of 2012 and opened by mid-2013),
• 194 Ritz-Carlton branded luxury residences,• a 150-room boutique hotel,• approximately 10,000 m² of retail space.
The tower’s pixilated profile makes each of its 77 floors unique.
ContractorBouygues Thai
ClientPACE DEVELOPMENT CORP. INDUS-TRIAL BUILDINGS CORP.
Key Data
• Construction date: 2012-2015• Completion time: 40 months
MAHANAKHONBangkok, Thailand
BOUYGUES CONSTRUCTION l RELEVANT EXPERIENCE
BOUYGUES CONSTRUCTIONHIGH RISE BUILDINGS MAIN REFERENCES 8
CHAPTER 1HIGH RISE BUILDINGS MAIN REFERENCES
General description
Construction on a 7-hectare central-city site of a 700 000 m² real-estate complex comprising:• 9 office towers with between 16 and 48 storeys,• a 25-floor 5-star hotel with 405 rooms,• a conference centre,• a 350 000 m² retail centre,• a 9-level building with above-ground and underground
parking for a total of • 5 374 vehicles,• a 1200 m² mosque.
Project carried out as part of a consortium.
ContractorBOUYGUES BATIMENT INTERNATIONAL
ClientBARWA FINANCIAL DISTRICT
Key Data
• Gross surface area: 700 000 m2• Concrete: 356 000 m3• Formwork: 1 000 000 m²• Construction dates: 2009-2013• Completion time: 42 months
QP DISTRICTDoha, Qatar
BOUYGUES CONSTRUCTION l RELEVANT EXPERIENCE
BOUYGUES CONSTRUCTIONHIGH RISE BUILDINGS MAIN REFERENCES 9
CHAPTER 1HIGH RISE BUILDINGS MAIN REFERENCES
General description
Located at the most prestigious address in Singapore, contract for the design and construction of a very high end residential tower, comprising 35 residential units on 36 storeys, with two carpark basements. Four private 15-metre swimming pools will be built cantilevered on the facade. The curtain wall incorporates a sophisticated sys-tem of directional sun screens intended to regulate light and heat according to the position of the sun. Contractor
DRAGAGES SINGAPORE
ClientSC GLOBAL
Key Data
• Construction dates:2011-2014• Gross area: 17,500 m2• 36 storeys /35 apartments• Largest apartment:11,000sq ft
SCULPTURASingapore
BOUYGUES CONSTRUCTION l RELEVANT EXPERIENCE
BOUYGUES CONSTRUCTIONHIGH RISE BUILDINGS MAIN REFERENCES 10
CHAPTER 1HIGH RISE BUILDINGS MAIN REFERENCES
General description
Main contractor for construction of three high condomini-um towers with a total floor area of 135,000 sq. m and 57 storeys above a 9th storey podium. The Met contains 370 luxury apartments, including six 550 sq. m. penthouses.
There is a swimming pool on the podium level (the ninth floor), and gardens, pools, two tennis courts and a jogging circuit on the ground floor. 720 car parking spaces are also provided.
ContractorBOUYGUES THAI
ClientPEEBLE BAY
Key Data
• Construction date: 2006-2008• Completion time: 30 months
THE METBangkok, Thailand
BOUYGUES CONSTRUCTION l RELEVANT EXPERIENCE
BOUYGUES CONSTRUCTIONHIGH RISE BUILDINGS MAIN REFERENCES 11
CHAPTER 1HIGH RISE BUILDINGS MAIN REFERENCES
General description
In the La Défense business district, main contractor for construction of a 38-storey tower building on 4 basement levels. The building has a total floor area of 70,000 m² laid out on vast panoramic landscaped floors.
8 levels of underground carpark with 581 spaces have also been built.
The T1 Tower has been designed like an immense sheet of glass standing about 200 metres high, curved back on it-self vertically at the southern end and gradually sweeping inwards to the top at the northern end.
ContractorBOUYGUES BATIMENT IDF
ClientSNC AVENIR DANTON DEFENSE
Key Data
• Construction dates: 2005-2008• Completion time: 38 months
TOUR T1 Paris, France
BOUYGUES CONSTRUCTION l RELEVANT EXPERIENCE
BOUYGUES CONSTRUCTIONHIGH RISE BUILDINGS MAIN REFERENCES 12
CHAPTER 1HIGH RISE BUILDINGS MAIN REFERENCES
General description
Pacific Place II is a scheme with two towers located in the business district of Hong Kong Island.• Tower A with 56 levels and a surface area of 130,000
m² includes buildings and a five-star hotel of 604 rooms, the Shangri-La.
• Tower B has 61 levels and a surface area of 96,000 m² with 230 apartments and a five-star hotel of 580 rooms, the Conrad, delivered on a turnkey basis.
Foundations (shaft excavation) and retaining walls made in a contiguous manually dug shaft. The technique consist-ed in raising the columns by using the foundation shafts up to a transfer floor, as of which the superstructure was built. At the same time, the floors were completed while moving down, and the earthworks were carried out as the works progressed. The curtain walls consist of an alumin-ium frame and reflecting glazing.
