Name of Hon'ble MLA: Shri Udhi Bhan Total population : 221118 Area (Sq km): 359.643 HSAMB Road Network Status HSAMB Roads Chronology: Haryana State Agricultural Marketing Board Summary of Road Network Name of Constituency: Hodal (SC) Constituency information (2001) PWD Roads Network: NH 0.00 SH 0.00 MDR 6.20 ODR 194.96 Transferred from HSAMB 42.67 Total 243.83 (Information of PWD road network in the Constituency may not be very accurate) Completed Roads under Maintenance 32 80.38 No SR envisaged roads km 3 9.80 SR Awarded roads km 1 2.20 SR sanctioned but yet to be awarded roads km 36 92.38 Sub Total: roads km New Construction going on 3 9.60 New Construction - Awarded roads km 3 9.60 Sub Total: roads km Transferred 7 20.23 Transferred to PWD (938 roads) roads km 7 20.23 Sub Total: roads km 46 122.21 Group Total: roads km 9 24.95 a) Roads Completed before 1-7-1999 roads km 25 60.95 b) Roads Completed between 1-7-1999 and 4-3-2005 roads km 6 20.79 c) Roads Completed between 5-3-2005 and 25-9-2009 roads km 3 5.92 d) Roads Completed between 26-9-2009 and 25-10-2014 roads km 43 112.61 Total: roads km Friday, February 05, 2016 Page 1 of 15 Hodal (SC) H

Haryana State Agricultural Marketing Board wise reports/Hodal (SC...Name of Hon'ble MLA: Shri Udhi Bhan Total population : 221118 Area (Sq km): 359.643 HSAMB Road Network Status HSAMB

Embed Size (px)

Citation preview

Name of Hon'ble MLA: Shri Udhi Bhan

Total population : 221118

Area (Sq km): 359.643

HSAMB Road Network Status

HSAMB Roads Chronology:

Haryana State Agricultural Marketing Board

Summary of Road Network

Name of Constituency: Hodal (SC)

Constituency information

(2001)

PWD Roads Network:

NH

0.00

SH

0.00

MDR

6.20

ODR

194.96

Transferred from HSAMB

42.67

Total

243.83

(Information of PWD road network in the

Constituency may not be very accurate)

Completed Roads under Maintenance

32 80.38No SR envisaged roads km

3 9.80SR Awarded roads km

1 2.20SR sanctioned but yet to be awarded roads km

36 92.38Sub Total: roads km

New Construction going on

3 9.60New Construction - Awarded roads km

3 9.60Sub Total: roads km

Transferred

7 20.23Transferred to PWD (938 roads) roads km

7 20.23Sub Total: roads km

46 122.21Group Total: roads km

9 24.95 a) Roads Completed before 1-7-1999 roads km

25 60.95 b) Roads Completed between 1-7-1999 and 4-3-2005 roads km

6 20.79 c) Roads Completed between 5-3-2005 and 25-9-2009 roads km

3 5.92 d) Roads Completed between 26-9-2009 and 25-10-2014 roads km

43 112.61Total: roads km

Friday, February 05, 2016 Page 1 of 15Hodal (SC) H

Completed Roads under Maintenance

No SR envisaged

H - 722 Approach Road To P.C. Aurangabad 0.701) km.

A/R (2015-16) alloted on 15.06.2015 (Shiv Baba Co-Op L&C Society Ltd)

104201 06-Jul-15

SR required 100485 21-Apr-15

Transferred back from PWD on 17.4.2013 within a list of 550 (76+474) roads.

45829 18-Apr-13

Constructed 1997, Path 6 karam, Crust 150mm, SR 175mm thick over 75mm WBM in 2009

15273 18-Nov-11

H - 729 Banchari To Godhota 4.402) km.

A/R (2015-16) alloted on 15.06.2015 (Shiv Baba Co-Op L&C Society Ltd)

104199 06-Jul-15

EE reported: road is in good condition 100488 21-Apr-15

Repair of berms to be done under MGNREGA scheme.37041 08-Nov-12

Road is patchless. Exp. 1.94 lacs21636 02-Apr-12

Constructed 2001, Path - 5 Karam, Metalled width 3.66 m Crust thickness is 150 mm WBM+PC. SR 2009, with 17.5cms CC in 120m in village Banchari, Patch work WBM+PC. Work Plan : AR in progress and will be completed on 30.09.2011.

11607 19-Oct-11

H - 730 Banchari To Lohina 4.303) km.

A/R (2015-16) alloted on 15.06.2015 (Shiv Baba Co-Op L&C Society Ltd)

104200 06-Jul-15

EE reported: road is in good condition 100489 21-Apr-15

Work completed in May, 2013. Road is in Good Condition.48105 06-Jun-13

A/A RS. 59.20 lacs on 14.05.12, allotted on 3.08.12(Sh. Devi singh )30496 21-Aug-12

Work Plan: (Pavers in 300m (Banchari) in rest 75mm WBM+PC. (63 lacs)

8985 12-Dec-11

Constructed 2005, Path - 5 Karam, Crust 150mm, SR - Nil.8949 07-Oct-11

H - 737 Bhiduki To Bijali Mandir 1.704) km.

