39
Handling of out of specification results Michael Koupparis University of Athens

Handling of out of specification results Michael Koupparis University of Athens

Embed Size (px)

Citation preview

Page 1: Handling of out of specification results Michael Koupparis University of Athens

Handling of out of specification results

Michael Koupparis

University of Athens

Page 2: Handling of out of specification results Michael Koupparis University of Athens

Handling of out of specification results

1.0         Purpose:         To provide instruction for handling of out of specification results.

2.0         Objective:      To provide a documented procedure for handling of out of specification results.

3.0         Scope:            This procedure is applicable for handling of out of specification results.

4.0         Responsibility: – Primary: Officer – QC– Secondary: Officer-QA / Officer-QC

Page 3: Handling of out of specification results Michael Koupparis University of Athens

5.0       Procedure

Initiation of OOS (Phase I):• QC chemist shall report to QC In-charge, as and

when he notices out of specification. • The analyst should retain the entire sample /

standard solution.• QC In-charge shall initiate Phase I investigation as

per the format given in the SOP• Initial results have to be reported along with the

certificate of analysis and worksheets.• Then the investigation is to be done by QC In-

charge for the following types of the OOS failure:

Page 4: Handling of out of specification results Michael Koupparis University of Athens

5.0       Procedure:

• Material failure: Review and Comparison of the party certificates of analysis of raw material used.– Material shall not match the specifications.– If OOS is identified, reject the material.

• Production: Change in reaction time / sequential addition of the components / Functioning of the equipment / review of BMR (Batch Manufacturing Record).– If OOS is identified reject the product of the reprocess– If OOS does not identified, investigate as laboratory error.

• Laboratory:  In laboratory, there are four possibilities for error:

Page 5: Handling of out of specification results Michael Koupparis University of Athens

5.0       Procedure:

• Clerical error: Correction to be made according to clerical error, training shall be given to analyst. And release the material.

• System failure: Power failure / calibration failure check / any spillage or contamination in standard and sample / unsuitable instrument is used / instrument parameters set incorrectly.

• Analyst failure: Errors in dilution / Usage of appropriate and valid standard / method followed / sample stored appropriately / status of balance / Homogeneity of the sampling procedure / status of Instruments.

• Sampling procedure failure: Sample preparation method followed / sample taken is representative / sampling plan followed / sampling equipments status.

Page 6: Handling of out of specification results Michael Koupparis University of Athens

5.0       Procedure:

• If not found from all the above-mentioned failures, product can be considered as the material failure on the basis of trend analysis.

• The QC In-charge will fill the phase I investigation form with duly signed to QA for further actions.

• Upon conclusion, and remark initiation of the OOS phase-II is to be done.

Page 7: Handling of out of specification results Michael Koupparis University of Athens

5.0       Procedure:Phase II investigation of OOS:

• Nature of OOS is to be decided as per phase- I conclusion.

• Reason / Remark is to be noted for the nature of the OOS.

• Repeat testing can only be performed after an investigation of failure is initiated.

Page 8: Handling of out of specification results Michael Koupparis University of Athens

5.0       Procedure:Phase II investigation of OOS:

• Determine if the cause of the OOS is based on clerical error.– If the review of the OOS result demonstrates the

result is attributable to error based on incorrect calculation, transcription error, etc. correct the entry (ies) in accordance with current laboratory notebook entry error corrections procedure and re-review the result.

– If the corrected result is within specifications and acceptable based on historical test result trends, record and report the result.

– A formal investigation report is not required in this case.

Page 9: Handling of out of specification results Michael Koupparis University of Athens

5.0       Procedure:Phase II investigation of OOS:

• Conduct additional analyst training and/or review the test or process procedure for clarity to minimize future inconsistencies.

Page 10: Handling of out of specification results Michael Koupparis University of Athens

5.0       Procedure:

• If the preliminary investigation of the OOS result demonstrates the result is attributable to a determinate analytical identifiable error(s) (e.g. non-adherence to monograph instructions, instrument response drift, observed technique/instrument abnormalities, etc.):– the OOS result is recorded in the laboratory notebook

with suitable explanation as part of the batch or process record, and

– repeat testing can be performed.– This initial OOS result, demonstrated to be

attributable to determinate error, is not considered in the final release of the material or process

Page 11: Handling of out of specification results Michael Koupparis University of Athens

5.0       Procedure:

• When the investigation demonstrates that the OOS result is attributable to determinate analytical identifiable error:– conduct repeat testing by the original analyst

A following any corrective action indicated by the investigation.