ContractorDRAGAGES HONG KONG
ClientSWIRE PROPERTIES
Key Data
• Gross surface area: 305,000 m²• Concrete: 250,000 m3• Steel: 65,000 t• Structural steelwork: 2,700 t• Earthworks: 217,000 m3 (including rock: 130,000 m3)• Construction dates : 1988-1991• Completion time : 34 months
PACIFIC PLACE IIHong Kong
BOUYGUES CONSTRUCTION l RELEVANT EXPERIENCE
BOUYGUES CONSTRUCTIONHIGH RISE BUILDINGS MAIN REFERENCES 13
CHAPTER 1HIGH RISE BUILDINGS MAIN REFERENCES
General description
Design-and-build contract for an up-market 302-apart-ment residential complex. The project comprises 8 blocks of 17 to 20 storeys, located on the sea front.
ContractorDRAGAGES SINGAPORE
ClientHO BEE INVESTMENTSIOI PROPERTIES
Key Data
• Gross floor area: 115 000 m²• Construction date: 2010-2013• Completion time: 28 months
PINNACLE COLLECTION CONDOMINIUMSingapore
BOUYGUES CONSTRUCTION l RELEVANT EXPERIENCE
BOUYGUES CONSTRUCTIONHIGH RISE BUILDINGS MAIN REFERENCES 14
CHAPTER 1HIGH RISE BUILDINGS MAIN REFERENCES
General description
Construction of an office complex including:40-level twin towersthree 9-level buildings
The entire complex is built on a podium consisting of 6 levels of carparks, 5 levels of plant rooms and common elements, a conference room, stores, and restaurants.
All three smaller buildings are enclosed by a vaste, 43 m high atrium. A 1.80 m thick, 3,600 m² reinforced concrete raft foundation with a volume of 6,500 m3 carries 85% of the total weight of the two towers.
ContractorBOUYGUES BATIMENT IDF
ClientTANAGRA
Key Data
• Total area: 350,000 m²• Precast concrete: 45,000 m3• Cladding: 80,000 m²• Construction date: 1998-2001• Completion time: 32 months
COEUR DEFENSEParis, France
BOUYGUES CONSTRUCTION l RELEVANT EXPERIENCE
BOUYGUES CONSTRUCTIONHIGH RISE BUILDINGS MAIN REFERENCES 15
CHAPTER 1HIGH RISE BUILDINGS MAIN REFERENCES
General description
Design and build construction of a building complex with 240,000 m² including:• A five-stars hotel of 600 rooms on 33 levels and a sur-
face area of 110,000 m²;• office tower of 42 levels and surface area of 65,000 m²• A shopping centre of 40,000 m² over two underground
carparks.
The construction of the project made use of reinforced con-crete and prestressed concrete techniques ; 12 beams in reinforced concrete with a span of 20 to 25 metres support the 30 storeys of the hotel (110,000 m²), 160 post-stressed beams of 22-metre range, superstructure of the office tow-er, support the post-stressed ribbed flooring of each level (65,000 m²) ; the floors of the hotel’s podium (50,000 m²) and of the shopping centre (40,000 m²).
ContractorDRAGAGES SINGAPORE
ClientPONTIAC MARINA
Key Data
• Gross floor area: 240 000 m²• Construction date: 1993-1995• Completion time: 32 months
PONTIAC MARINASingapore
BOUYGUES CONSTRUCTION l RELEVANT EXPERIENCE
BOUYGUES CONSTRUCTIONHIGH RISE BUILDINGS MAIN REFERENCES 16
CHAPTER 1HIGH RISE BUILDINGS MAIN REFERENCES
General description
Design and built contract for construction of condominium housing development, totalizing 694 flats. Located in the centre of Singapore island, the project comprises two 37-storey towers, a basement and a 5-storey carpark on 55,000m2 GFA. The works will be completed in 33 months.
Construction Challenges
To reduce the construction time and to increase the over-all productivity, Dragages Singapore proposed to build the complex core structure by using a self-climbing formwork system. This system helped to reduce the dependence on foreign labour by switching to a fully automated lifting process
ContractorDRAGAGES SINGAPORE
ClientCAPITALANDMITSUBISHI ESTATE ASIA
Key Data
• Gross floor area: 55 000 m²• Construction date: 2013-2016• Completion time: 33 months
SKYVUE @ BISHANSingapore
BOUYGUES CONSTRUCTION l RELEVANT EXPERIENCE
CITY OF DREAMS - MACAU
Chapter
2
OTH
ER L
AN
DM
AR
K P
RO
JEC
TS
BOUYGUES CONSTRUCTIONHIGH RISE BUILDINGS MAIN REFERENCES 18
CHAPTER 2 OTHER LANDMARK PROJECTS
General description
Main contractor for construction of an ecodistrict in down-town Miami. It includes a shopping mall, a 265-key hotel, two office towers, a 89-key serviced apartment tower, two residential buildings with 824 apartments and 1 240 un-derground parking spaces.