A/R (2015-16) alloted on 15.06.2015 (Shiv Baba Co-Op L&C Society Ltd)

104205 06-Jul-15

EE reported: road is in good condition 100492 21-Apr-15

S/R A/A on 03.10.2013 for Rs. 17.84 lac, allotted on 17.01.2014(Robin co-op L&C Society), Completed on 10.04.2014(Paverblock 141m Bhiduki Phirni) (CM Ann. Code 5928 dt. 5.05.2013)

69809 28-Apr-14

GSB + Paver block + both side drain (Bhiduki phirni) RD 0 to 141m, in rest length patchless. Est. Cost 17.39 lacs. (GPS length 1.75 km).

91385 01-Apr-13

Constructed 2002, Path - 5 Karam, Metalled width 3.66 m Crust thickness is 150 mm WBM+PC. SR 2008, patch work WBM + PC.

11593 19-Oct-11

Friday, February 05, 2016 Page 2 of 15Hodal (SC) H

Except 100 M length in village Bhiduki.

H - 740 Bhulwana To U.P.Border. 2.105) km.

A/R (2015-16) alloted on 15.06.2015 (Shiv Baba Co-Op L&C Society Ltd)

104206 06-Jul-15

A/R (2014-15) completed on 30.03.15, now road is in good condition.

100493 21-Apr-15

Constructed 2002, Path - 5 Karam, Metalled width 3.66 m Crust thickness is 150 mm WBM+PC. SR 2010, Patch work + PC.

11595 19-Oct-11

H - 741 Bisani Mandir To Samadhi At Banchari 2.006) km.

A/R (2015-16) alloted on 15.06.2015 (Shiv Baba Co-Op L&C Society Ltd)

104207 06-Jul-15

EE reported: road is in good condition 100494 21-Apr-15

Constructed 1999, Path - 2 Karam, Metalled width 3.66 m Crust thickness is 150 mm WBM+PC. SR 2010, Patch work WBM+PC.

11604 19-Oct-11

H - 747 Dakora To Marroli 3.007) km.

A/R (2015-16) alloted on 15.06.2015 (Sh. Devender Singh)104212 06-Jul-15

Satisfactory and also seen by W/ E.I.C102573 15-May-15

EE reported: road is in good condition 100497 21-Apr-15

Rev. D/E sanctioned for Rs. 49,10,800/- on 25.11.2014.89371 25-Nov-14

Work completed on 05.10.201487186 21-Oct-14

Only phirni dev. Of both Village in volved 250m Dakora & 350m Marroli. Drain and GSB completed, PIP block in progress. EE promise to complete upto 30.07.2014.

77395 04-Jul-14

CM annoucement code 5926 dated 05.05.2013 for repair. A/A on 03.10.2013 for Rs. 74.02 lacs. Paver block and drain (Dakora Phirni 400 m & Marroli Phirni 200m), Work allotted on 09.01.2014. ( Sh. Devi singh )

69814 28-Apr-14

Construction of drain and laying of GSB completed in vill. Marroli, further construction of drain in vill. Dakora started.

69727 24-Apr-14

GSB + Paver block + both side drain (Dakora phirni) RD 900 to 1300m = 400m & (Marroli) RD 2960 to 3160m = 200m. Rest length patchless. Est. Cost 74.53 lacs.

91388 01-Apr-13

Constructed 2002, Path - 5 Karam, Metalled width 3.66 m Crust thickness is 150 mm WBM+PC. SR 2010, Patch work WBM+PC.

11606 19-Oct-11

H - 749 Deeghot To Aurangabad 4.558) km.

AR will be done in PMGSY Scheme by PWD B&R.100498 21-Apr-15

PMGSY-Road done in 12/201023508 22-May-12

Constructed 2004, Path 6 karam, Crust 150mm. Under PMGSY, HSAMB widened to 5.5m. Now Crust is 300m. Work completed in 2010. Bill finalized. Maintenance till 6/2015 with M/S Gopaljee. There is no patch on the road. SDE/SE has seen it.

15294 15-Dec-11

History : Good condition. PMGSY- Road done in 12/2010.8952 07-Oct-11

Friday, February 05, 2016 Page 3 of 15Hodal (SC) H

H - 750 Deeghot To Nangla Gwal. 3.639) km.

A/R (2015-16) alloted on 15.06.2015 (Shiv Baba Co-Op L&C Society Ltd)

104209 06-Jul-15

EE reported: road is in good condition 100499 21-Apr-15

Transferred back from PWD on 17.4.2013 within a list of 550 (76+474) roads.

45830 18-Apr-13

Constructed 2001, Path 6 karam, Crust 150mm. CC 200m(Deeghot Phirni). In rest Patch + PC in 2008

15281 18-Nov-11

Transferred to PWD. PWD RoadID : 92107687 03-Oct-11

H - 751 Deeghot To Sailothi 4.2210) km.

