HEP SOLAR POWER PLANTS

HEP SOLAR POWER PLANTS · Installed SPPs on HEP buildings Year of 2014 9 SPPs: HEP’s headquarters in Zagreb; HEP ODS building in Čakovec, Šibenik (Bilicesubstation), Split, Opatija,

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: HEP SOLAR POWER PLANTS · Installed SPPs on HEP buildings Year of 2014 9 SPPs: HEP’s headquarters in Zagreb; HEP ODS building in Čakovec, Šibenik (Bilicesubstation), Split, Opatija,

HEP SOLAR POWER

PLANTS

Page 2: HEP SOLAR POWER PLANTS · Installed SPPs on HEP buildings Year of 2014 9 SPPs: HEP’s headquarters in Zagreb; HEP ODS building in Čakovec, Šibenik (Bilicesubstation), Split, Opatija,

RES-oriented development of HEP Group until 2030

HEP2030 Strategy is in line with the background documents for preparation of the Republic of Croatia’s Energy Strategy

The following renewable development scenario was selected:

01

Total capacity: 1,500 MW+ electrification through the development of the e-Mobility project (electric vehicles

charging points)

Purpose: 50% more RES, higher generation from RES

– an increaase from 6 TWh/year to 9 TWh/year

Revitalization

of hydro

power plants

02

Construction of hydro

power plants (HPS Kosinj/ Senj 2 HPP, pumped-

storage power plants (PSPP) and

small hydro)

03

Construction and

acquisition of RES

projects(wind farms, solar power

plants, other RES)

04

Construction of the highly

efficient gas-fired

cogeneration plants(EL-TO Zagreb CCCPP, TE-TO Osijek

CCCPP)

Page 3: HEP SOLAR POWER PLANTS · Installed SPPs on HEP buildings Year of 2014 9 SPPs: HEP’s headquarters in Zagreb; HEP ODS building in Čakovec, Šibenik (Bilicesubstation), Split, Opatija,

Solar power plantsuntil 2030

Total capacity: 350 MW (equal to HEP’s half of Krško nuclear power plant)

2019-2023: 20 MW/yeartotal value: HRK 750 million

2024-2030: 40 MW/year

The first four SPPs (Cres, Vis, Vrlika Jug, Kaštelir): 11.6 MW; HRK 80 million

SPPs on the HEP’s buildings rooftops(2019/2020): 2.1 MW, HRK 13 million

Page 4: HEP SOLAR POWER PLANTS · Installed SPPs on HEP buildings Year of 2014 9 SPPs: HEP’s headquarters in Zagreb; HEP ODS building in Čakovec, Šibenik (Bilicesubstation), Split, Opatija,

Locations of the power plants:

Kaštelir

Vrlika

Vis

Cres

Page 5: HEP SOLAR POWER PLANTS · Installed SPPs on HEP buildings Year of 2014 9 SPPs: HEP’s headquarters in Zagreb; HEP ODS building in Čakovec, Šibenik (Bilicesubstation), Split, Opatija,

Kaštelir SPP

Page 6: HEP SOLAR POWER PLANTS · Installed SPPs on HEP buildings Year of 2014 9 SPPs: HEP’s headquarters in Zagreb; HEP ODS building in Čakovec, Šibenik (Bilicesubstation), Split, Opatija,

Kaštelir SPP

Location Connection

capacityGeneration:

1,538,000 kWh (power consumption of

approx. 500 households)

Status: eligible producer within „feed-in tariff” system

Equipment: panels by Solvis (CRO)

Start of operation: December 2018

Acquisition date: 8 April 2019 (Purchase Contract between Plomin Holding & Elektrane Sabadin)

Contract’s value: HRK 10.2 million

5001 MWKaštelir,

Istria

Aerial shots of Kaštelir SPP - here.

Page 7: HEP SOLAR POWER PLANTS · Installed SPPs on HEP buildings Year of 2014 9 SPPs: HEP’s headquarters in Zagreb; HEP ODS building in Čakovec, Šibenik (Bilicesubstation), Split, Opatija,

Cres SPP3D simulation

Page 8: HEP SOLAR POWER PLANTS · Installed SPPs on HEP buildings Year of 2014 9 SPPs: HEP’s headquarters in Zagreb; HEP ODS building in Čakovec, Šibenik (Bilicesubstation), Split, Opatija,

Cres SPP

Status: not in the „feed-in tariff” system

Project’s takeover (Location Permit) from Primorsko-Goranska County: June 2019

Signing of the Construction Contract between HEP d.d. and joint bidding (PVI Solar, PVI GmbH, Intecco and Deling): 8 April 2019

Contract’s value: HRK 34.7 million

Construction period: Autumn 2019 to April 2020

Location Connection

capacity

Generation:

8.5 GWh/year(power consumption of

approx. 2,500 households)2,5006.5 MWTrinket,2 km from Orlec

settlement, Town of

Cres

Simulation of Cres SPP - here.

