2
PROJECT HISTORY Headquartered in Calgary with operations in Western Canada and Hull, Texas, KEYERA operates an integrated Canadian-based midstream business with extensive interconnected assets and depth of expertise in delivering midstream energy solutions. Our business consists of natural gas gathering and processing, natural gas liquids (NGLs), fractionation, transportation, storage and marketing, iso-octane production and sales and diluent logistic services for oil sands producers. We are committed to conducting our business in a way that balances diverse stakeholder expectations and emphasizes the health and safety of our employees and the communities where we operate. Simonette Gas Plant The Simonette gas plant is located approximately 92 kilometres southwest of the town of Valleyview, Alberta. The plant offers a full range of gas processing services including sour gas sweetening and acid gas disposal, NGL recovery and condensate stabilization. It receives its raw gas and raw liquids from an extensive network of pipelines that service key production areas/zones in Alberta. SIMONETTE GAS PLANT 1969 Constructed by Shell Canada 1992 Purchased by Suncor Energy 2005 ConocoPhillips Canada became working interest partner 2010 Keyera became operator after acquiring the plant 2014 Wapiti Pipeline and plant inlet expansion completed Plant expanded and condensate stabilizer installed Main: 780-524-7012 24-hour emergency: 780-524-7024 www.keyera.com SIMONETTE GAS PLANT Last Updated March 2018 PRODUCT DELIVERIES Sulphur Outbound by truck Gas Alliance Pipeline, TransCanada Pipeline NGLs Pembina Peace Pipeline and truck Condensate Pembina Peace Pipeline and truck FACILITY SPECIFICATIONS Licensed Capacity 300 Mmcf/d NGL truck handling facilities OWNERSHIP INTEREST Keyera 100%

Headquartered in Calgary with operations in Western Canada ... · PLANT LOCATION SIMONETTE GAS PLANT 780-534-7012 GPS - DECIMAL 54.422444, -117.761186 DEGREES 54°25'20.8"N 117°45'40.3"W

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Headquartered in Calgary with operations in Western Canada ... · PLANT LOCATION SIMONETTE GAS PLANT 780-534-7012 GPS - DECIMAL 54.422444, -117.761186 DEGREES 54°25'20.8"N 117°45'40.3"W

PROJECT HISTORY

Headquartered in Calgary with operations

in Western Canada and Hull, Texas, KEYERA operates an

integrated Canadian-based midstream business with

extensive interconnected assets and depth of expertise

in delivering midstream energy solutions.

Our business consists of natural gas gathering and processing,

natural gas liquids (NGLs), fractionation, transportation, storage

and marketing, iso-octane production and sales and diluent

logistic services for oil sands producers.

We are committed to conducting our business in a way that

balances diverse stakeholder expectations and emphasizes the

health and safety of our employees and the communities where

we operate.

Simonette Gas Plant

The Simonette gas plant is located approximately 92 kilometres

southwest of the town of Valleyview, Alberta. The plant offers a

full range of gas processing services including sour gas

sweetening and acid gas disposal, NGL recovery and condensate

stabilization. It receives its raw gas and raw liquids from an

extensive network of pipelines that service key production

areas/zones in Alberta.

SIMONETTE GAS PLANT

1969 Constructed by Shell Canada

1992 Purchased by Suncor Energy

2005 ConocoPhillips Canada became working interest partner

2010 Keyera became operator after acquiring the plant

2014 Wapiti Pipeline and plant inlet expansion completed

Plant expanded and condensate stabilizer installed

Main: 780-524-7012 24-hour emergency: 780-524-7024 www.keyera.com

SIMONETTE GAS PLANT Last Updated March 2018

PRODUCT DELIVERIES

Sulphur Outbound by truck

Gas Alliance Pipeline, TransCanada Pipeline

NGLs Pembina Peace Pipeline and truck

Condensate Pembina Peace Pipeline and truck

FACILITY SPECIFICATIONS Licensed Capacity 300 Mmcf/d

NGL truck handling facilities

OWNERSHIP INTEREST Keyera 100%

Page 2: Headquartered in Calgary with operations in Western Canada ... · PLANT LOCATION SIMONETTE GAS PLANT 780-534-7012 GPS - DECIMAL 54.422444, -117.761186 DEGREES 54°25'20.8"N 117°45'40.3"W

PLANT LOCATION

SIMONETTE GAS PLANT 780-534-7012

GPS - DECIMAL

54.422444, -117.761186

DEGREES

54°25'20.8"N 117°45'40.3"W

LEGAL SITE DESCRIPTION

09-06-063-25 W5M

FACILITY CONTACTS

Area Superintendent Lyle Leadley 780-524-7017

Plant Administrator Dale Moore 780-524-7003

MAILING ADDRESS Simonette Gas Plant

P.O. Box 58

Valleyview, AB T0H 3N0

Main: 780-524-7012 24-hour emergency: 780-524-7024 www.keyera.com

SIMONETTE GAS PLANT Last Updated March 2018