No S/R required .110579 24-Sep-15

A/R (2015-16) alloted on 15.06.2015 (Shiv Baba Co-Op L&C Society Ltd)

104210 06-Jul-15

AR completed on 30.03.2015, now road is in good condition.100500 21-Apr-15

SE Proposes: [Work Plan 2015-16 : Heavy Patch work in addition to ordinary repair entire length (Est. Cost. Rs. 7 Lakh)]

99515 15-Apr-15

Transferred back from PWD on 17.4.2013 within a list of 550 (76+474) roads.

45831 18-Apr-13

AA amounting to Rs. 28.50 lacs on 29/03/2000, Path 6 karam(Angled).Length 4.22 km

18316 16-Feb-12

Constructed 2002, Path 6 karam, Crust 150mm. 75mm WBM + PC in 2008

15283 18-Nov-11

Transferred to PWD. PWD RoadID : 92117684 03-Oct-11

H - 757 Ghasera To Nakhrola. 1.7011) km.

A/R (2015-16) alloted on 15.06.2015 (Sh. Devender Singh)104219 06-Jul-15

Patches developed during recent rains, will be repaired under A/R (2015-16)

100504 21-Apr-15

Transferred back from PWD on 17.4.2013 within a list of 550 (76+474) roads.

45835 18-Apr-13

Constructed 2001, Path - 9 Karam, Metalled width 3.66 m Crust thickness is 150 mm WBM+PC. SR 2010, with 17.5cms CC in 100m in village Nakhrola, rest 75mm WBM+ PC.

11594 19-Oct-11

H - 761 Godhota To Khirbi Sehjod Road 1.7012) km.

A/R (2015-16) alloted on 15.06.2015 (Sh. Devender Singh)104213 06-Jul-15

EE reported: road is in good condition 100507 21-Apr-15

Work completed final bill under preparation, will be submitted upto 25.12.2012.

39049 19-Dec-12

A/A Rs. 16.93 lacs on 14.05.12. SR allotted on 16.07.2012 (Sh. Devi Singh Contractor)

28977 03-Aug-12

Work Plan: 75mm WBM+PC in entire. (20 lacs).8990 07-Oct-11

Constructed 2004, Path - 5 Karam, Crust 150mm.8954 07-Oct-11

H - 762 Godhota To Mafi Jalalpur 1.3113) km.

Friday, February 05, 2016 Page 4 of 15Hodal (SC) H

A/R (2015-16) alloted on 15.06.2015 (Sh. Devender Singh)104214 06-Jul-15

EE reported: road is in good condition 100508 21-Apr-15

Rev. D/E sanctioned for Rs. 74,38,800/- on 25.11.2014.89373 25-Nov-14

TS for Rs. 1.05 crore, tender received on 05.12.2013. Work allotted to Dev Co-op Society on 09.01.2014. Work completed on 19.09.2014.

87189 28-Oct-14

Transferred back from PWD on 17.4.2013 within a list of 550 (76+474) roads.

45834 18-Apr-13

GSB + Paver block + both side drain (Godhota phirni) RD 540 to 1310 = 770m. Est. Cost 109.93.

91393 01-Apr-13

Constructed 1999, Path 6 karam, Crust 150mm. CC 0 to 540m laid by Gram Panchayat. RD 540 to 1310m=770m, 75mm WBM + PC in 2007

15277 18-Nov-11

Transferred to PWD. PWD RoadID : 92177690 03-Oct-11

H - 764 Gulawad To Karimpur 1.5014) km.

A/R (2015-16) alloted on 15.06.2015 (Sh. Devender Singh)104221 06-Jul-15

EE reported: road is in good condition 100509 21-Apr-15

Work Plan: 75mm WBM+PC in entire (18 lacs).8991 07-Oct-11

Constructed 2004, Path - 5 Karam, Crust 150mm, SR - NIL.8955 07-Oct-11

H - 765 Gulawad Village To School 0.8015) km.

A/R (2015-16) alloted on 15.06.2015 (Sh. Devender Singh)104222 06-Jul-15

EE reported: road is in good condition 100510 21-Apr-15

Work completed on 07.03.2013.42629 15-Mar-13

The same agency has not completed the work on ID 765,767,783,793,800, 805,808,811,826,830. The agency has taken time extension upto 30.04.12.Action will be taken after 30.04.12. Contractor: Sh. Vinod Kumar, 9991554240, SDE: Sh. Puran Lal, 9468004444, JE: Sh. Dharambir, 9466754244

22051 04-Apr-12

SR sanctioned on 15/10/2010, allotted 07/07/2011 with 75mm WBM+CC in entire length (Vinod Kumar). Supply of material in progress.

8993 07-Oct-11

Constructed 2004, Path - 5 Karam, Crust 150mm. Entire length of CC 175mm.

8957 07-Oct-11

H - 767 Hassanpur To Yamuna Ghat 2.3416) km.

A/R (2015-16) alloted on 15.06.2015 (Sh. Devender Singh)104215 06-Jul-15

SR required due to Road damaged by PWD (PH) Deptt.100512 21-Apr-15

Road is in good condition79133 14-Jul-14

Work Completed on 10/5/2013. (P.H. laid sewer line from RD 0 to 1400Mtr. Restoration yet to be done.