– Record and report the repeat results.– These repeat results are considered in the

final disposition of the material or process.

Page 12: Handling of out of specification results Michael Koupparis University of Athens

5.0       Procedure:

• If the preliminary investigation of the OOS test result demonstrates that it is not attributable to determinate identifiable error, but is attributable to indeterminate error (unknown):– Document the conclusion of the investigation.– Record the results in the laboratory notebook and

include as part of the batch or process record.– This initial OOS result is considered in the final

disposition of the material or process.

Page 13: Handling of out of specification results Michael Koupparis University of Athens

5.0       Procedure:

• Where repeat testing is warranted after the investigation has disclosed indeterminate error:– repeat the test in duplicate by the original

Analyst A and another Analyst B on the original sample unless the preliminary failure investigation demonstrated that the original sample was non-representative.

Page 14: Handling of out of specification results Michael Koupparis University of Athens

5.0       Procedure:

• Note: If the initial aliquot from the original sample is not sufficient for retest, a second aliquot from the original sample is used.

• In the event that the original sample has been consumed during analysis, a second sample (new sampling) can be used.

• Re-sampling / Re-processing is to be done in case of the sampling procedure failure / In-process sample failure.

Page 15: Handling of out of specification results Michael Koupparis University of Athens

5.0       Procedure:

• If one or both repeat results of Analyst A are out-of-specification and one or both of repeat results of Analyst B are out-of-specification:– record both repeat results of Analyst A and

Analyst B and the original OOS results of Analyst A as part of the batch or process record.

– Indicate the material as failing the specification.

Page 16: Handling of out of specification results Michael Koupparis University of Athens

5.0       Procedure:

• If both repeat results from Analyst A and both results from Analyst B are within normal specification range (review historical result trend):– record all repeat results as part of the batch

or process record.– Indicate the material as passing the

specification.

Page 17: Handling of out of specification results Michael Koupparis University of Athens

5.0       Procedure:

• If one or both results from Analyst B are out-of-specification and both results of Analyst A are within normal specification:– record both repeat results of Analyst A and B

and the original OOS results of Analyst A as part of the batch or process record.

– And based on the trend analysis material to be rejected or re-sampling to be performed and re-test by analyst B.

Page 18: Handling of out of specification results Michael Koupparis University of Athens

5.0       Procedure:

• If re-test results of Analyst B are out-of-specification:– record re-test results of Analyst B and the

original OOS results of Analyst A as part of the batch or process record.

– Indicate the material as failing the specification.

Page 19: Handling of out of specification results Michael Koupparis University of Athens

5.0       Procedure:

• If re-test results from Analyst B are within normal specification range (review historical result trend):– record re-test results as part of the batch or

process record.– Indicate the material as passing the

specification.

Page 20: Handling of out of specification results Michael Koupparis University of Athens

5.0       Procedure:

• When an OOS result has been demonstrated through laboratory investigation to be valid and reflects the true quality of the material:– an investigation is initiated to determine the

cause of the material failure.– The Product Failure Investigation, if required

based on the outcome of the OOS investigation, must be completed.

Page 21: Handling of out of specification results Michael Koupparis University of Athens

5.0       Procedure:

• Phase II concludes with the result of material / product-released / not released.

•   Attach the available certificate of Analysis and worksheets of all the tests conducted.

• Mention preventive / Further action.

• Final closure by QC In-charge and approval by the QA In-charge.

Page 22: Handling of out of specification results Michael Koupparis University of Athens

Intimation of the OOS (1)

• Intimate to materials departments and corporate QA of the OOS in case of rejection.

• QA Chemist to fill the final rejection note.• This note should include the following things:

OOS No. / Item code / Used for / Item name / Date of receipt / Control no. / Supplier’s consignment no./ Supplier’s name / Referred specification no. / Reason for rejection.

Page 23: Handling of out of specification results Michael Koupparis University of Athens

Intimation of the OOS (2)

• Party Certificate Of Analysis, XXXXXXXXX Pharmaceuticals Ltd Certificate Of Analysis and samples if available should be attached with the rejection note.

• Forward this to the material department for further action.

• If the frequency of the out of specification exceeds more than three times, then the vendor shall be black listed in case of raw / packing material and if in-process then the process shall be considered for change.    

Page 24: Handling of out of specification results Michael Koupparis University of Athens

6.0      Reference Documents

• Phase I Investigation Form

• Decision Tree of Phase II

• Phase II OOS Form

• Final rejection note

• OOS logbook.

