archivolt architecten bv
Residential complex Het Schip (‘The Ship’) was built in 1919 after designs by Michel de Klerk. It is an icon of the Amsterdam School of architecture. The planning for this national heritage site included large-scale restoration of the shells and renovation of the homes. Works are planned to start in the fall of 2015.
Because of the complexity of the building and the high monumental value, the owner – housing association Eigen Haard – assembled a multidisciplinary team, headed by archivolt architecten. Teamwork is enhanced by lean planning and open BIM is also employed, with an IFC building model as a basis for information exchange regarding engineering, drawing, construction plan systems and calculations. The team started by launching a joint and very extensive engineering survey to completely map all issues in the building.
Repairing the shell mainly required maintenance of the façade masonry, engineering connections, roofs, foundations, etc. The team collaborated with several government organisations to investigate the physical condition of the masonry, after which new bricks were manufactured, which have the same composition as the original materials. Using the right mortar allows us to aim for
physical characteristics similar to the original masonry.
A number of comfort improvements and sustainability measures will be applied to the building, with the utmost respect for this national monument and within the shell’s conditions. Insulation with retention walls, insulated glazing and installations are fitted into the building’s structure and detailing. The ventilation and heating equipment is installed in the communal residences attic, which will allow the housing association to perform maintenance on the machines without entering the home; moving the equipment furthermore compensates the homes for the loss of floor space due to the insulation measures.
Het Schip is a social housing heritage site. To ensure future use of this monument, the living programme will be optimised and the building will be made more sustainable. The new home layouts are based on contemporary housing conditions, with smaller numbers of people per residence. Studies into how the homes could optimally profit from the complex’s features and characteristics, such as the lack of outdoor space on the floors, led to optimisation of the home differentiation, which guides adjustments.
á Hembrugstraat
Zaanstraat / Spaarndammerplantsoen. à
Het Schip Amsterdam Spaarndammerbuurt neighbourhoodrestauration and renovation national heritage site Amsterdamse School
archivolt architecten bv
Colofon
81 social housing homes, casco museum residence and post officeLocation Amsterdam OostzaanstraatClient Eigen Haard, AmsterdamAssignment design teamPlan preparation 2013 – 2015Execution 2015 - 2017Restoration expert Ramon PaterArchitect Philip BreedveldTeam Frans Huijing, Eric Smook, Sunny Jessurun, Petra van Diemen Consultants design team Evers & Partners, VIAC, Interplan, LBP
archivolt architecten bv 30 januari 2015dd.
sch.
werk
nr.
bla
dnr.
1243 TO-Pn-11.1Restauratie en renovatie wooncomplex Het Schip
Portiek 11
1:50 A3
Eerste verdieping
13 14 15
a834x2.032
a834x2.032
c880x2.115
f680x2.115
g750x2.115
c880x2.115
f680x2.115
141
1.490x2.380
141
1.490x2.380
1051.440x1.490
1051.440x1.490
1051.440x1.490
1051.440x1.490
e880x2.115
51.380x1.300
51.380x1.300
51.380x1.300
51.380x1.300
g750x2.115
b880x2.1
15
i900x2.3
00
e880x2.115
b880x2.1
15
KK
KK
WM
WM
O N
114.070
7.820 7.820
portiek: 11bhuisnr.: 219
portiek: 11ahuisnr.: 223
CV
MK
balkonbalkon
TH TH
CV
MK
11b.1
badkamer5,9 m²
11a.1
badkamer4,6 m²
11a.1
wc1,0 m²
11a.1
hal5,4 m²
11b.1
hal5,4 m²
11b.1
woonkamer19,1 m²
11b.1
slaapkamer10,8 m²
11b.1
keuken4,9 m²
11a.1
woonkamer19,1 m²
11a.1
slaapkamer11,0 m²
11a.1
keuken4,9 m²
11a.1
GO26,8 m²
Zaanstraat 223
11b.1
GO26,8 m²
Zaanstraat 219
á Two-room apartments on the Zaanstraat
ã Open BIM model integrating the engineering model, installations and construction
Het Schip
archivolt architecten bv
Post office, Oostzaanstraat á
Cross section current and new äabove the bay windows above the post office
ß Masonry study using elevated work platform
ß Karsten tube measurements to assess the water absorption capacity of the old and the new masonry
Het Schip engineering
220220
archivolt architecten bv
W
KK
kooktoestel (niet bijgeleverd)
koelkast (niet bijgeleverd)
wasmachine (niet bijgeleverd)
MK
douche
meterkast
C.V.
optioneel, wanneer gestippeldaangegeven
7 november 2014dd.
form
.
werk
nr.
bla
dnr.
1243 225Restauratie en renovatie wooncomplexHet Schip
Derde verdieping
A4
archivolt architecten bv
sch.
1:100
Het aantal huurpunten voor deze woning:
Zaanstraat 225
Het totaal oppervlak van is m²
KK
225
KK
kast
portiek: 11bhuisnr.: 221
portiek: 11ahuisnr.: 225
CV
MK
balkon
TH TH
MK
hal6,68 m²
kast1,50 m²
woonkamer19,14 m²
slaapkamer6,96 m²
eetkeuken11,20 m²
11a.3
GO26,32 m²
Zaanstraat 225 Zaanstraat 221
Zaanstraat 225 70,8
N
186
1/1
W
KK
kooktoestel (niet bijgeleverd)
koelkast (niet bijgeleverd)
wasmachine (niet bijgeleverd)
MK
douche
meterkast
C.V.
optioneel, wanneer gestippeldaangegeven
7 november 2014dd.
form
.
werk
nr.
bla
dnr.
1243 225Restauratie en renovatie wooncomplexHet Schip
vierde verdieping
A4
archivolt architecten bv
sch.
1:100
Zie voorgaande blad voor aantal huurpunten voor deze woning
Zaanstraat 225
B
WM
portiek: 11bhuisnr.: B
portiek: 11ahuisnr.: B
TH TH
badkamer4,36 m²
berging (225)3,76 m²
berging (224)4,85 m²
berging (223)4,63 m²
installaties3,87 m²
hal2,65 m²
berginggang7,13 m²
slaapkamer12,70 m²
11a.3
GO12,60 m²
N
1/1
ß Floor plans maisonette third and fourth floors, Zaanstraat
ß Visualisations for residents
Het Schip BIM model for presentation and design coordination
á BIM model for coordination engineering, con-struction and installations (fragment Zaanstraat)
ã BIM model for presentation and design coor-dination
archivolt architecten bv
1.
+ + =
2.
3.feedback to team for processing/adjustments
Het Schip cyclical process open BIM
creating an integral building model using the team’s input analysis based on BIM model
gebouwmodel constructeur gebouwmodel installateur
error report/remark error report/remark error report/remark
engineering model architect constructive model installations model
integral building model (BIM)