48172 06-Jun-13

Constructed 2003, Path - 5 Karam, Crust 150mm. 8956 07-Oct-11

SR sanctioned on 15/10/2010, allotted 07/07/2011 with 850m CC in Hassanpur phirni (RD 0 to 450m, 750 to 1150m) from RD 450 to 750m CC already exist. Rest 75mm WBM + PC.

8992 07-Oct-11

Friday, February 05, 2016 Page 5 of 15Hodal (SC) H

H - 772 Kanwarka To Meerpur Kurali 4.4017) km.

EE reported: road is in good condition 100515 21-Apr-15

A/A D/E of Rs.86,04,900/- accorded and rates also approved on 20.12.2013 (The Dev. Co-op L&C Society Ltd.), allotted on 01.01.2014), work completed on 2.6.2014.

73536 03-Jun-14

Transferred back from PWD on 17.4.2013 within a list of 550 (76+474) roads.

45508 18-Apr-13

GSB + Paver block + both side drain (Kurali phirni) RD 2100 to 2842 = 742m, in rest 75mm WBM + PC & EW on berms in 3658m. Est. Cost 158.60 lacs. (GPS length 4.28 km)

91396 01-Apr-13

Constructed 1994, Path 6 & 9karam, Crust 150mm. CC 175mm over WBM in 2008.

15268 18-Nov-11

Transferred to PWD. PWD RoadID : 92157692 03-Oct-11

H - 773 Kawarka To Nakhrola 1.2518) km.

A/R (2015-16) alloted on 15.06.2015 (Sh. Devender Singh)104220 06-Jul-15

EE reported: road is in good condition 100516 21-Apr-15

A/A RS. 27.01 lacs on 14.05.12, allotted on 3.08.12( Anmol const. co.). Work completed on 28.03.2013.

44342 08-Apr-13

Constructed 2004, Path - 5 Karam, Crust 150mm, SR - NIL.8959 07-Oct-11

H - 774 Khambi To Dakora 5.0019) km.

EE reported: road is in good condition 100517 21-Apr-15

A/A for Rs. 27.75 lac on 20.08.2014. T/Sanction for Rs. `27.74 lacs on 21.8.14. Allotted on 22.8.14 (Dev Co-op . L&C Society). Completed on 16.11.2014.

88663 17-Nov-14

Work plan 2014-15: 75mm WBM + PC in (RD 0 to 2000m).Estimated Cost Rs. 28.00lac

75347 24-Jun-14

Constructed 2002, Path - 5 Karam, Metalled width 3.66 m Crust thickness is 150 mm WBM+PC. SR 2010, with 17.5cms CC in 685m in village Dakora Rest 75mm WBM+PC.

11596 19-Oct-11

H - 786 Marroli To Khambi 1.5020) km.

A/R (2015-16) alloted on 15.06.2015 (Sh. Devender Singh)104223 06-Jul-15

AR completed on 30.03.2015, now road is in good condition.100525 21-Apr-15

Transferred back from PWD on 17.4.2013 within a list of 550 (76+474) roads.

45833 18-Apr-13

Constructed 1999, Path 6 & 9karam, Crust 150mm. 75mm WBM+ PC in 2006

15276 18-Nov-11

Transferred to PWD. PWD RoadID : 92167691 03-Oct-11

H - 787 Marroli To Siha 2.9621) km.

EE reported: road is in good condition 100526 21-Apr-15

A/A D/E of Rs. 69,51,500/- accorded and rates approved on 20.12.2013 (The Dev. Co-op L&C Society Ltd.), allotted on

73337 30-May-14

Friday, February 05, 2016 Page 6 of 15Hodal (SC) H

01.01.2014. Work completed on 30.05.2014

Transferred back from PWD on 17.4.2013 within a list of 550 (76+474) roads.

45836 18-Apr-13

GSB + Paver block + both side drain (Marroli phirni) RD 0 to 596m, 75mm WBM + PC & EW on berms RD 596 to 2970m. Est. Cost 119.26 lacs. (GPS length 2.97 km)

91400 01-Apr-13

Constructed 2007, Path 6 karam, Crust 150mm15303 18-Nov-11

Transferred to PWD. PWD RoadID : 92257686 03-Oct-11

H - 799 Nangla Chawanka To Nangla Karimpur 1.7522) km.

A/R (2015-16) alloted on 15.06.2015 (Sh. Devender Singh)104224 06-Jul-15

EE reported: road is in good condition 100535 21-Apr-15

Pavers in 100m (Nangla Chawanka). Rest minor patching. Patches be done immediately. (6 lacs)

9003 07-Oct-11

Constructed 1990, Path - 4 & 6 Karam, Crust-150mm, CC 418m (Nangla Karimpur phirni) and rest Patch + PC done in 2005.

8967 07-Oct-11

H - 807 Pingore To Nangla 1.1023) km.

A/R (2015-16) alloted on 15.06.2015 (Shiv Baba Co-Op L&C Society Ltd)

104208 06-Jul-15

EE reported: road is in good condition 100541 21-Apr-15

Constructed 2002, Path - 4 Karam, Metalled width 3.66 m Crust thickness is 150 mm WBM+PC. SR 2010, with 17.5cms CC in 120m in village Nangla patch work WBM + PC at village Nangla.