The project will be using innovative technical solutions to enhance thermal comfort for users in a high sunshine re-gion. The complex will incorporate an architectural system known as the Climate Ribbon TM, devised by Swire Proper-ties. It is a trellis composed of steel, fabric and glass which will connect the buildings together. It will span 14,000 m² of the exterior part of the shopping centre.
Project carried out as part of a consortium
ContractorAMERICARIBE
ClientSWIRE PROPERTIES
Key Data
• Global gross area : 445 000m²• Retail: 53 000 m²• Office building : 25 000m²• Leed Gold Certification • Completion time: 31 months
BRICKELL CITY CENTREU.S.A
BOUYGUES CONSTRUCTION l OTHER EXPERIENCE
BOUYGUES CONSTRUCTIONHIGH RISE BUILDINGS MAIN REFERENCES 19
CHAPTER 2 OTHER LANDMARK PROJECTS
General description
Under a public-private partnership project, Dragages Sin-gapore is in charge of designing and building a sports complex comprising:• 55 000-seat stadium with retractable roof and air-con-
ditioned seating,• 6 000-seat indoor aquatic centre, and a water sports
centre for the general public,• 3 000-seat multifunction arena that will be fully scal-
able,• an exhibition centre, a sports museum and office space
for sporting associations,• 41 000m² of commercial space, and food and bever-
age outlets.
The project is located on a 35 hectare seafront site in the centre of the city.
ContractorDRAGAGES SINGAPORE
ClientSINGAPORE SPORTS COUNCIL
Key Data
• Construction date: 2010-2014• Completion time: 43 months
SINGAPORE SPORTS HUBSingapore
BOUYGUES CONSTRUCTION l OTHER EXPERIENCE
BOUYGUES CONSTRUCTIONHIGH RISE BUILDINGS MAIN REFERENCES 20
CHAPTER 2 OTHER LANDMARK PROJECTS
General description
Situed in line with a Paris historical axis, The Grande Arche in La Defense is a gigantic open cube some 100 metres wide and 110 metres high. The two sides are linked top and bottom by 3-storey decks spanning the intervening 70 metres. The entire building is clad with white marble.
Main characteristics
The top deck is hung from four 110 m long, 9.50 m high prestressed megabeams. They have a 70 m clear span, and were cast in place at the top of the building on a steel formwork gantry. Because the site was cluttered with rail and metro lines and motorways, the 300,000 tonnes of the cube are carried by just 12 bearing points (concrete piles).
ContractorBOUYGUES BATIMENT IDF
ClientSAEM TETE DEFENSE
Key Data
• Gross surface area: 224,000m2• Usable office space: 80,000m2 • Building weight: 300,000 t • Construction date: 1985 - 1989• Completion time: 48 months
ARCHE DE LA DEFENSESingapore
BOUYGUES CONSTRUCTION l OTHER EXPERIENCE
BOUYGUES CONSTRUCTIONHIGH RISE BUILDINGS MAIN REFERENCES 21
CHAPTER 2 OTHER LANDMARK PROJECTS
General description
Design-and-build contract for a harbour terminal for cruise ships along with supporting facilities. Located to the south of the former runway of the former Kai tak airport, the installation will be capable of simultaneously berthing two 8,000-passenger mega cruise liners.
Main characteristics The building will consist of a three-storey open plan landscaped structure. The 42-metre wide span col-umn-free layout will allow highly modular use of space. A network of on-grade and above-grade roads and pedes-trian walkways will connect the various sub-districts of the Kai Tak District, including the Runway Precinct (the former landing runway area), the Tourism Node and various wa-terfront locations.
ContractorDRAGAGES HONG KONG
ClientHONG-KONG GOVERNMENT
Key Data
• Construction date: 2010 - 2012• Completion time: 30 months
KAI TAK CRUISE TERMINALHong Kong
BOUYGUES CONSTRUCTION l OTHER EXPERIENCE
BOUYGUES CONSTRUCTIONHIGH RISE BUILDINGS MAIN REFERENCES 22
CHAPTER 2 OTHER LANDMARK PROJECTS
General description
Main contractor for building the new French defence min-istry.
The project comprises the construction of the main minis-try building on the western part of the site (140,000 m²), along with a vast redevelopment operation for the eastern part (170,000 m², including 120,000 m² ofrefurbishment). Meanwhile, an additional 90,000 m² of-fice development will be built on land further to the west of the site.
At the end of the construction phase, OPALE Defense will provide with BYES, Thales, Dalkia and Sodexo, operation, maintenance and management of building services for 27 years from their provision.
ContractorBOUYGUES BATIMENT IDF
ClientOPAL-DEFENSE
Key Data
• Handover: 2015• Completion time: 50 months
BALARD FRENCH DEFENCE MINISTRYFrance