Page 9: HEP SOLAR POWER PLANTS · Installed SPPs on HEP buildings Year of 2014 9 SPPs: HEP’s headquarters in Zagreb; HEP ODS building in Čakovec, Šibenik (Bilicesubstation), Split, Opatija,

Vis SPP Simulation

Page 10: HEP SOLAR POWER PLANTS · Installed SPPs on HEP buildings Year of 2014 9 SPPs: HEP’s headquarters in Zagreb; HEP ODS building in Čakovec, Šibenik (Bilicesubstation), Split, Opatija,

Vis SPP

Status: not in the „feed-in tariff” system

Project purchased from Končar OIE on December 2018

Contract’s value: HRK 20.1 million

Construction period: from April 2019 to December 2019

Location Connection

capacity

Generation:

3.1 million kWh/year (power consumption of

approx. 1.000 households)1,0002 MWGrizova glavica,3.6 km from Vis,

4.8 km from Komiža

Page 11: HEP SOLAR POWER PLANTS · Installed SPPs on HEP buildings Year of 2014 9 SPPs: HEP’s headquarters in Zagreb; HEP ODS building in Čakovec, Šibenik (Bilicesubstation), Split, Opatija,

Vrlika Jug SPPlocation

Page 12: HEP SOLAR POWER PLANTS · Installed SPPs on HEP buildings Year of 2014 9 SPPs: HEP’s headquarters in Zagreb; HEP ODS building in Čakovec, Šibenik (Bilicesubstation), Split, Opatija,

Vrlika Jug SPP

Status: not in the „feed-in tariff” system

Project’s takeover (by HEP Proizvodnja from the Town of Vrlika): December 2018

Value of investment: HRK 14.7 million

Construction period: from July to December 2019

Location Connection

capacity

Generation:

2,940,000 kWh(power consumption of

approx. 1.000 households)1,0002.1 MWOperating zone

Kosore,Town of Vrlika

Page 13: HEP SOLAR POWER PLANTS · Installed SPPs on HEP buildings Year of 2014 9 SPPs: HEP’s headquarters in Zagreb; HEP ODS building in Čakovec, Šibenik (Bilicesubstation), Split, Opatija,

Call for Expressions of Interest to potential partners for development and sale of RES projects

Target groups: Local self-government units (towns and municipalities) – mutual preparation of

spatial-planning documents for the solar power plants’ projects

Partners (legal or natural entities) interested for sale of the following projects:

- Non-integrated solar power plants (free standing solar panels) under development ≥ 2 MW

- Wind farms under development / in operation

- Hydro power plants under development / in operation ≥ 1 MW

Call for Expressions of Interest

effectiveness:

6 February – 31 December 2019

Page 14: HEP SOLAR POWER PLANTS · Installed SPPs on HEP buildings Year of 2014 9 SPPs: HEP’s headquarters in Zagreb; HEP ODS building in Čakovec, Šibenik (Bilicesubstation), Split, Opatija,

Electricity from the rooftops of HEP buildings

14

Constructed

SPPs

SPPs under

development

SPPs in preparation

Page 15: HEP SOLAR POWER PLANTS · Installed SPPs on HEP buildings Year of 2014 9 SPPs: HEP’s headquarters in Zagreb; HEP ODS building in Čakovec, Šibenik (Bilicesubstation), Split, Opatija,

Installed SPPs on HEP buildings

Year of 2014 9 SPPs: HEP’s headquarters in Zagreb; HEP ODS building in Čakovec,

Šibenik (Bilice substation), Split, Opatija, Zadar, Dubrovnik and Osijek (2)

total capacity: 207 kW

generation (from 2014 to 2018): 1 million kWh

Eligible producers of electricity within „feed-in tariff” system

Year of 2018 Ogulin SPP (10.8 kW) on Gojak HPP’s Administration building

Bisko SPP (20.52 kW) on Generation Centre Dalmatia’s building

Split SPP (17.28 kW) on HEP Proizvodnja’s Administration building in Split

Dubrovnik SPP (10.80 kW) on HEP Proizvodnja’s Administration bldng in Dubrovnik

Sveta Klara SPP (20 kW) on Elektra Zagreb’s facility, HEP ODS

All SPPs: customers with their own generation (without incentives)

Page 16: HEP SOLAR POWER PLANTS · Installed SPPs on HEP buildings Year of 2014 9 SPPs: HEP’s headquarters in Zagreb; HEP ODS building in Čakovec, Šibenik (Bilicesubstation), Split, Opatija,

SPPs on HEP’s buildings– in operation and in preparation

Facilities of HEP Proizvodnja:

- duration period: from 2019 to 2020

- more SPPs of total capacity 0.5 MW

- investment: HRK 5 million

Facilities of HEP ODS:

- duration period: 2019

- 1st phase (under development): 22 SPPs of total capacity 0.8 MW

- 2nd phase (in preparation): 22 SPPs of total capacity 0.8 MW

- investment: HRK 8 million

- Conducted by HEP ESCO

All SPPs: customers with their own generation (without incentives), primarily for their own consumption

Goal: decarbonization of buildings, energy efficiency increase

Page 17: HEP SOLAR POWER PLANTS · Installed SPPs on HEP buildings Year of 2014 9 SPPs: HEP’s headquarters in Zagreb; HEP ODS building in Čakovec, Šibenik (Bilicesubstation), Split, Opatija,