11592 19-Oct-11

H - 809 Pwd Road To Aligarh (Gundwas) 0.6024) km.

A/R (2015-16) alloted on 15.06.2015 (Shiv Baba Co-Op L&C Society Ltd)

104203 06-Jul-15

EE reported: road is in good condition 100543 21-Apr-15

EE reported work completed on 10.9.2013.55920 01-Oct-13

A/A RS. 10.96 lacs on 14.05.12, allotted on 24.07.12(A.K Jalani co.op Society)

30486 21-Aug-12

Work Plan: 75mm WBM+PC (13 lacs).16051 16-Dec-11

Constructed 2004, Path - 4 Karam, Crust-150mm. No SR sanctioned, SDE Sh. Puran Lal says to E-In-C & SE.

8970 07-Oct-11

H - 816 Rohta Patti To Nawalgarh 5.2325) km.

A/R (2015-16) alloted on 15.06.2015 (Sh. Devender Singh)104216 06-Jul-15

EE reported: road is in good condition 100548 21-Apr-15

Work Plan: 75mm WBM+PC(63 lacs).9008 07-Oct-11

Constructed 2006, Path - 5 Karam, Crust-150mm. SR - NIL. 8972 07-Oct-11

H - 821 Siha To Nangla 1.0026) km.

A/R (2015-16) alloted on 15.06.2015 (Sh. Devender Singh)104211 06-Jul-15

Friday, February 05, 2016 Page 7 of 15Hodal (SC) H

EE reported: road is in good condition 100551 21-Apr-15

Constructed 2001, Path - 5 Karam, Crust-150mm, Patch+PC done in 2010.

8975 07-Oct-11

H - 822 Siha To Palri 1.4227) km.

EE reported: road is in good condition 100552 21-Apr-15

AA for Rs. 29.37 lacs on 1.1.2014 & tender approved (MCR Const.). Work completed on 30.05.2014

73338 30-May-14

Transferred back from PWD on 17.4.2013 within a list of 550 (76+474) roads.

45837 18-Apr-13

GSB + Paver block + both side drain (Siha phirni) RD 0 to 241m, in rest 75mm WBM + PC & EW on berms. Est. Cost 50.51 lacs. (GPS length 1.36 km)

91403 01-Apr-13

Constructed 2006, Path 6 karam, Crust 150mm15297 18-Nov-11

H - 825 Solaka To Khambi 3.5028) km.

A/R (2015-16) alloted on 15.06.2015 (Sh. Devender Singh)104217 06-Jul-15

AR in progress, will be done in 2015-16.100554 21-Apr-15

Constructed 1999, Path - 4&6 Karam, Metalled width 3.66 m Crust thickness is 150 mm WBM+PC. SR 2008, patch work WBM + PC. Work Plan : AR completed on 30.09.2011, Exp. 0.56 lacs

11591 19-Oct-11

H - 831 Tumesra To Solaka Railway Station 4.8029) km.

Inspection: Worthy C.A Board ordered that the concerned JE, SDO & XEN charge sheeted under rule-8.

113392 03-Dec-15

A/R (2015-16) alloted on 15.06.2015 (Sh. Devender Singh)104218 06-Jul-15

S.E (QC) has requested to S.E guragon to supply the requisite detail and calculation of loss base of test results.

102548 15-May-15

EE reported: road is in good condition 100558 21-Apr-15

EE reported work completed on 16.9.2013.55921 01-Oct-13

A/A RS. 104.98 lacs , allotted on 03.08.12(Mansha Builders.)30487 21-Aug-12

Work Plan: Pavers in (600m), Gugharana (450m), 75mm WBM+PC in rest with additional 75mm WBM in 2.560 to 4.800 m (110 lacs).

9015 07-Oct-11

Constructed 2004, Path - 5 & 6 Karam, Crust-150mm C.C. in 60m, SR - Nil.

8979 07-Oct-11

H - 5052 Gulawad (Nanglu Karimpur) To Macchipura Road 3.0830) km.

A/R (2015-16) alloted on 15.06.2015 (Sh. Devender Singh)104225 06-Jul-15

EE reported: road is in good condition 100568 21-Apr-15

A/A on 15.11.2007 for Rs. 158 lacs of 5 no. roads 823, 780, 743, 5052 & 5054. D/E T/S on 19.12.2013 for Rs. 158,90,900/- lac

60345 30-Dec-13

Constructed 2011, Path 8 karam, Crust 225 mm15310 18-Nov-11

H - 5054 Satwagarhi Hassanpur Road To Mohali Hassanpur Road By Pass 0.9231) km.

Friday, February 05, 2016 Page 8 of 15Hodal (SC) H

A/A on 15.11.2007 for Rs. 158 lacs of 5 no. roads 823, 780, 743, 5052 & 5054. D/E T/S on 19.12.2013 for Rs. 158,90,900/- lac

60346 30-Dec-13

Sewer line laid by P.H department and will be repaired by P.H Department.

51064 04-Jul-13

Repair of berms to be done under MGNREGA scheme.37052 08-Nov-12

Constructed 2009, Path 5, 6 & 7 karam, Crust 225 mm15305 18-Nov-11

H - 7143 Meerpur to Korali to machhipura 1.9232) km.

