HANSON PRESSURE PIPE
Steve Smith
January 16,2014
PRESTRESSED CONCRETE
CYLINDER PIPE (PCCP)
Chesapeake
Section AWWASymposium
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
2/53
Slide 2- 06.August 2007Hanson sample slides Group Comm & IR
Interpace Projects with Problems
INTERPACE 45 MILLION FEET 11,500 PROJECTS
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
3/53
AWWA C-301 Key Improvements to Manufacturing
SUMMARY OF KEY IMPROVEMENTS TO PCCP(to AWWA C301 since 1984)
MORTAR COATING
Increased mortar coating thickness
Added cement slurry coating prior to prestressing and coating
Increased the minimum moisture content, which reduces absorptionmaking the coating less permeable
Required minimum compressive strength
Required a nondestructive thickness check on every pipe prior to removalfrom the coating machine
Required a soundness check on the cured coating on every pipe
PRESTRESSING WIRE
Increased the minimum size wire to 6 gauge, allowing better keying ofmortar to wire
Eliminated the possibility of using Class IV wire
Added a maximum temperature limit of 360 during wire drawing, whicheliminates the sensitivity of overheated wire to hydrogen embrittlement
Decreased the allowable fluctuation in wire wrapping tensile stress
Added tests to ensure high quality wire; i.e. Torsion, Bolt Cutter, Reduction ofArea, with testing required on every coil
ASTM A648 Supplementary HE Qualification Testing Requirement mandatory
CYLINDER STEEL
Eliminated Grade E cold rolled steel
Eliminated 18 gauge thickness; minimum is 16 gauge
Required testing of weld strengths
CONCRETE
Added minimum quality limits and testing frequencies for aggregates
Added limitation on allowable longitudinal cracks in core
OTHER
Required qualification of welders
Added requirement for test equipment calibration
Improved quality control of gaskets
Added allowable design stresses and minimum cylinder thicknesses forfittings
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
4/53
Slide 4- June 2009Toronto and Ottawa Ontario Canada Seminars
AWWA C301
Prestressed Concrete
Pressure Pipe, Steel
Cylinder Type
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
5/53
Slide 5- June 2009Toronto and Ottawa Ontario Canada Seminars
The New Hanson Pressure Pipe
Manufacturing Locations
Lubbock, TX
Grand Prair ie, TX
Victoria, TX
Palatka, FL
St. Eustache, QC,
Canada
Hattiesburg, MS
Bakewell , TN
South Beloit , IL
Stouffville,
ON, Canada
Uxbridge,
ON, Canada
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
6/53
PCCP History
First Installation (LCP) - 1942
First AWWA Standard (Tentative) - 1949
First Installation (ECP) 1953
Used in 90 of 100 Largest U.S. Municipalities
107,000,000 Feet (20,300 Miles), in U.S. and Canada
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
7/53
STEEL CYLINDER FABRICATION
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
8/53
JOINT RING ATTACHMENT
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
9/53
CYLINDER HYDRO TEST
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
10/53
APPLYING CONCRETE CORE LCP & BWP
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
11/53
ECP VERTICAL CASTING
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
12/53
HORIZONTAL PRESTRESSING
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
13/53
VERTICAL PRESTRESSING
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
14/53
MORTAR COATING
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
15/53
Slide 15- June 2009Toronto and Ottawa Ontario Canada Seminars
MORTAR COATING
VERTICAL
COATINGMACHINE FOR
ECP
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
16/53
MORTAR CURING
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
17/53
CONCRETE CURING
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
18/53
Slide 18- June 2009Toronto and Ottawa Ontario Canada Seminars
STEEL PLATE FABRICATION
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
19/53
Slide 19- June 2009
Toronto and Ottawa Ontario Canada Seminars
RAW FITTING
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
20/53
Slide 20- June 2009
Toronto and Ottawa Ontario Canada Seminars
MORTAR APPLICATION
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
21/53
ECP vs LCP
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
22/53
Field Services Emergency Repair
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
23/53
CPP Emergency Repair Questionnaire
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
24/53
Slide 24 - 10 October 2012
VC Summer Nuclear Plant Seminar
Emergency Repair Program
Hanson Pressure Pipe has established an emergency repair
program for all concrete pressure pipe products Customers can contact a Hanson employee 24/7 in the event of a
pipeline emergency
Pipe repair material is stocked in all manufacturing plants and
ready for immediate shipment
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
25/53
PCCP Emergency Repair Kit
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
26/53
PCCP Closures
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
27/53
Closure Installation Squareness Top and Bottom
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
28/53
Closure Installation Squareness Top and Bottom
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
29/53
Closure Installation Squareness Side to Side
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
30/53
Closures Squareness Side to Side
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
31/53
Closure Cutting
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
32/53
Field Weld Closure
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
33/53
Field Weld Closure
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
34/53
Field Weld Closure
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
35/53
Closure Using Come Along to Pull Joint Home
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
36/53
Closure Hydraulic Jacking Bell
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
37/53
FOLLOWER RING CLOSURE
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
38/53
Slide 38 - 10 October 2012
VC Summer Nuclear Plant Seminar
Repair Saddle Assembly
Repair Saddle Assembly can be used to address localized
problems on the pipe barrel Broken prestressing wires
Punctured steel cylinder
Damage must be far enough away from the joint to allow the
saddle assembly to be seated onto the pipe barrel
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
39/53
Concrete Pressure Pipe Repair Saddle
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
40/53
MECHANICAL JOINT SPIGOT
AND MECHANICAL JOINT BELL ADAPTERS
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
41/53
Slide 41 - 10 October 2012
VC Summer Nuclear Plant Seminar
Field Welding
Leaking joints can be welded for repair
Lined Cylinder Pipe joints can be welded on the exterior Embedded Cylinder Pipe joint usually will need to be welded on the
interior
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
42/53
STANDARD JOINT
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
43/53
SNAP RINGJOINT
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
44/53
SNAP RING JOINT
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
45/53
ASSEMBLED SNAP RING JOINT
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
46/53
HARNESS CLAMP JOINT - ECP
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
47/53
HARNESS CLAMP JOINT
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
48/53
Tapping Saddles
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
49/53
Tapping PCCP
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
50/53
Grouting with Diaper
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
51/53
Questions
and
Answers
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
52/53
Tapping Saddle Removing Prestress Wire
7/25/2019 Hanson_Chesapeake-Section-AWWA-Symposium-.pdf
53/53
PCCP
is a
Rigid
Pipe