Upload
eymund-diegel
View
216
Download
0
Tags:
Embed Size (px)
DESCRIPTION
This is a map of a proposed Water Desalination Plant in Haverstraw, NY. AKRF Environmental Planning and Engineering Consultants was retained to prepare the Environmental Impact Statement for the plant's operations on the Hudson River. Bathymetric and Sediment mapping prepared by Eymund Diegel using ArcGis with New York State Department of Environmental Conservation data.
Citation preview
Estuarine and Marine
WetlandFreshwater Pond
Freshwater Emergent Wetland
Freshwater Forested/Shrub
Wetland
Estuarine and Marine
Wetland
Estuarine and Marine
Wetland
Freshwater Forested/Shrub
Wetland
Freshwater Emergent Wetland
Freshwater Pond
Freshwater Pond
Freshwater Pond
Freshwater Pond
Freshwater Pond
Freshwater Forested/Shrub
Wetland
Riverine Wetland
Freshwater Emergent Wetland
SubmergedAquatic
Vegetation
SubmergedAquatic
Vegetation
SubmergedAquatic
Vegetation
SBSC / C
C
SBSBSB
SB
-24
-25
-26
-9-8
-7
-6
-27
-28
-11
-23
-22
-21
-29
-18
-17
-20
-16
-15
-14
-13
-12
-19-5
-30-31
-32
-4
-33
-34
-35
-36
-37
-10
-38
-39
-40
-3
-41
-2
0-1
-42
21
-43-44
-17
1
-5
-2
1
-16
-2
-2
0
-42
-11
-34
1
1
-33
-1
-14
-9
-15
0
-28
-30
-13
-2
-1
-12
0
1
-5
-2
-3
1
-17
0
1
0
-5
-20
-4
-5
-13
-7
-29
-1
2
0
-7
-4
-3
-6
-30
-29
-26
-2
-27
1
-32
-22
-3
-2
-3
0
-1
-19
-18
-3
-21
-16
-9
-14
-7
-10
-7-4
-42
-32
-3
-1
-33
-3
0 -16
-24
-8
-5 -2
1
-5
-16
-2
0
-11
-8
-4
2
-3
-4
-35
0-16
-17
-10
-7
-7
0
-1
-1
-29
-5
-3
-32
0
-36
-3
-7
-8
-11
-23
-6
-1
2
2
-4
-8
-26
-4 -3
0
-7
0
-5
-4
-6
-6
1
1
1
-6
-18
-18
-42
-28
-2-15
-31
0
-1
-3
-31
-7
0
-19
-2
-22
-3
-3
-4
-6
-15
-9
-1
-10
-17
-6
-1
-1
-3
-8
-33
-7
-5
-27
-19
-2
-14
-1
-5
-4
-16
-9
-6
-21
2
-2
-31
-4
-2-20
-3
0-9
-1
-11
-1
-29
-6
-5
-30
-2
-12
-5
-1
-18
-4
0
-21
-18
-10
-15
-5
Grassy Point R
d
Way
ne A
ve
Railroad Ave
Peck
St
Kno
x St
Main St
Rive
r Rd
Beach Rd
Samsondale Ave
Tann
eyan
ns L
n
Car
ol A
ve
North St
Ecology Rd
Munn Ave
Fifth St
Herdman St
Cameron St
Grassy Point Rd
Beach R
d
Bowline Point
Cedar Pond Brook
Minisceongo Creek
Ba
Mar
Dr
Gagan Rd
John St
Macke
y Ct
Lafayette St
Delloro St
Derby Ln
Dara Ln
Mar
ie L
nDebby Ln
Terry Ln
2nd St2nd St
Kwiecinski St
Fourth St
Nan
cy L
n
Cheryl Ln
Kim Ln
Brewster Ave
Grassy Point
Panco Petroleum Co. Wharf.
United States Gypsum Co., Stony Point Dock.
NYSDEC 2000Salinity Strata:Indeterminate.
10/21/2008Water Quality data:(Haverstraw BayMidchannel)
Salinity: 5.5 in Parts per 1000
Chlorophyl: 1.8 in relative units (0 = low, 20 = high)
Turbidity: 8 in nephelometric turbidity units (NTU) 100 + = very turbid
Oxygen: 88 %
source:Rockland County Dept. of Health /NYSDEC Region 3
Orange and Rockland Utilities,
Bowline Point Generating Station Pier.
Shipping Channel (NOAA 2008)
Haverstraw Water Supply Project Pilot Plant,Haverstraw, NY
Wetlands, Water Quality &Underwater Sediment Classifications
0 500 1,000
Shoreline filled since 1851 with material of unkown origin (NYSDEC)
Aerial - ESRI Icubed 2006
PROPOSED INTAKEPUMP STATION
PROPOSED WATERINTAKEPOINT
Havertraw
Bay N
avigation Channel
Hudson River.
PROPOSED PILOTPLANTLOCATION
Unsurveyed
Erosion - non-deposition
Erosion - bedrock
Dynamic - scour
Deposition - thin
Hudson River Sediment Classifications (NYSDEC 2006)
wetlands (NYSDEC 2003 / 2007)
Submerged Aquatic Vegetation (NYSDEC 2002)
wetlands (NWI 2004)
streams with water quality class (NYSDEC 2007)
1 foot bathymetric contours (NYSDEC 2008)
1 foot upland contours (NYSDEC 1995)
Proposed Raw Water Pump Station Footprint
Proposed Deaslination Pilot Plant Intake Pipe Footprint
Haverstraw Water Supply Project Raw Water Pump Station Site
Legend
Proposed Desalination Pilot Plant Raw Water Pipe to Desalination Plant