W/ E.I.C has ordered that GMD Consultant to check and submit report.

102546 15-May-15

EE reported: road is in good condition 100608 21-Apr-15

Work completed on 05.09.2014. The amount of screening deducted from the bill of agency.

86391 17-Nov-14

SE Gurgaon to comment on the report of SE (QC) & if not satisfied with quality of work then to send draft charge sheet. E-mailed to SE Gurgaon, EE Faridabad and SA.

83835 28-Aug-14

Work allotted on 03.01.14 and schedule date of completion is 02.05.14. E/W, GSB and 1st layer completed, laying of 2nd layer in progress.

68574 15-Apr-14

A/A on 30.08.2013 for Rs. 52.72 lacs, Tender approved on 18.12.2013 (Sh. Saheed Ahmed ), Tech. Sanctioned for Rs. 52.71 lac.

60075 18-Dec-13

Path: RD 0 to 810m = 39'08", 810 to 1700m=46'04", distance shortened 0.85 km.

60074 18-Dec-13

CM anouncement code 5910 dt. 05.05.2013. path is 14 & 15 karam51595 16-Jul-13

80.38 km. Sub Total:

SR Awarded

H - 723 Azizabad To Nangla Chawanka 2.301) km.

P.C. left. Likely 29.02.2016.115251 14-Jan-16

Chawanka phirni constructed by Panchayti Raj. (RD 1950 to 2030m =80m), in rest WBM completed but defects of undulation have to be removed by the agency.

102974 04-Jun-15

A/A and D/E of Rs. 33,83,000/- and rates also approved on 06.01.2014. ( M/S mcr Const. Co.).

61163 08-Jan-14

GSB + Paver block (Chawanka phirni) RD 1955 to 2030m = 75m, in rest 75mm WBM + PC in RD 0 to 1759m. Est. Cost 35.48 lacs. CC existing in RD 1759 to 1955m. (GPS length 2.03 km)

91381 01-Apr-13

Paver block in village Nangla Chawanka 75 Mtr and heavy patch + One layer 75mm WBM + PC RD 0 to 1579 M.

39190 19-Dec-12

Constructed 1990, Path - 4 & 6 Karam, Metalled width 3.66 m Crust thickness is 150 mm WBM+PC. SR 2008, with 17.5cms CC in 196m in Village Chawanka rest in Patch work WBM + PC. Work Plan : A/R work in progress, filling of pot hole with G3. Total Cost Rs.0.30 Lacs will be completed on 30.09.2011

11589 19-Oct-11

H - 738 Bhiduki To U.P.Border 3.502) km.

Friday, February 05, 2016 Page 9 of 15Hodal (SC) H

PIP completed in 210 mt. out of 620mt. .Likely date 15.02.2016.115254 14-Jan-16

WBM & P.C completed & work of phirni development is in progress.Likely date 31.12.2015

113264 30-Nov-15

The test report submitted by GMD Consultant is satisfactory.101847 11-May-15

A/A D/E of Rs. 70,97,000/- accorded and rates also approved on 19.12.2013 (The Dev. Co-op L&C Society ltd.),allotted on 08.01.2014 with provision paver block (Bhiduki Phirni) 650m, in rest WBM +PC.

61072 06-Jan-14

GSB + Paver block + both side drain (Bhiduki phirni) RD 0 to 650m, in rest 75mm WBM + PC and EW on berms. Est. Cost 133.84 lacs.

91386 01-Apr-13

Constructed 1994, Path 6 karam, Crust 150mm, SR patch + PC in 2004

15269 18-Nov-11

H - 827 Sondh To Dadka 4.003) km.

PIP completed in 500mt. & Likely date 29.02.2016.115260 14-Jan-16

Const. of drain & GSB completed in 800 M, work in progress. Clause - II imposed on 12.06.2015. Work is held up by the agency.Likely date 31.12.2015

113276 30-Nov-15

A/R (2015-16) alloted on 15.06.2015 (Shiv Baba Co-Op L&C Society Ltd)

104202 06-Jul-15

Worthy CA Board ordered that JE charge sheeted under rule-8. SE Gurgaon to submit charge sheet of JE & call explanation of EE & SDO .

102032 12-May-15

A/A for Rs. 90.61 lac on 20.08.2014. Alloted on 22.8.14 ( SYZygy Builders). T/Sanction for Rs. 90.60 lacs on 21.8.14.

83500 22-Aug-14

Work plan 2014-15: 250mm GSB + PIP blocks)+nala in (RD 0 to 665m), (RD 665 to 985m) widening on both side of existing CC by (250mm GSB + PIP block + nala) in village Sondh & widening in RD (3690 to 4000m) in 310m (250mm GSB + PIP block + nala) in village Dadka). Estimated

75345 24-Jun-14

Constructed 2002, Path - 5 Karam, Metalled width 3.66 m, Crust 150 mm. SR 2009, with 17.5cms CC in 630m in both villages Sondh & Dadka, Patch work WBM+PC.