Page 25: Handling of out of specification results Michael Koupparis University of Athens

6. LOG BOOK FOR OUT OF SPECIFICATION RESULTS

• Serial no: ………………….• OOS no: ……………….• Date: ……………………• Department: ……………• OOS details: …………….• Investigation details: …….• Signature of QA: …………• Remarks: …………………

Page 26: Handling of out of specification results Michael Koupparis University of Athens

7.0      Abbreviations:

• QA   = Quality Assurance department

• SOP = Standard Operating Procedure

• QC = Quality Control

• OOS = Out of specification

Page 27: Handling of out of specification results Michael Koupparis University of Athens

8.0      Copies to  Distribution Sites :

• QA - Quality Assurance department

• QC - Quality Control

Page 28: Handling of out of specification results Michael Koupparis University of Athens

OUT OF SPECIFICATION INVESTIGATION FORMFormat No.: SOP/QA/XXXX/F/1

Parameter Limit (Spec. No) Actual Result

Pass / Fail

Pass / Fail

Attachement: First CoA with Work sheet

Page 29: Handling of out of specification results Michael Koupparis University of Athens

Phase-I     Analyst failure

(Yes / No) • Is there any Error in calculation?                        • Is there any Error in dilution?                              • Are appropriate and valid standards and

reagents used?                                    • Are methods

followed?                                                                                          

Page 30: Handling of out of specification results Michael Koupparis University of Athens

Phase-I     Analyst failure

(Yes / No)

• Are the test parameters followed?                                      

• Is sample stored appropriately?                                      • Is the balance used with appropriate accuracy and

calibrated?  • Is the sample Homogenous?                                           • Is the calibrated instruments/Glassware

used?                                   • Is the analyst trained and

evaluated?                                         

Page 31: Handling of out of specification results Michael Koupparis University of Athens

Phase-I     System failure

(Yes / No)

• To check for Power failure                                                                     

• Are the system/Instruments are calibrated? (Calibrate again)                  

• Is the calibration standard Used appropriate?                                    

• Is there any spillage/contamination in Standard/sample?                      

• Is suitable instrument used?                                                                  

• Is the instrument parameters set correctly?                                           

• Are the Appropriate Equipment Accessories used?                                           

Page 32: Handling of out of specification results Michael Koupparis University of Athens

Phase-I     Sampling Procedure failure

(Yes / No)

• Is Sample preparation done properly?                                       • Is sample taken representative?                                             • Is sampling plan followed?                                                         • Are sampling equipments ok?                                                    • Were environmental conditioned OK during Sampling?      • Is Appropriate Sample container / Sample bag Used?              

Page 33: Handling of out of specification results Michael Koupparis University of Athens

Phase-I     Other Checks for In-process Sampling

(Yes / No)

• Check if there is change in reaction time.                • Is the Sequential addition of components followed? • Is functioning of equipment proper?                        • Is BMR/BPR (Batch Manufacturing Record / Batch

Process Record) reviewed and found OK?                    • Review & comparison of Party COA of Raw

Materials.           

Page 34: Handling of out of specification results Michael Koupparis University of Athens

Phase-I     Conclusion

System Failure / Analyst Failure / Sampling Failure / In-process Failure / Material Failure.

(According to the above conclusion initiate the OOS Phase II as per flow chart)

Page 35: Handling of out of specification results Michael Koupparis University of Athens

Phase-I     Remark:

QC In charge (Name/ Signature/ Date)

__________________________________

Authorized By: QA In Charge (Name/Sign/Date)

_______________________________

Page 36: Handling of out of specification results Michael Koupparis University of Athens
Page 37: Handling of out of specification results Michael Koupparis University of Athens

FINAL REJECTION NOTE

Format No.: SOP/QA/xxxx/F4Material/Product:                                                   Date of InitiationProcess/Stage:                                                      Date of Sampling Lot/Batch No.:                                                        OOS NumberLot/Batch size:                                                       Manufacturer’s Name:

To: Purchase Department / Plant Manager                                             DATE:

xxxxxxxxxxxxxxFrom: QA Site

Page 38: Handling of out of specification results Michael Koupparis University of Athens

Please note that the following item is finally rejected:

Details:• Item Code: • Used For: • Item Name: • Date of Receipt/Manufacturing • Control No./Batch No.: • Quantity Received: • Quantity Rejected: • Supplier’s Consignment No.: • Supplier’s Name: • Ref. Specification:

Page 39: Handling of out of specification results Michael Koupparis University of Athens

REASON FOR REJECTION:

Further Action Plan:QA In charge

Enclosure:Party COA, ---------------------- COA and SamplesCc To: Corporate QA, Supplier through Purchase Department