11608 19-Oct-11

9.80 km. Sub Total:

SR sanctioned but yet to be awarded

H - 716 Ainch To Bhendoli 2.201) km.

Tender to be invited after Panchyat election .115267 14-Jan-16

A/R (2015-16) alloted on 15.06.2015 (Shiv Baba Co-Op L&C Society Ltd)

104204 06-Jul-15

SE Proposes: [Work Plan 2015-16 : RD 1300 to 1650m=350m(250mm GSB + Paver Block + Drain in village Bhendoli + dressing of Berms) (Est. Cost. Rs. 25 Lakh.)]

99512 15-Apr-15

Constructed 2002, Path - 5 Karam, Metalled width 3.66 m Crust thickness is 150 mm WBM+PC. SR 2010, Patch work WBM+PC.

11597 19-Oct-11

2.20 km. Sub Total:

Friday, February 05, 2016 Page 10 of 15Hodal (SC) H

New Construction going on

New Construction - Awarded

H - 7140 Bhiduki to Pengaltu 3.661) km.

GSB in progress . Likely date 31.03.2016. 115283 14-Jan-16

A/A on 03.03.2014 for Rs. 1,14,48,200/-. Work allotted on 25.06.2014 (The Dev Co-Op Socity Co.) & D/E sanctioned for Rs. 1,10,37,900/-.

78996 14-Jul-14

Path: RD 0 to 90m=34'-7.5", 90 to 670m=31'-2", 670 to 1320m=36', 1320 to 2600m=27'-6.5", 2600 to 2650m=44', 2650 to 3600m=33'-8" wide st, distance shortened 1.115 Km to NGM Hassanpur, 10' span slab culvert at RD 1320m, HP culvert 6 no. (CM ann. Code 5915)

62210 28-Jan-14

CM anouncement code 5915 dt. 05.05.2013. path is 8 karam51592 16-Jul-13

H - 7142 Pingor to Palri 2.052) km.

PC left .Likely date 29.02.2016. 115284 14-Jan-16

W/ CA Board has order that SDE & JE are charge sheet under rule-8.102572 15-May-15

Worthy CA Board ordered that the Sh. Puran Lal SDO & Sh. Data Ram JE are charge sheeted Under Rule-8 in Road ID 7142.

96306 09-Mar-15

Tender approved on 30.12.2013 (M/S Manocha Builders), Tech. Sanctioned for Rs. 58,55,700/-, work allotted on 03.01.2014.

60420 31-Dec-13

A/A on 26.09.2013 for Rs. 59.80 lacs 56065 08-Oct-13

Length=2.05km Path RD 0 to 2050m=31'11", distance shortened =1.69km, reconstruction of 10' span culvert is required for which NOC from irr. Dept. may required.

52210 24-Jul-13

CM anouncement code 5911 dt. 05.05.2013. path is 6, & 7 karam51594 16-Jul-13

H - 7144 Hodal to Dadka 3.893) km.

WBM completed . PC left. Likely date 29.02.2016 .115285 14-Jan-16

GSB & 1st layer of metal completed, Iind layer is in progress. Clause - III imposed on 23.07.2015.Likely date 31.12.2015

113242 30-Nov-15

Worthy CA Board ordered that JE & SDO are charge sheeted under Rule-8. SE Gurgaon to submit charge sheet against the concerned JE & SDO within 20 days positively.

102522 14-May-15

CA asked EIC to get check work from GMD Consultant.98982 18-Mar-15

A/A on 11.12.2013 for Rs. 129.15 lacs. Tender approved on 19.2.2014. D/E sanctioned for Rs. 119.59 lacs, allotted on 4/3/2014 (Sh. Rashid Khan).

65374 25-Feb-14

Path: RD 0 to 2160m=44', 2160 to 2324m=38'2", 2324 to 2570m=31'-4.5", 2570 to 3980m= 33' wide st, distance shortened 1.50 Km, HP culvert 7 no. paver block RD 3530 to 3980m (Dadka).

59997 12-Dec-13

CM anouncement code 5909 dt. 05.05.2013. path is 6 & 8karam51596 16-Jul-13

9.60 km. Sub Total:

Friday, February 05, 2016 Page 11 of 15Hodal (SC) H

Transferred

Transferred to PWD (938 roads)

H - 731 Banswan To Biduki 3.261) km.

PWD has allotted works worth 120.35 lacs.43424 20-Mar-13

Constructed 2005, Path 6 karam, Crust 150mm15295 18-Nov-11

Transferred to PWD. PWD RoadID : 92227688 03-Oct-11

H - 734 Bedha Patti (Hodal-Hassanpur) Road To Bhulwana Rly. Phatak 1.602) km.

PWD has allotted works worth 46.82 lacs.43416 20-Mar-13

Constructed 2004, Path 6 karam, Crust 150mm15290 18-Nov-11

Transferred to PWD. PWD RoadID : 92237681 03-Oct-11

H - 735 Bedha Patti To Vijay Garh. 4.003) km.

PWD has allotted works worth 137.98 lacs.43415 20-Mar-13

Constructed 2003, Path 6 karam, Crust 150mm15284 18-Nov-11

Transferred to PWD. PWD RoadID : 92218177 03-Oct-11

H - 736 Bedhapatti To Godhota Road 1.004) km.

PWD has allotted works worth 97.42 lacs.43412 20-Mar-13

Constructed 1995, Path 6 karam, Crust 150mm, SR patch + PC in 2010

15270 18-Nov-11

Transferred to PWD. PWD RoadID : 92127683 03-Oct-11

H - 742 Brij Parikarma Banchari To Sondh 3.625) km.

PWD has allotted works worth 111.47 lacs.43425 20-Mar-13

Constructed 2006, Path 6 karam, Crust 150mm15296 18-Nov-11

Transferred to PWD. PWD RoadID : 92277694 03-Oct-11

H - 748 Darana To Bhiduki. 3.506) km.

PWD has allotted works worth 65.46 lacs.43414 20-Mar-13

Constructed 2004, Path 6 karam, Crust 150mm15291 18-Nov-11

Transferred to PWD. PWD RoadID : 92187689 03-Oct-11

H - 781 Likhi To Ghasera Via Elenabad 3.257) km.

PWD has allotted works worth 62.88 lacs.43099 19-Mar-13

Constructed 1997, Path 6 & 9karam, Crust 150mm. 75mm WBM + PC in 2004

15272 18-Nov-11

Transferred to PWD. PWD RoadID : 92137682 03-Oct-11

Friday, February 05, 2016 Page 12 of 15Hodal (SC) H

20.23 km. Sub Total:

Friday, February 05, 2016 Page 13 of 15Hodal (SC) H

Other

Dropped

H - 7516 Tapovan to Vishnu Khurd in village Banchari 1.751) km.

P/R sent to ACS (Agri.) vide CA memo no. 336 dt. 23.06.1480211 24-Jul-14

On 20.5.2014, road demanded by Sh. O.P. Sharma, Former Governer Nagaland.

73065 26-May-14

H - 7529 Banchari to Sevli 5.262) km.

P/R sent to ACS (Agri.) vide CA memo no. 399 dt. 15.07.1480167 24-Jul-14

P/R sent to ACS(A) vide CA no. 399 dt. 15.07.2014. 79621 17-Jul-14

PR sent to CA on 15.07.2014.79615 17-Jul-14

Path: Rd 0 to 3850m=34'9", 3850 to 4460m=32', 4460 to 5260m=35'4" wide st, distance shortened 1.14 km, Estt. Cost Rs. 265 lac including Rs. 100 lac cost of bridge, falls in policy of baord.

79285 14-Jul-14

Recommended by Mahender Singh, Member Zila Parishad, Palwal. Path is 7 & 8 karam.

73442 03-Jun-14

H - 7770 Bhulwana to Garhi Patti 2.433) km.

Length 2.43 km Path: RD 0 to 125m=2k, 125 to 380m=6k, 380 to 725m=9k, 725 to 2425m=7k, no distance shorten.

93589 05-Mar-15

Worthy CA ordered on 26.02. 15 that the proposed road does not fall within the policy of HSAMB. The proposal has been filed.

93560 04-Mar-15

The Proposed road does not fall within the policy of HSAMB. Case is filed.

93320 03-Mar-15

Road demanded by Villagers in D.C. Janata Darbar Palwal.93093 06-Feb-15

H - 7771 Bhulwana to Vijay Garh 2.204) km.

Worthy EIC has ordered to file the case on 06.04.15 as this road does not fall in the const. policy of the Board due to no distance shortened.

99171 09-Apr-15

Length 2.20 km, Path :  RD 0 to 530m = 7 k, 530 to 1030m=7k, 1030 to 1540m=7k, 1540 to 2200m=9k,no distance shortened, Parallel road, leads to UP Border.

99156 08-Apr-15

P/R returned to SE Gurgaon on 10.03.2015 to get resubmitted the proposal as demanded by villagers and also submit distance shortened route map.

98490 11-Mar-15

Length 2.20 km, Path: RD 0 to1540m=7k, RD 1540 to 2200m=9k, no distance shortened.

93591 05-Mar-15

Road demanded by Villagers in D.C. Janata Darbar Palwal.93094 06-Feb-15

11.64 km. Sub Total:

Rejected by Government

Friday, February 05, 2016 Page 14 of 15Hodal (SC) H

H - 5957 Kisore Pur to Kiranj. 3.651) km.

Proposal not approved by Govt. on dated 01.03.11.14733 16-Nov-11

H - 5958 Kisore Pur to Attarchata. 1.302) km.

Proposal not approved by Govt. on dated 01.03.11.14734 16-Nov-11

H - 7141 Sondh to Indana 5.133) km.

Hon'ble CM has not approved the construction of road on 25.11.2013 due to less path.

59387 09-Dec-13

Length=5.13km, path RD 0 to2600m=33',RD 2600 to 2970m=32'6", RD 2970 to 3650m=22', RD 3650 to 4300m=27'6", RD 4300 to 5126m=28'2",st., no distance shortend

52213 24-Jul-13

CM anouncement code 5914 dt. 05.05.2013. path is 4, 5 , 6, & 7 karam

51593 16-Jul-13

10.08 km. Sub Total: