100
Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa County

Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

  • Upload
    hahuong

  • View
    228

  • Download
    3

Embed Size (px)

Citation preview

Page 1: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa County

Page 2: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa
Page 3: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa County

PREPARED BY

HABAROW - SAKA WRUA, IUCN, FaIDA, WRMA AND OTHER STAKEHOLDERSHABAROW SAKA WRUA,P.O. BOX 15 - 70100 GARISSASAKA TOWN

NOVEMBER 2012

Page 4: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Acknowledgment We are grateful to Saka Community for actively participating in and dedicating their time and effort to the preparation of this adapted Sub-catchment Management Plan (ASCMP).

We are indebted to staff of the Ministries of Northern Kenya and Other Arid Lands, Livestock Development, Agriculture, Water and Irrigation, Forestry and Wildlife and Office of the President – Provincial Administration for their contribution and facilitation towards the ASCMP preparation.

Our heartfelt appreciation goes to Howard Buffet Foundation and Austrian Development Cooperation for funding the activity through the Global Water Initiative (GWI) and Building Drought Resilience (BDR) Projects respectively and the International Union for Conservation of Nature (IUCN) for providing technical support. We are also grateful to Omar Abdi and colleagues from the Water Resources Management Authority (WRMA) – Lower Tana for their inputs and guidance. Logistics and facilitation could not have been possible without Mohamed Shalle – the Director, Fafi Integrated Development Association (FaIDA) and his staff at FaIDA Head Office – Garissa and our driver Ahmed Abdulrazak (IUCN Eastern and Southern Africa Regional Office - ESARO).

The document was written by Dr. Ahmed Mohamed and Yasin Mahadi (IUCN - ESARO), and Jaafarsadiq Hassan (FaIDA). Comments and contributions were received from John Owino, Guyo Roba, Sarah Gibbons and Dr. Eliot Taylor all from IUCN- ESARO.

Page ii

Page 5: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Table of ContentsAcknowledgment ......................................................................................................................................................... iiList of tables................................................................................................................................................................ ivList of figures .............................................................................................................................................................. ivPlates ........................................................................................................................................................................... ivAcronyms ..................................................................................................................................................................... v

Chapter 1: Introduction ............................................................................................................................................. 11.1 Overview of adapted SCMP development .......................................................................................... 11.2 Objectives of the Adapted SCMP ....................................................................................................... 2

Chapter 2: Overview of Sub-Catchment .................................................................................................................. 3

Chapter 3: Catchment Characteristics ..................................................................................................................... 53.1 Community resource mapping ............................................................................................................ 53.2 Water and land management units ...................................................................................................... 53.3 Current status of resources .................................................................................................................. 73.4 Existing management practices ........................................................................................................... 83.5 Population and settlement ................................................................................................................. 103.6 Problem identification and ranking ................................................................................................... 10

Chapter 4: Management approach ......................................................................................................................... 204.1 Participatory conservation of catchment for drought resilience ....................................................... 20

Chapter 5: Resource availability and demand ....................................................................................................... 27

Chapter 6: Natural resources allocation for sustainable, equitable and efficient use by communities ............ 32

Chapter 7: Resource protection ............................................................................................................................... 38

Chapter 8: Catchment protection ............................................................................................................................ 43

Chapter 9: Capacity building .................................................................................................................................. 47

Chapter 10: Infrastructure development to boost resource conservation and mitigate against disasters and conflicts ............................................................................................................ 53

Chapter 11: Stakeholder analysis for right based approach and poverty reduction .......................................... 57

Chapter 12: Participatory monitoring and evaluation .......................................................................................... 65

Chapter 13: Finance and implementation of project activities ............................................................................. 68

Chapter 14: Mainstreaming and up-scaling of the approach ............................................................................... 70

AnnexesAnnex 1: Challenges related to forests/woodlands and management of the resource in Saka WRUA 72Annex 2: Challenges related to rivers and management of the resource in Saka WRUA .................... 73Annex 3: Challenges on farmlands and management of the resource in Saka WRUA ........................ 74Annex 4: Challenges on livestock and management of the resource in Saka WRUA .......................... 75Annex 5: Challenges on wildlife and management of the resource in Saka WRUA ............................ 76Annex 6: Challenge on fodder and pasture and management of the resource in Saka WRUA ............ 77Annex 7: Challenges on minerals and management of the resource in Saka WRUA ........................... 78Annex 8: Challenges on shallow wells and management of the resource in Saka WRUA .................. 79Annex 9: List Participants for Adapted SCMP-SAKA ......................................................................... 80Annex 10: Coordinates of Major Centres in Saka Sub-Catchment-from transact drives/walks ........... 81Annex 11: Coordinates of Major Laghas and Water Pans in the Sub-Catchment from

transact drives/walks........................................................................................................... 82Annex 12: Coordinates of minerals sites- from transact drives/walks .................................................. 83Annex 13: Plant species (Trees, shrubs and herbs) in Saka .................................................................. 84Annex 14: Habarow – Saka Adapted Sub-Catchment Management Plan: Summary Work Plan and

Budget (2012/2017) .............................................................................................................. 85

Page iii

Page 6: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Annex 15: Field visit photos ................................................................................................................. 89

List of TablesTable 1 Estimated livestock population in Saka Sub-catchment ........................................................................... 9

Table 2 Estimated yields of crops/fruits grown in Saka Sub-catchment ............................................................... 9

Table 3 Estimated population of Saka Sub-catchment ........................................................................................ 10

Table 4 Ranking Natural resource related problems in Saka Sub catchment ...................................................... 10

Table 5 Planned matrix for catchment characteristics ........................................................................................ 12

Table 6 Planned matrix for management approach in Saka Sub-catchment ........................................................ 22

Table 7 Demand for water (Human) in Saka Sub-catchment .............................................................................. 27

Table 8 Demand for water (livestock) ................................................................................................................. 27

Table 9 Demand for water (farms) ....................................................................................................................... 27

Table 10 Pasture requirement by livestock ............................................................................................................ 27

Table 11 Estimated pasture and forage production in Saka Sub catchment ......................................................... 27

Table 12 Resource availability and demand in Habarow - Saka Sub-catchment .................................................. 28

Table 13 Natural resource allocation plan for sustainable, equitable and efficient use in Saka sub-catchment .... 33

Table 14 Planned activities for implementation of resource protection in Saka Sub-catchment .......................... 39

Table 15 Implementation of catchment conservation activities within the management units ............................. 44

Table 16 Capacity building for community and partners on adaptive SCMP ....................................................... 49

Table 17 Implementation of infrastructure development to boost resource protection and conservation ............. 54

Table 18 Analysis of local stakeholders in Saka .................................................................................................... 59

Table 19 Improve stakeholder coordination and collaboration for harmonization of plans, right based approach and poverty reduction .............................................................................................................. 63

Table 20 Parameters to monitor for different natural resources ............................................................................ 65

Table 21 Participatory Monitoring and Evaluation of natural resources within Saka Sub-catchment .................. 66

Table 22 Capacity Building on Finance and Implementation of project activities ................................................ 69

Table 23 Activities for mainstreaming and up scaling of the adapted SCMP approach ........................................ 71

List of Figures Figure 1 Map of Lagha Tula Sub-catchment ...........................................................................................................3

Figure 2 Venn diagram for Saka Community – Local level collaboration and coordination ................................58

PlatesPlate 1: Community resource maps of Saka Sub-catchment on the ground by elders and women ..........................6

Plate 2: Community resource maps of Saka Sub-catchment on paper ....................................................................6

Plate 3: Current status/situation map and resource management units as defined by Saka Community .................7

Plate 4: Community vision map for Saka Sub-catchment ......................................................................................20

Page iv

Page 7: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Acronyms

ASALs Arid and Semi-Arid Lands

CDF Constituency Development Fund

FaIDA Fafi Integrated Development Association

IUCN International Union for Conservation of Nature

KARI Kenya Agricultural Research Institute

KEFRI Kenya Forest Research Institute

KFS Kenya Forest Service

KTB Kenya Tourism Board

KWS Kenya Wildlife Service

LATF Local Authority Transfer Fund

MoA Ministry of Agriculture

MoLD Ministry of Livestock Development

MoL Ministry of Lands

MoE&MR Ministry of Environment and Mineral Resources

MoE Ministry of Education

MoPHS Ministry of Public Health and Sanitation

MoPV Ministry of Planning and Vision 2030

MoPW Ministry of Public Works

MoR Ministry of Roads

MoWI Ministry of Water and Irrigation

WRMA Water Resource Management Authority

WRUA Water Resource Users Association

NDMA National Drought Management Authority

NEMA National Environment Management Authority

NWSB Northern Water Services Board

NRT Northern Rangelands Trust

SCMP Sub-catchment Management Plan

WDC WRUA Development Cycle

Page v

Page 8: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Page vi

Page 9: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Chapter 1: Introduction

1.1 Overview of Adapted SCMP Development The Adapted Sub-Catchment Management Plan for pastoral communities in the Arid and Semi-arid Lands (ASALs) of Kenya is a working document developed through a participatory process by engaging relevant stakeholders, including Water Resource Users Association (WRUA), other resource users associations, government officials and Non-Governmental Organizations (NGOs) to effectively manage and conserve natural resources through integrated resource management. ASCMPs consider both water and land resource management components to enhance equitable and sustainable resource management for improved livelihoods of communities in sub-catchments.

The ASCMP preparation followed the WRUA Development Cycle (WDC) guide with some additions to address the particular issues associated with arid areas. ASALs face different challenges compared to more humid environments and as such require different kinds of attention. The uncharacteristic nature of ASALs is manifested in the following amongst other things:

• Unique, heterogeneous and fragile ecosystems that are prone to degradation

• Most of the land is communally owned and migration is the back bone for survival

• Poverty levels are high and communities rely heavily on natural resources for their livelihood

• There are increasing constraints to mobility as dry season fodder/forage reserves are converted to arable agriculture. Mobility is further constrained by haphazard and mushrooming settlements in pasture areas

• The spread of invasive weeds such as Prosopis juliflora are adversely affecting natural pastures

• Adverse impacts of climate change in recent decades that contribute to higher rainfall variability and low reliability than in the past

• Weak governance due to dysfunctional traditional /customary laws and institutions and poorly or non-functioning modern laws and institutions, leading to the proliferation of unsustainable management practices

• Poor understanding of dryland systems leading to inappropriate approaches to development.

The Habarow – Saka Sub-catchment referred to in this report as Saka Sub-catchment for which this adapted SCMP was developed, is an arid land comprising over 90% range, mainly pastoral land. Consequently, the need to integrate rangeland planning and management component into this SCMP is of paramount importance in order to ensure holistic management of resources.

The adapted SCMP is a plan that aims to ensure sustainable management of both land and water resources in the sub-catchment area in order to enhance the livelihoods of communities. The plan entails a participatory approach in both the planning and management of resources. It is designed to ensure equitable sharing of benefits associated with the exploitation of resources, supported by effective governance mechanisms that also mainstream gender.

In order to help realise development of the adapted SCMP, experts from IUCN (from both the Water Wetlands and Drylands Programmes) and WRMA conducted a ‘Training of Trainers (ToT)’ workshop on rangeland and water management planning process for ASALs in Garissa between 22nd and 24th August 2012. The training equipped community members and relevant stakeholders on ways of integrating rangeland management planning and conventional sub-catchment management planning process aimed at allowing them to produce an all-inclusive and integrated adapted SCMP which caters for special need of dryland environment.

The adapted SCMP is a plan for five years with provision of adjustments based on prevailing conditions.

The adapted SCMP was developed through a participatory process involving all the relevant stakeholders through meetings held at Saka Al-Hamdu Hall, Saka Centre from 4th to 11th September 2012. The participants included community representatives from entire Saka sub-catchment, Saka WRUA Committee and key stakeholders including Departments of Agriculture, Livestock, Water and National Drought Management Authority, Kenya Wildlife Service (KWS), Fafi Integrated Development Association (FaIDA) and International Union for Conservation of Nature (IUCN).

Page 1

Page 10: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Prior to starting work on chapters of the adapted SCMP, WRUA members and other stakeholders involved in SCMP preparation were sensitised and enlightened on the steps required in the development of the adapted SCMP in order to enable them understand and follow the recommended procedure. The adapted SCMP has a total of 14 chapters and various methods were used during SCMP development including:

Group work (stakeholder input): community members and other participants participated as individuals in the development of SCMP chapters by contributing ideas, providing information and acting as facilitators in some sessions

Discussion: after the content of each chapter was prepared there was a discussion session where participants gave their comments and made additions or adjustments

Transect walk/drives: based on the problems identified by community members, participants were divided into groups to visit specific sites related to each problem. Related information to location names, GPS coordinates, problem/issue, planned/possible activities to solve the problem etc. were also collected

Literature review and data collection from different departments: various literatures were reviewed to obtain relevant information to use in compilation of some sections of the SCMP. Data was also obtained from different government departments including from WRMA, the Ministry of Livestock Development, the Kenya Forest Service etc.

1.2 Objectives of the Adapted SCMP• To improve the quantity and quality of water and land resources to enhance livelihoods

• To improve the ability of the rangeland and riparian areas within the sub-catchment to provide ecosystem services

• To improve the governance of land and water resources by promoting stakeholders participation in natural resource management (NRM)

• To enhance compliance to water, land and environmental regulations

• To develop well-governed and self-reliant WRUA and other land users.

Page 2

Page 11: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Chapter 2: Overview of Sub-Catchment

The chapter summarizes the resources within the catchment, threats affecting them and the effects, affected and solution options.

The Saka Sub-catchment (Figure 1) lies in the Saka Division, Balamabala District, Garissa County. The sub-catchment covers Saka Division with two locations, that is, Daley and Saka. The catchment covers an area of 748.1 km2 and is settled by Kenya Somali pastoralists and agro-pastoralists whose survival is heavily dependent on natural resources both within and outside the sub-catchment boundary. Neighbouring communities also have access to the resources in the Saka area, such as pasture and water resources.

Saka is endowed with riparian forests and woodlands, a permanent river (Tana River) and many seasonal rivers locally known as “Laghas”, seasonal shallow wells, farmlands, livestock, wildlife, fodder and pasture and minerals (sand, stones, gravels). Natural resources are the life line of the Saka community as well as some of the neighbouring populace and there is thus a need to effectively and sustainably manage these resources for the wellbeing of the population. Livestock is the backbone of the economy with limited sources of income also from crop production and small scale business.

The Saka community is actively involved in management of natural resource in various ways. The sub-catchment has a WRUA in place whose mandate is to sustainably manage water and other natural resources. The WRUA’s membership is voluntary and currently consists of people from varied backgrounds including pastoralists, agro-pastoralists, traders and women. The WRUA works closely with various line ministries and government agencies, in particular WRMA and Ministry of Water. IUCN, in partnership with WRMA and FaIDA, also works with the WRUA; this work is focussed mainly in enhancing their capacity on natural resource management and resource governance through strengthening of traditional institutions and laws on resource use and management, as well as initiating activities that build community resilience to drought and curtail environmental degradation

Page 3

Figure 1. Hydrological map of Saka Sub-catchment (Source WRMA Garissa Office, 2012)

Page 12: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

An integrated land and water resources management approach provides a suitable platform for a sustainable management approach, including allocation and monitoring of resources to meet the communities’ social, economic and environmental needs. SCMP preparation is pinned on the principles of integrated land and water management approaches in order to achieve the results desired by all the stakeholders involved. Although the area has vast natural resources there are a myriad of socio-economic and environmental challenges facing communities of the sub-catchment and their environment adversely affecting their wellbeing. These problems affect the wellbeing of communities in the Saka sub-catchment. The forests and woodlands are threatened by deforestation, wildfire, drought, overgrazing, charcoal burning, soil erosion and conversion to croplands and mushrooming and haphazard settlements. The effects, affected and solution options are Annex 1.

The rivers are vulnerable to river diversions, change of river course, floods and river bank erosion. Other pressures in the use the resource include destruction of farmlands, crocodile menace, mosquito infestation and spread of Prosopis juliflora (Mathenge) invasive weed. The effects, affected and solution options are Annex 2.

Farmlands are exposed to human-wildlife conflicts, inadequate irrigation infrastructure, flush floods, destruction of crops and other properties, lack of fence and protection, pest and diseases, inadequate capacity on crop production, frequent breakdown of water pumps, pastoralist-farmers conflicts, poor roads and poor market for farm produce. The effects, affected and solution options are Annex 3.

Livestock challenges constitute pests and diseases, predators (e.g. hyenas, crocodile, baboons and lions), drought, poor markets, inadequate extension services (e.g. veterinary services), wildfire caused by charcoal burning (leading to destruction of fodder, pasture and injuries to animals), inadequate pasture, influx from neighboring villages, obstruction of watering corridors, conversion of pasture land into farmlands and inadequate water for livestock use. Detailed are in Annex 4.

Wildlife resource is abundant within the sub-catchment but is constrained by inadequate water, pests and diseases, loss of habitat to crop farming and settlements, increased human-wildlife conflicts and no direct income from wildlife. Wildlife such hyenas and crocodiles feed on livestock, elephants and hippos destructs crops and fruits and is causing human death and disabilities. Detailed are in Annex 5.

Fodder and pasture is seasonal in nature and the constraints and threats related to it include frequent drought, wildfire, overgrazing, de-vegetation, clearance for mushrooming settlement and inland water sources, invasive weeds e.g. P. juliflora, inadequate water to access far away pastures, livestock influx especially those for Garissa market and wildlife-livestock conflict especially during the dry spell. The effects, affected and solution options for fodder and pastures are Annex 6.

Minerals (sand, cement like material, stones, hardcore and gravels) within the sub-catchment are faced by water erosion (especially sand), poor management and markets and inadequate skills to exploit. Detailed are in Annex 7.

The threats related to shallow well resources are collapsing of walls causing deaths and injuries, water from the source are polluted and contaminated, wildlife – human - livestock conflict and human to human conflicts for the use of the resource, spread and transmission of pest and diseases, “lagha” sedimentation filling shallow wells with eroded materials and the digging of the resource is labor intensive. The effects, affected and solution options are Annex 8.

In the course of the SCMP preparation, communities and other stakeholders identified various potential interventions, the individuals or institutions to involve and the resources required to overcome the challenges. The details are covered in Chapter 4 and subsequent chapters.

Page 4

Page 13: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Chapter 3: Catchment Characteristics

Baseline on current status and management of water and land resourcesThe chapter provides baseline details on current status and management of water and land resources including community mapping, the identified management units and the current status of the available natural resources within the catchment and how they are used and managed. The chapter ends with problem ranking within Saka and matrix to overcome the challenges in obtaining data for planning of sustainable natural resource management (NRM).

3.1 Community resource mappingIn order to get an accurate picture of baseline conditions, especially the nature and location of natural (including water) resources, community members drew resource maps of the sub-catchment. Such ‘community resource maps’ were used as an important data gathering tool as they help show the status of resources, as well as the issues/challenges that negatively affect them. They also provide information on how best to manage them, and give understanding on the common resources that require protection from all community members. Finally, such maps also allow others to know what resources their sub-catchment is endowed with.

The maps reflect community resource boundaries as opposed to administrative ones. They also show agreed management units, mobility (pattern of the livestock movement during dry and wet seasons) to access pasture and water, water sources; wet and dry season pastures; minerals resources; crop farming; influx patterns; roads; settlements; threats and the nature and location of existing management practices.Community maps are also an important tool to aid in understanding landscape level planning and management in pastoral set ups.

Locally available materials (grass, leaves, stones, soil, disposed containers, vegetables, ash, animal dung etc.) were used to prepare the maps on the ground by three groups (women, elders and youth) (Plates 1) before transferring them on to paper (Plate 2) for plenary discussion and verification with the community. Further, transect drives and walks by technical staff and community resource experts were used to confirm the status map.

3.2 Water and land management units Saka Sub-catchment falls within the management unit 4GB and consists of three resource management units: pastoral zone, which is estimated to cover 80% of land, agro-pastoral zone 18% and settlement zone 2% (Plate 3). The resource management units were defined and agreed with the community.

The pastoral unit consists of communal grazing areas away from the River Tana and is mostly used during the rainy seasons. The zone is freely used by all members of the community plus those from neighboring communities. Additionally, wildlife simultaneously uses the zone with livestock. Consequently, it’s prone to overgrazing, de-vegetation, wild fire, human-wildlife conflict and general environmental degradation. As dry season approaches water becomes a constraint and livestock herds plus wild animals migrate to the agro-pastoral zone while other members of the community search for casual jobs in the settlement zone.

Agro-pastoral unit consists of flood plains and cover 2-3 km stretch from the banks of the River Tana towards the hinterland. The zone locally known as “Bada or Goosh” is covered by luxuriant Acacia tortilis forest with intermittent individually or group owned crop lands. The natural vegetation is managed by elders based on unwritten but agreed by-laws and supported by the government chiefs. Despites these efforts, the land unit is threatened by deforestation, charcoal burning, overgrazing and human-wildlife conflict.

Settlement zone consists of 11 mushrooming and haphazard settled centres formed by pastoral dropouts and business persons and they are the main market outlets for pastoral and agro-pastoral products. The major constraints include lack of physical planning, polythene menace, insufficient quality water for domestic use, inadequate capacity to handle and process products and conflict over land ownership (plots).

Page 5

Page 14: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Page 6

Plate 1(a) Map by elders Plate 1(a) Map by women

Plate 2a Map by Youth Plate2b Map by Women

Plate2c Map by Elders

Plate 1: Community resource maps of Saka Sub-catchment on the ground by elders and women

Plate 2: Community resource maps of Saka Sub-catchment on paper

Page 15: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

3.3 Current status of resources Climate and weather conditions Saka is situated in an arid area. For the past decades rainfall in Saka has been irregular and erratic leading to recurrent droughts and flush floods. Mean annual rainfall is estimated at 300mm. The long rains occur April and May and the short rains between November and December. Mean annual temperature is approximately 30oC while annual evaporation is estimated at over 2,000 mm. January and February are the hottest months and June - July the coldest.

HydrologyThe sub-catchment is blessed to have the River Tana that forms Saka’s southern border (Figure 1) and has over 10 seasonal rivers (laghas) with the major ones being Habarow and Fadiwayne. Many shallow wells are located along the laghas mainly used for watering small stocks and occasionally for human consumption. There are four water pans located along northern border and are mainly used in rainy seasons though some have rarely impound water because of poor site location and inlets. Water tankering is another source of water for populations in North Saka especially in drought periods. Slopes are generally flat with gentle increase towards the north.

There is water scarcity in the sub-catchment and this often results in human-wildlife conflict over water resources due to competition mainly around open water sources. Defecation and urination by wildlife and livestock also causes water pollution to open water sources. Currently, the Saka sub-catchment has no water allocation plan in place.

Geology and soilsThe dominant soil type in the sub-catchment is sandy (reddish or whitish) derived from sedimentary rocks with slight variation in areas along the rivers that have alluvial soils (a mixture of loam, sand and clay) as a result of periodic floods.

Land useCommunity mainly practices nomadic pastoralism where their livestock depends on free access to pasture and fodder. Currently there is no planned wet and dry season grazing system in place although wet season grazing is concentrated away from the river and vice versa in dry seasons to avoid tsetse fly infestation and to minimize adverse impacts of floods within the river flood plains. The pasture and fodder resources are utilized by Saka Community and other migrant pastoralists from neighboring villages and divisions. There are few incidences of conflict reported on resource use but there are concerns that livestock for Garissa Livestock Market is causing overgrazing.

Page 7

Plate 3: Current status/situation map and resource management units as defined by Saka Community

Page 16: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Crop and agroforestry irrigation farming is practiced partly along the River Tana. Pastoralist-farmer conflicts and human-wildlife are not uncommon especially in dry seasons.

There are over 10 haphazard and mushrooming settlements within the sub-catchment mostly along the River Tana. These settlements are recent and are as a result of recurrent droughts that wiped out livestock forcing many pastoral dropouts to settle in order to attract food aid, try petty business and crop farming as the last alternative. The settlements also houses vulnerable members of pastoralists as able bodied members herd the few remaining livestock.

3.4 Existing management practicesSaka Community is actively involved in the management of natural resources through traditional norms and elders although weakened over time. Community elders are involved in giving advice on resource use and heavily on conflict resolution.

The Sub-catchment has a WRUA since 2011 whose mandate is to sustainably manage water and other natural resources. The WRUA is a registered association with Ministry of Gender, Children Social Development on 16th February 20011 with certificate number 139174 and with Office of the Attorney General with receipt number SOC/61255 of 8th July 2011. There are over 90 members mostly representing different community institutions and more are registering with time. The WRUA’s membership is voluntary and currently consists of people from varied backgrounds including pastoralists, traders and women. The WRUA work closely with various government agencies in particular with WRMA, Ministries of Water and Irrigation (MoWI), Livestock Development and Agriculture and CARE. IUCN, in partnership with WRMA and FaIDA, also works with the WRUA; this work is focussed mainly in enhancing their capacity in natural resource management and resource governance through strengthening of traditional institutions and laws on resource use and management, as well as initiating activities that build community resilience to drought and curtail environmental degradation.

Currently the WRUA is tasked with water management and conservation plus environmental protection in general. However, the WRUA will upscale their mandate to include pasture and fodder management, wildlife and other natural resources. Community members using the WRUA as a platform will engage with government departments and other partners on issues around management, protection, efficient use of resources, reporting and apprehending of criminals/those who break agreement and norms on resource use.

Communities practice a pastoralism life style where their livestock and those of neighbouring communities depend on free access to pasture and fodder. There have been minor incidences of conflict over use of resources between pastoralists and agro-pastoralists. In 2005, the community with the support of the area chiefs set up committee of elders and unwritten by-laws to support resource conservation especially in the “Bada or Goosh” (riparian Acacia forests). Some of the rules include no cutting of leaving trees and no more farms and new settlements within in the “Bada” and south the Garissa – Balamabala Road. When the WRUA was formed in 2011, the above mentioned elders joined the new structure to continue with the conservation efforts.

Forest and woodlands resourcesSaka sub-catchment is covered with luxuriant riparian Acacia forest along the Tana River and Acacia - Commiphora woodlands on the plains. The resource is protected using by-laws set by the community and it’s estimated to be about 40% of the land cover. The major vegetation are Acacia tortilis and A. elatior along the Tana River and A. tortilis, A. mellifera, A. senegal, A. reficiens, Delonix elata, Terminalia orbicularis, Boscia spp, Boswelia neglecta, Commiphora erythrea and C. africana on the plains. Non-wood products such as gums, resins, honey, pods and thatch are also among the products derived from the forest/woodlands. The community similarly uses the forest to obtain poles for construction and fuel-wood. The biggest threats to the forest and woodlands are deforestation; charcoal burning and invasive weeds especially Prosopis juliflora.

Wildlife resources Wildlife resources are plenty and available in the sub-catchment grazing/browsing freely with livestock. The flourishing status of wildlife is attributed to protection from the community. The community sees wildlife ungulates as an assurance against livestock predators such as hyena, cheetah, lion and wild dogs. They also appreciate the role of marabou stock in disposing carcasses. Others also value the role of wildlife in tourism that generates salaries for teachers, health staff and others government staff. They also associate birds in pollination and dispersal of indigenous plant species. Other community members also find wildlife to be encouraging the sprouting of natural vegetation and in providing manure for vegetation. However, threats such as settlement, habitat loss, drought and conflicts with humans exist. Saka sub-catchment has endangered and threatened species e.g. Wild Dogs (Lycaon pictus), African Elephant (Loxodonta africana), African Lions (Panthera leo) and Grevy’s Zebra (Equus grevyi). Common wildlife species found in the sub-catchment include: Somali Ostrich (Struthio camelus molybdophanes), Reticulated Giraffe (Giraffa camelopardalis reticulata), hippopotamus (Hippopotamus amphibious), Lesser Kudu (Tragelaphus imberbis), Plain Zebra (Equus quagga), Aardvark (Orycteropus

Page 8

Page 17: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

afer), Genet Cat (Genetta sp.), African Civet Cat (Civettictis civetta), White Tailed Mongoose (Ichneumia albicauda), Spotted Hyena (Crocuta crocuta), leopard (Panthera pardus), cheetah (Acinonyx jubatus), Black–backed Jackal (Canis mesomelas), African Wildcat (Felis sylvestris lybica), Honey Badger (Mellivora capensis), Velvet Monkey (Chlorocebus pygerythrus), Olive baboons (Papio anubis), African Hedgehog (Atelerix albiventris), bats, Ground Squirrel (many species), Lesser Bush Baby (Galago senegalensis), spring hare (Pedetes capensis), crocodile (Crocodylus niloticus), gerenuk (Litocranius walleri), dik-dik (Madoqua kirkii), warthog (Phacochoerus africanus), tortoise (Geochelone sulcata), porcupine (Hystrix cristata), as well as many different kinds of snakes and numerous bat and bird species.

Livestock resources Livestock is the main asset of communities living in Saka. Communities rear different kinds of livestock with the main ones being camels, cattle, goats, sheep, donkeys and poultry (Table 1). Almost every household depends on livestock for subsistence and as a source of income. It is estimated that livestock contributes to 95% of food production and income in the sub-catchment. In recent years the livestock resource has been affected by severe and recurrent droughts weakening herd and eventually causing death in some instances thereby, leading to lose of livelihoods.

Water resources The water resources in the sub-catchment include permanent and seasonal rivers (Laghas), shallow wells, water pans and natural ponds. There is one permanent river (River Tana), 15 Laghas and about 75 seasonal shallow wells situated at interval of about half kilometer along the major Laghas. In rainy season, it is estimated that a single shallow well can sustain thousand herds a day for a period of two month. The water resource is threatened by pollution, contamination, conflicts, fencing and recurrent drought. The major uses of water in the sub-catchment are domestic use, livestock use and crop farming.

A part from livestock, other major water uses are for domestic (communities, schools, health facilities and mosques) and crop irrigation in farms.

FarmlandsSome community members practice crop and agroforestry farming along the River Tana with most being small scale farms. They are 25 registered group farms. Watering of farms is usually done manually though pump sets are used in some of the farms. The crops and fruits grown include maize, tomatoes, watermelon, mangoes, onions, bananas, pawpaw, kales (Sukuma wiki), and capsicum (Pilipili hoho) (Table 2).

Pasture and fodder resources Pasture and fodder resources are vital component for the pastoral community. The pasture zone cover about 90% of the sub-catchment and dominated by grasses (Aristida spp, Eragrostis spp, Tetrapogon spp) legumes and shrubs (Indigofera spp, Tephrosia spp, Seracocomopsis pallida, Ipomea donaldsonii, Cordia spp, Anistosis tannensis, Acacia spp, Duospermum spp) while the riparian forest mainly of A. tortilis are vital for fodder accessibility and nutrition especially in dry seasons. It’s estimated that a single Acacia tortilis tree can produce 10 kg of pods per season or 20 kg per year. Unfortunately, some perennial palatable species such as Chrysopogon aucheri, Chloris roxburghiana, Sprobolus helvolus, Dactyloctenium aegyptium, Entropogon macrostachyus, Litepes senegalensis and Bleriperisperum spp have disappeared/over exploited due to overgrazing/over browsing. Farms along the River Tana also provide crop stovers, fodder from agroforestry tree leaves and some grow grasses (mainly Sudan Grass) through irrigation for livestock. Pasture and fodder are important to the livestock enterprise, however this resource is threatened by overgrazing, overstocking and climate change.

Regrettably, traditional grazing plans have been abandoned. There are also no distinctive rules and regulations on wet and dry season grazing and regulations that separate the use of resources by local community and outsider groups.

Table 1 Estimated livestock population in Saka Sub-catchment

Livestock Population

Camel 71,450Cattle 94,040Goats 260,800Sheep 107,000Donkeys 16,000Hives –Langstroths 88Hives-KTBH 372Hives-local 560Poultry 3,200

Source: District Livestock Production Office, Balambala (2012)

Table 2 Estimated yields of crops/fruits grown in Saka Sub-catchment

Crop/vegetable/fruits Estimate production (tons/year)

Tomato 130

Watermelon 4.5

Mangoes 20

Onion 120

Banana 120

Pawpaw 3

Sukuma wiki 0.5

Pilipilihoho 0.5

Maize 560Source: District Agricultural Office, Balambala (2012)

Page 9

Page 18: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Minerals The minerals found in the sub-catchment include sand, cement like stones most probably “mudstone”, stones/hardcore and gravel. There could be other precious minerals but no exploration has been conducted to ascertain the type of minerals, their quantity and quality. The level of exploitation is very low due to inadequate skills and lack of investment. However, sand and soil are harvested for shelter but the degradation resulting from such exploitation is minimal therefore, not alarming. However, stringent measures need to be put in place to avoid widespread land degradation in future.

3.5 Population and settlement The sub-catchment is estimated to be inhabited by approximately 7,000 people with density of nine persons per km (Table 3)

3.6 Problem identification and ranking Problem identification and pairwise ranking was conducted with the community. The ranking was based on the severity and extent of the problems as perceived by the community (Table 4). Deforestation was perceived to be the most severe and polythene bag menace the least.

Table 4: Ranking Natural resource related problems in Saka Sub catchment

Problem DF WFR OV DR SE PB Score Rank

Deforestation (DF) 1 1 1 1 1 5 1

Wildfire/charcoal burning (WFR) 0 1 1 1 1 4 2

Overgrazing (OV) 0 0 1 1 1 3 3

Drought (DR) 0 0 0 1 1 2 4

Soil erosion (SE) 0 0 0 0 1 1 5

Polythene bags (PB) 0 0 0 0 0 0 6

Additionally, problem identification and ranking was done for each existing resource in the sub-catchment and are listed below:

Problem identification and ranking for river related issues 1. Change of river course 2. Floods and related problems e.g. mosquito infestation, pollution and turbidity 3. River bank erosion 4. Crocodile menace 5. River diversion 6. Spread of Prosopis juliflora

Table 3 Estimated population of Saka Sub-catchment

Location Population Household Area Density no. (km2) (persons/km2)

Female Male Total

Saka 2,673 2,338 5,011 913 531.9 9

Daley 1,036 868 1,904 342 216.2 9

Total 3,709 3,206 6,915 1,255 748.1 Source: Kenya National Bureau of Statistics (2009)

Page 10

Page 19: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Problem identification and ranking for farmland 1. Destruction /lack of irrigation infrastructure 2. Flash floods 3. Human-wildlife conflicts arising from no/lack fence and protection to control entry of wildlife as well as livestock 4. Poor market 5. Poor roads6. Inadequate capacity on crop production 7. Frequent breakdown of pumps 8. Pastoralist encroachment to farms9. Pests and diseases

Problem identification for pasture/fodder and forests/woodlands1. Fire 2. Frequent droughts 3. Mushrooming of settlement and water sources 4. De-vegetation/deforestation5. Overgrazing 6. Livestock influx especially those for Garissa Market 7. Inadequate water to access pasture 8. Invasive weeds e.g. Prosopis9. Wildlife and livestock conflicts especially during the dry spell

Problem identification for wildlife 1. No direct benefit from wildlife2. Human-wildlife conflicts including destruction of farm products, human deaths and livestock 3. Inadequate water 4. Conversion of pasture to farms 5. Pests and diseases

Problem identification for livestock

1. Drought

2. Pests and diseases

3. Inadequate extension services

4. Poor market

5. Inadequate pasture due to overgrazing, deforestation and charcoal burning

6. Predators

7. Conversion of pasture into farmlands

8. Closure of watering corridors

Generally there is little baseline information on natural resource status and related activities that influence conditions of resources. To gain more information on the current status of the natural resources that will enhance sound management, community members and other stakeholders involved in SCMP preparation identified certain areas that need gathering of baseline information (Table 5). The budget for the various proceeding chapters (in Kenya Shillings – Kshs) consists of lump sum estimates including transport, inputs, per diems, stationery and expertise costs.

Page 11

Page 20: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Tabl

e 5:

Pla

nned

mat

rix

for c

atch

men

t cha

ract

eris

tics

Targ

et: O

btai

n ad

equa

te n

atur

al re

sour

ce d

ata

Ove

rall

outp

ut: R

elia

ble

curr

ent n

atur

al re

sour

ce d

ata

A

ctiv

ities

Sub-

activ

ityR

espo

nsib

ility

Out

puts

Indi

cato

rsT

ime

fram

eW

here

Bud

get (

kshs

)

100,

000

300,

000

Prob

lem

Bas

elin

e su

rvey

to

esta

blis

h th

e ex

tent

of

defo

rest

atio

n

Def

ores

tatio

n/

De-

vege

tatio

nSe

nsiti

zatio

n re

port

Def

ores

tatio

n as

sess

men

t rep

ort

Rep

ort s

ucce

ssfu

lly c

ompl

eted

and

acc

epte

d

Succ

essf

ully

com

plet

ed a

nd a

ccep

ted

repo

rt.

Det

aile

d da

ta o

n sp

ecie

s cu

t, am

ount

of b

iom

ass

defo

rest

ed a

nd fo

r wha

t pur

pose

R

epor

t suc

cess

fully

com

plet

ed a

nd a

ccep

ted

Oct

201

2

Nov

201

2–

Mar

ch 2

013

In a

ll re

sour

ce

man

agem

ent

units

In a

ll re

sour

ce

man

agem

ent

units

• C

omm

unity

sen

sitis

atio

n (T

rans

port,

Exp

ertis

e,

Stat

ione

ry, L

unch

es

Des

ign

of fi

eld

met

hodo

logy

an

d da

ta c

olle

ctio

n

• W

RU

A•

WR

MA

• IU

CN

• Fa

IDA

• K

FS•

ND

MA

• A

dmin

istra

tion

• C

omm

unity

• K

FS

• W

RM

A•

IUC

N•

FaID

A•

WR

UA

• N

DM

A

Shar

e de

fore

stat

ion

repo

rt w

ith W

RU

A a

nd c

omm

unity

(T

rans

port,

Exp

ertis

e,

Stat

ione

ry, L

unch

es)

• K

FS•

WR

UA

• IU

CN

• Fa

IDA

• N

DM

A•

NEM

A•

WR

MA

• A

dmin

istra

tion

• C

omm

unity

Wor

ksho

p re

port

Rep

ort s

ucce

ssfu

lly c

ompl

eted

and

acc

epte

d

May

201

3Sa

ka C

entre

100,

000

Sub-

tota

l50

0,00

0

Cha

rcoa

l bur

ning

Cha

rcoa

l sur

vey

Com

mun

ity s

ensi

tisat

ion

• K

FS•

WR

UA

• W

RM

A•

IUC

N•

FaID

A•

ND

MA

• A

dmin

istra

tion

• C

ount

y C

ounc

il•

Com

mun

ity

Sens

itiza

tion

repo

rtO

ct 2

012

In a

ll re

sour

ce

man

agem

ent

units

100,

000

Des

ign

and

cond

uct c

harc

oal

surv

ey•

WR

UA

• K

FS•

IUC

N•

FaID

A•

ND

MA

• N

EMA

• W

RM

A

Cha

rcoa

l ass

essm

ent

repo

rt •

Succ

essf

ully

com

plet

ed a

nd a

ccep

ted

repo

rt•

Det

aile

d da

ta o

n pr

efer

red

spec

ies,

vol

ume

harv

este

d

Dec

embe

r 201

2 –

Janu

ary

2013

All

reso

urce

m

anag

emen

t un

its

300,

000

Shar

e ch

arco

al s

urve

y re

port

with

WR

UA

and

com

mun

ity•

WR

UA

• K

FS•

IUC

N•

FaID

A•

ND

MA

• N

EMA

• W

RM

A•

Adm

inis

tratio

n•

Com

mun

ity

Wor

ksho

p re

port

Rep

ort s

ucce

ssfu

lly c

ompl

eted

and

acc

epte

dM

arch

201

3Sa

ka C

entre

100,

000

Sub-

tota

l50

0,00

0

Page 12

Page 21: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Act

iviti

esSu

b-ac

tivity

Res

pons

ibili

tyO

utpu

tsIn

dica

tors

Tim

e fr

ame

Whe

reB

udge

t (ks

hs)

Prob

lem

Con

duct

geo

logi

cal

surv

eyM

inin

g Se

nsiti

zatio

n re

port

Rep

ort s

ucce

ssfu

lly c

ompl

eted

and

acc

epte

dO

ct 2

012

All

reso

urce

m

anag

emen

t un

its

Com

mun

ity s

ensi

tisat

ion

• W

RU

A•

WR

MA

• IU

CN

• Fa

IDA

• M

ines

& G

eolo

gy•

Adm

inis

tratio

n •

Cou

nty

Cou

ncil

• C

omm

unity

100,

000

Des

ign

and

cond

uct

geol

ogic

al s

urve

y in

clud

ing

map

ping

• C

onsu

ltant

• M

ines

& G

eolo

gy•

WR

MA

• IU

CN

• Fa

IDA

• W

RU

A•

Min

es &

Geo

logy

• W

RU

A•

Con

sulta

nt•

Min

es &

Geo

logy

Geo

logi

cal/

min

ing

surv

ey re

port

Det

aile

d da

ta o

n th

e m

iner

als

foun

d in

the

sub-

catc

hmen

t and

eco

nom

y of

exp

loita

tion/

use

Nov

embe

r 20

12–

Mar

ch

2013

In a

ll re

sour

ce

man

agem

ent

units

8,00

0,00

0

Shar

e ge

olog

ical

sur

vey

repo

rt w

ith W

RU

A a

nd c

omm

unity

• K

FS•

IUC

N•

FaID

A•

ND

MA

• N

EMA

• W

RM

A•

Adm

inis

tratio

n•

Com

mun

ity

Wor

ksho

p re

port

Rep

ort s

ucce

ssfu

lly c

ompl

eted

and

acc

epte

dM

ay 2

013

Saka

Cen

tre10

0,00

0

Sub-

tota

l8,

200,

000

Ove

rgra

zing

C

ondu

ct p

astu

re

surv

eyC

omm

unity

sen

sitis

atio

n on

pa

stur

e st

atus

& li

vest

ock

infl u

x

• W

RU

A•

WR

MA

• IU

CN

• Fa

IDA

• N

DM

A•

MoL

D•

Adm

inis

tratio

n•

Cou

nty

Cou

ncil

• C

omm

unity

Sens

itiza

tion

repo

rtR

epor

t suc

cess

fully

com

plet

ed a

nd a

ccep

ted

Febr

uary

201

3

Past

oral

and

ag

ro-p

asto

ral

units

100,

000

Des

ign

and

cond

uct p

astu

re

surv

ey in

clud

ing

map

ping

&

stat

us

• W

RU

A•

WR

MA

• IU

CN

• Fa

IDA

• N

DM

A•

MoL

D

Past

ure

stat

us re

port

• Su

rvey

suc

cess

fully

com

plet

ed a

nd re

ports

ac

cept

ed•

Det

aile

d da

ta o

n th

e pa

stur

e st

atus

in th

e su

b-ca

tchm

ent a

nd c

ause

s of

deg

rada

tion

Mar

ch -

May

20

13

300,

000

Des

ign

and

cond

uct i

mpa

ct

asse

ssm

ent o

f infl

ux

of

lives

tock

for G

aris

sa M

arke

t on

reso

urce

s w

ithin

the

sub-

catc

hmen

t

• W

RU

A•

WR

MA

• IU

CN

• Fa

IDA

• M

oLD

Impa

ct re

port

on

infl u

x of

live

stoc

k fo

r G

aris

sa m

arke

t

• Su

rvey

s su

cces

sful

ly c

ompl

eted

and

repo

rts

acce

pted

D

etai

led

data

on

the

past

ure

stat

us in

the

sub-

catc

hmen

t and

cau

ses

of d

egra

datio

n

June

– A

ugus

t 20

1330

0,00

0

Shar

e w

ith c

omm

unity

pas

ture

st

atus

and

impa

ct o

f liv

esto

ck

for G

aris

sa M

arke

t rep

orts

• W

RU

A•

IUC

N•

FaID

A•

ND

MA

• N

EMA

• W

RM

A

• K

FS•

Adm

inis

tratio

n•

Com

mun

ity

Wor

ksho

p re

port

Rep

ort s

ucce

ssfu

lly c

ompl

eted

and

acc

epte

dO

ct 2

013

Saka

Cen

tre10

0,00

0

Sub-

tota

l80

0,00

0

Page 13

Page 22: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Act

iviti

esSu

b-ac

tivity

Res

pons

ibili

tyO

utpu

tsIn

dica

tors

Tim

e fra

me

Whe

reBu

dget

(ksh

s)Pr

oble

m

Base

line

surv

ey

on w

ater

reso

urce

s (g

roun

d an

d su

rface

w

ater

)

Lack

of d

ata

on

wat

er re

sour

ces

Sens

itiza

tion

repo

rtRe

port

succ

essf

ully

com

plet

ed a

nd a

ccep

ted

Mar

ch 2

013

All

reso

urce

m

anag

emen

t un

its

Com

mun

ity se

nsiti

satio

n •

WRU

A•

WRM

A•

MoW

&I

• N

DM

A•

IUCN

• Fa

IDA

• A

dmin

istra

tion

• Co

mm

unity

100,

000

Wat

er re

sour

ces (

grou

nd a

nd

surfa

ce w

ater

) sur

vey

for b

oth

quan

tity

and

qual

ity

• Co

nsul

tant

• W

RUA

• W

RMA

• M

oW&

I •

IUCN

• Fa

IDA

Wat

er re

sour

ces

asse

ssm

ent r

epor

t•

Succ

essf

ully

com

plet

ed a

nd a

ccep

ted

repo

rt•

Det

aile

d da

ta o

n lo

catio

n, v

olum

e, se

ason

ality

etc

of

surfa

ce a

nd g

roun

d w

ater

Apr

il-Ju

ne 2

013

500,

000

Shar

e w

ith c

omm

unity

wat

er

sour

ces s

tatu

s rep

ort

• W

RUA

• Co

nsul

tant

• IU

CN•

FaID

A•

ND

MA

• N

EMA

• W

RMA

• K

FS•

Adm

inist

ratio

n•

Com

mun

ity

Wor

ksho

p re

port

Repo

rt su

cces

sful

ly c

ompl

eted

and

acc

epte

dA

ugus

t 201

3Sa

ka C

entre

100,

000

Sub-

tota

l70

0,00

0

Cha

nge o

f riv

er

cour

se

Stud

y on

cau

ses o

f riv

er c

ours

e ch

ange

Co

mm

unity

sens

itisa

tion

• W

RUA

• W

RMA

• IU

CN•

FaID

A•

MoL

D•

MoA

• M

oW&

I •

Adm

inist

ratio

n •

Com

mun

ity

Sens

itiza

tion

repo

rtRe

port

succ

essf

ully

com

plet

ed a

nd a

ccep

ted

Febr

uary

201

3 Pa

stora

l and

ag

ro-p

asto

ral

units

100,

000

Des

ign

and

cond

uct r

iver

co

urse

cha

nge

• W

RUA

• W

RMA

• IU

CN•

FaID

A•

MoL

D•

MoA

• M

oW&

I

Chan

ge o

f riv

er

cour

se r

epor

t•

Surv

eys s

ucce

ssfu

lly c

ompl

eted

and

repo

rts

acce

pted

• D

etai

led

data

on

caus

es o

f riv

er c

ours

e ch

ange

Mar

ch –

May

20

1330

0,00

0

Shar

e w

ith c

omm

unity

rive

r co

urse

cha

nge

repo

rt•

WRU

A•

IUCN

• Fa

IDA

• N

DM

A•

NEM

A•

WRM

A •

KFS

• A

dmin

istra

tion

• Co

mm

unity

Wor

ksho

p re

port

Repo

rt su

cces

sful

ly c

ompl

eted

and

acc

epte

dJu

ly 2

013

Saka

Cen

tre10

0,00

0

Sub-

tota

l50

0,00

0

Page 14

Page 23: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Act

iviti

esSu

b-ac

tivity

Res

pons

ibili

tyO

utpu

tsIn

dica

tors

Tim

e fr

ame

Whe

reB

udge

t (ks

hs)

Prob

lem

Stud

y ca

uses

of b

anks

er

osio

nR

iver

ban

k er

osio

nSe

nsiti

zatio

n re

port

Rep

ort s

ucce

ssfu

lly c

ompl

eted

and

acc

epte

dA

pril

2013

Pa

stor

al a

nd

agro

-pas

tora

l un

its

Com

mun

ity se

nsiti

satio

n •

WR

UA

• W

RM

A•

IUC

N•

FaID

A•

KEN

GEN

• La

nd a

nd R

ecla

mat

ion

• M

oLD

• M

oA•

MoW

&I

• A

dmin

istra

tion

• C

omm

unity

100,

000

Des

ign

and

cond

uct c

ause

s of

river

ero

sion

WR

UA

• W

RM

A•

IUC

N•

FaID

A

Cau

ses o

f riv

er

chan

ge re

port

• Su

rvey

s suc

cess

fully

com

plet

ed a

nd re

ports

ac

cept

ed•

Det

aile

d da

ta o

n ca

uses

of r

iver

ban

k er

osio

n

May

– Ju

ly 2

013

300,

000

Sub-

tota

l40

0,00

0

Floo

ds

Floo

d as

sess

men

t and

ca

uses

C

omm

unity

sens

itisa

tion

• W

RU

A•

KEN

GEN

• W

RM

A•

IUC

N•

FaID

A•

Land

Rec

lam

atio

n D

epar

tmen

t •

MoW

&I

• M

oA•

MoP

HS

• N

DM

A•

Com

mun

ity•

Adm

inis

tratio

n

Sens

itiza

tion

repo

rtR

epor

t suc

cess

fully

com

plet

ed a

nd a

ccep

ted

Mar

ch 2

013

Agr

o-pa

stor

al

unit

100,

000

Des

ign

and

cond

uct

asse

ssm

ent,

impa

cts a

nd

caus

es o

f fl o

ods

• W

RU

A•

WR

MA

• IU

CN

• Fa

IDA

• M

oPH

S•

ND

MA

Floo

d as

sess

men

t re

port

Ass

essm

ent s

ucce

ssfu

lly c

ompl

eted

and

repo

rt

acce

pted

• D

etai

led

data

on

impa

cts o

f fl o

ods a

nd th

eir

caus

es

May

– Ju

ly 2

013

300,

000

Shar

e w

ith c

omm

unity

rive

r ba

nk e

rosi

on a

nd fl

ood

repo

rts•

WR

UA

• IU

CN

• Fa

IDA

• N

DM

A•

NEM

A•

WR

MA

KFS

• C

omm

unity

• A

dmin

istra

tion

Wor

ksho

p re

port

Rep

ort s

ucce

ssfu

lly c

ompl

eted

and

acc

epte

dSe

pt 2

013

Saka

Cen

tre10

0,00

0

Sub-

tota

l

Pollu

tion

Ana

lysi

s of t

he

qual

ity o

f wat

er fr

om

all s

ourc

es

Com

mun

ity se

nsiti

satio

n •

WR

UA

• W

RM

A•

IUC

N•

FaID

A•

MoP

HS

• N

atio

nal W

ater

Boa

rd S

ervi

ces (

NW

BS)

• G

over

nmen

t Lab

orat

ory

• A

dmin

istra

tion

• C

omm

unity

Sens

itiza

tion

repo

rtR

epor

t suc

cess

fully

com

plet

ed a

nd a

ccep

ted

Apr

il 20

13A

ll re

sour

ce

man

agem

ent

units

500,

000

100,

000

Page 15

Page 24: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Act

iviti

esSu

b-ac

tivity

Res

pons

ibili

tyO

utpu

tsIn

dica

tors

Tim

e fr

ame

Whe

reB

udge

t (ks

hs)

Prob

lem

Effe

cts o

f cro

codi

le

on p

eopl

e an

d liv

esto

ck

Cro

codi

le m

enac

e

Wat

er q

ualit

y re

port

• Q

ualit

y an

alys

is su

cces

sful

ly c

ompl

eted

and

re

port

acce

pted

• D

etai

led

data

on

qual

ity o

f wat

er fr

om a

ll so

urce

s w

ithin

the

sub-

catc

hmen

t and

thei

r im

plic

atio

ns

May

– Ju

ly 2

013

Saka

Cen

tre

Des

ign

and

cond

uct q

ualit

y as

sess

men

t and

impl

icat

ions

• C

onsu

ltant

• W

RM

A•

WR

UA

• IU

CN

• Fa

IDA

• M

oPH

S•

NW

BS

• G

over

nmen

t Lab

500,

000

All

reso

urce

m

anag

emen

t un

its

Shar

e w

ith c

omm

unity

po

llutio

n re

port

• W

RU

A•

Con

sulta

nt•

IUC

N•

FaID

A•

ND

MA

• N

EMA

• W

RM

A

• K

FS•

Adm

inis

tratio

n•

Com

mun

ity

Wor

ksho

p re

port

Rep

ort s

ucce

ssfu

lly c

ompl

eted

and

acc

epte

dSe

pt 2

013

100,

000

Sub-

tota

l70

0,00

0

Com

mun

ity se

nsiti

satio

n •

WR

UA

MoL

D•

MoA

• A

dmin

istra

tion

• K

WS

• IU

CN

• Fa

IDA

• W

RM

A•

Com

mun

ity

Sens

itiza

tion

repo

rtR

epor

t suc

cess

fully

com

plet

ed a

nd a

ccep

ted

June

201

3 A

gro-

past

oral

un

it 10

0,00

0

Des

ign

and

cond

uct s

urve

y to

as

sess

impa

cts o

f cro

codi

le

on p

eopl

e an

d liv

esto

ck

• M

oLD

• M

oA•

WR

UA

• K

WS

• IU

CN

• Fa

IDA

• W

RM

A

Surv

ey re

port

• Su

rvey

succ

essf

ully

com

plet

ed a

nd re

port

acce

pted

• D

etai

led

data

on

effe

cts o

f cro

codi

le o

n hu

man

s an

d liv

esto

ck a

nd th

eir i

mpl

icat

ions

doc

umen

ted

June

-Jul

y 20

1330

0,00

0

Shar

e w

ith c

omm

unity

cr

ocod

ile m

enac

e re

port

• W

RU

A•

IUC

N•

FaID

A•

ND

MA

• N

EMA

• W

RM

A

• K

FS•

Adm

inis

tratio

n•

Com

mun

ity

Wor

ksho

p re

port

Rep

ort s

ucce

ssfu

lly c

ompl

eted

and

acc

epte

dSe

pt 2

013

Saka

Cen

tre10

0,00

0

Sub-

tota

l

Wild

fi re

Ass

essm

ent o

f ca

uses

and

con

trol

of w

ildfi r

es

Com

mun

ity se

nsiti

satio

n •

WR

UA

MoL

D•

Adm

inis

tratio

n•

KFS

• Pa

stor

alis

ts

• IU

CN

• Fa

IDA

ND

MA

• C

omm

unity

Sens

itiza

tion

repo

rtR

epor

t suc

cess

fully

com

plet

ed a

nd a

ccep

ted

Oct

201

3 Pa

stor

al a

nd

agro

-pas

tora

l un

its

500,

000

100,

000

Page 16

Page 25: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Act

iviti

esSu

b-ac

tivity

Res

pons

ibili

tyO

utpu

tsIn

dica

tors

Tim

e fr

ame

Whe

reBu

dget

(ksh

s)Pr

oble

m

Wild

fi re

asse

ssm

ent

repo

rt

• A

sses

smen

t suc

cess

fully

com

plet

ed a

nd re

port

acce

pted

• D

etai

led

data

on

caus

es o

f wild

fi res

and

con

trols

do

cum

ente

d

Nov

201

3 –J

an

2014

Des

ign

and

cond

uct

asse

ssm

ent o

n ca

uses

and

co

ntro

l of w

ildfi r

es

• M

oLD

• W

RU

A•

KFS

• IU

CN

• Fa

IDA

• N

DM

A

300,

000

Saka

Cen

tre

Ass

essm

ent o

f se

ttlem

ent p

atte

rns

Settl

emen

t

Shar

e w

ith c

omm

unity

w

ildfi r

e re

port

• W

RU

A•

IUC

N•

FaID

A•

ND

MA

• N

EMA

• W

RM

A

• K

FS•

Com

mun

ity•

Adm

inis

tratio

n

Wor

ksho

p re

port

Rep

ort s

ucce

ssfu

lly c

ompl

eted

and

acc

epte

dM

arch

201

410

0,00

0

Sub-

tota

l

Past

oral

and

ag

ro-p

asto

ral

units

500,

000

100,

000

Com

mun

ity se

nsiti

satio

n •

WR

UA

MoL

D•

Cou

nty

Gov

’t/ C

ount

y C

ounc

il•

Adm

inis

tratio

n •

IUC

N•

ND

MA

• C

omm

unity

Sens

itiza

tion

repo

rtR

epor

t suc

cess

fully

com

plet

ed a

nd a

ccep

ted

Apr

il 2

013

Settl

emen

t, pa

stor

al a

nd

agro

-pas

tora

l un

its

Des

ign

and

cond

uct

asse

ssm

ent o

n ca

uses

an

d co

ntro

l of h

apha

zard

se

ttlem

ents

• M

oLD

• IU

CN

• W

RU

A•

ND

MA

• W

RU

A•

IUC

N•

FaID

A•

ND

MA

Settl

emen

t pat

tern

as

sess

men

t re

port

• A

sses

smen

t suc

cess

fully

com

plet

ed a

nd re

port

acce

pted

• D

etai

led

data

on

data

on

settl

emen

t pat

tern

do

cum

ente

d

May

–Ju

ly 2

013

300,

000

Shar

e w

ith c

omm

unity

se

ttlem

ent r

epor

t•

NEM

A•

WR

MA

KFS

• A

dmin

istra

tion

• C

omm

unity

Wor

ksho

p re

port

Rep

ort s

ucce

ssfu

lly c

ompl

eted

and

acc

epte

dSe

pt 2

013

Saka

Cen

tre10

0,00

0

Sub-

tota

l

Inva

sive

wee

d –

Pros

opis

julifl

ora

(M

athe

nge)

Ass

essm

ent o

f Pr

osop

is c

over

age,

th

reat

and

con

trol/

man

agem

ent

Com

mun

ity se

nsiti

satio

n •

MoL

D•

KFS

• K

EFR

I•

NEM

A•

WR

UA

• Fa

IDA

IUC

N

• N

DM

A

• A

dmin

istra

tion

• M

oA•

Cou

nty

Gov

’t/ C

ount

y C

ounc

il•

Com

mun

ity

Sens

itiza

tion

repo

rtR

epor

t suc

cess

fully

com

plet

ed a

nd a

ccep

ted

Mar

ch 2

013

Past

oral

and

ag

ro-p

asto

ral

units

500,

000

100,

000

Page 17

Page 26: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Act

iviti

esSu

b-ac

tivity

Res

pons

ibili

tyO

utpu

tsIn

dica

tors

Tim

e fr

ame

Whe

reB

udge

t (ks

hs)

Prob

lem

Mat

heng

e as

sess

men

t re

port

• A

sses

smen

t suc

cess

fully

com

plet

ed a

nd r

epor

t ac

cept

ed•

Det

aile

d da

ta o

n da

ta o

n co

vera

ge o

f inv

asiv

e w

eeds

, thr

eats

and

man

agem

ent i

n pl

ace

Apr

il-Ju

ne 2

013

Des

ign

and

cond

uct

asse

ssm

ent o

f cov

erag

e,

thre

at a

nd c

ontro

l/ m

anag

emen

t

• M

oLD

• K

EFR

I•

KFS

• N

DM

A•

IUC

N•

WR

UA

• M

oA

300,

000

Sub-

tota

l

Saka

Cen

tre

Con

duct

in

fras

truct

ure

stat

us

and

need

s as

sess

men

t su

rvey

Inad

equa

te

irri

gatio

n in

fras

truc

ture

Inva

sive

wee

d –

Pros

opis

julifl

ora

(M

athe

nge)

Ass

essm

ent o

f Pr

osop

is c

over

age,

th

reat

and

con

trol/

man

agem

ent

Past

oral

and

ag

ro-p

asto

ral

units

Shar

e w

ith c

omm

unity

Pr

osop

is re

port

• W

RU

A•

IUC

N•

FaID

A•

ND

MA

• N

EMA

• W

RM

A

• K

FS•

Adm

inis

tratio

n•

Com

mun

ity

Wor

ksho

p re

port

Rep

ort s

ucce

ssfu

lly c

ompl

eted

and

acc

epte

dSe

pt 2

013

100,

000

500,

000

100,

000

Com

mun

ity s

ensi

tisat

ion

• W

RU

A•

MoA

• M

oWI

• N

DM

A•

Adm

inis

tratio

n•

Farm

ers

Sens

itiza

tion

repo

rtR

epor

t suc

cess

fully

com

plet

ed a

nd a

ccep

ted

Sept

embe

r 201

3A

gro-

past

oral

un

it

Des

ign

and

cond

uct

infr

astru

ctur

e st

atus

and

ne

eds

asse

ssm

ent

• M

oWI

• M

oA•

WR

UA

• N

DM

A

Infr

astru

ctur

e st

atus

an

d ne

eds

asse

ssm

ent

repo

rt

• A

sses

smen

t su

cces

sful

ly c

ompl

eted

and

repo

rt ac

cept

ed

• D

etai

led

data

on

data

on

stat

us o

f inf

rast

ruct

ure

in

plac

e

Oct

-Dec

201

330

0,00

0

Shar

e w

ith c

omm

unity

irr

igat

ion

infr

astru

ctur

e

repo

rt

• W

RU

A•

MoA

• M

oWI

• N

DM

A•

Adm

inis

tratio

n•

Com

mun

ity

Wor

ksho

p re

port

Rep

ort s

ucce

ssfu

lly c

ompl

eted

and

acc

epte

dFe

b 20

1410

0,00

0

Sub-

tota

l

Hum

an-w

ildlif

e co

nfl ic

t C

ondu

ct a

sses

smen

t su

rvey

C

omm

unity

sen

sitis

atio

n •

WR

UA

KW

S•

MoA

• C

hief

s•

Adm

inis

tratio

n•

MoL

D•

Com

mun

ity

Sens

itiza

tion

repo

rtR

epor

t suc

cess

fully

com

plet

ed a

nd a

ccep

ted

Oct

ober

201

3A

gro-

past

oral

un

it

500,

000

100,

000

Des

ign

and

cond

uct h

uman

-w

ildlif

e co

nfl ic

t sur

vey

• K

WS

• M

oA•

WR

UA

• M

oLD

Hum

an –

wild

life

confl

ict s

urve

y re

port

• A

sses

smen

t suc

cess

fully

com

plet

ed a

nd r

epor

t ac

cept

ed•

Det

aile

d da

ta o

n hu

man

– w

ildlif

e co

nfl ic

t in

plac

e

Jan-

Mar

ch 2

014

300,

000

Shar

e w

ith c

omm

unity

w

ildfi r

e re

port

• W

RU

A•

IUC

N•

FaID

A•

ND

MA

• N

EMA

• W

RM

A

• K

FS•

Adm

inis

tratio

n•

Com

mun

ity

Wor

ksho

p re

port

Rep

ort s

ucce

ssfu

lly c

ompl

eted

and

acc

epte

dA

pril

2014

Saka

Cen

tre10

0,00

0

Sub-

tota

l50

0,00

0

Page 18

Page 27: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Act

iviti

esSu

b-ac

tivity

Res

pons

ibili

tyO

utpu

tsIn

dica

tors

Tim

e fr

ame

Whe

reB

udge

t (ks

hs)

Prob

lem

Sens

itiza

tion

repo

rtR

epor

t suc

cess

fully

com

plet

ed a

nd a

ccep

ted

Jan

2014

Com

mun

ity se

nsiti

satio

n •

WR

UA

• M

oA•

MoL

D

• A

dmin

istra

tion

• IU

CN

• Fa

IDA

Com

mun

ity

100,

000

Poor

mar

ket a

nd

road

sM

arke

t cha

in su

rvey

an

d va

lue

chai

n an

alys

is

Gar

issa

Cou

nty

and

natio

nal

leve

l

Des

ign

and

cond

uct m

arke

t va

lue

chai

n an

alys

is•

Con

sulta

nt•

MoA

• M

oLD

WR

UA

• IU

CN

• Fa

IDA

• N

DM

A

Mar

ket s

urve

y an

d va

lue

chai

n re

ports

• Su

rvey

and

ana

lysi

s suc

cess

fully

com

plet

ed a

nd

repo

rt ac

cept

ed•

Det

aile

d da

ta o

n m

arke

t sur

vey

and

valu

e ch

ain

anal

ysis

in p

lace

Jan

– M

arch

20

1450

0,00

0

Shar

e w

ith c

omm

unity

m

arke

t cha

in a

naly

sis r

epor

t•

WR

UA

• C

onsu

ltant

• IU

CN

• Fa

IDA

• N

DM

A•

NEM

A•

WR

MA

KFS

• A

dmin

istra

tion

• C

omm

unity

Wor

ksho

p re

port

Rep

ort s

ucce

ssfu

lly c

ompl

eted

and

acc

epte

dM

ay 2

014

Saka

Cen

tre10

0,00

0

Sub-

tota

l

Tota

l cos

t (K

shs)

700,

000

16,5

00,0

00

Page 19

Page 28: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Chapter 4: Management approach

The chapter provides details on the management approaches that are considered appropriate for the progressive improvement of water and land management in the sub-catchment. It also explores ways of sustainably maximizing the benefits accruing from the resources that are available in sub-catchment. The management will adopt an approach where appropriate technologies and participatory processes are the main focus in the implementation of the adapted SCMP to ensure sustainability and resilience to drought. One of the key management themes of the adapted SCMP is to decentralize management activities with a view to making the WRUA and the stakeholders more responsive to the needs of their sub-catchment. This will be achieved through the following:

• Vision mapping of the management units

• Capacity build the WRUA to provide the services required to manage water and land resources.

• Sustainable NRM within a management unit to overcome the current challenges.

Saka sub-catchment is mainly suitable for livestock production. Nevertheless, irrigation farming is also practiced along the River Tana and rainfed crop farming in flush flood plains along some of the major laghas such as Qabobey and Fadiweyne. During the ASCMP development community members and other stakeholders proposed various interventions and management practices to overcome problems faced by the community. Most of the proposed activities will be spearheaded by community members with technical and financial support from government and other donor agencies. Saka WRUA is expected to mobilize community members to actively participate in implementing the proposed activities.

Objectives• To ensure a well conserved catchment that is sufficient both in quantity and quality of water and other land resources to

meet human and environmental requirement

• To ensure the local community is involved in the management, conservation and protection of the water and land resources

• To promote community resilience to drought through sustainable, equitable and efficient land and water resource management.

4.1 Participatory conservation of catchment for drought resilience

A combined community resource map was used to draw the vision map (Plate 4). The map contains proposed activities per management unit to overcome the challenges faced within the sub-catchment in the next five years. The catchment is classified as ALARM due to water scarcity, environmental degradation such as charcoal production and frequent droughts. Other challenges for each management unit are indicated below:

Page 20Plate 4: Community vision map for Saka Sub-catchment

Page 29: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Management unitsSaka Sub-catchment falls within 4GC and consists of three resource management units: pastoral, agro-pastoral and settlement.

Pastoral unitThe pastoral unit is the largest of the three management units and it is mainly used as grazing zone for livestock and wildlife especially in wet season and normal dry spell. The major challenges were highlighted in Chapter Three.

The following are the proposed activities to combat the above challenges:

• Regulate and guide dry and wet grazing seasons to avoid overgrazing

• Enlighten on stocking rates

• Reseeding and reforestation with local species from the sub-catchment

• Improve the availability of water for livestock, domestic and wildlife

• Management of pests and diseases – including information on early warning/surveillance

• Reduce human-wildlife conflict through sensitization and awareness creation, strengthen partnership with KWS, formation of game scouts, increased corporate responsibility to communities and ecotourism promotion

• Formation/strengthen of by-laws on pasture, water, livestock and environmental management

• Infrastructure development – roads, communication network to enhance the above suggested solutions.

Agro-pastoral unit This unit is the second largest management unit within the sub-catchment and it is mainly used as dry season grazing zone for livestock and wildlife. The zone also covers croplands dotted within the area. The major constraints were highlighted in Chapter Three.

The following are the proposed activities to reduce the severity of the above challenges:

• Formation/strengthen of by-laws on pasture, fodder and crop management

• Conservation of Acacia tortilis riparian forests for fodder through community forest scouts, strengthen partnership with KFS and KEFRI, afforestation and reforestation

• Protection of existing Malkas (water corridors) and advocacy for more

• River bank protection/stabilization

• Promotion fodder farming and agroforestry

• Promotion of wildlife farming and sanctuaries

• Reduce farmer-pastoralist-wildlife conflicts through electric fencing, strengthen partnership with KWS, formation of game scouts, increased corporate responsibility to communities and ecotourism promotion

• Sensitization and awareness creation

• Management and mainstreaming of conservation activities in irrigation schemes.

Settlement unitThis unit is the smallest management unit within the sub-catchment and it is mainly used as town centres and market outlets for livestock and crop products. The settlement zone consists of mushrooming and haphazard town centres formed by pastoral dropouts and businessmen. The major constraints were highlighted in Chapter Three.

The following are the proposed activities to reduce the impacts of the above challenges:

• Physical planning of major settlements

• Formation/strengthen of by-laws on environmental conservation

• Establishment of markets for livestock and crops

• Recycling of polythene bags and planned disposal of solid waste

• Promotion of natural resource based cottage industries

• Provision of clean and adequate water

• Promotion of natural resource management education.

Based on the above threats and activities the community developed work plan and budget matrix for management interventions to build resilience and enhance sustainable land and water uses (Table 6).

Page 21

Page 30: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Tabl

e 6:

Pla

nned

mat

rix

for m

anag

emen

t app

roac

h in

Sak

a Su

b-ca

tchm

ent

Targ

et: T

o bu

ild c

omm

unity

resi

lienc

e an

d en

hanc

e su

stai

nabl

e re

sour

ce m

anag

emen

t in

the

sub-

catc

hmen

t to

be

spea

rhea

ded

by W

RU

A m

embe

rs a

nd o

ther

sta

keho

lder

s O

vera

ll ou

tput

: The

com

mun

ity w

ithin

the

sub-

catc

hmen

t und

erst

and

the

ecol

ogic

al, c

omm

erci

al a

nd li

velih

ood

zone

s an

d ap

prop

riate

mec

hani

sm to

sol

ve th

e ex

istin

g re

sour

ces

chal

leng

es

Act

iviti

esSu

b-ac

tiviti

esR

espo

nsib

ility

Out

puts

Indi

cato

rsW

hen

Whe

reB

udge

t (ks

hs)

500,

000

Prob

lem

/ O

bjec

tives

Cap

acity

bui

ldin

g of

WR

UA

and

co

mm

unity

m

embe

rs o

n na

tura

l res

ourc

e m

anag

emen

t to

solv

e w

ater

sca

rcity

Wat

er sc

arci

tyW

orks

hop

repo

rt •

Succ

essf

ully

doc

umen

ted

and

acce

pted

w

orks

hop

repo

rt•

Impr

oved

wat

er m

anag

emen

t

Jan

2013

Settl

emen

t zon

e (S

aka

Cen

tre)

Wor

ksho

p on

man

agem

ent

of e

xist

ing

wat

er s

ourc

es

(3da

ys)

• W

RU

A

• M

oWI

• W

RM

A

• IU

CN

• Fa

IDA

• O

ther

NG

Os

Awar

enes

s ra

isin

g on

re

sour

ce u

se a

nd m

anag

emen

t un

der d

evol

ved

syst

em o

f go

vern

ance

s (1

1 se

nsiti

zatio

n m

eetin

gs -

Bar

azas

)

• W

RU

A•

WR

MA

• IU

CN

• Fa

IDA

• K

FS•

KW

S•

MoA

• M

oLD

• N

DM

A•

MoW

&I

Awar

enes

s cr

eatio

n re

port

Succ

essf

ully

doc

umen

ted

and

acce

pted

aw

aren

ess

repo

rtJa

n 20

13Se

ttlem

ent z

one

(in 1

1 ce

ntre

s)60

0,00

0

Sub-

tota

l1,

100,

000

100,

000

Poor

land

use

Map

ping

the

sub-

catc

hmen

t int

o m

anag

emen

t uni

t

Hol

d 11

Com

mun

ity

sens

itiza

tion

sess

ions

WR

UA

• W

RM

A•

IUC

N•

FaID

A•

ND

MA

Awar

enes

s cr

eatio

n re

port

Succ

essf

ully

doc

umen

ted

and

acce

pted

se

nsiti

zatio

n re

port

Feb

– M

arch

20

13Se

ttlem

ent z

one

(in 1

1 ce

ntre

s)

Dig

itisa

tion

of c

omm

unity

m

ap (

Geo

-ref

eren

cing

, im

age

clas

sifi c

atio

n, g

roun

d tru

thin

g an

d va

lidat

ion,

pr

intin

g an

d sh

arin

g w

ith

partn

ers

and

com

mun

ity)

• C

onsu

ltant

• W

RM

A•

IUC

N•

FaID

A•

ND

MA

• W

RU

A

Dig

itize

d m

ap o

f Sa

ka S

ub-c

atch

men

t m

anag

emen

t uni

ts

with

det

aile

d re

port

Succ

essf

ully

doc

umen

ted

and

acce

pted

dig

itize

d m

ap

Apr

il 20

13A

ll m

anag

emen

t un

its w

ithin

the

sub-

catc

hmen

t

1,00

0,00

0

Shar

e w

ith c

omm

unity

GIS

m

aps

• C

onsu

ltant

• W

RU

A•

IUC

N•

FaID

A•

ND

MA

• N

EMA

• W

RM

A

• K

FS•

Adm

inis

tratio

n•

Com

mun

ity

Wor

ksho

p re

port

Rep

ort s

ucce

ssfu

lly c

ompl

eted

and

acc

epte

dJu

ne 2

013

Saka

Cen

tre10

0,00

0

Sub-

tota

l1,

200,

000

100,

000

Cha

rcoa

l bur

ning

Sust

aina

ble

char

coal

pr

oduc

tion

Awar

enes

s cr

eatio

n on

su

stai

nabl

e ch

arco

al

prod

uctio

n an

d m

anag

emen

t

• K

FS•

WR

UA

• C

omm

unity

• C

ount

y G

ov’t/

Cou

nty

Cou

ncil

• N

EMA

• W

RM

A•

IUC

N•

FaID

A•

ND

MA

Awar

enes

s cr

eatio

n re

port

• Su

cces

sful

ly d

ocum

ente

d an

d ac

cept

ed

awar

enes

s re

port

• Im

prov

ed tr

ee c

over

with

in th

e su

b-ca

tchm

ent

Apr

il 20

13A

ll m

anag

emen

t un

its w

ithin

the

sub-

catc

hmen

t

Page 22

Page 31: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Sub-

activ

ities

Act

iviti

esW

here

Bud

get (

kshs

)W

hen

Out

puts

300,

000

Prob

lem

/ O

bjec

tives

Reg

ulat

e an

d gu

ide

dry

and

wet

seas

on

graz

ing

Succ

essf

ully

regi

ster

ed a

nd re

cogn

ized

cha

rcoa

l pr

oduc

ers a

ssoc

iatio

nsM

ay-J

une

2013

All

man

agem

ent

units

with

in th

e su

b-ca

tchm

ent

Form

atio

n of

cha

rcoa

l a

prod

ucer

s ass

ocia

tion

that

pr

actic

e su

stai

nabl

e ch

arco

al

prod

uctio

n

• K

FS•

WR

UA

• N

EMA

• N

DM

A

• Fa

IDA

Res

pons

ibili

tyIn

dica

tors

Ove

rgra

zing

Reg

iste

red

char

coal

pro

duce

rs

asso

ciat

ions

Dev

elop

men

t of w

oodl

and/

fore

st m

anag

emen

t pla

n •

KFS

• W

RU

A

• C

omm

unity

• N

EMA

• W

RM

A•

IUC

N•

FaID

A•

ND

MA

Det

aile

d w

oodl

and/

fo

rest

man

agem

ent

plan

Woo

dlan

d m

anag

emen

t pla

n su

cces

sful

ly

docu

men

ted

and

acce

pted

Aug

ust-S

ept

2013

Past

oral

and

ag

ro-p

asto

ral

units

1,00

0,00

0

Shar

e w

ith c

omm

unity

w

oodl

and/

fore

st m

anag

emen

t pl

an

• W

RU

A•

IUC

N•

FaID

A•

ND

MA

• N

EMA

• W

RM

A

• K

FS•

Adm

inis

tratio

n•

Com

mun

ity

Wor

ksho

p re

port

Rep

ort s

ucce

ssfu

lly c

ompl

eted

and

acc

epte

dSe

pt 2

013

Saka

Cen

tre10

0,00

0

Sub-

tota

l1,

500,

000

1,00

0,00

0C

omm

unity

con

sulta

tion

mee

tings

WR

UA

• M

oLD

• A

dmin

istra

tion

• El

ders

• C

omm

unity

KW

S•

IUC

N•

FaID

A•

WR

MA

• N

DM

A

Cha

rcoa

l bur

ning

Sust

aina

ble

char

coal

pr

oduc

tion

Gra

zing

man

agem

ent

com

mitt

ee (G

MC

) fo

rmed

/stre

ngth

ened

to

regu

late

dry

and

w

et se

ason

gra

zing

Min

utes

of m

eetin

gs

Oct

ober

eve

ry

year

and

Mar

ch

ever

y ye

ar (

for 5

ye

ars)

Past

oral

and

ag

ro-p

asto

ral

units

Dev

elop

men

t of d

ry a

nd w

et

graz

ing

patte

rn•

Con

sulta

nt•

WR

UA

• K

WS

• M

oLD

• IU

CN

• Fa

IDA

• W

RM

A•

ND

MA

Seas

onal

gra

zing

ca

lend

ar p

lann

ed

and

impl

emen

ted

by

GM

C

Prog

ress

repo

rtsO

ctob

er e

very

ye

ar a

nd M

arch

ev

ery

year

( fo

r 5

year

s)

Past

oral

and

ag

ro-p

asto

ral

units

1,00

0,00

0

Shar

ing

dry

and

wet

gra

zing

pa

ttern

with

com

mun

ity

• C

onsu

ltant

• W

RU

A•

KW

S•

MoL

D•

IUC

N•

FaID

A•

WR

MA

• N

DM

A•

Elde

rs•

Com

mun

ity•

Adm

inis

tratio

n

Wor

ksho

p re

port

Rep

ort s

ucce

ssfu

lly c

ompl

eted

and

acc

epte

dSe

pt 2

013

Saka

Cen

tre10

0,00

0

Page 23

Page 32: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Sub-

activ

ities

Act

iviti

esW

here

Budg

et (k

shs)

Whe

nO

utpu

ts

2,50

0,00

0

Prob

lem

/ O

bjec

tives

Prog

ress

repo

rts20

13 -

2017

Past

oral

and

ag

ro-p

asto

ral

units

Impl

emen

tatio

n of

dry

and

w

et g

razi

ng p

atte

rn•

WR

UA

• M

oLD

• K

WS

• IU

CN

• Fa

IDA

• W

RM

A•

ND

MA

• El

ders

• C

omm

unity

• A

dmin

istra

tion

• C

ount

y C

ounc

il/ C

ount

y G

ov’t

Res

pons

ibili

tyIn

dica

tors

Plan

ned

seas

onal

gr

azin

g ca

lend

ar

impl

emen

ted

by

GM

C

Ove

rgra

zing

Reg

ulat

e an

d gu

ide

dry

and

wet

seas

on

graz

ing

Sens

itiza

tion

and

awar

enes

s cr

eatio

n w

orks

hops

• W

RU

A•

Adm

inis

tratio

n •

Elde

rs

• K

WS

• M

oLD

• IU

CN

• Fa

IDA

• W

RM

A•

ND

MA

Com

mun

ities

se

nsiti

zed

on

dest

ocki

ng

No.

of s

ensi

tizat

ion

mee

tings

A

pril

2013

June

201

4Pa

stor

al a

nd

agro

-pas

tora

l un

its

300,

000

Sub-

tota

l4,

900,

000

300,

000

Wea

k ea

rly

war

ning

syst

em

Enlig

hten

co

mm

uniti

es o

n th

e ne

ed to

des

tock

Doc

umen

t the

exi

stin

g an

d tra

ditio

nal e

arly

war

ning

sy

stem

s

• N

DM

A•

Met

Dep

t •

MoL

D•

MoA

• K

WS

• W

RU

A•

WR

MA

• IU

CN

• Fa

IDA

Exis

ting

and

tradi

tiona

l rep

orts

Trad

ition

al e

arly

war

ning

s suc

cess

fully

doc

umen

ted

and

repo

rt ac

cept

edN

ov 2

013

Past

oral

and

ag

ro-p

asto

ral

units

Inte

grat

e tra

ditio

nal a

nd

mod

ern

early

war

ning

sy

stem

s

Inte

grat

ed tr

aditi

onal

an

d m

oder

n ea

rly

war

ning

repo

rts

Inte

grat

ed tr

aditi

onal

and

mod

ern

early

war

ning

re

ports

succ

essf

ully

doc

umen

ted

and

repo

rt ac

cept

ed

Nov

201

330

0,00

0

Dev

elop

and

stre

ngth

en

early

war

ning

syst

ems a

nd

surv

eilla

nce

Red

uced

inci

denc

e of

pe

sts a

nd d

isea

ses

infe

stat

ion

No.

of l

ives

tock

vac

cina

ted/

trea

ted

Con

tinuo

us fr

om

Oct

ober

201

2-Ju

ne 2

017

Past

oral

and

ag

ro-p

asto

ral

units

1,00

0,00

0

Com

mun

ity c

onsu

ltatio

n to

se

nsiti

ze a

nd a

gree

on

the

num

ber a

nd th

e co

st o

f off-

take

per

live

stoc

k

• M

oLD

• M

oA•

KW

S•

ND

MA

Sens

itiza

tion

repo

rtsA

gree

d no

. of l

ives

tock

for o

ff- ta

ke

Dro

ught

yea

rs50

0,00

0

Exec

utio

n of

off-

take

• W

RU

A•

Met

Dep

t•

Adm

inis

tratio

n•

DSG

Live

stoc

k of

f -ta

ke

plan

Agr

eed

no. o

f liv

esto

ck fo

r off-

take

D

roug

ht y

ears

Past

oral

and

ag

ro-p

asto

ral

units

10,0

00,0

00

Sub-

tota

l12

,100

,000

3,00

0,00

0C

onfl i

ct o

ver

natu

ral r

esou

rces

Stre

ngth

en e

xist

ing

peac

e co

mm

ittee

s to

redu

ce c

onfl i

ct o

ver

reso

urce

s dur

ing

drou

ght p

erio

ds

Trai

ning

com

mitt

ees o

n co

nfl ic

t res

olut

ion

(1 se

ssio

n pe

r yea

r)

• Pe

ace

com

mitt

ee•

WR

UA

MoL

D•

MoA

• K

WS

• N

DM

A•

Adm

inis

tratio

n•

DSG

Trai

ning

repo

rtsSu

cces

sful

ly d

ocum

ente

d an

d ac

cept

ed tr

aini

ng

repo

rtsJu

ly p

er y

ear f

or

5 ye

ars

All

man

agem

ent

units

in th

e su

b-ca

tchm

ent

Expo

sure

vis

it fo

r pea

ce

com

mitt

ees t

o ar

eas w

ith

activ

e pe

ace

initi

ativ

es

Expo

sure

repo

rtsSu

cces

sful

ly d

ocum

ente

d an

d ac

cept

ed e

xpos

ure

repo

rtsO

ne e

xpos

ure

afte

r eve

ry tw

o ye

ars

2,50

0,00

0

Surv

eilla

nce

by p

eace

co

mm

ittee

s and

con

fl ict

re

solu

tion

mee

tings

Surv

eilla

nce

and

mee

ting

repo

rtsSu

cces

sful

ly d

ocum

ente

d an

d ac

cept

ed su

rvei

llanc

e an

d m

eetin

g re

ports

Two

surv

eilla

nce

and

mee

tings

per

ye

ar

1,00

0,00

0

Sub-

tota

l6,

500,

000

Man

agem

ent o

f na

tura

l dis

aste

rs

(pes

ts a

nd d

isea

ses,

drou

ght)

Page 24

Page 33: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Sub-

activ

ities

Act

iviti

esW

here

Budg

et (k

shs)

Whe

nO

utpu

ts

1,00

0,00

0

Prob

lem

/ O

bjec

tives

• N

o. c

onfl i

cts a

void

ed

• N

o. o

f mee

tings

exe

cute

d to

reso

lve

confl

ict

June

– O

ctob

er

per y

ear

Febr

uary

Mar

ch p

er y

ear

(201

3-20

17)

Pasto

ral a

nd

agro

-pas

tora

l un

its

Hum

an-w

ildlif

e co

nfl ic

t re

solu

tion

mee

tings

• W

RUA

• W

RMA

• K

WS

• N

DM

A•

KFS

• M

oLD

• M

oA•

IUCN

• Fa

IDA

Res

pons

ibili

tyIn

dica

tors

Redu

ced

inci

denc

e of

hum

an-w

ildlif

e co

nfl ic

ts

Hum

an –

wild

life

confl

ict

Redu

ce h

uman

-w

ildlif

e co

nfl ic

t

Sens

itiza

tion

on p

eace

ful

co-e

xiste

nce

with

wild

life

on-fa

rms

• K

WS

• IU

CN•

FaID

A•

WRU

A•

WRM

A•

Peac

e co

mm

ittee

MoA

Com

mun

ities

se

nsiti

zed

on

peac

eful

co-

exist

ence

(th

emse

lves

and

with

na

ture

)

No.

of s

ensit

izat

ion

mee

tings

Oct

ober

201

2 –

June

201

7A

gro-

pasto

ral

unit

500,

000

Sub-

tota

l1,

500,

000

5,00

0,00

0W

eak

cust

omar

y in

stitu

tions

& la

ws

for N

RM

Form

ation

/str

engt

hen

of

insti

tutio

ns an

d by

-law

s on

the

man

agem

ent a

nd

use/r

esou

rce s

harin

g of

natu

ral r

esou

rces

(p

astu

re, f

odde

r, liv

esto

ck, w

ater a

nd

crop

man

agem

ent

and

envi

ronm

ental

co

nser

vatio

n) b

y re

siden

ts an

d ou

tside

rs

Mee

tings

with

com

mun

ities

an

d pa

rtner

s to

form

ulat

e,

deve

lop

and

enfo

rce

by-la

ws

• IU

CN•

FaID

A•

MoL

D•

KW

S•

KFS

• M

oWI

• A

dmin

istra

tion

• El

ders

WRU

A•

WRM

A•

MoA

• En

viro

nmen

tal c

omm

ittee

• O

ther

NG

Os

Impr

oved

gov

erna

nce

on p

astu

re, l

ives

tock

an

d en

viro

nmen

t th

roug

h le

galiz

ed

custo

mar

y in

stitu

tions

an

d by

-law

s

No.

of b

y-la

ws d

evel

oped

and

enf

orce

dO

ctob

er 2

012

– Ju

ne 2

017

Pasto

ral,

agro

-pa

stora

l and

se

ttlem

ent u

nits

Wea

k bi

odiv

ersit

y co

nser

vatio

n al

ong

Riv

er T

ana

Awar

enes

s cre

atio

n an

d se

nsiti

zatio

n m

eetin

gs o

n co

nser

vatio

n of

Aca

cia

torti

lis

ripar

ian

fore

sts “

Bada

” fo

r fo

dder

• K

FS•

KW

S•

WRU

A•

WRM

A•

IUCN

FaID

A•

Com

mun

ity

• El

ders

Adm

inist

ratio

n

Com

mun

ities

se

nsiti

zed

and

fore

sts

cons

erve

d

• A

crea

ge o

f “Ba

da”

fore

st co

nser

ved

• N

o. o

f mee

tings

org

aniz

ed fo

r co

nser

vatio

n “B

ada”

fore

st

Nov

embe

r 201

2 –

June

201

7A

gro-

pasto

ral

unit

1,00

0,00

0Pr

omot

e bi

odiv

ersit

y co

nser

vatio

n

• W

RUA

• M

oA•

WRM

A•

IUCN

• Fa

IDA

• N

EMA

• K

FS•

CDF

• LA

TF

Trai

ning

s on

fodd

er fa

rmin

g an

d ag

rofre

stry

on-fa

rms

Fodd

er a

nd

agro

fore

stry

prom

oted

on

farm

s •

No.

of t

rain

ings

on

fodd

er a

nd a

grof

ores

try•

Acr

eage

und

er fo

dder

/agr

ofor

estry

Oct

ober

201

2 –

June

201

7 A

gro-

pasto

ral

unit

1,00

0,00

0

Page 25

Page 34: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Sub-

activ

ities

Act

iviti

esW

here

Budg

et (k

shs)

Whe

nO

utpu

ts

1,00

0,00

0

Prob

lem

/ O

bjec

tives

No.

of s

chem

es th

at p

rom

ote

biod

iver

sity

co

nser

vatio

nO

ctob

er 2

012-

June

201

7A

gro-

past

oral

un

itPr

omot

ion

of in

dige

nous

sp

ecie

s bio

dive

rsity

co

nser

vatio

n on

-far

ms

• M

W&

I•

MoA

• W

RU

A

• K

enya

Red

Cro

ss

• A

deso

• IU

CN

• Fa

IDA

Farm

ers

• W

RM

A•

ND

MA

• C

DF

• LA

TF

Res

pons

ibili

tyIn

dica

tors

Bio

dive

rsity

co

nser

vatio

n pr

omot

ed w

ithin

gr

oup

irrig

atio

n sc

hem

es

Tota

l

Wea

k bi

odiv

ersit

y co

nser

vatio

n al

ong

Riv

er T

ana

Prom

ote

biod

iver

sity

co

nser

vatio

n

Rec

yclin

g of

pol

y ba

gs a

nd

was

te m

anag

emen

t•

WR

UA

• W

RM

A•

NEM

A•

IUC

N•

FaID

A•

Line

min

istri

es (H

oDs)

Was

te m

anag

ed

and

poly

then

e ba

gs

recy

cled

in m

ajor

ce

ntre

s with

in th

e su

b-ca

tchm

ent

Kgs

of p

olyt

hene

and

was

te m

anag

ed a

nd re

cycl

ed

July

201

3 –

Dec

embe

r 201

4Se

ttlem

ent u

nit

1,00

0,00

0

Sub-

tota

l4,

000,

000

37,8

00,0

00

Page 26

Page 35: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Chapter 5: Resource availability and demand

This chapter provides a description of the resource balance status within the sub-catchment with respect to availability of the resources and demand. The chapter shows that the resource balance has to consider the reserve, the future demands, and needs for conservation. The information will be used to develop resource allocation plans to identify deficit and surplus areas for improvement and to mitigate resource deficits and uses. Water and land resources are the backbone for community survival within the sub-catchment. An important concept of resource management is to match or balance the demand for resources with its availability, through suitable resource allocation arrangements. Establishing demand for resources within the sub-catchment and ascertaining the resource availability will help in planning effectively to enable community use the resources equitably and sustainably.

At the sub-catchment level, there is a large number of often competing resource needs by residents and outsiders. The main source of water for communities and their livestock are R. Tana, ponds, pans and shallow wells. Except for the R. Tana the rest of the sources are seasonal. Water and pasture use are highest in wet seasons when the sources are in plenty than in dry seasons. The current resource use especially pastures and water (in sites far from the R. Tana) may not sustain the resources in the sub-catchment (Tables 7, 8, 9, 10 and 11) and therefore freely access in neighboring villages outside the sub-catchment. Similarly, outsiders freely access pasture and water from the sub-catchment. Unfortunately, there is limited resource assessment data in order to ensure sustainable use so as to strengthen capacity to manage natural resources and source markets for natural resource products and therefore this has to be the priority (Table 12).

Demand for fuel-wood and poles for constructionThe estimated 1,170 households in Saka depend on the surrounding vegetation to meet their fuel and shelter needs. Each household on average collects firewood after every two days. Distance within 2 Km radius is estimated to meet firewood demands but for poles people travel up to 5-10 km into the woodlands.

Table 7. Demand for water (Human) in Saka Sub-catchment

Location Population Water Demand Total Water (45l/day) Demand in m3 in m3/d

Female Male Total

Saka 2673 2338 5011 0.045 225.50

Daley 1036 868 1904 0.045 85.68

Total 3709 3206 6915 0.045 311.18Sources: KNBS (2009), WRMA (2011)

Table 10. Pasture requirement by livestock

Type Population Average body Percentage calculation Average Requirement Total requirement weight(kg) for pasture per animal per day (kg/day) (kg/day)Camel 71,450 400 8% body weight 32 2,286,400

Cattle 94,040 250 8% body weight 20 1,880,800

Goats 260,800 45 10% body weight 5 1,304,600

Sheep 107,000 45 10% body weight 5 535,000

Donkey 16,000 250 8% body weight 20 320,000

Total 63,26,800

Source: District Livestock Production office (2012)

Pasture/forage

Pasture

Fodder trees (excluding pods)

Acacia pods

Total

Average Production (Kg)

2.5kgs per m2 per season

25 – 30 kgs per season

10Kgs per tree per season

Total area less settlement (km2) avail-able for forage and fodder

733.1

No data

No data

Total average production (kgs)/year

36,655,000

36,655,000Source: District Livestock Production office (2012)

Table 11. Estimated pasture and forage production in Saka Sub catchment

Table 9. Demand for water (farms)

No of farm Approximate Water requirement Total size in acre in a day water (L/day) requirement (L/day)

25 25 42,870 1,071,750

Sources: DAO Balamabala (2012)

Page 27

Table 8. Demand for water (livestock)

Type Population Requirement Total per animal requirement per day (L/day) (L/day)

Camel 71,450 20 1,429,000

Cattle 94,040 15 1,410,600

Goats 260,800 5 1,304,000

Sheep 107,000 5 535,000

Donkeys 16,000 15 240,000

Total 552,490 4,918,600

Sources: District Livestock Production Office (2012), Mohamed et al (2009)

Page 36: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Tabl

e 12

. Res

ourc

e av

aila

bilit

y an

d de

man

d in

Hab

arow

- Sa

ka S

ub-c

atch

men

t

Res

pons

ibili

tyO

utpu

tsIn

dica

tors

Whe

nW

here

Bud

get (

kshs

)Pr

oble

m/

Obj

ectiv

esA

ctiv

ities

Sub-

activ

ities

Targ

et: E

stab

lish

natu

ral r

esou

rce

dem

and

and

supp

ly fo

r Sak

a Su

b-ca

tchm

ent

Ove

rall

outp

ut: A

dequ

ate

data

on

natu

ral r

esou

rce

dem

and

and

supp

ly e

stab

lishe

d

300,

000

Ass

essm

ent o

f wat

er

pote

ntia

l, re

serv

e an

d ba

lanc

e fo

r do

mes

tic, i

rrig

atio

n an

d liv

esto

ck

Impr

ove

wat

er

avai

labi

lity

for

dom

estic

, ir

riga

tion

and

envi

ronm

ent

Sens

itiza

tion

repo

rtsR

epor

t doc

umen

ted

and

acc

epte

d

Oct

ober

201

2 In

all

man

agem

ent

units

with

in th

e su

b-ca

tchm

ent

Com

mun

ity s

ensi

tizat

ion

mee

tings

(thr

ee m

eetin

gs)

• W

RU

A•

MoW

I•

Chi

ef•

Elde

rs

• K

WS

• C

omm

unity

• M

oLD

• M

oA

• K

FS•

IUC

N•

FaID

A•

WR

MA

• N

DM

A1,

000,

000

Janu

ary

– M

arch

20

13

Surv

ey a

sses

smen

t suc

cess

fully

com

plet

ed a

nd

repo

rt ac

cept

ed

Wat

er s

tatu

s re

port

• C

onsu

ltant

• W

RU

A•

Com

mun

ity•

IUC

N•

FaID

A•

WR

MA

• N

DM

A

Ass

ess

wat

er a

vaila

bilit

y,

dem

and

and

rese

rve

in th

e su

b-ca

tchm

ent

Shar

e w

ith c

omm

unity

w

ater

ava

ilabi

lity,

dem

and

and

rese

rve

incl

udin

g en

viro

nmen

tal fl

ow

s re

port

• W

RU

A•

Con

sulta

nt•

Com

mun

ity•

IUC

N•

FaID

A•

ND

MA

• W

RM

A

• A

dmin

istra

tion

• C

omm

unity

Wor

ksho

p re

port

Rep

ort s

ucce

ssfu

lly c

ompl

eted

and

acc

epte

dJu

ne 2

013

In a

ll m

anag

emen

t un

its w

ithin

the

sub-

catc

hmen

t

300,

000

Sub-

tota

l1,

600,

000

Impr

ove

Past

ure/

fodd

er a

vaila

bilit

y A

sses

smen

t of

past

ure/

fodd

er

pote

ntia

l, re

serv

e an

d ba

lanc

e fo

r liv

esto

ck a

nd w

ild

herb

ivor

es

Com

mun

ity s

ensi

tizat

ion

mee

tings

(thr

ee m

eetin

gs)

• W

RU

A•

Chi

efs

• El

ders

KW

S•

MoL

D•

MW

I•

IUC

N•

FaID

A•

WR

MA

• N

DM

A

Sens

itiza

tion

repo

rtsR

epor

t doc

umen

ted

and

acc

epte

d

Oct

ober

201

2 In

all

man

agem

ent

units

with

in th

e su

b-ca

tchm

ent

300,

000

Ass

ess

quan

tity

and

qual

ity o

f pa

stur

e an

d fo

dder

sta

tus

• C

onsu

ltant

• W

RU

A•

KW

S•

IUC

N•

FaID

A•

WR

MA

• N

DM

A

• K

AR

I•

KEF

RI

Past

ure/

fodd

er s

tatu

s re

port

Rep

ort d

ocum

ente

d a

nd a

ccep

ted

A

pril

– M

ay

2013

and

Dec

20

13-J

anua

ry

2014

Past

oral

and

ag

ro-p

asto

ral

units

500,

000

Page 28

Page 37: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Sub-

activ

ities

Act

iviti

esW

here

Bud

get (

kshs

)W

hen

Out

puts

300,

000

Prob

lem

/ O

bjec

tives

Rep

ort s

ucce

ssfu

lly c

ompl

eted

and

acc

epte

dFe

b 20

14In

all

man

agem

ent

units

with

in th

e su

b-ca

tchm

ent

Shar

e w

ith c

omm

unity

pa

stur

e av

aila

bilit

y, d

eman

d an

d re

serv

e re

port

• W

RU

A•

Con

sulta

nt•

Com

mun

ity•

IUC

N•

FaID

A•

ND

MA

• W

RM

A

• A

dmin

istra

tion

• C

omm

unity

Res

pons

ibili

tyIn

dica

tors

Wor

ksho

p re

port

Lan

d us

e pl

anni

ngA

sses

smen

t of l

and

use/

cove

r

Sub-

tota

l1,

100,

000

Com

mun

ity s

ensi

tizat

ion

mee

tings

(thr

ee m

eetin

gs)

• W

RU

A•

Chi

efs

• El

ders

KW

S•

KFS

• M

oLD

• M

oL•

MW

I•

IUC

N•

FaID

A•

WR

MA

• N

DM

A

Sens

itiza

tion

repo

rtR

epor

t doc

umen

ted

and

acc

epte

d

Oct

ober

201

3 In

all

man

agem

ent

units

with

in th

e su

b-ca

tchm

ent

300,

000

Ass

ess

curr

ent l

and

uses

/co

ver

• C

onsu

ltant

• W

RU

A•

WR

MA

• IU

CN

• Fa

IDA

• N

DM

A•

MoL

Dig

itize

d cu

rren

t and

fu

ture

land

use

/cov

er

map

Surv

ey s

ucce

ssfu

lly c

ompl

eted

and

map

s ac

cept

ed

Oct

ober

201

2 –

Dec

embe

r 201

3In

all

man

agem

ent

units

with

in th

e su

b-ca

tchm

ent

500,

000

Shar

e w

ith c

omm

unity

cu

rren

t sta

tus

of la

nd u

se/

cove

r

• W

RU

A•

Con

sulta

nt•

Com

mun

ity•

IUC

N•

FaID

A•

ND

MA

• W

RM

A

• M

oL•

Adm

inis

tratio

n

Wor

ksho

p re

port

Rep

ort s

ucce

ssfu

lly c

ompl

eted

and

acc

epte

dFe

b 20

14In

all

man

agem

ent

units

with

in th

e su

b-ca

tchm

ent

300,

000

Sub-

tota

l1,

100,

000

Com

mun

ity s

ensi

tizat

ion

mee

tings

(thr

ee m

eetin

gs)

Ass

essm

ent o

f cro

p an

d ag

rofo

rest

ry p

rodu

ctio

n

Ass

essm

ent o

f cro

p an

d ag

rofo

rest

ry

prod

uctio

n po

tent

ial

• W

RU

A•

Chi

efs

• El

ders

KFS

• M

oLD

• M

oL•

MW

I•

IUC

N•

FaID

A•

WR

MA

• N

DM

A

Sens

itiza

tion

repo

rtR

epor

t doc

umen

ted

and

acc

epte

d

Oct

ober

201

2 –

Ja

nuar

y 20

13

In a

ll m

anag

emen

t un

its w

ithin

the

sub-

catc

hmen

t

300,

000

• C

onsu

ltant

• W

RU

A•

IUC

N•

FaID

A•

WR

MA

• N

DM

A•

KEF

RI

• K

AR

I

pote

ntia

l inc

ludi

ng s

oil

nutri

ent

Cro

p an

d ag

rofo

rest

ry p

oten

tial

repo

rt

Rep

ort s

ucce

ssfu

lly d

ocum

ente

d a

nd a

ccep

ted

Ja

nuar

y –

Dec

20

13A

gro-

past

oral

an

d pa

stor

al

units

500,

000

Page 29

Page 38: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Sub-

activ

ities

Act

iviti

esW

here

Bud

get (

kshs

)W

hen

Out

puts

300,

000

Prob

lem

/ O

bjec

tives

Rep

ort s

ucce

ssfu

lly c

ompl

eted

and

acc

epte

dFe

b 20

14In

all

man

agem

ent

units

with

in th

e su

b-ca

tchm

ent

Shar

e w

ith c

omm

unity

cro

p an

d ag

rofo

rest

ry p

oten

tial

repo

rt

• W

RU

A•

Con

sulta

nt•

Com

mun

ity•

IUC

N•

FaID

A•

ND

MA

• W

RM

A•

MoL

D•

MoA

• K

FS•

Adm

inis

tratio

n•

Com

mun

ity

Res

pons

ibili

tyIn

dica

tors

Wor

ksho

p re

port

Ass

essm

ent o

f for

est/

woo

dlan

ds st

atus

Com

mun

ity se

nsiti

zatio

n m

eetin

gs (t

hree

mee

tings

)

Sub-

tota

l

1,10

0,00

0

• W

RU

A•

Chi

efs

• En

viro

nmen

tal c

omm

ittee

KFS

• IU

CN

• Fa

IDA

• W

RM

A•

ND

MA

KEF

RI

• C

onsu

ltant

• W

RU

A•

IUC

N•

FaID

A•

WR

MA

• N

DM

A

• K

FS•

KEF

RI

• W

RU

A•

Con

sulta

nt•

IUC

N•

FaID

A•

ND

MA

• W

RM

A•

MoL

D•

MoA

• K

FS•

Adm

inis

tratio

n•

Com

mun

ity

Sub-

tota

l

Ass

ess f

ores

t/woo

dlan

ds/

past

ure

avai

labi

lity,

dem

and

and

rese

rve

Shar

e w

ith c

omm

unity

fo

rest

/woo

dlan

d av

aila

bilit

y,

dem

and

and

rese

rve

repo

rt

Sens

itiza

tion

repo

rt

Fore

st/

woo

dlan

d as

sess

men

t re

port

Wor

ksho

p re

port

Rep

ort d

ocum

ente

d a

nd a

ccep

ted

Ass

essm

ent s

ucce

ssfu

lly c

ompl

eted

and

repo

rt ac

cept

ed

Rep

ort s

ucce

ssfu

lly c

ompl

eted

and

acc

epte

d

Oct

ober

201

2

Dec

embe

r 201

3 –

Janu

ary

2014

Feb

2014

In a

ll m

anag

emen

t un

its w

ithin

the

sub-

catc

hmen

t

In a

ll m

anag

emen

t un

its w

ithin

the

sub-

catc

hmen

t

In a

ll m

anag

emen

t un

its w

ithin

the

sub-

catc

hmen

t

300,

000

800,

000

300,

000

1,40

0,00

0

Com

mun

ity se

nsiti

zatio

n m

eetin

gs (t

hree

mee

tings

)C

limat

ic c

hang

e im

pact

ass

essm

ent

• W

RU

A•

Chi

efs

• El

ders

KW

S•

MoL

D•

MoW

I•

IUC

N•

FaID

A•

WR

MA

• N

DM

A

Sens

itiza

tion

repo

rtR

epor

t doc

umen

ted

and

acc

epte

d

Oct

ober

201

2 –

Ja

nuar

y 20

13

In a

ll m

anag

emen

t un

its w

ithin

the

sub-

catc

hmen

t

300,

000

Page 30

Page 39: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Sub-

activ

ities

Act

iviti

esW

here

Budg

et (k

shs)

Whe

nO

utpu

ts

500,

000

Prob

lem

/ O

bjec

tives

Ass

essm

ent s

ucce

ssfu

lly c

ompl

eted

and

repo

rt ac

cept

ed

Oct

ober

201

2 –

Dec

embe

r 201

3In

all

man

agem

ent

units

with

in th

e su

b-ca

tchm

ent

Ass

ess i

mpa

cts o

f clim

ate

chan

ge o

n co

mm

uniti

es a

nd

natu

ral r

esou

rces

• Co

nsul

tant

• W

RUA

• IU

CN•

FaID

A•

WRM

A•

ND

MA

• M

et D

ept

Res

pons

ibili

tyIn

dica

tors

Impa

ct o

f clim

ate

chan

ge a

sses

smen

t re

port

Min

eral

sEx

plor

atio

n an

d as

sess

men

t of

min

eral

s in

the

sub-

catc

hmen

t

Shar

e w

ith c

omm

unity

im

pact

s of c

limat

e ch

ange

re

port

• W

RUA

• Co

nsul

tant

• IU

CN•

FaID

A•

ND

MA

• W

RMA

• M

oLD

• M

oA•

KFS

• A

dmin

istra

tion

• Co

mm

unity

Wor

ksho

p re

port

Repo

rt su

cces

sful

ly c

ompl

eted

and

acc

epte

dFe

b 20

14A

ll m

anag

emen

t un

its w

ithin

the

sub-

catc

hmen

t

300,

000

Sub-

tota

l1,

100,

000

Com

mun

ity se

nsiti

zatio

n m

eetin

gs (t

hree

mee

tings

)•

Min

es a

nd G

eolo

gy

• N

EMA

• W

RUA

• Ch

iefs

• El

ders

KW

S•

MoL

D•

MoW

I•

IUCN

• Fa

IDA

• W

RMA

• N

DM

A

• Co

nsul

tant

• W

RUA

• M

ines

and

Geo

logy

NEM

A•

IUCN

• Fa

IDA

• W

RMA

• N

DM

A

• W

RUA

• Co

nsul

tant

• IU

CN•

FaID

A•

ND

MA

• W

RMA

• M

oLD

• M

oA•

KFS

• A

dmin

istra

tion

• Co

mm

unity

Sub-

tota

l

Tota

l

Surv

ey a

nd m

ap m

iner

al

reso

urce

s

Shar

e w

ith c

omm

unity

m

iner

al re

sour

ces r

epor

t

Sens

itiza

tion

repo

rt

Map

s sho

win

g w

here

m

iner

als a

re fo

und

Wor

ksho

p re

port

Repo

rt do

cum

ente

d a

nd a

ccep

ted

Map

s doc

umen

ted

and

acc

epte

d

Repo

rt su

cces

sful

ly c

ompl

eted

and

acc

epte

d

Oct

ober

201

2 –

Ja

nuar

y 20

13

Oct

ober

201

2 –

Dec

embe

r 201

3

Feb

2014

In a

ll m

anag

emen

t un

its w

ithin

the

sub-

catc

hmen

t

Pasto

ral a

nd

agro

-pas

tora

l un

its

All

man

agem

ent

units

with

in th

e su

b-ca

tchm

ent

300,

000

500,

000

300,

000

1,10

0,00

0

8,50

0,00

0

Page 31

Page 40: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Chapter 6: Natural resources allocation for sustainable, equitable and efficient use by communities

Livelihoods in the sub-catchment are dependent on natural resources. The major natural resources used include water, pasture/fodder, wood and non-wood products (poles, withies, charcoal, firewood, thatch, wild fruits, gums and resins), minerals (sand, stones, gravel and soil) and land. Traditionally, all community members within Saka have equal access to use river and pans/ponds water but shallow wells are privately owned by persons who dug them. Water for farm irrigation is dependent upon the economic power of individual/group farmers. Similarly, piped water in settlements like Saka is accessed by all who can afford connection and monthly charges. Moreover, pastoralists including those from neighboring villages freely access Tana River water via corridors locally known as “Hilas or Malkas”. The same “Malkas” are used by wildlife to freely access river water. Potentially, the sub-catchment with an area of 748.1 km2 (748,100 m2) and with estimated annual rainfall of 300mm generates estimated 224,430,000 m3 of water but almost all of it is lost through runoff without harnessing.

Customarily, Saka community members also have the right to access pasture and fodder resources. Outsiders too access the resource with the permission from Saka Community elders. Similarly, Saka community access pastures and fodder in the neighboring villages in case it does not rain within the sub-catchment. Furthermore, in rainy seasons when pasture is in plenty Saka community migrate to pastures in neighboring locations and divisions e.g. Dujis, Shimbirey, Dadaab and Lagdera. In drought years the community shifts to beyond Balamabala into Ukambani (Mwingi, Tseikuru), Meru, Isiolo and Tana River areas. However, in normal years they stay within the Saka Sub-catchment.

Conventionally, the community members freely access dry woods for firewood and charcoal production. They can also freely access poles, withies and other shelter materials for construction.

Unfortunately, the traditional institutions and rules on resource allocations have become ineffective over the years due to lack of support from the formal system. The consequence has been ineffective controls in the use and management of natural resources leading to increased incidences of deforestation, overgrazing and misuse catalyzed by poverty and ever increasing demands from urban centres.

There are also no allocation plans for natural resources within the sub-catchment and therefore there is need to develop such plans. To achieve the above there is a need to generate necessary data and information and capacity build the community to develop participatory plans. Improved and sustainable resource use is critical in the allocation and management of resources therefore, cornerstones of this chapter. The principles governing the development of allocation plans are to ensure equity and efficient resource use.

The current allocation of resources according to the community is unsustainable, inequitable and inefficient especially along the River Tana. Additionally, there is need for charcoal production and use of other non-wood products to have license. The community recognises the need for capacity building on management of natural resources and empowerment on market intelligence for natural resource products. The main instruments to guide allocation of resources are based on principles of integrated natural resource management. The instruments include plans for water allocation, grazing management, physical planning & land use, conflict resolution and resource contingency (Table 13).

Page 32

Page 41: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Tabl

e 13

. Nat

ural

reso

urce

allo

catio

n pl

an fo

r sus

tain

able

, equ

itabl

e an

d ef

ficie

nt u

se in

Sak

a su

b-ca

tchm

ent

Res

pons

ibili

tyO

utpu

tsIn

dica

tors

Whe

nW

here

Bud

get (

kshs

)Pr

oble

m/

Obj

ectiv

esA

ctiv

ities

Sub-

activ

ities

Targ

et: T

o de

velo

p na

tura

l res

ourc

e al

loca

tion

plan

s O

vera

ll ou

tput

: Nat

ural

reso

urce

allo

catio

n pl

ans

in p

lace

300,

000

Dev

elop

men

t of

Wat

er a

lloca

tion

plan

s (W

AP)

for

com

plia

nce

to w

ater

ab

stra

ctio

n an

d us

e ba

sed

on th

e W

ater

A

ct

Wat

er a

lloca

tion

Sens

itiza

tion

repo

rtsR

epor

t doc

umen

ted

and

acc

epte

d

Oct

ober

201

2 –

Ja

nuar

y 20

13

In a

ll m

anag

emen

t un

its w

ithin

the

sub-

catc

hmen

t

Com

mun

ity s

ensi

tizat

ion

mee

tings

on

allo

catio

n pl

an,

abst

ract

ion,

wat

er u

se p

erm

its

and

wat

er u

ser c

harg

es (t

hree

m

eetin

gs)

• W

RU

A•

MoW

I•

Chi

efs

• El

ders

KW

S•

MoL

D•

MoA

KFS

• IU

CN

• Fa

IDA

• W

RM

A•

ND

MA

Abs

tract

ion

surv

ey to

ass

ess

quan

tity

and

qual

ity

• C

onsu

ltant

• W

RU

A•

MoW

I•

KW

S•

MoL

D•

MoA

KFS

• IU

CN

• Fa

IDA

• W

RM

A•

ND

MA

Abs

tract

ion

repo

rtSu

rvey

ass

essm

ent s

ucce

ssfu

lly c

ompl

eted

and

re

port

acce

pted

Ja

nuar

y –

Dec

embe

r 201

3 1,

000,

000

Prep

arat

ion

of a

lloca

tion

plan

in

clud

ing

envi

ronm

enta

l fl o

ws

(Con

sulta

ncy)

Wat

er a

lloca

tion

plan

Plan

suc

cess

fully

com

plet

ed a

nd a

ccep

ted

500,

000

Shar

e w

ith c

omm

unity

w

ater

allo

catio

n pl

an (t

hree

m

eetin

gs)

Wor

ksho

p re

port

Rep

ort s

ucce

ssfu

lly c

ompl

eted

and

acc

epte

d30

0,00

0

Sub-

tota

l2,

100,

000

• W

RU

A•

Con

sulta

nt•

MoW

I•

KW

S•

MoL

D•

MoA

KFS

• IU

CN

• Fa

IDA

• W

RM

A•

ND

MA

• A

dmin

istra

tion

• C

omm

unity

Impr

ove

Past

ure/

fodd

er a

vaila

bilit

y D

evel

opm

ent o

f pa

stur

e/fo

dder

pla

n fo

r liv

esto

ck a

nd

wild

her

bivo

res

Com

mun

ity s

ensi

tizat

ion

mee

tings

(thr

ee m

eetin

gs)

• W

RU

A•

Chi

efs

• El

ders

KW

S•

MoL

D•

MoW

I•

IUC

N•

FaID

A•

WR

MA

• N

DM

A

• K

AR

I•

KEF

RI

Sens

itiza

tion

repo

rtsR

epor

t doc

umen

ted

and

acc

epte

d

Feb

2014

Oct

ober

201

2

All

man

agem

ent

units

with

in th

e su

b-ca

tchm

ent

In a

ll m

anag

emen

t un

its w

ithin

the

sub-

catc

hmen

t

300,

000

Page 33

Page 42: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Res

pons

ibili

tyO

utpu

tsIn

dica

tors

Whe

nW

here

Budg

et (k

shs)

Prob

lem

/ O

bjec

tives

Act

iviti

esSu

b-ac

tiviti

es

1,00

0,00

0D

evel

opm

ent o

f pa

sture

/fodd

er p

lan

for l

ives

tock

and

wild

her

bivo

res

Impr

ove P

astu

re/

fodd

er a

vaila

bilit

y•

Rang

e cap

acity

ho

ldin

g pl

an fo

r co

mm

unal

land

s •

Sub-

catc

hmen

t gr

azin

g m

anag

emen

t pla

n fo

r dry

and

wet

se

ason

s

• Ra

nge c

apac

ity h

oldi

ng p

lan

and

graz

ing

man

agem

ent p

lan

succ

essf

ully

com

plet

ed an

d re

port

acce

pted

Nov

– D

ec 2

013

Pasto

ral a

nd

agro

-pas

tora

l un

its

Dev

elop

men

t of g

razi

ng

man

agem

ent p

lans

for

lives

tock

and

wild

her

bivo

res

in ar

id co

mm

unal

land

s to

advi

ce o

n dr

y an

d w

et se

ason

gr

azin

g

• Co

nsul

tant

• W

RUA

• K

WS

• M

oLD

• M

oWI

• IU

CN•

FaID

A•

WRM

A•

ND

MA

• K

ARI

• K

EFRI

Shar

e with

gra

zing

m

anag

emen

t pla

ns•

WRU

A•

Cons

ulta

nt•

MoW

I•

KW

S•

MoL

D•

MoA

KFS

• IU

CN•

FaID

A•

WRM

A•

ND

MA

• A

dmin

istra

tion

• Co

mm

unity

Wor

ksho

p re

port

Repo

rt su

cces

sful

ly co

mpl

eted

and

acce

pted

Feb

2014

All

man

agem

ent

units

with

in th

e su

b-ca

tchm

ent

300,

000

Sub-

tota

l

Land

use

pla

nnin

gD

evel

opm

ent o

f la

nd

use/

cove

r pla

n Co

mm

unity

sens

itiza

tion

mee

tings

(thr

ee m

eetin

gs)

• W

RUA

• Ch

iefs

• El

ders

KW

S•

KFS

• M

oLD

• M

oL•

MoW

I•

IUCN

• Fa

IDA

• W

RMA

• N

DM

A

Sens

itiza

tion

repo

rtRe

port

docu

men

ted

and

acce

pted

O

ctob

er 2

012

– Ja

nuar

y 20

13

In al

l m

anag

emen

t un

its w

ithin

the

sub-

catc

hmen

t

1,60

0,00

0

300,

000

Map

out

land

use

/cov

er p

lan

for f

utur

e•

Cons

ulta

nt•

WRU

A•

WRM

A•

IUCN

• Fa

IDA

• K

WS

• K

FS•

MoL

D•

MoL

• M

oWI

Dig

itize

d la

nd u

se/

cove

r fut

ure p

lan

with

map

and

deta

iled

repo

rt

Plan

succ

essf

ully

com

plet

ed an

d m

aps a

ccep

ted

O

ctob

er 2

012

– D

ecem

ber 2

013

In al

l m

anag

emen

t un

its w

ithin

the

sub-

catc

hmen

t

500,

000

Page 34

Page 43: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Res

pons

ibili

tyO

utpu

tsIn

dica

tors

Whe

nW

here

Bud

get (

kshs

)Pr

oble

m/

Obj

ectiv

esA

ctiv

ities

Sub-

activ

ities

300,

000

Fore

st/w

oodl

ands

m

anag

emen

t pla

n

Phys

ical

pla

ns fo

r m

ajor

cen

tres

Wor

ksho

p re

port

Rep

ort s

ucce

ssfu

lly c

ompl

eted

and

acc

epte

dFe

b 20

14A

ll m

anag

emen

t un

its w

ithin

the

sub-

catc

hmen

t

Shar

e w

ith c

omm

unity

land

us

e/co

ver

plan

• W

RU

A•

Con

sulta

nt•

MoW

I•

KW

S•

MoL

D•

MoA

KFS

• IU

CN

• Fa

IDA

• W

RM

A•

ND

MA

• A

dmin

istra

tion

• C

omm

unity

Lan

d us

e pl

anni

ngD

evel

opm

ent o

f la

nd

use/

cove

r pla

n

Sub-

tota

l

Com

mun

ity se

nsiti

zatio

n m

eetin

gs (t

hree

mee

tings

)•

WR

UA

• C

hief

s•

Envi

ronm

enta

l com

mitt

ee

• K

FS•

IUC

N•

FaID

A•

WR

MA

• N

DM

A

• K

EFR

I

Sens

itiza

tion

repo

rtR

epor

t doc

umen

ted

and

acc

epte

d

Oct

ober

201

2 –

Ja

nuar

y 20

13

Agr

o-pa

stor

al

and

past

oral

un

its

1,10

0,00

0

Dev

elop

men

t of f

ores

t/w

oodl

ands

man

agem

ent p

lan

• W

RU

A•

KFS

• IU

CN

• Fa

IDA

• W

RM

A•

ND

MA

KEF

RI

Fore

st/w

oodl

and

man

agem

ent p

lan

Plan

succ

essf

ully

com

plet

ed a

nd re

port

acce

pted

O

ctob

er 2

012

– D

ecem

ber 2

013

Past

oral

and

A

gro-

past

oral

un

its

300,

000

Shar

e w

ith c

omm

unity

fore

st/

woo

dlan

ds m

anag

emen

t pla

n•

WR

UA

• C

onsu

ltant

• K

FS•

MoW

I•

KW

S•

MoL

D•

MoA

IUC

N•

FaID

A•

WR

MA

• N

DM

A•

Adm

inis

tratio

n•

Com

mun

ity

Wor

ksho

p re

port

Rep

ort s

ucce

ssfu

lly c

ompl

eted

and

acc

epte

dFe

b 20

14A

ll m

anag

emen

t un

its w

ithin

the

sub-

catc

hmen

t

1,00

0,00

0

300,

000

Sub-

tota

l1,

600,

000

• M

in o

f Lan

ds•

WR

UA

• M

WI

• C

hief

s•

Elde

rs

• K

WS

• M

oLD

• M

oA•

IUC

N•

FaID

A•

WR

MA

• N

DM

A

• C

ount

y C

ounc

il

Dev

elop

men

t of

phys

ical

pla

ns

Com

mun

ity se

nsiti

zatio

n m

eetin

gs (t

hree

mee

tings

)Se

nsiti

zatio

n re

port

Rep

ort d

ocum

ente

d a

nd a

ccep

ted

O

ctob

er 2

012

Janu

ary

2013

A

gro-

past

oral

an

d pa

stor

al

units

300,

000

Page 35

Page 44: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Res

pons

ibili

tyO

utpu

tsIn

dica

tors

Whe

nW

here

Bud

get (

kshs

)Pr

oble

m/

Obj

ectiv

esA

ctiv

ities

Sub-

activ

ities

1,00

0,00

0Ph

ysic

al p

lans

for

maj

or se

ttlem

ents

(f

our c

entre

s) w

ithin

th

e su

b-ca

tchm

ent

No.

of p

lans

dev

elop

ed a

nd a

ppro

ved

by c

ount

y go

vern

men

t Ja

nuar

y - A

pril

2014

Settl

emen

t uni

tPr

epar

atio

n of

phy

sica

l pla

n fo

r maj

or c

entre

s•

Con

sulta

nt•

Min

of L

ands

• W

RU

A•

WR

MA

• C

ount

y C

ounc

il

Min

eral

sD

evel

opm

ent o

f pl

an fo

r exp

lora

tion

and

expl

oita

tion

of

min

eral

s with

in th

e su

b-ca

tchm

ent

Phys

ical

pla

ns fo

r m

ajor

cen

tres

Dev

elop

men

t of

phys

ical

pla

ns

Shar

e w

ith c

omm

unity

ph

ysic

al p

lan

• W

RU

A•

Con

sulta

nt•

Min

of L

ands

• W

RM

A•

MoW

I•

KW

S•

MoL

D•

MoA

IUC

N•

FaID

A•

WR

MA

• N

DM

A•

Adm

inis

tratio

n•

Com

mun

ity

Wor

ksho

p re

port

Rep

ort s

ucce

ssfu

lly c

ompl

eted

and

acc

epte

dJu

ne 2

014

300,

000

Sub-

tota

l

Com

mun

ity se

nsiti

zatio

n m

eetin

gs (t

hree

mee

tings

)

1,60

0,00

0

• M

ines

&G

eolo

gy

• W

RU

A•

NEM

A•

Chi

efs

• El

ders

KW

S•

MoL

D•

MoW

I•

IUC

N•

FaID

A•

WR

MA

• N

DM

A

Sens

itiza

tion

repo

rtR

epor

t doc

umen

ted

and

acc

epte

d

Oct

ober

201

2 –

Ja

nuar

y 20

13

Agr

o-pa

stor

al

and

past

oral

un

its

300,

000

Expl

orat

ion

and

sust

aina

ble

expl

oita

tion

plan

(qua

ntity

an

d qu

ality

)

• C

onsu

ltant

• M

ines

and

Geo

logy

NEM

A•

WR

UA

• K

WS

• IU

CN

• Fa

IDA

• W

RM

A•

ND

MA

Expl

orat

ion

and

sust

aina

ble

expl

oita

tion

plan

Plan

succ

essf

ully

com

plet

ed a

nd re

port

acce

pted

O

ctob

er 2

012

– D

ecem

ber 2

013

Past

oral

and

ag

ro-p

asto

ral

units

1,50

0,00

0

Shar

e w

ith c

omm

unity

ex

plor

atio

n an

d su

stai

nabl

e m

iner

als e

xplo

itatio

n pl

an

• W

RU

A•

Con

sulta

nt•

Min

es &

Geo

logy

• W

RM

A•

NEM

A•

KW

S•

KFS

• M

oLD

• M

oA

• IU

CN

• Fa

IDA

• N

DM

A•

Adm

inis

tratio

n•

Com

mun

ity

Wor

ksho

p re

port

Rep

ort s

ucce

ssfu

lly c

ompl

eted

and

acc

epte

dJu

ne 2

014

All

man

agem

ent

units

with

in th

e su

b-ca

tchm

ent

300,

000

Settl

emen

t uni

t

Sub-

tota

l2,

100,

000

Page 36

Page 45: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Res

pons

ibili

tyO

utpu

tsIn

dica

tors

Whe

nW

here

Bud

get (

kshs

)Pr

oble

m/

Obj

ectiv

esA

ctiv

ities

Sub-

activ

ities

300,

000

Sens

itiza

tion

repo

rtR

epor

t doc

umen

ted

and

acc

epte

d

Oct

ober

201

2 –

Ja

nuar

y 20

13

All

man

agem

ent

units

with

in th

e su

b-ca

tchm

ent

Com

mun

ity se

nsiti

zatio

n m

eetin

gs o

n re

sour

ce

allo

catio

n, c

ontin

genc

y &

co

nfl ic

t res

olut

ion

plan

s (th

ree

mee

tings

)

• W

RU

A•

Chi

efs

• El

ders

KW

S•

KFS

• M

oA•

MoL

D•

MoW

I•

IUC

N•

FaID

A•

WR

MA

• N

DM

A

Res

ourc

e &

co

nfl ic

t res

olut

ion

plan

ning

Res

ourc

e sh

arin

g an

d co

nfl ic

t re

solu

tion

pla

nnin

g

Dev

elop

par

ticip

ator

y eq

uita

ble

reso

urce

use

pla

nR

esou

rce

shar

ing

and

allo

catio

n pl

an

Res

ourc

e al

loca

tion

plan

dev

elop

ed a

nd a

ppro

ved

by

coun

ty g

over

nmen

tN

ov 2

012

500,

000

Dev

elop

par

ticip

ator

y re

sour

ce c

ontin

genc

y pl

ans

Dev

elop

nat

ural

reso

urce

co

nfl ic

t res

olut

ion

plan

s

Shar

e w

ith c

omm

unity

re

sour

ce a

lloca

tion,

co

ntin

genc

y &

reso

urce

co

nfl ic

t pla

ns

• W

RU

A•

Peac

e co

mm

ittee

• M

oWI

• A

dmin

• El

ders

KW

S•

KFS

• M

oLD

• M

oA•

IUC

N•

FaID

A•

WR

MA

• N

DM

A•

Com

mun

ity

Sub-

tota

l

Tota

l

Res

ourc

e co

ntin

genc

y pl

ans

Con

fl ict

reso

lutio

n pl

ans

Wor

ksho

p re

port

No.

of r

esou

rce

cont

inge

ncy

plan

s dev

elop

ed a

nd

acce

pted

No.

of c

onfl i

ct re

solu

tion

plan

s dev

elop

ed a

nd

acce

pted

Rep

ort s

ucce

ssfu

lly c

ompl

eted

and

acc

epte

d

Nov

201

2

Dec

201

2

Jan

2013

500,

000

500,

000

300,

000

2,10

0,00

0

12,2

00,0

00

Page 37

Page 46: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Chapter 7: Resource protection

This chapter describes the approach and options adopted in order to protect the natural resources using integrated approach. The WRUA is keen to ensure that the sources are retained in their natural state as much as possible. There is need to establish management agreement and enforce the same. Similarly, it is important to support activities that arrest and reverse declining resources and catchment productivity and those that will capacity build communities on the same (Table 14).

Water sourcesCurrently, there is minimal protection of water sources. Analysis of the quality of water from all water sources has not been fully undertaken and there are only two dispensaries at Daley and Saka Centres within the sub catchment to treat water borne/related diseases such as diarrhea, malaria and typhoid. Water quality is estimated to be grossly contaminated and polluted. The prime threats to the quantity and quality of water sources are erosion (river bank and soil erosion within the sub-catchment and neighboring villages) due to overgrazing, deforestation, opening of land for cultivation and settlement plus sand harvesting.

Another major challenge is pollution due to open defecation of the increasing population, floods, poor governance such as poor management of open water sources (lack of fence, direct access by people and livestock, siltation due to embankment erosion, overgrazing in the catchment), animal waste, application of pesticides on farms, poor solid waste disposal mechanisms and lack of drainage and sewage systems in settlements. As a result diarrhea is the most prevalent waterborne disease in the sub-catchment affecting 30% of the population. The invasion of exotic species/weed such as Prosopis juliflora is adversely affecting water quality and biodiversity conservation along the rivers and in pastures. Other threats include conflict over the use of the resource, change of river course and river diversion for irrigation that also contributes to the breeding of mosquitoes.

Pasture, fodder, forest and woodland resourcesThere exist unwritten community by-laws that protect the “Bada or Goshe” (riparian Acacia forests) as mentioned in Chapter 3. The major threats to the quantity and quality of pasture and fodder are recurrent droughts, wildfire, overgrazing, deforestation, mushrooming settlements and establishment of inland water sources, invasive weeds such as P. juliflora, livestock influx especially those for Garissa and conflict over the use of the resource.

Wild animalsCustomarily, like all other Kenyan Somalis the Saka Community don’t hunt wild animals but threats to the existence of wildlife diversity include inadequate access to water especially in dry seasons, pests and diseases, habitat loss to crop farming and settlements, human – wildlife conflict and no direct income from the resource to the community.

Mineral resources

There are no protection measures on the use of minerals in the sub-catchment. Threats to mineral resources comprise of over exploitation of the resource by individuals without the full consent of the community and no direct income from the resource to the community.

Comprehensive protection measures for all resources as suggested by the community and stakeholders are summarised in Table 14.

Page 38

Page 47: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Tabl

e 14

. Pl

anne

d ac

tiviti

es fo

r im

plem

enta

tion

of re

sour

ce p

rote

ctio

n in

Sak

a Su

b-ca

tchm

ent

Wat

erO

ctob

er 2

012

- Ju

ne 2

017

Agr

o-pa

stor

al

unit

Sens

itiza

tion

on n

one

culti

vatio

n of

60m

from

rive

r ba

nk b

y p

rote

ctin

g n

atur

al

vege

tatio

n al

ong

the

Riv

er

Tana

Riv

er b

ank

prot

ectio

n•

WR

UA

• M

oA•

KFS

• IU

CN

• Fa

IDA

• W

RM

A•

Farm

ers

• C

DF

• LA

TF•

NEM

A

Sens

itiza

tion

repo

rtR

epor

t doc

umen

ted

and

acc

epte

d

500,

000

Act

iviti

esSu

b-ac

tivity

Res

pons

ibili

tyO

utpu

tsIn

dica

tors

Whe

nW

here

Bud

get (

kshs

)R

esou

rce(

s)

Targ

et: P

rote

ctio

n of

the

exis

ting

natu

ral r

esou

rces

in o

rder

to a

chie

ve d

esire

d se

rvic

es

Ove

rall

outp

ut: C

atch

men

t mai

ntai

n ab

ility

to p

rovi

de re

quire

d se

rvic

es

Prob

lem

s/O

bjec

tives

Riv

er b

ank

eros

ion

Inap

prop

riate

m

anag

emen

t of

wat

er so

urce

s

Impr

ove

gove

rnan

ce o

n m

anag

emen

t of

wat

er so

urce

s

Form

/stre

ngth

en (t

rain

) W

UA

s on

gove

rnan

ce•

WR

UA

• IU

CN

• K

FS•

FaID

A•

WR

MA

• M

oWI

• C

omm

unity

• C

DF

• LA

TF•

NEM

A

WU

As f

orm

ed/

stre

ngth

ened

No.

of W

UA

s for

med

/ stre

ngth

ened

Febr

uary

201

3 to

Ju

ne 2

017

Saka

Sub

- ca

tchm

ent

1,00

0,00

0

Pollu

tion

Pollu

tion

surv

eyC

omm

unity

sens

itiza

tion

mee

tings

(thr

ee m

eetin

gs)

Exec

ute

pollu

tion

surv

ey

Shar

e w

ith c

omm

unity

po

llutio

n re

port

• M

oW&

I•

MoP

HS

• W

RU

A•

NEM

A•

Adm

in•

Com

mun

ity

• IU

CN

• Fa

IDA

• W

RM

A•

ND

MA

Sens

itiza

tion

repo

rt

Pollu

tion

stat

us re

port

Wor

ksho

p re

port

Rep

ort d

ocum

ente

d a

nd a

ccep

ted

Rep

ort d

ocum

ente

d a

nd a

ccep

ted

Rep

ort s

ucce

ssfu

lly c

ompl

eted

and

ac

cept

ed

Oct

ober

201

2

Dec

embe

r 201

2 –

Janu

ary

2013

May

201

3

Agr

o-pa

stor

al

and

past

oral

un

its

Agr

o-pa

stor

al

and

past

oral

un

its

All

man

agem

ent

units

with

in th

e su

b-ca

tchm

ent

300,

000

500,

000

300,

000

Red

uce

pollu

tion

in

settl

emen

ts•

WR

UA

• M

oPH

• IU

CN

• Fa

IDA

• W

RM

A•

CA

RE

• M

ERC

Y U

SA

Sens

itiza

tion

on e

co-

sani

tatio

n

• W

RU

A•

WR

MA

• M

oA•

IUC

N•

FaID

A•

Farm

ers

• K

RC

S

Cap

acity

bui

ldin

g on

use

of p

estic

ides

Trai

n fa

rmer

s on

appr

opria

te

use

of p

estic

ides

(tw

o se

ssio

ns)

Sens

itiza

tion

repo

rt

Trai

ning

repo

rts

Rep

ort d

ocum

ente

d a

nd a

ccep

ted

Rep

orts

doc

umen

ted

and

acc

epte

d

June

201

3O

ctob

er 2

013

Janu

ary

2014

Mar

ch 2

013

Settl

emen

t uni

t

Saka

Cen

tre

300,

000

500,

000

Sub-

tota

l1,

900,

000

Page 39

Page 48: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Past

ure

and

fore

st

reso

urce

s

Apr

il 20

14A

pril

2015

Apr

il 20

16

Saka

Sub

-ca

tchm

ent

Sens

itiza

tion

and

awar

enes

s on

use

of s

hallo

w w

ells

(th

ree

sess

ions

)

Red

uce

risks

to

colla

pse

of sh

allo

w

wel

ls

• W

RU

A•

NEM

A

• W

RU

A•

NEM

A

• M

oWI

Sens

itiza

tion

repo

rtR

epor

t doc

umen

ted

and

acc

epte

d

300,

000

Act

iviti

esSu

b-ac

tivity

Res

pons

ibili

tyO

utpu

tsIn

dica

tors

Whe

nW

here

Bud

get (

kshs

)R

esou

rce(

s)Pr

oble

ms/

Obj

ectiv

es

Col

laps

ing

of

shal

low

wel

ls

Wat

er

Inap

prop

riate

m

anag

emen

t of

past

ure

and

fore

st

reso

urce

s due

dr

ough

t, w

ildfi r

e,

over

graz

ing,

de

fore

stat

ion

Supp

ort t

he

cons

erva

tion

of

past

ure

and

fore

st

reso

urce

s

Red

uce

the

risk

of

fi re

to p

astu

res a

nd

fore

sts/

woo

dlan

ds

Red

uce

over

graz

ing

Prom

ote

gene

ban

k fo

r hig

h va

lue

plan

t spe

cies

• K

FS•

WR

UA

• M

oLD

• M

oA•

WR

MA

• IU

CN

• Fa

IDA

• K

EFR

I•

KA

RI

• M

oLD

• M

oA•

WR

MA

• IU

CN

• Fa

IDA

• K

FS•

KEF

RI

• K

AR

I

• A

dmin

.•

KFS

• W

RU

A•

WR

MA

• IU

CN

• Fa

IDA

• M

oLD

• M

oLD

• M

oA•

WR

MA

• IU

CN

• Fa

IDA

• K

FS•

KEF

RI

• K

AR

I

• K

FS•

WR

MA

• IU

CN

• Fa

IDA

• W

RU

A•

Envi

ronm

enta

l Com

mitt

ee•

NEM

A•

Com

mun

ity

• K

FS•

Cou

nty

Gov

’t

• K

FS•

WR

UA

• K

WS

• IU

CN

• A

dmin

.•

FaID

A

Stre

ngth

en fo

rest

m

anag

emen

t with

in

the

sub-

catc

hmen

t

Cre

ate

fi reb

reak

s and

EIA

/au

dit w

ithin

pla

nned

pas

ture

s

Prot

ect v

eget

atio

n th

roug

h by

-law

s & a

war

enes

s cre

atio

n

Div

ersi

fy c

omm

unity

ass

ets

to re

duce

ove

rgra

zing

Form

atio

n of

Com

mun

ity

Fore

st A

ssoc

iatio

ns (C

FAs)

w

ith fo

rest

scou

ts fo

r im

plem

enta

tion

Post

ing

of fo

rest

per

sonn

el

Awar

enes

s rai

sing

on

the

dang

ers o

f uns

usta

inab

le

char

coal

bur

ning

Com

mun

ity

empo

wer

ed o

n de

velo

pmen

t of

biod

iver

sity

gen

e ba

nks

Fire

brea

ks d

evel

oped

an

d EI

A/a

udit

inco

rpor

ated

into

gr

azin

g m

anag

emen

t pl

an

90 a

cres

of s

tand

ing

hay

cons

erve

d

Prom

otio

n of

smal

l sc

ale

busi

ness

Two

CFA

s with

sc

outs

form

ed

Fore

st p

erso

nnel

po

sted

to S

aka

Sub-

catc

hmen

t

Com

mun

ities

se

nsiti

zed

on d

ange

rs

of c

harc

oal b

urni

ng

Sub-

tota

l

No.

gen

e ba

nks c

reat

ed, a

nd sp

ecie

s co

llect

ed a

nd c

onse

rved

No.

of fi

rebr

eaks

and

EIA

/aud

it in

corp

orat

ed in

to g

razi

ng p

lan

Are

a co

nser

ved

(acr

es)

No.

of s

mal

l sca

le b

usin

ess

deve

lope

d an

d su

cces

sful

ly

impl

emen

ted

No.

of C

FAs a

nd sc

outs

in p

lace

and

su

ppor

ted

by K

FS

No.

of o

ffi ce

rs p

oste

d an

d su

stai

ned

No.

of c

omm

unity

mem

bers

se

nsiti

zed

May

201

3 –

Dec

embe

r 201

4

May

201

3 D

ecem

ber 2

013

Dec

embe

r 201

2 –

June

201

7

May

201

3 -

June

201

7

July

– A

ugus

t 20

13

Imm

edia

te

Dec

embe

r 201

2

Saka

Cen

tre

Past

oral

and

ag

ro-p

asto

ral

units

Agr

o-pa

stor

al

and

past

oral

un

its

Saka

sub-

ca

tchm

ent

Dal

ey L

ocat

ion

Saka

Loc

atio

n

Saka

sub-

catc

hmen

t

Saka

sub-

catc

hmen

t

1,00

0,00

0

1,00

0,00

0

500,

000

500,

000

600,

000

N/A

500,

000

4,10

0,00

0

Page 40

Page 49: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Oct

ober

201

2 -

June

201

7A

ll m

anag

emen

t un

its in

the

sub-

catc

hmen

t

Sens

itize

com

mun

ities

on

by-

law

s con

cern

ing

mus

hroo

min

g se

ttlem

ent a

nd

esta

blis

hmen

t of h

apha

zard

w

ater

sour

ces

Con

trol

mus

hroo

min

g se

ttlem

ents

and

es

tabl

ishm

ent

of in

land

wat

er

sour

ces

• M

oL•

MoP

• A

dmin

.•

WR

UA

• M

oLD

• C

omm

unity

IUC

N•

KW

S

Com

mun

ities

se

nsiti

zed

on st

oppa

ge

of m

ushr

oom

ing

settl

emen

ts a

nd

esta

blis

hmen

t of

haph

azar

d w

ater

so

urce

s

No.

of m

eetin

gs

500,

000

Act

iviti

esSu

b-ac

tivity

Res

pons

ibili

tyO

utpu

tsIn

dica

tors

Whe

nW

here

Bud

get (

kshs

)R

esou

rce(

s)Pr

oble

ms/

Obj

ectiv

es

Mus

hroo

min

g se

ttlem

ents

and

es

tabl

ishm

ent o

f ha

phaz

ard

wat

er

sour

ces c

ontri

butin

g to

env

ironm

enta

l de

grad

atio

n

Env

iron

men

t

• C

ount

y go

vt•

LATF

• C

DF

• M

oL•

WR

MA

• W

RU

A•

MoW

I•

FaID

A•

NW

SB•

MoP

H

Maj

or c

entre

s in

the

sub-

catc

hmen

t w

ith d

rain

age

and

sew

erag

e sy

stem

s +

garb

age

colle

ctio

n an

d du

mpi

ng si

tes

No.

of d

rain

age,

sew

age,

gar

bage

co

llect

ion

and

dum

ping

site

s de

velo

ped

and

impl

emen

ted

Janu

ary

2013

Dec

embe

r 201

4Se

ttlem

ent u

nit

10,0

00,0

00Es

tabl

ishm

ent o

f dra

inag

e an

d se

wer

age

syst

ems,

and

solid

was

te m

anag

emen

t in

clud

ing

EIA

/aud

it

Sub-

tota

l

Wild

ani

mal

sN

o di

rect

inco

me

• W

RU

A•

Com

mun

ity•

Adm

in.

• K

WS

• K

TB•

IUC

N•

FaID

A•

ND

MA

• N

RT

• W

RU

A•

KW

S•

Adm

in

• K

WS

• C

ount

y G

ov’t

• K

WS

• W

RU

A•

Adm

in•

MoL

D•

MoA

• W

RM

A•

ND

MA

• IU

CN

• Fa

IDA

Sub-

tota

l

Stre

ngth

en w

ildlif

e m

anag

emen

t with

in

the

sub-

catc

hmen

t

Sens

itiza

tion

wor

ksho

ps o

n im

porta

nce

of w

ildlif

e

Prom

otio

n of

eco

tour

ism

Form

atio

n of

Com

mun

ity

Wild

life A

ssoc

iatio

ns (C

WA

s)

with

wild

life

scou

ts fo

r im

plem

enta

tion

Wild

life

pers

onne

l to

be

post

ed

Red

uce

hum

an/li

vest

ock

– w

ildlif

e co

nfl ic

t on

farm

s and

pa

stur

es t

hrou

gh se

nsiti

zatio

n m

eetin

gs to

redu

ce h

uman

wild

life

confl

icts

Esta

blis

h hi

stor

ical

wild

life

corr

idor

s and

map

wild

life

atta

ck h

otsp

ots a

ttack

site

s

Impr

ove

repo

rting

of w

ildlif

e in

cide

nce

to K

WS

for a

ctio

n (e

.g. r

eloc

atio

n)

• W

RU

A•

KW

S•

Adm

in•

MoL

D•

MoA

• C

omm

unity

Sens

itiza

tion

repo

rt

Ecot

ouris

m p

oten

tial

prom

oted

with

in th

e su

b- c

atch

men

t

Two

CW

As w

ith

scou

ts fo

rmed

KW

S pe

rson

nel

post

ed to

Sak

a Su

b-ca

tchm

ent

Sens

itiza

tion

repo

rt

Cor

ridor

map

s and

re

ports

Wild

life

inci

denc

e re

ports

Rep

ort d

ocum

ente

d a

nd a

ccep

ted

No.

of p

rom

otio

n ca

mpa

igns

un

derta

ken

No.

of C

WA

s and

scou

ts in

pla

ce

and

supp

orte

d by

KW

S

No.

of o

ffi ce

rs p

oste

d an

d su

stai

ned

Rep

ort d

ocum

ente

d a

nd a

ccep

ted

Cor

ridor

map

s and

repo

rts a

ccep

ted

for i

mpl

emen

tatio

n

Succ

essf

ul in

cide

nce

repo

rts a

ccep

ted

impl

emen

ted

by K

WS

Oct

ober

201

2 –

Dec

embe

r 201

5

July

– A

ugus

t 20

13

Imm

edia

te

Feb

2013

– F

eb

2017

Imm

edia

te

Imm

edia

te

Saka

sub-

ca

tchm

ent

Dal

ey L

ocat

ion

Saka

Loc

atio

n

Saka

sub-

catc

hmen

t

Saka

sub-

catc

hmen

t

Past

oral

and

ag

ro-p

asto

ral

units

Past

oral

and

ag

ro-p

asto

ral

units

10,5

00,0

00

500,

000

500,

000

600,

000

N/A

500,

000

600,

000

500,

000

3,20

0,00

0

Page 41

Page 50: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Mar

ch 2

013

– Ju

ne 2

017

Saka

Sub

-ca

tchm

ent

Sens

itiza

tion

of c

omm

unity

on

use

and

con

serv

atio

n of

th

e m

iner

als –

WR

UA

as e

ntry

po

ints

for m

iner

al u

se

Prom

ote

parti

cipa

tory

m

iner

al u

se

• M

oE&

MR

• IU

CN

• W

RU

A•

WR

MA

• M

oL•

FaID

A•

Com

mun

ity•

Cou

nty

Gov

t•

Adm

in.

Sens

itiza

tion

repo

rtsR

epor

t doc

umen

ted

and

acc

epte

d

500,

000

Act

iviti

esSu

b-ac

tivity

Res

pons

ibili

tyO

utpu

tsIn

dica

tors

Whe

nW

here

Bud

get (

kshs

)R

esou

rce(

s)Pr

oble

ms/

Obj

ectiv

es

• N

o di

rect

inco

me

to c

omm

unity

Expl

oitin

g w

ithou

t the

full

cons

ent o

f the

co

mm

unity

Min

eral

res

ourc

es

Tota

l22

,000

,000

Page 42

Page 51: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Chapter 8: Catchment protection

This chapter provides details regarding implementation of strategies for catchment conservation. It looks at the different types of land uses and addresses each separately. The strategies are based on the zoning of the catchment area as identified earlier. The implementation of catchment conservation activities is aimed at increasing the productivity and sustainability of the sub-catchment based on the principles of integrated natural resource management. Currently there are conservation efforts emanating from the community though minimal and requires to be strengthened. Conservation in the sub-catchment is greatly attached and related to the community customary norms, culture and faith and therefore, should be considered when making conservation plans.

A part from the River Tana, the sub-catchment is dissected by at least 11 major laghas that drain flush floods into the river and flood plains that support dryland farming in rainy seasons. The over 7,000 population of Saka are mainly pastoralists and agro-pastoralists with livestock as the backbone of economy. Crop farming through group farms is concentrated along the R. Tana and supported by limited institutions such as Food For Asset Project of NDMA/Kenya Red Cross Society/UN World Food Programme/Ministry of Agriculture. The objective of conservation in the sub-catchment is to boost resource use without affecting ability of ecosystem to provide resources and services therefore, reducing detrimental impacts. Charcoal burning, deforestation, river bank erosion and overgrazing are issues of concern to be addressed to ease conservation.

Obstacles to conservation in the sub-catchment are linked directly or indirectly to human activities not ruling out natural factors e.g. climate change. Nonetheless, the community has expressed strong will for conservation. This is well demonstrated by community recognition of natural resource dynamics and relationships e.g. appreciation of the role of wild herbivores as a buffer to predators against livestock. The community’s will is limited by inadequate knowledge and information on conservation coupled with factors such as poverty and drought that exacerbate environmental degradation (deforestation, charcoal burning, river bank erosion and overgrazing). Proposed conservation activities have been summarized in Table 15.

Page 43

Page 52: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Tabl

e 15

. Im

plem

enta

tion

of c

atch

men

t con

serv

atio

n ac

tiviti

es w

ithin

the

man

agem

ent u

nits

Wat

erO

ctob

er 2

012

to

June

201

7O

n fa

rms a

nd in

in

stitu

tions

Com

mun

ity tr

ee n

urse

ries

Riv

er b

ank

stab

iliza

tion

• W

RU

A•

MoA

• M

oLD

• K

FS•

IUC

N•

FaID

A•

WR

MA

• Fa

rmer

s •

CD

F •

LATF

Tree

nur

serie

s pr

omot

ed a

nd

esta

blis

hed

No.

seed

lings

rais

ed in

nur

serie

s/

plan

ted

and

surv

ived

1,00

0,00

0

Act

iviti

esSu

b-ac

tivity

Res

pons

ibili

tyO

utpu

tsIn

dica

tors

Whe

nW

here

Bud

get (

kshs

)R

esou

rce

Targ

et: T

o re

duce

cat

chm

ent d

egra

datio

n th

roug

h in

tegr

atio

n of

pro

tect

ion

and

cons

erva

tion

appr

oach

Ove

rall

outp

ut: R

ehab

ilita

ted

catc

hmen

t tha

t has

abi

lity

to o

ffer

a ba

lanc

ed e

cosy

stem

serv

ices

Prob

lem

s/O

bjec

tives

Eros

ion

Mod

el fa

rms w

ith

agro

fore

stry

tree

s

• W

RU

A•

MoA

• K

FS•

IUC

N•

FaID

A•

WR

MA

• Fa

rmer

s •

CD

F •

LATF

Con

stru

ctio

n of

gab

ions

al

ong

maj

or fl

oodi

ng si

tes

with

in fa

rms

Mod

el fa

rms p

lant

ed

with

agr

ofor

estry

tree

s

Gab

ion

cons

truct

ed o

n fa

rms

No.

of m

odel

farm

s tar

gete

d

No.

of g

abio

n co

nstru

cted

O

ctob

er 2

012

– O

ctob

er 2

014

Farm

s alo

ng

Riv

er T

ana

On

farm

s with

in

the

fl ood

pla

ins

- Agr

o-pa

stor

al

unit

2,00

0,00

0

5,00

0,00

0

Sub-

tota

l8,

000,

000

Past

ure

and

fore

st

reso

urce

sD

roug

ht a

nd

over

graz

ing

Prom

ote

past

ure

cons

erva

tion

on

com

mun

al la

nds

and

farm

s

Div

ersi

on o

f lag

has t

o ra

nge

land

to p

rom

ote

past

ure

grow

th

• M

oWI

• M

oLD

• C

DF

• W

RU

A•

LATF

• C

ount

y go

vt•

ND

MA

• Pa

stor

alis

ts

• W

RU

A•

MoL

D•

Cou

nty

gove

rnm

ent

• N

DM

A•

IUC

N•

FaID

A

• M

oLD

• M

oA•

WR

MA

• IU

CN

• Fa

IDA

• K

FS•

KEF

RI

• K

AR

I

• M

oLD

• W

RM

A•

MoA

• IU

CN

• K

AR

I

Sub-

tota

l

Red

uce

impa

ct d

ue to

Infl u

x of

pas

tora

lists

Prom

ote

the

plan

ting

of

drou

ght t

oler

ant f

orag

e an

d fo

dder

spec

ies

Hay

bal

ing

and

cons

erva

tion

Lagh

as d

iver

ted

to ir

rigat

e na

tura

l pa

stur

es

• St

reng

then

ing

of

by-la

ws o

n se

ason

al

graz

ing

• Se

tting

up

of

desi

gnat

ed li

vest

ock

rout

es

App

ropr

iate

spec

ies

iden

tifi e

d an

d pr

omot

ed (1

0 sp

ecie

s)

Hay

bal

es p

rodu

ced

(1,0

00 b

ales

) and

st

ored

No.

of l

agha

s div

erte

d fo

r pro

duct

ion

with

in ra

ngel

ands

• N

o. o

f by-

law

s dev

elop

ed a

nd

enfo

rced

• N

o. o

f des

igna

ted

lives

tock

rout

es

No.

of s

peci

es id

entifi

ed

and

succ

essf

ully

pro

mot

ed

No.

of h

ay b

ales

pro

duce

d an

d st

ored

Dec

embe

r 201

4 –

Dec

201

5

Oct

ober

201

2 –

June

201

7

May

201

3 -

June

201

7

Sub-

tota

lPa

stor

al u

nit

(Tak

oyH

irbai

Dur

dura

neA

bdi g

ab)

Past

oral

and

ag

ro-p

asto

ral

units

Saka

Sub

- ca

tchm

ent

Agr

o-pa

stor

al

units

3,00

0,00

0

500,

000

1,00

0,00

0

500,

000

5,00

0,00

0

Page 44

Page 53: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Wild

ani

mal

s

May

201

3 -

June

201

7Pa

stor

al u

nit

Agr

o-pa

stor

al

unit

Settl

emen

t uni

t

Ref

ores

tatio

n, a

ffore

stat

ion

and

rese

edin

g w

ith p

riorit

y to

lo

cal s

peci

es

Rec

lam

atio

n of

de

grad

ed si

tes

• W

RU

A•

IUC

N•

KFS

• M

oA•

Com

mun

ity

• C

hief

s•

WR

MA

• N

EMA

• C

DF

• LA

TF

Deg

rade

d si

tes p

lant

ed

with

tree

s (10

,000

tre

es) a

nd re

seed

ed

(30

acre

s)

• N

o. o

f tre

es p

lant

ed a

nd su

rviv

ed

• A

crea

ge su

cces

sful

ly re

fore

sted

an

d re

seed

ed

3,00

0,00

0

Act

iviti

esSu

b-ac

tivity

Res

pons

ibili

tyO

utpu

tsIn

dica

tors

Whe

nW

here

Bud

get (

kshs

)R

esou

rce

Prob

lem

s/O

bjec

tives

Def

ores

tatio

n

Sub-

tota

l

Inva

sive

wee

dsC

ontro

l and

m

anag

emen

t of

inva

sive

wee

ds

Con

trol a

nd m

anag

emen

t of P

. ju

lifl o

ra•

KFS

• W

RM

A•

ND

MA

• IU

CN

• Fa

IDA

• M

oLD

• M

oA•

WR

UA

• C

omm

unity

• A

dmin

Cov

erag

e of

Pro

sopi

si

n th

e su

b ca

tchm

ent

redu

ced

(by

50%

)

No.

of a

crea

ge w

here

P. j

ulifl

ora

has

been

con

trolle

d an

d m

anag

edO

ctob

er 2

012

– Ju

ne 2

017

Saka

sub-

ca

tchm

ent

3,00

0,00

0

3,00

0,00

0

Sub-

tota

l

No

dire

ct in

com

ePr

omot

e leg

aliz

ed

gam

e far

min

g &

co

mm

unity

man

aged

sa

nctu

arie

s

Fish

and

gam

e fa

rmin

g in

clud

ing

croc

odile

, bird

s fa

rmin

g (g

uine

a fo

wl,

ostri

ch)

prom

oted

• M

oLD

• Fi

sher

ies

• K

WS

• IU

CN

• W

RU

A

• K

WS

• W

RU

A•

Wild

life

com

mitt

ee

• IU

CN

• Fa

IDA

• W

RM

A•

KTB

• M

oE•

PTA

• B

oG•

WR

UA

• W

ildlif

e co

mm

ittee

Sub-

tota

l

Publ

icity

and

mar

ketin

g of

wild

life

in S

aka

and

esta

blis

hmen

t of a

sa

nctu

ary

in M

atha

hlib

aah

Form

atio

n of

wild

life

club

in

scho

ols

and

expo

sure

to

urs

Elec

tric

fenc

ing

of g

roup

fa

rms

Gam

e fa

rms (

fi sh,

cr

ocod

ile a

nd

beeh

ives

) es

tabl

ishe

d

Esta

blis

h, re

gist

er &

m

arke

t a sa

nctu

ary

• Sc

hool

clu

bs

esta

blis

hed

• Se

nsiti

zatio

n an

d ex

posu

re to

ur o

f th

e te

ache

rs a

nd

stud

ents

No.

of g

ame

farm

s suc

cess

fully

es

tabl

ishe

d

• Es

tabl

ishe

d an

d op

erat

iona

l sa

nctu

ary

• A

mou

nt o

f inc

ome

gene

rate

d fr

om

the

sanc

tuar

y

• N

o. o

f clu

bs fo

rmed

and

op

erat

iona

l•

No.

of t

ours

and

No.

of

parti

cipa

nts

Nov

embe

r 201

3 –

June

201

7

Janu

ary

2013

-

June

201

7

Oct

ober

201

2 -

Aug

ust 2

014

Agr

o-pa

stor

al

unit

Mat

halib

aah

Mat

halib

aah

Saka

Dal

ey

Had

ley

11,0

00,0

00

2,00

0,00

0

2,00

0,00

0

500,

000

4,50

0,00

0

60,0

00,0

00•

WR

UA

• Fa

rmer

s•

KW

S•

IUC

N•

MoA

• N

DM

A•

CD

F•

WR

UA

CD

F

Impr

ove

farm

pr

oduc

tivity

to

redu

ce c

ropl

and

expa

nsio

n an

d re

duce

cro

p pr

oduc

tion

– w

ildlif

e co

nfl ic

t

Roa

min

g liv

esto

ck

and

wild

life

men

ace

Cro

psG

roup

s far

ms (

25)

elec

tric

fenc

ed

No.

of f

arm

s ele

ctric

fenc

ed

Janu

ary

2013

to

Dec

embe

r 201

4A

gro-

past

oral

un

it

Page 45

Page 54: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

From

Apr

il 20

13

to D

ec 2

014

Agr

o-pa

stor

al

unit

Lini

ng o

f con

cret

e ca

nals

Impr

ove

prod

uctiv

ity

thro

ugh

lives

tock

m

arke

ting,

acc

ess t

o w

ater

, bre

edin

g an

d co

ordi

natio

n

• M

oA•

KW

S•

MoW

I•

ND

MA

Con

cret

e ca

nals

es

tabl

ishe

d in

gro

up

farm

s (25

)

Km

of c

oncr

ete

cana

ls e

stab

lishe

d 40

,000

,000

Act

iviti

esSu

b-ac

tivity

Res

pons

ibili

tyO

utpu

tsIn

dica

tors

Whe

nW

here

Budg

et (k

shs)

Res

ourc

ePr

oble

ms/

Obj

ectiv

es

Dec

reas

ing

lives

tock

pr

oduc

tivity

Live

stoc

k

Prov

isio

n of

cer

tifi e

d se

eds,

seed

lings

and

ferti

lizer

s•

MoA

• W

RU

A•

Farm

ers

• IU

CN

• Fa

IDA

• LA

TF

• M

oA•

Farm

er

• IU

CN

WR

UA

• Fa

IDA

• M

oA•

Farm

er

• W

RU

A•

MoW

I

Trai

ning

farm

ers o

n cr

op

husb

andr

y

Prov

isio

n of

irrig

atio

n pu

mps

to

gro

up fa

rms

Inpu

ts p

rocu

red

and

dist

ribut

ed to

gro

up

farm

s (25

)

Fam

er g

roup

s (25

) tra

ined

on

crop

pr

oduc

tion

Pum

p se

ts p

rovi

ded

to

grou

p fa

rms (

10)

No.

farm

s sup

porte

d w

ith in

puts

No.

of f

arm

ers t

rain

ed

No.

of p

umps

ets p

rovi

ded

Oct

ober

201

2 -

June

201

6

May

201

2 –

May

20

15

Oct

ober

201

3 –

Mar

ch 2

014

Agr

o-pa

stor

al

unit

Saka

Cen

tre

All

farm

s la

ckin

g pu

mps

2,00

0,00

0

2,00

0,00

0

7,00

0,00

0

Sub-

tota

l11

1,00

0,00

0

Esta

blis

hmen

t & su

ppor

t to

lives

tock

mar

ketin

g gr

oups

to

ass

ist i

n m

arke

ting

and

train

ing

• M

oLD

• K

LMC

• C

ount

y G

ov’t

• C

DF

• LA

TF

• M

oLD

• W

RU

A•

KW

S•

WR

MA

• Pa

stor

alis

ts•

Farm

ers

• M

WI

• M

oA•

IUC

N•

FaID

A•

Adm

inis

tratio

n

• M

oLD

• K

AR

I•

WR

UA

• Lo

cal c

omm

unity

bre

edin

g

expe

rts•

MoL

D•

WR

UA

• K

WS

• W

RM

A•

Past

oral

gro

ups

Sens

itiza

tion

on p

rote

ctio

n of

“M

alka

s” a

nd o

peni

ng u

p m

ore

for b

oth

lives

tock

and

w

ildlif

e to

acc

ess t

he ri

ver

(100

m w

ide)

Prom

otio

n of

bes

t loc

al

bree

ds

Hol

d m

eetin

gs a

nd se

min

ars

to su

ppor

t coo

rdin

atio

n be

twee

n liv

esto

ck

stak

ehol

ders

Sub-

tota

l

Tota

l

Func

tiona

l mar

ketin

g gr

oups

(2) i

n pl

ace

Com

mun

ities

se

nsiti

zed

on

prot

ectio

n of

“M

alka

s” (a

t lea

st 1

0)

Bre

ed o

f liv

esto

ck

spec

ies p

rom

oted

(at

leas

t 4)

Coo

rdin

atio

n be

twee

n st

akeh

olde

rs im

prov

ed

No.

of m

arke

ting

gro

ups r

egis

tere

d an

d fu

nctio

nal

No.

of p

rote

cted

and

func

tioni

ng

“Mal

kas”

No.

of b

reed

s pro

mot

ed

No.

of l

ives

tock

coo

rdin

atio

n m

eetin

gs

Apr

il 20

13

Febr

uary

201

3 to

June

201

7

Nov

embe

r 201

3 –

Dec

201

6

Ever

y Fe

b fr

om

2013

-201

7

Saka

Loc

atio

nD

aley

Loc

atio

n

Agr

o-pa

stor

al

zone

Past

oral

and

ag

ro-p

asto

ral

units

Saka

sub-

catc

hmen

t

3,00

0,00

0

1,00

0,00

0

2,00

0,00

0

1,00

0,00

0

7,00

0,00

0

141,

500,

000

Page 46

Page 55: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Chapter 9: Capacity building

The chapter involves description of the WRUA training needs, measures needed to enhance governance and strengthening management capacity. The chapter identifies the capacity building needs at sectorial levels of WRUA and partners. It also provides an action plan for the implementation of capacity building activities to achieve the targets and goals in the sub-catchment.

The WRUA is young having been started July 2011 and has no office. The community has received some training on water and natural resource management from various NGOs, Government ministries and other agencies. IUCN has trained communities on: sustainable land and water management and conservation practices, integration of sub-catchment management plan and rangeland management plan to formulate ASCMP. Similarly, CARE trained WUAs on water conservation and WRMA on WRUA WDC in particular formation and registration of WRUA with various government departments. After receiving various trainings the WRUA officials held meetings to capacity build their members too. To gain maximum benefit and effectively implement proposed activities in the adapted SCMP community members and implementing partners need to be capacity built in several areas related to sustainable natural resource management.

The community cited the need to execute needs assessment but the following are also the tentative capacity building areas at sectoral levels as identified by the stakeholders:

Water• Roles of WRUA members

• Exposure tours to other WRUAs

• Publicity on WRUA activities

• Training on environmental conservation and management

• Training on participatory monitoring and evaluation

• Training on data collection and monitoring on water levels and meteorological station

• Establishing of WRUA office

• Training on management and protection of water sources

Agriculture • Training on pesticides and insecticides

• Training on management of farm pumps and irrigation infrastructure

• Marketing and value addition of farms produce

• Post harvesting techniques

• Diversification of crops and making it a business e.g. aagro-forestry

• Crop husbandry

• Establishment of co-operative societies

Livestock • Training on pest and disease control and administration vet drugs

• Training of overstocking and its impacts on environment

• Training on marketing and values addition of livestock

• Establishment of livestock groups to assist in marketing

• Training on pasture /fodder production

• Training on beekeeping, fish farming ,crocodile farming and bird farming

Page 47

Page 56: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Wildlife • Training on conservation of wildlife

• Training on data collection on signs and symptoms of outbreak of diseases for early reporting and action plan

• Life-saving skills from attacks of wildlife

• Sensitization of community and by-laws creation on land use and management (all sectors

• Training on proposal writing and development

Minerals

• Training on exploitation and usage of minerals and uses of its equipment

• Training on marketing of ballast, building blocks and cement

• Entrepreneurial training

• Education tour to Matuu, Thika,

• Sensitization on the impacts of the exploitation process

Pasture and fodder production • Sensitization on use of wet and dry season fodder during different periods

• Training on pasture and fodder production and storage e.g. hays farms

• Sensitization on dangers of causing wildfire

• Training on pasture and fodder seeding and re-seeding in rainy season

• Training on pasture/fodder marketing

• Training on Mathenge and bush control

• Storage for fodder produced.

Details on the execution of the above are in Table 16.

Page 48

Page 57: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Tabl

e 16

. C

apac

ity b

uild

ing

for c

omm

unity

and

par

tner

s on

adap

tive

SCM

P

Res

pons

ibili

tyO

utpu

tsIn

dica

tors

Whe

nW

here

Bud

get (

kshs

)Pr

oble

m/

Obj

ectiv

esA

ctiv

ities

Sub-

activ

ities

Targ

et: E

nhan

ce th

e ca

paci

ty o

f the

com

mun

ity a

nd W

RU

A o

n ac

tivity

impl

emen

tatio

n th

roug

h ne

twor

king

and

par

tner

ship

O

vera

ll ou

tput

: Im

prov

ed c

apac

ity to

ove

rcom

e e

xist

ing

chal

leng

es a

nd c

apita

lise

on e

xist

ing

oppo

rtuni

ties

100,

000

Con

duct

cap

acity

ne

eds

asse

ssm

ent

and

train

on

coor

dina

tion

Inad

equa

te

capa

city

to e

xecu

te

and

coor

dina

te

catc

hmen

t m

anag

emen

t ac

tiviti

es

Sens

itiza

tion

repo

rtR

epor

t doc

umen

ted

and

acc

epte

d

Oct

ober

201

2 A

ll m

anag

emen

t un

its w

ithin

the

sub-

catc

hmen

t

Sens

itiza

tion

of c

omm

unity

on

cap

acity

nee

ds a

sses

smen

t

• W

RU

A•

MoA

• K

FS•

KW

S•

MoL

D•

IUC

N•

FaID

A•

WR

MA

• C

omm

unity

• C

FA

Exec

utio

n of

cap

acity

nee

ds

asse

ssm

ent

Shar

e ca

paci

ty n

eeds

repo

rt w

ith c

omm

unity

Trai

ning

on

best

way

s to

en

forc

e by

-law

s in

cat

chm

ent

Aw

aren

ess

crea

tion

on B

DR

Pr

ojec

t im

plem

enta

tion

activ

ities

thro

ugho

ut th

e su

b-ca

tchm

ent a

nd b

eyon

d

Cap

acity

nee

ds o

f com

mun

ity

and

stak

ehol

ders

iden

tifi e

d

Wor

ksho

p re

port

Enha

nced

enf

orce

men

t of

by-

law

s in

pla

ce

Com

mun

ities

and

par

tner

s in

form

ed o

n pr

ojec

t act

iviti

es

to b

e im

plem

ente

d

Ass

essm

ent r

epor

t

Rep

ort s

ucce

ssfu

lly c

ompl

eted

and

ac

cept

ed

No.

of e

nfor

cem

ent a

gent

s tra

ined

No.

of a

war

enes

s cr

eatio

n m

eetin

gs

cond

ucte

d

Sub-

tota

l

Dec

embe

r 201

2

Feb

2013

July

201

3– S

ept

2015

Apr

il 20

13

Saka

Cen

tre

All

man

agem

ent

units

with

in th

e su

b-ca

tchm

ent

300,

000

100,

000

600,

000

400,

000

1,50

0,00

0

Inad

equa

te

capa

city

on

wat

er

man

agem

ent

Cap

acity

bu

ildin

g on

wat

er

man

agem

ent

Trai

ning

WR

UA

mem

bers

on

inst

itutio

nal d

evel

opm

ent

• W

RU

A•

MoA

• K

FS•

KW

S•

MoL

D•

IUC

N•

FaID

A•

WR

MA

• C

omm

unity

• C

FA

Publ

icity

of W

RU

A a

ctiv

ities

in

the

sub-

catc

hmen

t and

be

yond

Trai

ning

on

envi

ronm

enta

l co

nser

vatio

n an

d m

anag

emen

t

Trai

ning

on

parti

cipa

tory

m

onito

ring

and

eval

uatio

n

Trai

ning

ses

sion

s (th

ree)

co

nduc

ted

and

a m

anua

l de

velo

ped

Publ

icat

ions

on

WR

UA

ac

tiviti

es p

rodu

ced

(one

per

ye

ar) a

nd a

war

enes

s cr

eate

d

Trai

ning

(one

) on

en

viro

nmen

tal c

onse

rvat

ion

and

man

agem

ent

cond

ucte

d

Trai

ning

(one

) on

pa

rtici

pato

ry m

onito

ring

and

eval

uatio

n co

nduc

ted

Trai

ning

on

data

col

lect

ion

an

d m

onito

ring

of ri

ver l

evel

s an

d m

etro

logi

cal c

entre

s

Trai

ning

(one

) on

da

ta

colle

ctio

n a

nd m

onito

ring

of

river

leve

ls a

nd m

etro

logi

cal

cent

res

Trai

ning

(one

) on

man

agem

ent

and

prot

ectio

n of

wat

er

reso

urce

s

Trai

ning

on

man

agem

ent a

nd

prot

ectio

n of

wat

er re

sour

ces

• W

RU

A•

Met

Dep

t•

FaID

A•

IUC

N•

WR

MA

• W

RU

A•

WR

MA

• M

oWI

• Fa

IDA

• IU

CN

Sub-

tota

l

• N

o. o

f tra

inin

gs a

nd p

artic

ipan

ts•

No.

of m

anua

l

• N

o. o

f pub

licat

ions

• N

o. o

f aw

aren

ess

cam

paig

ns

No.

of t

rain

ing

and

par

ticip

ants

No.

of t

rain

ing

and

par

ticip

ants

No.

of m

onito

rs id

entifi

ed

and

train

ed fo

r th

e st

atio

ns

No.

of t

rain

ing

and

par

ticip

ants

Nov

embe

r 201

2 to

Jun

e 20

17

Janu

ary

2013

to

Jan

uary

201

5

Dec

embe

r 201

2

Febr

uary

201

3

Oct

ober

201

2

June

201

3

Dal

eyH

adle

y Sa

ka

All

man

agem

ent

units

with

in th

e su

b-ca

tchm

ent

Saka

Cen

tre

Saka

Cen

tre

Saka

Cen

tre

1,00

0,00

0

600,

000

300,

000

400,

000

300,

000

300,

000

2,90

0,00

0

Inad

equa

te

capa

city

in

agri

cultu

ral

man

agem

ent

Cap

acity

bui

ldin

g on

agr

icul

ture

crop

pro

duct

ion

and

agro

fore

stry

• Fa

rmer

s •

MoA

• Ir

rigat

ion

• W

RU

A

• O

pera

tors

MoA

• M

oWI

• Li

ne m

inis

tries

Trai

ning

on

pest

s an

d di

seas

es

incl

udin

g ea

rly w

arni

ng o

n th

e sa

me

Trai

ning

on

mai

nten

ance

and

op

erat

ion

of f

arm

pum

ps a

nd

irrig

atio

n in

fras

truct

ure

Trai

ning

on

pes

ts a

nd d

isea

ses

(one

)

Trai

ning

on

oper

atio

n of

pu

mps

and

mai

nten

ance

of

irrig

atio

n in

fras

truct

ure

No.

of t

rain

ing

and

par

ticip

ants

No.

of t

rain

ing

and

parti

cipa

nts

Oct

ober

201

2 –

June

201

7A

gro-

past

oral

un

it

Ope

rato

rs a

nd

farm

ers

in A

gro-

past

oral

uni

t

Oct

ober

201

2 O

ctob

er 2

015

500,

000

500,

000

Page 49

Page 58: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Res

pons

ibili

tyO

utpu

tsIn

dica

tors

Whe

nW

here

Bud

get (

kshs

)Pr

oble

m/

Obj

ectiv

esA

ctiv

ities

Sub-

activ

ities

300,

000

Cap

acity

bui

ldin

g on

live

stoc

k m

anag

emen

t

Inad

equa

te

capa

city

in

Liv

esto

ck

man

agem

ent

Trai

ning

on

mar

ketin

g st

rate

gies

to v

alue

add

ition

of

farm

pro

duce

(one

)

No.

of t

rain

ing

and

par

ticip

ants

Apr

il 21

03

Agr

o-pa

stor

al

unit

Trai

ning

on

mar

ketin

g an

d va

lue

addi

tion

of fa

rm

prod

uce

• Fa

rmer

s •

MoA

In

adeq

uate

ca

paci

ty in

ag

ricu

ltura

l m

anag

emen

t

Cap

acity

bui

ldin

g on

agr

icul

ture

crop

pro

duct

ion

and

agro

fore

stry

Trai

ning

on

post

-har

vest

te

chni

ques

Tr

aini

ng m

anua

l dev

elop

ed

(one

)N

o. o

f tra

inin

g, a

nd p

artic

ipan

ts

Mar

ch -

Febr

uary

201

3 A

gro-

past

oral

un

it30

0,00

0

• M

oA•

Farm

ers

• M

oLD

• K

WS

• K

FS•

IUC

N•

FaID

A•

WR

MA

• W

RU

A

Trai

ning

on

dive

rsifi

catio

n of

cr

ops a

nd a

gro-

fore

stry

Trai

ning

con

duct

ed o

n

dive

rsifi

catio

n of

cro

ps a

nd

agro

-for

estry

No.

farm

ers

and

past

oral

ists

trai

ned

Oct

ober

201

3 -

Oct

ober

201

5A

gro-

past

oral

un

it60

0,00

0

• M

oA•

MoL

D•

Past

oral

gro

ups

• K

WS

Co-

oper

ativ

e so

ciet

y es

tabl

ishe

d (o

ne)

No.

of c

oope

rativ

e so

ciet

y w

ith

regi

ster

ed m

embe

rs a

nd o

pera

tiona

lEs

tabl

ishi

ng o

f coo

pera

tive

soci

ety

Apr

il 20

14

Agr

o-pa

stor

al

unit

200,

000

• M

oA•

MoL

D•

IUC

N•

FaID

A•

WR

MA

• W

RU

A•

Farm

ers

Trai

ning

on

crop

m

anag

emen

tTr

aini

ngs c

ondu

cted

on

crop

m

anag

emen

t (tw

o)N

o. o

f tra

inin

gs a

nd p

artic

ipan

tsO

ctob

er 2

012

- Ju

ne 2

017

Agr

o-pa

stor

al

unit

500,

000

Sub-

tota

l2,

900,

000

Trai

ning

on

pest

s, di

seas

e co

ntro

l and

ear

ly w

arni

ng

• M

oLD

• Pa

stor

alis

t •

Farm

ers

• K

WS

Trai

ning

s con

duct

ed o

n pe

sts,

dise

ase

cont

rol a

nd

early

war

ning

and

a m

anua

l de

velo

ped

No.

of t

rain

ings

, par

ticip

ants

, and

m

anua

l dev

elop

edN

ovem

ber 2

012

– Ju

ne 2

017

Past

oral

and

ag

ro-p

asto

ral

units

400,

000

• M

oLD

• K

WS

• K

WS

• IU

CN

• Fa

IDA

• Pa

stor

al g

roup

s

Trai

ning

on

mar

ketin

g an

d va

lue

addi

tion

of li

vest

ock

prod

ucts

Trai

ning

s con

duct

ed (t

wo)

on

m

arke

ting

and

valu

e ad

ditio

n of

live

stoc

k pr

oduc

ts a

nd a

m

anua

l dev

elop

ed

• N

o. o

f tra

inin

gs a

nd p

artic

ipan

ts•

A tr

aini

ng m

anua

lN

ovem

ber 2

012

– Ju

ne 2

015

Saka

Cen

tre30

0,00

0

• M

oLD

• IU

CN

• Fa

IDA

• W

RU

A•

WR

MA

• Pa

stor

al g

roup

s

Trai

ning

on

rang

e m

anag

emen

t and

gra

zing

sy

stem

Trai

ning

on

rang

e re

sour

ces

man

agem

ent c

ondu

cted

No.

of t

rain

ings

and

par

ticip

ants

Dec

embe

r 201

2 -

June

201

7Pa

stor

al a

nd

agro

-pas

tora

l un

its

500,

000

Trai

ning

on

past

ure/

fodd

er

prod

uctio

n, st

orag

e &

m

arke

ting

• IU

CN

• Fa

IDA

• W

RU

A•

WR

MA

• M

oLD

• K

FS•

Past

oral

gro

ups

Trai

ning

s con

duct

ed o

n pa

stur

e/fo

dder

pro

duct

ion,

st

orag

e &

mar

ketin

g

No.

of t

rain

ings

and

par

ticip

ants

May

201

3 –

June

20

17Pa

stor

al a

nd

agro

-pas

tora

l un

its

600,

000

Page 50

Page 59: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Res

pons

ibili

tyO

utpu

tsIn

dica

tors

Whe

nW

here

Budg

et (k

shs)

Prob

lem

/ O

bjec

tives

Act

iviti

esSu

b-ac

tiviti

es

300,

000

Trai

ning

con

duct

ed o

n be

ekee

ping

No.

of t

rain

ing

and

par

ticip

ants

Janu

ary

2015

A

gro-

past

oral

un

itTr

aini

ng o

n be

ekee

ping

WR

UA

• B

ee fa

rmer

s •

IUC

N•

FaID

A

• C

AR

E•

ND

MA

Inad

equa

te

capa

city

in w

ildlif

e m

anag

emen

t

Cap

acity

bui

ldin

g on

wild

life

man

agem

ent

Cap

acity

bui

ldin

g on

live

stoc

k m

anag

emen

t

Inad

equa

te

capa

city

in

Live

stoc

k m

anag

emen

t

Trai

ning

on

fi sh

farm

ing

• Fi

sher

ies

• M

oLD

• M

oA•

WR

MA

Trai

ning

con

duct

ed o

n fi s

h fa

rmin

gN

o. o

f tra

inin

g an

d pa

rtici

pant

sFe

brua

ry 2

015

Agr

o-pa

stor

al

unit

300,

000

Sub-

tota

l2,

400,

000

Trai

ning

and

aw

aren

ess o

n w

ildlif

e co

nser

vatio

n •

KW

S•

WR

UA

• C

omm

unity

IUC

N•

MoL

D•

KFS

Farm

ers

• N

EMA

• K

WS

• W

RM

A

• C

omm

unity

scou

ts

• IU

CN

• Fa

IDA

• M

oLD

• K

FS

• K

WS

• M

oH•

Prov

. Adm

in.

• R

ed c

ross

• St

. Joh

n

Trai

ning

on

data

col

lect

ion

on si

gns a

nd sy

mpt

oms o

f ou

tbre

ak o

f dis

ease

s for

ear

ly

war

ning

Trai

ning

on

Life

-sav

ing

skill

s fr

om w

ildlif

e at

tack

s

Sens

itiza

tion

cond

ucte

d o

n w

ildlif

e c

onse

rvat

ion

(two)

Com

mun

ity tr

aini

ng o

n da

ta c

olle

ctio

n - s

igns

and

sy

mpt

oms o

f out

brea

k of

di

seas

es

Com

mun

ity tr

aine

d o

n lif

e-sa

ving

skill

s fro

m w

ildlif

e at

tack

s

No.

of s

ensi

tizat

ion

mee

tings

and

pa

rtici

pant

s

No.

of t

rain

ing

and

par

ticip

ants

No.

of t

rain

ing

and

parti

cipa

nts

Dec

embe

r 201

2

July

201

3

May

201

3

All

man

agem

ent

units

with

in th

e Su

b-ca

tchm

ent

Saka

Cen

tre

Saka

Cen

tre

500,

000

300,

000

300,

000

Sub-

tota

l1,

100,

000

Inad

equa

te

capa

city

in la

nd

use

plan

ning

and

m

anag

emen

t

Cap

acity

bui

ldin

g on

land

use

pla

nnin

g an

d m

anag

emen

t

Sens

itiza

tion

on la

nd u

se a

nd

man

agem

ent

• IU

CN

• Fa

IDA

• A

ll lin

e m

inis

tries

(HoD

s)•

Com

mun

ity

• W

RU

A

Com

mun

ity se

nsiti

zed

on

land

use

and

man

agem

ent

No.

of s

ensi

tizat

ion

sess

ions

and

pa

rtici

pant

sSe

ptem

ber 2

012

– Ju

ne 2

017

All

man

agem

ent

units

with

in th

e Su

b-ca

tchm

ent

500,

000

Inad

equa

te

capa

city

on

Min

eral

use

• M

oEN

R

• W

RU

A•

Adm

in.

• C

ount

y G

ov’t

• M

ines

and

Geo

logy

Dep

t•

NEM

A•

Adm

in•

WR

UA

• M

inis

try o

f Tra

de

• C

ount

y G

ov’t

• M

inis

try o

f Tra

de

• A

dmin

.•

NG

Os

• H

oDs

Cap

acity

bui

ldin

g on

min

eral

use

and

m

anag

emen

t

Trai

ning

on

sust

aina

ble

use

of

min

eral

s

Trai

ning

on

mar

ketin

g of

ba

llast

, bui

ldin

g bl

ocks

and

ce

men

t (m

iner

al p

rodu

cts)

Entre

pren

eurs

hip

train

ing

and

educ

atio

nal t

our

Com

mun

ity tr

aini

ng o

n su

stai

nabl

e m

iner

al u

se

cond

ucte

d

Com

mun

ity tr

aine

d on

m

arke

ting

of m

iner

al

prod

ucts

Com

mun

ity fa

cilit

ated

with

an

exp

osur

e to

ur (o

ne)

No.

of t

rain

ings

and

par

ticip

ants

No.

of t

rain

ing

and

parti

cipa

nts

No.

of e

xpos

ure

tour

and

par

ticip

ants

Aug

ust

2013

Aug

ust 2

014

Sept

embe

r 201

3

Sept

embe

r 201

4

Saka

Saka

Saka

Thik

aM

atuu

500,

000

300,

000

800,

000

Page 51

Page 60: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Res

pons

ibili

tyO

utpu

tsIn

dica

tors

Whe

nW

here

Bud

get (

kshs

)Pr

oble

m/

Obj

ectiv

esA

ctiv

ities

Sub-

activ

ities

300,

000

Com

mun

ity se

nsiti

zed

on

the

impa

cts o

f min

eral

s ex

ploi

tatio

n pr

oces

s

No.

of s

ensi

tizat

ion

mee

ting

and

parti

cipa

nts

Dec

embe

r 201

4Sa

kaSu

b-to

tal

Sens

itiza

tion

on th

e im

pact

s of

min

eral

s exp

loita

tion

proc

ess

• N

EMA

• M

ines

and

Geo

logy

Dep

t•

MoH

• M

PHS

• A

dmin

.

Cap

acity

bui

ld o

n pa

stur

e an

d fo

dder

pr

oduc

tion

Inad

equa

te

capa

city

on

Past

ure

and

fo

dder

pro

duct

ion

Inad

equa

te

capa

city

on

Min

eral

use

Cap

acity

bui

ldin

g on

min

eral

use

and

m

anag

emen

t

Sub-

tota

l

Sens

itiza

tion

on u

se o

f dr

y an

d w

et se

ason

fodd

er

prod

uctio

n du

ring

diffe

rent

pe

riods

• M

oLD

• M

oWI

• N

DM

A•

KW

S•

KFS

• C

AR

E•

IUC

N•

FaID

A•

MoA

Com

mun

ity se

nsiti

zed

on u

se

of d

ry a

nd w

et se

ason

fodd

er

prod

uctio

n

No.

of s

ensi

tizat

ion

mee

ting

and

parti

cipa

nts

Oct

ober

201

2 –

June

201

6Sa

ka

1,90

0,00

0

Trai

ning

on

prev

entio

n of

Pr

osop

is ju

lifl o

ra (M

athe

nge)

an

d bu

sh c

ontro

l

• K

FS•

MoA

• W

RU

A•

WR

MA

• M

oWI

• M

oLD

Com

mun

ity tr

aine

d on

pr

even

tion

and

cont

rol o

f M

athe

nge

and

bush

No.

of t

rain

ing

and

train

ees

Ever

y ye

ar

Nov

embe

r (20

12

– 20

16)

Past

oral

and

ag

ro-p

asto

ral

units

1,00

0,00

0

Sub-

tota

l2,

000,

000

15,2

00,0

00

1,00

0,00

0

Tota

l

Page 52

Page 61: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Chapter 10: Infrastructure development to boost resource conservation and mitigate against disasters and conflicts

The chapter provides details on the strategy for infrastructure development to boost resource conservation, mitigate disasters and conflicts.

Infrastructure is vital in the conservation of natural resources. The current status of infrastructure in Saka sub-catchment are poor therefore, there is urgent need for improvement. Major constrains to conservation related to infrastructure development in the sub-catchment are drought, floods, conflicts, inadequate water for domestic use and shrinking “Malkas” (water corridors). Furthermore, the situation is worsened by lack of modern early warning systems making community to rely on indigenous technical knowledge (ITK). Moreover, roads network is poor. Innovative solutions such as integrated early warnings systems (both modern and ITK), construction of check dams along the “Laghas” as well as diversification livelihoods and promotion of water corridors to reduce conservation constraints (Table 17).

Page 53

Page 62: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Tabl

e 17

. Im

plem

enta

tion

of in

fras

truc

ture

dev

elop

men

t to

boos

t res

ourc

e pr

otec

tion

and

cons

erva

tion

Res

pons

ibili

tyO

utpu

tsIn

dica

tors

Whe

nW

here

Bud

get (

kshs

)Pr

oble

m/

Obj

ectiv

esA

ctiv

ities

Sub-

activ

ities

Targ

et: I

ncre

ase

avai

labi

lity

and

acce

ssib

ility

to n

atur

al re

sour

ces

with

in th

e su

b-ca

tchm

ent

Ove

rall

outp

ut: I

mpr

ove

infr

astru

ctur

e to

acc

ess

and

utili

se n

atur

al re

sour

ces

with

in th

e su

b-ca

tchm

ent

300,

000

Esta

blis

h ea

rly

war

ning

sys

tem

for

drou

ght

Inad

equa

te e

arly

w

arni

ng s

yste

m

(EW

S) a

gain

st

drou

ght

A m

et. s

tatio

n N

o. o

f met

eoro

logi

cal

cent

re

Oct

ober

201

2 Sa

ka

Adm

inis

tratio

n Po

lice

cam

p

Esta

blis

hmen

t of

met

eoro

logi

cal

stat

ion

• W

RM

A•

Met

. Dep

t•

WR

UA

• M

oA•

IUC

N•

KW

S•

FaID

A•

ND

MA

• W

RU

A•

WR

MA

• C

omm

unity

Met

Dep

t•

ND

MA

• IU

CN

• Fa

IDA

• M

oA•

KW

S•

Adm

inis

tratio

n

• N

DM

A•

MoL

D•

MoA

• M

oWI

• K

WS

• K

FS•

WR

UA

• M

et. D

ept

• N

DM

A•

WR

MA

• IU

CN

• Fa

IDA

• Li

ne m

inis

tries

• W

RU

A

Stre

ngth

enin

g an

d en

hanc

ing

of tr

aditi

onal

EW

S an

d do

cum

enta

tion

Supp

ort a

nd s

hare

the

pr

oduc

tion

of b

ulle

tins

on

drou

ght

Dro

ught

con

tinge

ncy

plan

One

trad

ition

al E

WS

docu

men

ted

and

avai

led

Bul

letin

pro

duce

d an

d di

ssem

inat

ed o

n qu

arte

rly

basi

s

One

Sak

a co

mm

unity

co

ntin

genc

y pl

an d

evel

oped

pe

r yea

r

No.

of

docu

men

tatio

n

No.

of i

ssue

s pr

oduc

ed a

nd s

hare

d

No.

of c

ontin

genc

y pl

ans

deve

lope

d

Oct

ober

201

3

Qua

rterly

Oct

ober

201

2 –

June

201

7

Janu

ary

and

June

ev

ery

year

(201

3 - 2

017)

Saka

Saka

Saka

300,

000

1,00

0,00

0

1,00

0,00

0

Sub-

tota

l2,

600,

000

Inad

equa

te e

arly

w

arni

ng s

yste

m

(EW

S) a

gain

st

fl ood

s

Esta

blis

h ea

rly

war

ning

sys

tem

for

fl ood

s

Esta

blis

hmen

t of R

GS

• W

RM

A•

WR

UA

• IU

CN

• Fa

IDA

• N

DM

A•

Line

min

istri

es

• W

RM

A•

KEN

GEN

• W

RU

A•

Red

cro

ss•

MoL

D•

IUC

N•

FaID

A•

Med

ia

Esta

blis

hmen

t of fl

ood

in

form

atio

n sh

arin

g sy

stem

At l

east

one

RG

S st

atio

n es

tabl

ishe

d

Floo

d in

form

atio

n ge

nera

ted

and

shar

ed p

er y

ear (

two)

No.

of R

GS

stat

ions

No.

of fl

ood

info

rmat

ion

shar

ed a

nd

impl

emen

ted

Apr

il 20

13

Oct

ober

201

2 –

June

201

7

Saka

Saka

300,

000

500,

000

Page 54

Page 63: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Res

pons

ibili

tyO

utpu

tsIn

dica

tors

Whe

nW

here

Bud

get (

kshs

)Pr

oble

m/

Obj

ectiv

esA

ctiv

ities

Sub-

activ

ities

1,00

0,00

0

Stre

ngth

en c

onfl i

ct

reso

lutio

nsIn

adeq

uate

ear

ly

war

ning

on

natu

ral

reso

urce

use

co

nfl ic

ts

Saka

com

mun

ity fl

ood

cont

inge

ncy

plan

dev

elop

ed

each

yea

r

No.

of c

ontin

genc

y pl

ans d

evel

oped

Oct

ober

/Mar

ch

ever

y ye

ar (2

012

- 201

7)

Saka

Floo

d co

ntin

genc

y pl

an•

WR

MA

• K

enG

en•

Red

cro

ss•

MoL

D•

IUC

N•

WR

UA

• N

DM

A•

FaID

A•

Line

min

istri

es

Sub-

tota

l1,

800,

000

Esta

blis

hmen

t of E

WS

on

natu

ral r

esou

rce

confl

icts

• W

RM

A•

WR

UA

• Pe

ace

Com

mitt

ee•

ND

MA

• K

WS

• El

ders

IUC

N•

FaID

A•

Chi

ef

• Li

ne m

inis

tries

EWS

on n

atur

al re

sour

ce

confl

ict d

evel

oped

per

yea

r to

redu

ce c

onfl i

cts (

At l

east

two)

• N

o. o

f con

fl ict

s re

solv

ed

• N

o. o

f pea

ce m

eetin

gs h

eld

One

mee

ting/

yr(2

013

– 20

17)

Saka

cen

tre1,

000,

000

• M

oW•

CD

F•

WR

UA

• LA

TF•

Cou

nty

Gov

t

Con

stru

ctio

n of

wat

er p

ans

alon

g “l

agha

s”Im

prov

e av

aila

bilit

y of

wat

er fo

r do

mes

tic a

nd

lives

tock

use

Inad

equa

te w

ater

su

pply

• M

oWI

• W

RM

A•

IUC

N•

FaID

A•

WR

MA

• M

oW•

CD

F•

WR

UA

• LA

TF•

Cou

nty

govt

• M

oWI

• C

DF

• W

RU

A•

FaID

A•

IUC

N

• M

oWI

• C

DF

• W

RU

A•

IUC

N

Sub-

tota

l

Purc

hase

of r

ainw

ater

ha

rves

ting

stru

ctur

es in

in

stitu

tions

Con

stru

ctio

n of

dam

s alo

ng

the

“lag

has”

to h

arne

ss

runo

ff

Dril

ling

of b

oreh

oles

Dis

iltin

g of

exi

stin

g w

ater

pa

ns a

nd c

onst

ruct

ion

of

inle

ts

Wat

er p

ans c

onst

ruct

ed (t

hree

st

ruct

ures

eac

h 30

,000

m3 )

Eigh

t wat

er ta

nks o

f 10,

000

m3

and

acce

ssor

ies f

or in

stitu

tions

- s

choo

ls, d

ispe

nsar

ies

Dam

s con

stru

cted

to h

arne

ss

runo

ff

Bor

ehol

es d

rille

d &

equ

ippe

d (a

t lea

st tw

o)

Wat

er p

ans (

fi ve)

dis

tille

d an

d in

lets

con

stru

cted

No.

of w

ater

pan

s con

stru

cted

• N

o. o

f stru

ctur

es a

ppro

pria

tely

in

stal

led

• N

o. o

f ben

efi c

iarie

s

No.

dam

s con

stru

cted

No.

of b

oreh

oles

dril

led

& e

quip

ped

No.

of w

ater

pan

s dis

tille

d an

d w

ith

inle

ts

Janu

ary–

Dec

20

14

Oct

ober

201

2 –

Nov

embe

r 201

4

Janu

ary–

Dec

20

14

Janu

ary–

Dec

20

14

Janu

ary-

Dec

20

15

Past

oral

uni

t (at

H

igla

,Fa

diw

eyne

,Su

ban)

Settl

emen

t uni

t (a

t Dal

ey,

Saka

,M

atha

hlib

aah,

Had

ley,

Hirb

ai)

Past

oral

uni

t (H

abar

ow

laga

ha)

Settl

emen

t uni

t (S

aka

Junc

tion,

B

alam

bala

Ju

nctio

n)

Settl

emen

t and

pa

stor

al u

nits

(S

aka

Junc

tion,

Bal

amba

la

Junc

tion,

Ohi

o,

Uro

w, A

qala

ar)

10,0

00,0

00

5,00

0,00

0

30,0

00,0

00

30,0

00,0

00

10,0

00,0

00

85,0

00,0

00

Inad

equa

te

coor

dina

tion

at

com

mun

ity le

vel

Stre

ngth

en W

RU

A

as a

coo

rdin

atio

n un

it

Esta

blis

hing

of W

RU

A

offi c

e (m

ater

ials

to b

e pr

ovid

ed b

y c

omm

unity

)

• W

RU

A•

WR

MA

• Li

ne m

inis

tries

Func

tiona

l WR

UA

offi

ce

Roa

ds b

ush

clea

red

& g

rade

d (a

t lea

st 5

0 km

)

Offi

ce st

ruct

ure

esta

blis

hed

and

oper

atio

nal

Sept

embe

r 201

3 Sa

ka C

entre

300,

000

Page 55

Page 64: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Res

pons

ibili

tyO

utpu

tsIn

dica

tors

Whe

nW

here

Bud

get (

kshs

)Pr

oble

m/

Obj

ectiv

esA

ctiv

ities

Sub-

activ

ities

200,

000,

000

Impr

ove

road

sPo

or r

oads

Mic

ro-p

roce

ssin

g m

achi

nes

Km

bus

h cl

eare

d &

gra

ded

Nov

embe

r 201

2 –J

une

2017

D

aley

to H

irbai

Saka

to S

aka

Junc

tion

Bus

h cl

earin

g &

gra

ding

Min

. of R

oads

NEM

A•

WR

UA

• C

hief

Cou

nty

govt

• N

YS

• C

DF

• LA

TF

• M

oA•

NEM

A•

WR

UA

• Fa

rmer

s•

Past

oral

ists

• N

EMA

• M

oLD

• C

ount

y C

ounc

il •

WR

UA

Adm

inis

tratio

n •

Publ

ic h

ealth

• N

EMA

• M

oLD

• C

ount

y go

vt•

WR

UA

Adm

inis

tratio

n •

Publ

ic H

ealth

• N

EMA

• M

oLD

• C

ount

y C

ounc

il •

WR

UA

Adm

inis

tratio

n •

Publ

ic H

ealth

• N

EMA

Cou

nty

govt

• M

in.o

f Wor

ks

Lac

k of

mar

ket

plac

e Im

prov

e ac

cess

to

mar

kets

and

val

ue

addi

tion

Prov

isio

n of

mic

ro p

roce

ssin

g m

achi

ne fo

r cro

p an

d liv

esto

ck p

rodu

ce (v

alue

ad

ditio

n)

Esta

blis

hmen

t of l

ives

tock

m

arke

t for

sale

of a

nim

als

Con

stru

ctio

n of

slau

ghte

r ho

use

and

tann

ery

Esta

blis

hmen

t of c

emen

t fa

ctor

y (b

ased

on

the

outc

ome

of th

e ba

selin

e su

rvey

)

Purc

hase

of b

lock

cut

ting

mac

hine

esta

blis

hed

for v

eget

able

s, fr

uits

, milk

and

mea

t

Live

stoc

k m

arke

t for

sale

of

anim

als o

n kn

own

mar

ket d

ay

esta

blis

hed

(one

)

Slau

ghte

r hou

se (o

ne)

Smal

l sca

le c

emen

t fac

tory

Blo

ck c

uttin

g m

achi

ne o

n si

te

No.

of p

rodu

cts p

roce

ssed

A fu

nctio

nal l

ives

tock

mar

ket e

stab

lishe

d

A fu

nctio

nal s

laug

hter

hou

se e

stab

lishe

d

Ope

ratio

nal c

emen

t fac

tory

est

ablis

hed

A fu

nctio

nal b

lock

cut

ting

mac

hine

pr

ocur

ed

Dec

embe

r 201

3

Janu

ary

2013

Dec

embe

r 201

3

Dec

embe

r 201

4

Dec

embe

r 201

4

Saka

cen

tre

Saka

cen

tre

Saka

cen

tre

Dal

ey

Had

ley

4,00

0,00

0`

800,

000

10,0

00,0

00

10,0

00,0

00

5,00

0,00

00

Sub-

tota

l

Tota

l

29,8

00,0

00

320,

500,

000

Page 56

Page 65: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Chapter 11: Stakeholder analysis for right based approach and poverty reduction

The chapter explores the coordination and collaboration of different stakeholders (e.g. permanent, occasional and outsiders) and their roles based on rights, responsibility, relationship and revenues to avoid conflicts and gender disparities while promoting good governance to access and manage land and water resources within the sub-catchment. Furthermore, water and land resources are basic human rights under the new constitution and play a considerable role on economic activities in arid areas therefore harmonized coordination of WRUA plans with stakeholders concerns to reduce poverty, gender parity and alternative livelihoods is paramount.

Stakeholders were identified at different levels e.g. local, intermediate and NGOs & International agencies. The following are identified stakeholders at different levels:

11.1 Local levela) WRUA

b) Chiefs

c) Village elders

d) Peace committee

e) Religious leaders e.g. Imams

f) Environmental committee

g) Farmers/ pastoralists

h) Extension officers

i) Women leaders

j) Youth leaders

k) Parent teachers associations (PTA)/ school management committee (SMC)

l) Health Facility management committee(FMC)

m) Relief Committee (RC)

n) Councilor

The relationship between all these institutions is in Figure 2

11.2 Intermediate levela) Ministry of Water and Irrigation (District Water Officer)

b) Water Resource Management Authority (WRMA)

c) Office of the President (District Commissioner/District Officer)

d) Ministry of Livestock Development (District Livestock Production Officer/District Veterinary Officer)

e) Ministry of Agriculture (District Agricultural Officer)

f) Ministry of Northern Kenya and Other Arid lands(National Drought Management Authority-Drought Management Officer)

g) Ministry of Public health and Sanitation (District Public Health Officer)

h) Ministry of Education(District Education Officer)

i) Ministry of Local Government (Garissa County Council)

Page 57

Page 66: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Page 56

j) Ministry of Forestry and Wildlife - Kenya Wildlife Services (KWS), Kenya Forest Service (KFS)

k) Ministry of Environment and Mineral Resources - National Environment Management Authority (NEMA), Mines and Geology Department

11.3 NGOs and international agenciesa) Kenya Red Cross Society (KRCS)

b) Fafi Integrated Development Association (FaIDA)

c) Care International

d) World Concern

e) International Union for Conservation of Nature (IUCN)

f) Mkono International

g) Japan International Corporation Agency (JICA)

h) Veterinaries San Frontier-Belgium(VSF-B)

i) SIMAHO

j) Mercy USA

k) African Development Solutions (Adeso)

11.4 Roles of Local StakeholdersThe community indicated the roles, strengths and weaknesses of local stakeholders (Table 18).

The community and participants developed planned matrix to improve coordination and collaboration between multi-sectoral institutions for harmonization of plans, right based approach and poverty reduction (Table 19).Page 58

Councilor

Imams

Farmers/pastoralists

Peace Committee

Chief

Village elders

Relief Committee

PTA

WRUA

Environmental Committee

FMC

Extension Officers

Youth leaders

Women leaders

Figure 2. Venn diagram for Saka Community – Local level collaboration and coordination

Page 67: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Page 579

STA

KE

HO

LD

ER

S

WR

UA

Chi

ef

Eld

ers

Peac

e co

mm

ittee

Rel

igio

us le

ader

s e.g

. im

ams,

shei

khs

Env

iron

men

tal

com

mitt

ee

Farm

ers/

past

oral

ist

RO

LE

S

• C

onse

rvat

ion

and

man

agem

ent o

f res

ourc

es w

ithin

Sak

a di

visi

on•

Awar

enes

s cre

atio

n on

nat

ural

reso

urce

man

agem

ent

• En

sure

the

qual

ity a

nd q

uant

ity o

f nat

ural

reso

urce

pr

oduc

ts

• G

razi

ng m

anag

emen

t •

Peac

e bu

ildin

g an

d co

nflic

t res

olut

ion

• A

cces

s to

wat

er a

nd p

astu

re fo

r pas

tora

list e

spec

ially

al

ong

the

Riv

er T

ana

• Pe

st a

nd d

isea

se su

rvei

llanc

e fo

r hum

an, l

ives

tock

, cro

ps

and

wild

life

• Ea

rly w

arni

ng fo

r dro

ught

, floo

d an

d co

nflic

ts

• Se

nsiti

zatio

n or

aw

aren

ess c

reat

ion

in B

araz

as•

Peac

e bu

ildin

g •

Enfo

rcem

ent o

f law

s and

by-

law

s aga

inst

natu

ral r

esou

rce

use

• M

onito

ring

of d

evel

opm

ent a

ctiv

ities

• P

rote

ctio

n an

d co

nser

vatio

n of

nat

ural

reso

urce

s (m

anag

emen

t and

use

) with

in th

e vi

llage

s •

Sens

itiza

tion

and

awar

enes

s cre

atio

n •

Peac

e bu

ildin

g

• Pe

ace

build

ing

• M

aint

ain

law

and

ord

er

• Aw

aren

ess c

reat

ion

• C

onfli

ct re

solu

tion

• C

onfli

ct a

naly

sis

• Se

nsiti

zatio

n on

reso

urce

con

serv

atio

n an

d pr

otec

tion

• Pe

ace

build

ing

• C

onse

rvat

ion

• Fo

od p

rodu

ctio

n •

Inco

me

gene

ratio

n •

Envi

ronm

enta

l con

serv

atio

n •

Rep

ort o

n in

cide

nce

of e

nviro

nmen

tal d

egra

datio

n •

Surv

eilla

nce

STR

EN

GT

H

• Th

ey a

re th

e vo

ice

of th

e co

mm

unity

Rep

rese

nt th

e un

ity w

ith b

y-la

ws

• R

egis

tere

d by

A.G

and

min

istry

of s

ocia

l ser

vice

s •

Hav

e ta

ngib

le re

sour

ces c

onse

rvat

ion

thro

ugh

thei

r ef

fort

• A

stro

ng le

ader

ship

stru

ctur

e (o

ffici

als/

man

agem

ent)

• C

lose

wor

king

rela

tions

hip

with

loca

l ins

titut

ion

incl

udin

g W

RU

A•

Stro

ng in

fluen

ce in

abi

ding

of l

aw

• Th

ey h

ave

earn

ed tr

ust b

y th

e co

mm

unity

Stro

ng su

ppor

t fro

m th

e ch

iefs

, pea

ce c

omm

ittee

and

go

vern

men

t offi

cial

s •

Rel

y on

the

good

will

of t

he y

outh

to g

ive

info

rmat

ion

and

enfo

rce

• R

apid

resp

onse

to c

onfli

ct re

solu

tion

• St

rong

supp

ort f

rom

the

gove

rnm

ent a

nd c

omm

unity

• Ve

ry m

uch

trust

ed

• W

ork

with

com

mun

ity (u

se re

ligio

us m

essa

ge to

in

fluen

ce o

n co

nser

vatio

n)

• G

ood

know

ledg

e on

indi

geno

us te

chni

cal k

now

ledg

e

• Ve

ry d

edic

ated

bec

ause

it is

thei

r liv

elih

ood

• In

nova

tive

in d

evel

opin

g te

chno

logi

es o

n na

tura

l re

sour

ce

WE

AK

NE

SS

• In

adeq

uate

kno

wle

dge

and

capa

city

in n

atur

al

reso

urce

s man

agem

ent

• La

ck o

f exp

osur

e •

Can

not b

e ev

eryw

here

with

in th

e va

st S

aka

• R

are

in m

onito

ring/

surv

eilla

nce

• Fe

w la

w e

nfor

cem

ent o

ffice

rs (a

dmin

istra

tion

polic

e)

unde

r his

/her

dis

posa

l •

Inad

equa

te c

apac

ity a

nd k

now

ledg

e on

nat

ural

re

sour

ce m

anag

emen

t •

Inad

equa

te k

now

ledg

e on

nat

ural

reso

urce

use

• Li

mite

d su

ppor

t to

tradi

tiona

l ins

titut

ions

and

rule

s, w

hich

they

rely

on

• N

o in

com

e fo

r the

ir ef

forts

• In

adeq

uate

kno

wle

dge

on n

atur

al re

sour

ce

man

agem

ent

confl

ict r

esou

rce

reso

lutio

ns

• N

o so

urce

of i

ncom

e •

Inad

equa

te k

now

ledg

e om

nat

ural

reso

urce

m

anag

emen

t and

use

• W

eak

tradi

tiona

l ins

titut

ions

and

rule

s, w

hich

they

re

ly o

n

• C

onfli

cts

• In

adeq

uate

kno

wle

dge

and

inap

prop

riate

pra

ctic

es in

na

tura

l res

ourc

es

Tabl

e 18

. Ana

lysi

s of l

ocal

stak

ehol

ders

in S

aka

Page 68: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Page 60

STA

KE

HO

LD

ER

S

Ext

ensi

on o

ffice

rs

Yout

h le

ader

s

Wom

en le

ader

s

PTA

FMC

Rel

ief c

omm

ittee

RO

LE

S

• Se

nsiti

zatio

n, tr

aini

ng a

nd te

chni

cal a

dvic

e on

nat

ural

re

sour

ces p

rote

ctio

n an

d co

nser

vatio

n (a

gric

ultu

re,

fore

stry

, soi

l and

wat

er c

onse

rvat

ion,

env

ironm

enta

l co

nser

vatio

n, li

vest

ock

prod

uctio

n an

d he

alth

, wat

er

deve

lopm

ent)

• Se

rvic

e de

liver

y •

Dat

a co

llect

ion

• Pe

ace

build

ing

• C

omm

unity

mob

iliza

tion

• Su

rvei

llanc

e re

ports

Dis

sem

inat

e in

form

atio

n on

EW

S, te

chno

logy

• Se

nsiti

zatio

n an

d m

obili

zatio

n •

Peac

e bu

ildin

g •

Rep

ortin

g on

inci

denc

e on

nat

ural

reso

urce

s man

agem

ent

• Vo

lunt

eerin

g

• Pa

rtici

patio

n in

env

ironm

enta

l con

serv

atio

n su

ch a

s tre

e pl

antin

g •

Peac

e bu

ildin

g •

Enga

ged

in s

anita

tion

• Fo

od p

rodu

ctio

n •

Prov

ide

dom

estic

wat

er u

se

• Su

rvei

llanc

e re

porti

ng

• Ed

ucat

e on

env

ironm

enta

l con

serv

atio

n •

Sani

tatio

n an

d he

alth

Affo

rest

atio

n •

Peac

e bu

ildin

g •

Live

stoc

k ke

epin

g (4

K c

lubs

, Wild

life

club

s)

• H

ealth

and

sani

tatio

n •

Sens

itiza

tion

and

awar

enes

s •

Envi

ronm

enta

l con

serv

atio

n

• En

sure

env

ironm

enta

l con

serv

atio

n th

roug

h FF

A•

Peac

e bu

ildin

g an

d co

nflic

t res

olut

ion

• Pr

ovid

e in

form

atio

n on

food

nee

ds

STR

EN

GT

H

• W

ork

clos

ely

with

WR

UA

chi

efs/

past

oral

ist a

nd

farm

ers

• En

hanc

e ca

paci

ty b

uild

ing

• D

edic

ated

and

vol

unte

ers (

som

e)

• Pr

ovid

e lin

k b

etw

een

com

mun

ity a

nd e

xten

sion

w

orke

rs

• Th

ey h

ave

info

rmat

ion

and

know

ledg

e •

They

are t

ruste

d an

d w

ork

well

the c

omm

unity

and

elder

s•

Ded

icat

ed to

com

mun

ity n

atur

al re

sour

ce

cons

erva

tion

• D

edic

ated

Con

flict

reso

lutio

n an

d pe

ace

build

ing

initi

ativ

es

• Fo

rmed

clu

bs h

ealth

/san

itatio

n an

d 4K

clu

bs

• In

com

e ge

nera

tion

from

sale

of g

oats

• E

stab

lishe

d/ a

ctiv

e en

viro

nmen

tal c

onse

rvat

ion

• Su

pply

food

for

wor

k •

Res

olve

con

flict

s

WE

AK

NE

SS

• Po

or c

omm

unic

atio

n in

rela

tion

to c

over

age

• In

adeq

uate

skill

s on

natu

ral r

esou

rces

man

agem

ent

• In

adeq

uate

cap

acity

to re

spon

d to

em

ergi

ng is

sues

Inad

equa

te fa

cilit

ies/

fund

s

• In

adeq

uate

skill

s on

cons

erva

tion

• U

nem

ploy

ed

• N

ot w

ell r

ecog

nize

d by

the

com

mun

ity

• In

adeq

uate

cap

acity

on

NR

M•

Poor

infr

astru

ctur

e cu

rtails

thei

r act

iviti

es

• In

adeq

uate

kno

wle

dge

on N

RM

Poor

com

mun

icat

ion

and

faci

litie

s and

ger

mpl

asm

se

edlin

gs a

nd se

eds

• N

o fe

nce

for c

onse

rvat

ion

• In

adeq

uate

kno

wle

dge

• Po

or c

omm

unic

atio

n

• In

adeq

uate

info

rmat

ion

on N

RM

• C

orru

ptio

n •

Ineq

ualit

y in

reso

urce

allo

catio

n

Page 69: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Page 61

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

STA

KE

HO

LD

ER

Pr

ovin

cial

Adm

inis

trat

ion

Ken

ya F

ores

t ser

vice

Min

istr

y of

Pub

lic H

ealth

and

Sa

nita

tion

(MoP

HS)

Min

istr

y of

Wat

er &

ir

riga

tion(

MW

I)

Min

istr

y of

Agr

icul

ture

(MoA

)

Loc

al A

utho

ritie

s – C

ount

y C

ounc

il

Rel

igio

us In

stitu

tions

Nat

iona

l Env

iron

men

tal

Man

agem

ent A

utho

rity

(NEM

A)

Irri

gatio

n D

epar

tmen

t

Fish

erie

s Dep

artm

ent

Ken

ya W

ildlif

e Se

rvic

e

Nat

iona

l Dro

ught

Man

agem

ent

Aut

hori

ty (N

DM

A)

Min

istr

y of

live

stoc

k an

d m

arke

ting

Min

istr

y of

Edu

catio

n

Min

es a

nd G

eolo

gy D

epar

tmen

t

NG

Os a

nd In

tern

atio

nal a

genc

ies

RO

LE

(S)

Sens

itiza

tion

/mob

iliza

tion

of m

embe

rs o

f the

pub

lic th

roug

h B

araz

as a

nd a

ny o

ther

foru

m, M

onito

ring

of si

tes o

nce

reha

bilit

ated

/rep

osse

ssed

,En

forc

ing

exis

ting

law

s on

cons

erva

tion,

Ass

ist i

n id

entif

ying

deg

rade

d ar

eas f

or re

habi

litat

ion,

Pro

vide

the

secu

rity

for a

ll.

Giv

e te

chni

cal a

dvic

e on

tree

nur

sery

est

ablis

hmen

t & m

anag

emen

t, R

ehab

ilita

tion

of d

egra

ded

site

s, co

mm

unity

edu

catio

n, W

ater

bod

ies c

onse

rvat

ion

(Wat

er

frie

ndly

tree

s, W

ater

unf

riend

ly tr

ees,

Riv

er li

ne m

aint

enan

ce.

Pollu

tion

cont

rol t

hrou

gh a

war

enes

s cre

atio

n in

bot

h do

mes

tic a

nd c

omm

unity

leve

ls e

.g. s

tora

ge/h

arve

stin

g m

etho

ds, p

rese

rvat

ion

of w

ater

in b

araz

as, M

onito

ring

the

wat

er u

sage

in re

latio

n to

hum

an a

ctiv

ities

that

they

rend

er w

ater

unfi

t for

hum

an c

onsu

mpt

ion,

Con

trolli

ng a

nd p

rese

rvat

ion

of w

ater

as f

ood,

Pro

tect

ion

of w

ater

bo

dies

e.g

. spr

ings

, dam

s, sh

allo

w /d

eep

wel

ls e

.t.c

Trea

tmen

t of w

ater

at d

omes

tic a

nd c

omm

unity

leve

l by

prov

isio

n of

chl

orin

e (a

qua

tabs

, wat

er g

uard

and

PU

R).

Mon

itorin

g of

wat

er re

sour

ce m

anag

emen

t, Su

perv

isor

y, P

rovi

sion

of t

echn

ical

supp

ort e

.g. d

esig

n of

wat

er in

fras

truct

ure

Soil

cons

erva

tion-

Mob

iliza

tion,

Lay

ing

out o

f soi

l con

serv

atio

n st

ruct

ures

, Tra

inin

g on

impo

rtanc

e of

soil

cons

erva

tion,

Nur

sery

est

ablis

hmen

t-Mob

iliza

tion,

Tra

inin

g on

nur

sery

est

ablis

hmen

t and

man

agem

ent,

Trai

ning

on

Agr

ofor

estry

tree

est

ablis

hmen

t and

man

agem

ent,

Riv

er b

ank

prot

ectio

n-M

obili

zatio

n, R

iver

ban

k pe

ggin

g,

Trai

ning

on

wat

er fr

iend

ly tr

ees,

Wat

er h

arve

stin

g-Tr

aini

ng, L

ayin

g ou

t of w

ater

har

vest

ing

stru

ctur

e, E

ffici

ent u

se o

f wat

er (b

est m

etho

d fo

r irr

igat

ion)

Sens

itiza

tion

thro

ugh

Bar

aza,

Car

etak

er o

f pub

lic la

nd- c

ounc

il ar

e tru

stee

s of a

ll pu

blic

land

whi

ch a

re so

met

imes

wet

land

s and

wel

ls e

ncro

achm

ent c

an b

e pr

even

ted

by c

ount

y co

unci

l, Tr

ee p

lant

ing,

Res

ettle

men

t iss

ues,

Fund

s for

pro

tect

ion

of sp

rings

from

–LA

TIF

Ann

ounc

emen

ts/ s

ensi

tizat

ion,

Loc

al m

edia

, Rel

igio

us fo

rum

to in

vite

the

stak

ehol

ders

Wat

er R

esou

rces

man

agem

ent a

s per

(EM

CA

), M

anag

emen

t of w

etla

nds a

nd w

ater

reso

urce

s, m

onito

ring

of e

nviro

nmen

tal d

egra

datio

n an

d po

llutio

n th

roug

h

Envi

ronm

enta

l Im

pact

Ass

essm

ent,

Enfo

rcem

ent o

f the

Act

Giv

e te

chni

cal a

dvic

e on

pro

duct

ion

of to

pogr

aphi

c su

rvey

s of p

ropo

sed

proj

ect,

desi

gn o

f irr

igat

ion

proj

ect a

nd B

Qs a

nd c

ostin

g, c

o-im

plem

enta

tion

of th

e pr

ojec

t w

ith st

ake

hold

ers a

nd fa

rmer

s, Tr

aini

ng o

f far

mer

s in

colla

bora

tion

with

MO

A o

n rig

ht c

rop,

soil

and

wat

er re

latio

nshi

p, A

ssis

t in

desi

gn o

f any

reco

mm

ende

d dr

aina

ge w

orks

, Edu

cate

pub

lic o

n ef

fect

ive

and

effic

ient

use

of w

ater

.

Fish

erie

s dat

a co

llect

ion-

mon

thly

fish

erie

s pro

duct

ion

data

, Reg

ulat

ion

of fi

sher

ies a

ctiv

ities

, iss

uing

of l

icen

ses a

nd p

erm

it to

fish

erm

en a

nd fi

sh tr

ader

s. Pr

omot

e fis

h fa

rmin

g ac

tiviti

es, t

echn

ical

adv

ice

on fi

sh p

ond

cons

truct

ion

and

fish

farm

ing,

ext

ensi

on se

rvic

e th

roug

h co

llabo

ratio

n w

ith o

ther

stak

ehol

ders

.

Sust

aina

bly

cons

erve

and

man

age

Ken

ya’s

wild

life

and

its h

abita

t in

colla

bora

tion

with

stak

ehol

ders

for p

oste

rity

and

the

futu

re g

ener

atio

n, c

onse

rve

and

man

age

Ken

ya’s

wild

life

scie

ntifi

cally

, res

pons

ibly

and

pro

fess

iona

lly, c

omm

unity

mob

iliza

tion

on w

ildlif

e aw

aren

ess a

nd g

ive

tech

nica

l adv

ice

whe

re n

eces

sary

, car

ry o

ut

cont

rol o

n as

tray

wild

life

on th

e (P

.A.C

) pro

blem

atic

, ass

ist i

n gr

oups

that

hav

e co

mm

on in

tere

st in

wild

life

cons

erva

tion

and

man

agem

ent t

echn

ical

adv

ice

and

prov

ide

fund

s if a

vaila

ble.

Proj

ect i

mpl

emen

tatio

n at

com

mun

ity le

vel p

rovi

sion

of f

unds

for e

mer

genc

y se

rvic

es, m

itiga

tion

of d

roug

ht a

nd e

nhan

cing

ada

ptat

ion

to d

roug

hts.

Giv

e te

chni

cal a

dvic

e on

live

stoc

k pr

oduc

tion,

opt

imum

No

lives

tock

on

a gi

ven

squi

re a

rea,

type

s of p

astu

re a

nd m

arke

ting

of th

eir p

rodu

cts,

anim

al tr

eatm

ent

vacc

inat

ion

prov

isio

n of

lab

serv

ices

.

Prov

isio

nbas

ic e

duca

tion,

skill

s and

tale

nt to

you

ng p

eopl

e, p

hysi

cal e

duca

tion

ands

choo

l fee

ding

pro

gram

me.

Expl

orat

ion

of m

iner

als,

keep

ing

of in

vent

ory

of m

iner

als a

nd o

ther

nat

ural

reso

urce

s, pr

ovid

e te

chni

cal a

dvic

e on

exp

loita

tion

of m

iner

als,

issui

ng p

erm

its a

nd li

cens

es.

Prov

isio

n of

relie

f foo

d, p

rovi

sion

of w

ater

and

sani

tatio

n, p

rovi

sion

of s

eed/

seed

lings

, far

m to

ols t

o th

e lo

cals

, sen

sitiz

atio

n an

d ca

paci

ty b

uild

ing,

pro

mot

ion

of

cons

erva

tion

and

envi

ronm

enta

l aw

aren

ess p

rovi

sion

of m

icro

finan

ce to

the

com

mun

ity m

embe

rs a

nd a

ssis

ting

of sc

hool

i.e.

pro

vidi

ng.

11.5

Inte

rmed

iate

, Nat

iona

l and

Inte

rnat

iona

l Sta

keho

lder

s and

The

ir R

oles

The

role

s of s

take

hold

ers h

ave

been

sum

mar

ized

bel

ow:

Page 70: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

STA

KE

HO

LD

ER

Perm

anen

t use

r

RIG

HT

SR

ESP

ON

SIB

ILIT

IES

RE

LAT

ION

SHIP

11.6

Sta

keho

lder

Ana

lysi

sTh

e ro

les o

f sta

keho

lder

s at c

omm

unity

leve

l hav

e be

en su

mm

ariz

ed b

elow

:

RE

VE

NU

ES

WR

UA

• C

ontro

l and

man

age

acce

ss to

the

natu

ral

reso

urce

s •

Equi

tabl

e di

strib

utio

n of

nat

ural

reso

urce

s •

Form

atio

n of

by-

law

s and

enf

orci

ng th

em

• M

inim

ize

reso

urce

bas

ed c

onfli

cts (

reso

lvin

g co

nflic

ts )

• C

apac

ity b

uild

ing

com

mun

ity

• M

onito

ring

the

reso

urce

s use

Adv

ocac

y on

pro

per u

se

• Li

nk th

e co

mm

unity

to o

ther

stak

ehol

ders

• M

utua

l •

Rec

ipro

cal

• M

embe

rshi

p co

ntrib

utio

ns (m

oney

, foo

d,

fodd

er) l

evy

thro

ugh

WR

UA

• Pr

ide/

imag

e

Env

iron

men

tal

com

mitt

ee (w

ildlif

e,

rang

e an

d fo

rest

)

• C

ontro

l and

man

age

of se

ctor

res

ourc

es

• En

viro

nmen

tal c

onse

rvat

ion

(sec

tor b

ased

)•

Mut

ual

• R

ecip

roca

l •

Mem

bers

hip

cont

ribut

ion

levy

cha

rges

Inco

me

from

sale

of p

rodu

cts

Com

mun

ity

Saka

(far

mer

s and

pa

stor

alis

ts)

• Eq

uita

ble

acce

ss a

nd d

istri

butio

n of

all

reso

urce

s •

Rig

ht to

usa

ge a

nd m

anag

emen

t

• C

onse

rvat

ion

and

use

of n

atur

al re

sour

ces c

onse

rvat

ion

• R

espe

ct a

nd a

bide

by

the

by-la

ws

• M

onito

r use

nat

ural

reso

urce

Adv

ocac

y on

pro

per u

se

• Tr

ain

on n

atur

al re

sour

ces

• M

utua

l •

Food

Taxe

s fro

m p

rodu

cts

Gov

ernm

ent m

inis

trie

s an

d ag

enci

es

• Su

ppor

t and

app

reci

ate

the

use

and

man

agem

ent

• Se

nsiti

zatio

n on

pro

per u

se a

nd m

anag

emen

t of n

atur

al

reso

urce

s •

Con

flict

s res

olut

ion

• Pr

otec

tion

of n

atur

al re

sour

ces b

y us

e of

pol

icy

• A

dvoc

acy

on p

rope

r use

Faci

litat

e pr

otec

tion

and

cons

erva

tion

• Su

ppor

tive

• Fi

nes/

levi

es

• Pe

rmit

char

ges o

n liv

esto

ck a

nd c

rop

prod

ucts

and

wild

life

Occ

asio

nal u

sers

Nei

ghbo

ring

B

alam

bala

and

San

kuri

co

mm

uniti

es

• En

forc

e la

w o

n na

tura

l res

ourc

es

• A

cces

s to

past

ure

and

wat

er u

se

• R

ight

to p

eace

Rig

ht to

info

rmat

ion

on e

xist

ing

by-la

ws

• A

bide

by

the

laid

by-

law

s •

Ensu

re a

nd m

aint

ain

peac

e•

Prot

ect a

nd c

onse

rve

the

exis

ting

reso

urce

s

• M

utua

l•

Rec

ipro

cal

Non

e

Cas

ual l

abou

rs•

Peac

e•

By-

law

s •

Abi

de b

y th

e by

-law

s •

Hel

p in

con

serv

atio

n •

Mut

ual

Inco

me

Out

side

r gr

oup

Lag

dera

, Fafi

, tra

ders

, liv

esto

ck o

n tr

ansi

t to

liv

esto

ck m

arke

t

• R

ight

to p

eace

Rig

ht to

info

rmat

ion

on e

xist

ing

by-la

ws

• A

cces

s to

avai

labl

e w

ater

and

pas

ture

• E

nsur

e pe

ace

• A

bide

by

the

exis

ting

by –

law

s •

Prot

ect a

nd c

onse

rve

the

exis

ting

reso

urce

s

• M

utua

l •

Rec

ipro

cal

Inco

me

wat

er a

nd p

astu

re

Page 62

Page 71: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Tabl

e 19

. Im

prov

e st

akeh

olde

r coo

rdin

atio

n an

d co

llabo

ratio

n fo

r har

mon

izat

ion

of p

lans

, rig

ht b

ased

app

roac

h an

d po

vert

y re

duct

ion

Resp

onsib

ility

Out

puts

Indi

cato

rsW

hen

Whe

reBu

dget

(ksh

s)Pr

oblem

/ O

bjec

tives

Activ

ities

Sub-

activ

ities

Targ

et: F

oste

r coo

rdin

atio

n an

d co

llabo

ratio

n of

stak

ehol

ders

to re

duce

pov

erty

and

over

com

e bar

riers

in ac

cess

ing

and

man

agin

g la

nd an

d w

ater

reso

urce

s O

vera

ll ou

tput

: Stre

ngth

ened

coor

dina

tion

and

colla

bora

tion

to eq

uita

bly

acce

ss an

d m

anag

e nat

ural

reso

urce

s

1,20

0,00

0Im

prov

e co

ordi

natio

n an

d ge

nder

par

ity in

de

cisio

n m

akin

g

Lim

ited

coor

dina

tion

betw

een

stake

hold

ers,

imba

lanc

e gen

der

invo

lvem

ent a

nd

recu

rren

t con

fl ict

on

nat

ural

reso

urce

m

anag

emen

t

Dia

logu

e mee

tings

M

inut

es/p

roce

edin

gs o

f dia

logu

e mee

tings

he

ld p

er y

ear f

or th

ree y

ears

May

201

3 M

ay 2

015

May

201

7

Gar

issa

Stre

ngth

en d

ialo

gue b

etw

een

tradi

tiona

l and

form

al

insti

tutio

ns t

o m

itiga

te

exac

erba

tion

of h

azar

ds

• W

RUA

• W

RMA

• IU

CN•

FaID

A•

Line

min

istrie

s •

Com

mun

ity

• N

GO

s

• W

RUA

• W

RMA

• IU

CN•

FaID

A•

Line

min

istrie

s•

NG

Os

• W

RUA

• W

RMA

• IU

CN•

FaID

A•

Line

min

istrie

s

• W

RUA

• W

RMA

• IU

CN•

FaID

A•

Line

min

istrie

s•

DSG

• N

GO

s

• W

RUA

• W

RMA

• IU

CN•

FaID

A•

Line

min

istrie

s

• W

RUA

• W

RMA

• M

oG•

IUCN

• Fa

IDA

• Li

ne m

inist

ries

Mee

tings

to h

arm

oniz

e im

plem

enta

tion

of a

dapt

ed

sub-

catc

hmen

t man

agem

ent

plan

with

insti

tutio

nal p

lans

Faci

litat

e Exc

hang

e visi

ts to

impr

ove c

apac

ity an

d ex

posu

re to

dro

ught

re

silie

nce t

hrou

gh ef

fect

ive

catc

hmen

t man

agem

ent

Dev

elop

men

t of a

ctio

n pl

an

to fo

llow

up

on le

arni

ng ar

eas

iden

tifi e

d th

roug

h ex

chan

ge

visit

s

Trai

ning

on

mul

ti-sta

keho

lder

pr

oces

ses t

o re

duce

confl

ict

over

nat

ural

reso

urce

s with

in

the c

atch

men

t are

a

Sub-

tota

l

Tech

nica

l wor

k pl

ans

Exch

ange

visi

ts to

oth

er

sub-

catc

hmen

t of s

imila

r co

nditi

ons

Act

ion

plan

dev

elop

ed af

ter

ever

y ex

chan

ge v

isits

NRM

confl

ict r

educ

tion

train

ings

(per

yea

r for

thre

e ye

ars)

Gen

der a

nd m

ains

tream

ing

wor

ksho

p M

ains

tream

ing

of g

ende

r iss

ues i

nto

WRU

A ac

tiviti

es

No.

of w

ork

plan

s dev

elop

ed p

er y

ear t

o be

endo

rsed

by

DSG

No.

of v

isits

per y

ear f

or th

ree y

ears

Repo

rts

No.

of c

omm

unity

actio

ns p

lans

dev

elop

ed

No.

of t

rain

ings

and

train

ees

Trai

ning

repo

rt

No.

of p

artic

ipan

tsW

orks

hop

repo

rt

Mar

ch ea

ch y

ear

(201

3-20

17)

Nov

201

3N

ov 2

015

Nov

201

6

Dec

201

3D

ec 2

015

Dec

201

6

Aug

ust 2

013

Aug

201

5A

ug 2

016

Dec

embe

r 201

2

Gar

issa

Tana

, Ew

aso

and

Ath

i cat

chm

ents

Gar

issa

Gar

issa

Gar

issa

2,00

0,00

0

2,00

0,00

0

600,

000

900,

000

300,

000

7,00

0,00

0

Page 63

Page 72: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Res

pons

ibili

tyO

utpu

tsIn

dica

tors

Whe

nW

here

Bud

get

(ksh

s)P

robl

em/

Obj

ecti

ves

Act

ivit

ies

Sub-

acti

viti

es

1,00

0,00

0Im

prov

e in

form

atio

n di

ssem

inat

ion

Dry

wit

h in

form

atio

n es

peci

ally

at

loca

l le

vel

NR

M in

form

atio

n pa

ckag

ing

and

diss

emin

atio

n m

eetin

g at

co

mm

unity

leve

l (on

e m

eetin

g pe

r ye

ar f

or th

ree

year

s)

No.

mee

tings

N

o. o

f N

RM

pac

kage

s de

velo

ped

Oct

201

2 –J

une

2017

Saka

cen

tre

Dis

sem

inat

ion

and

pack

agin

g

of N

RM

info

rmat

ion

to lo

cal

stak

ehol

ders

• W

RU

A•

WR

MA

• IU

CN

• Fa

IDA

• L

ine

min

istr

ies

Lim

ited

alt

erna

tive

liv

elih

oods

Pr

omot

ion

of a

ltern

ativ

e liv

elih

oods

to

redu

ce p

ress

ure

on

natu

ral r

esou

rces

an

d re

duce

sp

iral

ling

pove

rty

Sub-

tota

lTo

tal

Iden

tifi c

atio

n, p

rom

otio

n an

d st

reng

then

ing

of a

ltern

ativ

e liv

elih

ood

with

sta

keho

lder

s

• W

RU

A•

Adm

inis

trat

ion

• E

lder

s•

Com

mun

ity

• M

oLD

• M

oA•

IUC

N•

FaID

A•

WR

MA

• N

DM

A•

KFS

• K

WS

• M

oW&

I•

WR

MA

• W

RU

A•

IUC

N•

FaID

A•

Lin

e m

inis

trie

s (H

OD

s)

• C

omm

unity

A m

eetin

g pe

r ye

ar f

or tw

o ye

ars

to id

entif

y al

tern

ativ

e liv

elih

oods

No.

and

out

com

e of

the

mee

tings

Janu

ary

2013

June

201

7 G

aris

sa

1,00

0,00

0

Dev

elop

men

t of

wor

k pl

an

for

iden

tifi e

d liv

elih

ood

activ

ities

Wor

k pl

an d

evel

oped

per

yea

r fo

r th

ree

year

sN

o. p

lans

dev

elop

edE

very

yea

r 20

13

– 20

17

Gar

issa

90

0,00

0

Tra

inin

g an

d im

plem

enta

tion

on id

entifi

ed

alte

rnat

ive

livel

ihoo

d pr

iori

ties

e.g.

re

stoc

king

Liv

elih

ood

proj

ects

im

plem

ente

d pe

r ye

ar (

two

per

year

)

No.

of

proj

ects

impl

emen

ted

and

subs

eque

nt r

epor

tsO

ctob

er 2

012

– Ju

ne 2

017

Tot

al

Saka

Sub

-ca

tchm

ent

5,00

0,00

0

Sub-

tota

l6,

900,

000

14,9

00,0

00

Page 64

Page 73: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Chapter 12: Participatory monitoring and evaluation

Participatory monitoring and evaluation of the water and land resources is a key element in the management of natural resources. Monitoring requires routine measurements and visits to allow the assessment to extract the required information (both quality and quality). It should identify the pertinent parameters to assess at a given quality in time and space and evaluate the present and future demands. It is necessary to ensure that natural resources and the catchment monitoring systems provide accurate data. It is also advisable for the data to be assessed and analysed in a way that the information needed from the Sub-catchment is available, accurate and timely. Parameters identified for different natural resources are listed in Table 20.

Page 65

The community has natural resource monitoring mechanisms in place especially for pasture, fodder, water and animal body conditions. Pastoral elders and young men travel to far distances in search of better water and pasture for livestock (locally called Sahaan) before the household migrate to the identified sites. The WRUA and chiefs also monitor to control wanton cutting of fodder trees, charcoal burning and conflicts over resource before intervention whenever necessary. To ensure participatory monitoring and evaluation systems during SCMP implementation process community members and other stakeholders involved in SCMP preparation identified activities that need to be formulated (Table 21).

RESOURCE PARAMETERS

Water • Amount (litres/m3) for domestic, livestock, crops/trees, wildlife, environmental flow• Attitude change (No.)• Capacity building (No. of trainings/meetings/trainees, No. and types of training materials, No of exchange visits)• Levels of contamination and pollution for domestic consumption• Type and no. of technologies/practices introduced and practiced

Pasture and forest • Coverage (acres, ha or %)• Livestock body conditions• Survival of seedlings (%, No.)• Attitude change (No.)• Type and no. of technologies/practices introduced and practiced• Capacity building (No. of trainings/meetings/trainees, No. and types of training materials, No of exchange visits)

Wildlife • Species type and abundance • Incidence of poaching• Incidence of human-wildlife conflict• Incidence of pests and diseases • Diversity• Habitat• Attitude change• Capacity building• Capacity building (No. of trainings/meetings/trainees, No. and types of training materials, No of exchange visits) • Type and no. of technologies/practices introduced and practiced

• Yield per ha/acre• Change in land use cover (%) • Amount agro-processed • Capacity building• Attitude change • Quality of agro-processed products• Type and no. of technologies/practices introduced and practiced• Capacity building (No. of trainings/meetings/trainees, No. and types of training materials, No of exchange visits)

Crops

Livestock • Species type and abundance• Incidence of pests and diseases• Yield per species or hive (honey)• Amount agro-processed • Quality of products before and after processing• Type and no. of technologies/practices introduced and practiced• Capacity building (No. of trainings/meetings/trainees, No. and types of training materials)

Table 20. Parameters to monitor for different natural resources

• No. of sustainable NRM business opportunities and their levels of incomeLivelihoods diversification

Page 74: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Res

pons

ibili

tyO

utpu

tsIn

dica

tors

Whe

nW

here

Bud

get (

kshs

)Pr

oble

m/

Obj

ectiv

esA

ctiv

ities

Sub-

activ

ities

Targ

et: E

stab

lish

and

stre

ngth

en p

artic

ipat

ory

mon

itorin

g an

d ev

alua

tion

for s

usta

inab

le m

anag

emen

t of n

atur

al re

sour

ces a

nd re

liabl

e da

taba

se

Ove

rall

outp

ut: E

nhan

ced

parti

cipa

tory

mon

itorin

g an

d ev

alua

tion

syst

em a

nd n

atur

al re

sour

ce d

ata

avai

led

at a

ll le

vels

500,

000

Join

t mon

itorin

g pl

anni

ngL

ack

of m

onito

ring

pl

anA

nnua

l mon

itorin

g pl

an

Year

ly m

onito

ring

pla

n de

velo

ped

Ann

ually

(20

13-2

017)

Saka

Cen

trePr

epar

e jo

int m

onito

ring

plan

• W

RU

A•

IUC

N•

WR

MA

• M

et D

ept

• N

DM

A•

Com

mun

ity

• A

dmin

istra

tion

• Li

ne m

inis

tries

• W

RU

A•

IUC

N•

WR

MA

• M

et D

ept

• N

DM

A•

Com

mun

ity

• A

dmin

istra

tion

• Li

ne m

inis

tries

Wat

er q

uant

ity

and

qual

ity

Join

t mon

itorin

g of

w

ater

sour

ces

Mon

itor c

onta

min

atio

n an

d po

llutio

n le

vels

for a

ll w

ater

so

urce

s (bo

reho

les,

wat

er

pans

, sha

llow

wel

ls a

nd ri

ver)

Mon

itor w

ater

leve

ls, a

mou

nt

cons

umed

and

clim

ate

data

(f

or a

ll riv

er g

augi

ng a

nd

hydr

omet

stat

ions

, wat

er

met

ers)

Con

tam

inat

ion

and

pollu

tion

leve

ls o

f all

wat

er so

urce

s im

prov

ed

Stat

us o

f equ

ipm

ent a

nd d

ata

mon

itore

d an

d im

prov

ed

No.

of w

ater

sour

ces a

nd e

quip

men

t m

onito

red

for c

onta

min

atio

n,

pollu

tion,

ear

ly w

arni

ngs,

cons

umpt

ion

and

perf

orm

ance

• Si

ze a

nd st

atus

of r

ehab

ilita

ted

site

s•

Surv

ival

rate

s of s

peci

es

Ann

ually

(20

13-2

017)

Ann

ually

(20

13-2

017)

Saka

Sub

-ca

tchm

ent

500,

000

500,

000

1,00

0,00

0 Sp

ecie

s div

ersi

ty, c

over

, re

gene

ratio

n, su

rviv

al a

nd

prod

uctio

n

• D

PLO

• W

RM

A•

IUC

N•

Envi

ronm

enta

l com

mitt

ee

• W

RU

A•

FaID

A

Perf

orm

ance

of p

astu

re a

nd

fore

st a

ctiv

ities

(cov

erag

e,

No

and

dive

rsity

of s

peci

es,

surv

ival

rate

s, re

gene

ratio

n ra

tes,

No.

of h

ay b

ales

pr

oduc

ed)

Stre

ngth

en tr

aditi

onal

m

onito

ring

• M

oA•

ND

MA

• K

FS

“Sah

aan”

trad

ition

al

mon

itorin

g of

pas

ture

and

w

ater

stre

ngth

ened

Impr

ovem

ent t

o “S

ahaa

n”

tradi

tiona

l sys

tem

Ann

ually

(20

13-2

017)

100

acre

s per

m

anag

emen

t uni

t (p

asto

ral a

nd

agro

-pas

tora

l) pe

r yea

r with

in

the

sub-

catc

hmen

t

Sub-

tota

l1,

000,

000

Past

ure

and

fore

st

reso

urce

sJo

int m

onito

ring

of

past

ure

and

fore

st

reso

urce

s

Sub-

tota

l

500,

000

1,50

0,00

0

1,00

0,00

0 W

ildlif

e Jo

int m

onito

ring

of

wild

life

activ

ities

Perf

orm

ance

of w

ildlif

e an

d di

vers

ity w

ithin

M

atha

hlib

aah

sanc

tuar

y

• K

WS

• C

omm

unity

WR

UA

• IU

CN

• Fa

IDA

• M

W&

I

• Sp

ecie

s div

ersi

ty a

nd b

ody

cond

ition

s•

Inco

me

from

con

serv

atio

n of

wild

life

• Pe

rfor

man

ce o

f spe

cies

Am

ount

of i

ncom

e ge

nera

ted

Ann

ually

(20

13-2

017)

Mat

hahl

ibaa

h Sa

nctu

ary

Cro

ps, f

ruits

and

ir

riga

ted

fodd

er

Join

t mon

itorin

g of

fa

rmla

nd a

ctiv

ities

Mon

itor p

erfo

rman

ce o

f cr

ops,

frui

ts a

nd fo

dder

on

farm

s

• W

RU

A•

Com

mun

ity

• C

hief

s•

MoA

• M

oLD

• K

FS•

IUC

N•

FaID

A

• M

WI

• W

RM

A•

ND

MA

Perf

orm

ance

of c

rops

and

fo

dder

pro

duct

ion

(in 2

5 gr

oup

farm

s)

• Y

ield

s per

yea

r (fo

r con

sum

ptio

n an

d m

arke

t)•

No.

of h

ay b

ales

of h

arve

sted

an

d st

ored

• In

cide

nce

of p

ests

and

dis

ease

s

Ann

ually

(20

13-2

017)

Agr

o-pa

stor

al

unit

1,00

0,00

0

Tabl

e 21

. Pa

rtic

ipat

ory

Mon

itori

ng a

nd E

valu

atio

n of

nat

ural

reso

urce

s with

in S

aka

Sub-

catc

hmen

t

Page 66

Page 75: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Res

pons

ibili

tyO

utpu

tsIn

dica

tors

Whe

nW

here

Bud

get (

kshs

)Pr

oble

m/

Obj

ectiv

esA

ctiv

ities

Sub-

activ

ities

1,00

0,00

0Jo

int m

onito

ring

of

lives

tock

act

iviti

esL

ives

tock

Li

vest

ock

prod

uctio

n an

d he

alth

• Li

vest

ock

yiel

ds (m

ilk, m

eat,

hone

y, fi

sh m

eat,

hide

s and

skin

s)

prod

uced

, con

sum

ed/ m

arke

ted

per s

easo

n/yr

• In

cide

nce

of p

ests

and

dis

ease

s

Ann

ually

(20

13-2

017)

Past

oral

and

ag

ro-p

asto

ral

units

Mon

itor l

ives

tock

pe

rfor

man

ce•

WR

UA

• C

omm

unity

Chi

efs

• M

oA•

MoL

D•

KFS

• IU

CN

• Fa

IDA

MW

I •

WR

MA

• N

DM

A

Infr

astr

uctu

re•

WR

UA

• C

omm

unity

MoA

• M

oLD

• M

oWI

• M

oR•

KFS

• IU

CN

• Fa

IDA

MW

I •

WR

MA

• N

DM

A

Join

t mon

itorin

g of

in

fras

truct

ure

Mon

itor p

erfo

rman

ce o

f in

fras

truct

ural

stru

ctur

esSt

atus

of i

nfra

stru

ctur

eD

ista

nce,

num

ber a

nd si

ze o

f st

ruct

ures

con

stru

cted

/ reh

abili

tate

dD

ec 2

014

Saka

Sub

- ca

tchm

ent

1,00

0,00

0

Eva

luat

ion

Inte

rnal

eva

luat

ion

by im

plem

entin

g pa

rtner

s

Join

t eva

luat

ion

of p

ropo

sed

targ

ets a

nd o

utpu

ts•

WR

UA

• C

omm

unity

MoA

• M

oLD

• M

oWI

• M

oR•

KFS

• IU

CN

• Fa

IDA

MW

I •

WR

MA

• N

DM

A

Eval

uatio

n re

port

Eval

uatio

n re

port

docu

men

ted

and

acce

pted

Dec

201

6 Sa

ka S

ub-

catc

hmen

tTo

tal

2,00

0,00

0

Tota

l9,

000,

000

Page 67

Page 76: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Chapter 13: Finance and implementation of project activities

Natural resource management has suffered from chronic under investment for many years. This means that investment needs to be targeted to obtain maximum beneficial impact. At the same time innovative and sustainable approach to financing need to be piloted and established. Potential sources of funds are: Revenue generated by WRUA, WDC funds, Partner funds, Private sector and local funds. The establishment of efficient, effective and sustainable financing mechanism will enable the implementation of adapted SCMP activities.

Currently, the main income for the WRUA is monthly contributions from members but contribution from members is paltry due to lack of financial ability of members to raise the necessary amount for development. The WRUA has treasurer and sub-committee on financial sourcing and management but lacks financial skills. The WRUA management requires intensive and comprehensive capacity building on proposal development and report writing, negotiation skills and resource mobilization, record keeping e.g. adult education, financial and procurement management, information sharing, networking and partnership, sustainability, ownership, operation and maintenance and training on leadership and governance (Table 22).Sound mechanisms for financial sourcing and management will help in initiation and implementation of the proposed activities.

Page 68

Page 77: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Tabl

e 22

. Cap

acity

Bui

ldin

g on

Fin

ance

and

Impl

emen

tatio

n of

pro

ject

act

iviti

es

Res

pons

ibili

tyO

utpu

tsIn

dica

tors

Whe

nW

here

Bud

get (

kshs

)P

robl

em/

Obj

ecti

ves

Act

ivit

ies

Sub-

acti

viti

es

Targ

et: C

apac

ity b

uild

WR

UA

on

fi nan

ce a

nd re

sour

ce m

obili

zatio

n (b

oth

inte

rnal

and

ext

erna

l) fo

r suc

cess

ful e

xecu

tion

of p

lann

ed A

SCM

P ac

tiviti

es

Ove

rall

outp

ut: A

fi na

ncia

lly s

tron

g a

nd p

roac

tive

WR

UA

that

impl

emen

ts p

lann

ed a

ctiv

ities

on

time

in p

lace

900,

000

Cap

acity

bui

ld

WR

UA

on

prop

osal

de

velo

pmen

t

Cap

acit

y bu

ildin

g on

pro

posa

l de

velo

pmen

t and

w

riti

ng

A c

omm

unity

trai

ning

(per

ye

ar fo

r thr

ee y

ears

)•

Trai

ning

repo

rts

• N

o. o

f pro

posa

ls d

evel

oped

and

fu

nded

Oct

ober

(201

3-20

15)

Saka

Cen

tre

Trai

ning

on

prop

osal

de

velo

pmen

t and

wri

ting

• W

RU

A•

WR

MA

• M

oWI

• IU

CN

• Fa

IDA

• M

oPV

Neg

otia

tion

ski

lls

and

reso

urce

m

obili

zati

on

Cap

acity

bui

ld

WR

UA

on

reso

urce

m

obili

zatio

n

Trai

ning

on

nego

tiatio

n sk

ills

and

reso

urce

mob

iliza

tion

A c

omm

unity

trai

ning

(per

ye

ar fo

r thr

ee y

ears

)•

Trai

ning

repo

rts

• L

evel

of a

dapt

abili

ty to

the

skill

s an

d ne

gotia

tions

Janu

ary

(201

3-20

15)

Saka

Cen

tre

900,

000

Rec

ord

keep

ing

Cas

h bo

oks

Vou

cher

s P

etty

cas

h In

voic

es

Del

iver

y no

tes

Far

m r

ecor

ds

min

utes

Cap

acity

bui

ld

WR

UA

on

reco

rd

keep

ing

Trai

ning

on

reco

rd k

eepi

ngA

com

mun

ity tr

aini

ng (p

er

year

for t

hree

yea

rs)

• Tr

aini

ng re

port

s •

No.

of r

ecor

ds d

evel

oped

M

arch

(201

3-20

15)

Saka

Cen

tre

600,

000

Adu

lt ed

ucat

ion

to im

prov

e kn

owle

dge

on re

adin

g an

d w

ritin

g sk

ills

incl

udin

g re

fres

her c

ours

e

• M

oE•

WR

UA

• W

RM

A•

MoW

I•

IUC

N•

FaID

A

An

adul

t edu

catio

n ce

ntre

su

ppor

ted

(con

tinuo

us) f

or 5

ye

ars

• N

o. T

rain

ing

sess

ions

No.

of t

rain

ees

able

to re

ad a

nd

wri

te

Febr

uary

201

3 –

June

20

17Sa

ka C

entr

e2,

000,

000

Sub-

tota

l2,

600,

000

400,

000

Info

rmat

ion

shar

ing,

ne

twor

king

and

pa

rtne

rshi

p

Cap

acity

bui

ld

WR

UA

on

info

rmat

ion

shar

ing

and

netw

orki

ng

Trai

ning

on

exte

rnal

and

in

tern

al re

sour

ce g

ener

atio

n•

WR

UA

WR

MA

• M

oWI

• IU

CN

• Fa

IDA

• M

oPV

A c

omm

unity

trai

ning

(per

ye

ar fo

r tw

o ye

ars)

• Tr

aini

ng re

port

s •

Skill

s in

use

on

reso

urce

ge

nera

tion

May

201

3M

ay 2

014

Info

rmat

ion

cent

re e

stab

lishe

d an

d su

ppor

ted

June

– S

ept 2

013

An

info

rmat

ion

cent

re in

pla

ce

Saka

Cen

tre

Saka

Cen

tre

500,

000

Est

ablis

hmen

t of i

nfor

mat

ion

cent

reSu

b-to

tal

900,

000

Fin

anci

al a

nd

proc

urem

ent

proc

edur

es

• Fi

nanc

e an

d pr

ocur

emen

t sub

-com

mitt

ee

of W

RU

A•

WR

UA

WR

MA

• M

oWI

• IU

CN

• Fa

IDA

• M

oPV

Trai

ning

on

proc

urem

ent

proc

edur

e an

d fi n

anci

al

man

agem

ent

Cap

acity

bui

ld

WR

UA

on

proc

urem

ent a

nd

fi nan

ce

A tr

aini

ng p

er y

ear f

or tw

o ye

ars

• Tr

aini

ng re

port

s •

Proc

urem

ent p

roce

dure

s la

id

and

follo

wed

in a

cqui

sitio

n of

ite

ms

Apr

il 20

13A

pril

2014

Sa

ka C

entr

e40

0,00

0

Sust

aina

bilit

y,

owne

rshi

p,

oper

atio

n an

d m

aint

enan

ce

Cap

acity

bui

ld

WR

UA

on

oper

atio

n an

d m

aint

enan

ce o

f eq

uipm

ent

Trai

ning

on

sust

aina

bilit

y,

owne

rshi

p, o

pera

tion

and

mai

nten

ance

• W

RU

A•

WR

MA

• M

oWI

• IU

CN

• Fa

IDA

• M

oPV

• W

RU

A•

WR

MA

• M

OW

I•

IUC

N•

FaID

A•

MoP

V

Dec

201

3D

ec 2

014

Dec

201

5

A tr

aini

ng p

er y

ear f

or th

ree

year

s•

Trai

ning

repo

rts

• N

o. S

ucce

ssfu

l pro

ject

s ex

ecut

ed

Saka

Cen

tre

600,

000

Ups

cale

lead

ersh

ip

and

gove

rnan

ce o

n na

tura

l res

ourc

e m

anag

emen

t

Cap

acity

bui

ld

WR

UA

on

lead

ersh

ip

and

gove

rnan

ce

Trai

ning

on

lead

ersh

ip a

nd

gove

rnan

ceA

trai

ning

per

yea

r for

two

year

s•

Trai

ning

repo

rts

July

201

3 Ju

ly 2

015

Saka

Cen

tre

900,

000

Tota

l7,

200,

000

Page 69

Page 78: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Chapter 14: Mainstreaming and up-scaling of the approach

The adapted SCMP approach is to deliver development goals as well as environmental sustainability that are currently a challenge to development in the arid pastoral zones. The community based approach is a dream plan for the Saka community that currently faces adverse effects of climate change. The community promised to implement and promote the approach within a time frame using own resources and support from the Government and partners. They pledged to embrace appropriate technologies, jointly monitor and evaluate planned activities.

However, the anticipated consequence of the successful implementation of the adapted SCMP in the sub-catchment will be influx from the neighboring areas due to thriving status of natural resources especially pasture and water thereby affecting the benefits to be achieved. Furthermore, it is likely to create natural resource based conflicts within and around the Saka “oasis”. Accordingly, if the plan yields the desired results it’s essential and indispensible to scale up the approach to neighbors, entire Balambala District, Garissa County, ASAL communities, the region and the world to avert the foreseen degradation and achieve similar status on natural resource management.

To scale up the approach, the Government and partners will be required to provide technical and financial support in implementing activities within appropriate time frame (based on seasonal calendar), ensure peace and contribute resources. Also county government and partners are required to mainstreaming adapted SCMP into their development programs, participate in monitoring and evaluation, introduce and seek approval of adapted SCMP by the DSG and development of supportive policies (Table 23). The coming in force of county government system also offer an opportunity for community members and residents of the county to participate actively in management of their resources through adoption of the practices that fit their local conditions than adapt prescriptive management practices applicable to different areas that has different socio-economic and environmental conditions. The devolved government also offer platform where community members and residents of the county can organize themselves to formulate rules on resource management and also strengthen the existing regulations and practices.

Adapted SCMP developed through participatory process can be one of the earlier documents presented to county government for adoption.

Page 70

Page 79: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Tabl

e 23

. A

ctiv

ities

for m

ains

trea

min

g an

d up

scal

ing

of th

e ad

apte

d SC

MP

appr

oach

.

Res

pons

ibili

tyO

utpu

tsIn

dica

tors

Whe

nW

here

Bud

get (

kshs

)Pr

oble

m/

Obj

ectiv

esA

ctiv

ities

Sub-

activ

ities

Targ

et: M

ains

tream

and

scal

e up

the A

SCM

P ap

proa

ch to

sub-

catc

hmen

ts in

Gar

issa

and

oth

er c

ount

ies w

ith si

mila

r env

ironm

ent

Ove

rall

outp

ut: A

dapt

ed S

CM

P ap

proa

ch m

ains

tream

ed in

to c

ount

y pl

anni

ng p

roce

ss a

nd a

dopt

ed b

y co

untie

s and

WR

UA

s

300,

000

Har

mon

ize A

SCM

P ac

tiviti

es w

ith

seas

onal

pla

ns o

f Sa

ka C

omm

unity

Act

iviti

es in

line

w

ith se

ason

al

cale

ndar

A p

lan

mat

rix fo

r ada

pted

SC

MP

base

d on

seas

onal

ca

lend

ar d

evel

oped

Seas

onal

cal

enda

r bas

ed a

dapt

ed

SCM

P in

pla

ce

Oct

ober

201

2 Sa

kaSe

ason

al c

alen

dar p

lann

ing

• W

RU

A•

WR

MA

• IU

CN

• Fa

IDA

• Li

ne m

inis

tries

Ado

ptio

n an

d m

ains

trea

min

g A

SCM

P

Mai

nstre

am A

SCM

P in

to c

ount

y pl

anni

ng

proc

esse

s

Con

sult

coun

ty g

over

nmen

ts

on b

est w

ays t

o m

ains

tream

A

SCM

P in

to c

ount

y pl

ans

• Fa

IDA

• IU

CN

• W

RM

A•

Cou

nty

Gov

’t

ASC

MP

mai

nstre

amin

g pl

an

form

ulat

edM

ains

tream

ing

plan

agr

eed

upon

by

stak

ehol

ders

July

201

3G

aris

sa10

0,00

0

• Fa

IDA

• IU

CN

• W

RM

A•

SCSG

• W

RU

A

• C

ount

y G

ov’t

Pres

ent A

SCM

P to

Sub

-co

unty

Ste

erin

g G

roup

(S

CSG

) for

end

orse

men

t and

ad

optio

n

Pres

ent A

SCM

P to

cou

nty

gove

rnm

ent f

or a

dopt

ion

and

impl

emen

tatio

n

ASC

MP

pres

enta

tion

and

adop

tion

repo

rt SC

MP

pres

enta

tion

and

adop

tion

repo

rt su

cces

sful

ly c

ompl

eted

Se

pt 2

013

Bal

amab

ala

Gar

issa

200,

000

100,

000

Sept

201

3M

inut

es d

ocum

ente

d an

d ac

cept

ed

for i

mpl

emen

tatio

nM

inut

es o

f mee

tings

Sub-

tota

l40

0,00

0

Up

scal

ing

of

ASC

MP

to

coun

ties a

nd

sub-

catc

hmen

ts

with

sim

ilar

envi

ronm

ent

Up

scal

ing

of

ASC

MP

to

coun

ties a

nd su

b-ca

tchm

ents

with

si

mila

r env

ironm

ent

thro

ugh

skill

s dev

elop

men

t an

d fo

rmul

atio

n of

po

licie

s on

adap

ted

SCM

P

Sens

itiza

tion

on a

dapt

ed

SCM

P to

par

tner

s (lo

cal a

nd

inte

rmed

iate

) in

diffe

rent

fo

rum

s

• W

RU

A•

WR

MA

• IU

CN

• Fa

IDA

• Li

ne m

inis

tries

Sens

itiza

tion

mee

tings

for

partn

ers o

n th

e ad

apte

d SC

MP

(two)

Sens

itiza

tion

repo

rtsN

ov 2

012

Mar

ch 2

013

Saka

Bal

amba

la40

0,00

0

Trai

ning

of p

artn

ers

on a

dapt

ed S

CM

P an

d m

ains

tream

ing

it in

to se

ctor

al

plan

s

Con

tribu

te to

the

deve

lopm

ent o

f sup

porti

ve

polic

ies f

or th

e ad

apte

d SC

MP

Partn

ers t

rain

ing

on A

SCM

P at

sub-

coun

ty, c

ount

y an

d na

tiona

l lev

els

A c

ontri

butio

n to

pol

icy

on

sust

aina

ble

NR

M fo

r pas

tora

l ar

eas

Trai

ning

rep

ort

No.

of

partn

ers t

hat m

ains

tream

ed

ASC

MP

Polic

ies i

n pl

ace

and

func

tiona

l

Nov

201

3Ja

n 20

14M

arch

201

4M

ay 2

014

Bal

amba

laG

aris

saM

omba

saN

airo

bi

2,00

0,00

0

Apr

il 20

13

Gar

issa

Nai

robi

500,

000

Sub-

tota

l

Tota

l

2,90

0,00

0

3,60

0,00

0

Page 71

Page 80: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Annexes

Annex 1: Challenges related to forests/woodlands and management of the resource in Saka WRUA

CHALLENGE EFFECTS AFFECTED SOLUTION OPTIONS

AfforestationReforestationBylawsPatrols by community scouts, KFS, KWS, Chiefs, environmental committeeSensitization & awareness creation

Pastoralists Agro-pastoralists

Reduced vegetation coverInadequate fodderSoil erosion Environmental degradation

Deforestation

Fire BylawsPatrols by community scouts, KFS, KWS, Chiefs, Environmental committeeSensitization & awareness creation

PastoralistsAgro-pastoralists, Settlement dwellers Businessmen

Deaths & injuries of animals and peopleReduced pasture & fodder coverReduced biodiversity

Drought Loss of livelihoodsConflicts over natural resourcesInflux from outside the sub catchmentOvergrazing

PastoralistsAgro-pastoralists, Settlement dwellers, Businessmen

Diversification of livelihoodsBylaws on conflict resolutions

Overgrazing Reduced pastures and water Soil erosion

PastoralistsAgro-pastoralists

BylawsSensitization & awareness creationGrazing management by environmental committee

BylawsSensitization & awareness creationGrazing management by environmental committeeRiver bank stabilization

PastoralistsAgro-pastoralists, Settlement dwellers

Siltation of pansIncreased river bank erosionReduced grass cover

Soil erosion

Polythene menace Livestock feeding on poly bags leading to deathpollution of environment

PastoralistsAgro-pastoralists, Settlement dwellers

Recycling & re-useReduce use of polythene

Charcoal burning Deforestation of high value treesInadequate fodderWildfires

PastoralistsAgro-pastoralists

AfforestationReforestationBylawsPatrols by community scouts, KFS, KWS, Chiefs, Environmental committeeSensitization & awareness creation

Sensitization & awareness creationDialogue and networking with upstream usersTreatment and piped water systems

Sensitization & awareness creationNo new settlementsPhysical planning

PastoralistsAgro-pastoralists, Settlement dwellers

Water sources grossly contaminated and polluted

Pollution of water sources

Mushrooming and haphazard settlements

Reduced vegetation cover – poles and withies for shelter, firewood, charcoalInadequate fodder and loss of pasture lands

Pastoralists Agro-pastoralists, Settlement dwellers

Page 72

Page 81: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Annex 2: Challenges related to rivers and management of the resource in Saka WRUA

CHALLENGE EFFECTS AFFECTED SOLUTION OPTIONS

River diversion Reduced water quantitySource of conflicts

PastoralistsAgro-pastoralists, Settlement dwellers

Enforcement of Water Act 2002Bylaws

Change of river course

Loss of arable land Deaths & injuries livestock and humans Increased erosion

PastoralistsAgro-pastoralists, Settlement dwellers

Monitoring of river course Sensitization and awareness River bank stabilization

Floods Reduced access to water Loss propertyInjuries to animals & humans Displacement of settlements Increased bank erosion Increased incidence of water-borne diseases

PastoralistsAgro-pastoralists, Settlement dwellers

Early warning systems Sensitization & awareness creationSettlement to higher groundsRiver bank stabilization

River bank erosion Increased soil erosion,Collapsing of river bank Influences change of river course & floods

PastoralistsAgro-pastoralists

Enforce Water, Agriculture Acts and EMCA on riparian reserve Stabilization of river banks Sensitization and awareness creation

Destruction of farms lands

Reduced crop production Loss of livelihood and income

Agro-pastoralist Early warning systems Sensitization and awareness creationDiversification of livelihoods River bank stabilization

Crocodile menace Death and/or injuries of animals & humans

Pastoralists Agro-pastoralists, Settlement dwellers

Sensitization and awareness creationCrocodile farming

Mosquito infestation

Increased incidence of malaria & other mosquito related diseases

Pastoralists Agro-pastoralists, Settlement dwellers

Control of stagnant water near settlement Sensitization on mosquito control methods

Spread of Prosopisjuliflora (Mathenge) invasive weed

Aggressively competes with indigenous species Loss plant biodiversity Loss cropland and pastures

Pastoralists Agro-pastoralists, Settlement dwellers

Control and management of Mathenge

Page 73

Page 82: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Annex 3: Challenges on farmlands and management of the resource in Saka WRUA

CHALLENGE EFFECTS AFFECTED SOLUTION OPTIONS

Human-wildlife conflicts

Death &/or injuries of humans Increased game killings

Agro-pastoralistsPastoralists

Sanctuary for wildlife Sensitization and awareness Electric fencing of farms

Inadequate irrigation infrastructure

Low crop production Exposure to risk like crocodile attacksInefficient use of water

Agro-pastoralists Development of irrigation infrastructure

Flush floods Increased erosion Risk of displacement No/limited access to farms causing loss of farm products

Pastoralists Agro-pastoralists, Settlement dwellers

Diversion of floods to pans & rangeland pastures

Destruction of crops and other properties

loss of farm products & properties leading to increased poverty levels

Pastoralists Agro-pastoralists

Early warning systems Sensitization and awareness creationRe-build livelihoods

Lack of fence and protection

Loss of farm products Increased human-wildlife conflicts

Agro-pastoralists Electric fencesPatrols by community scouts, KWS, Environmental committee

Pest and diseases Loss of farm produce & income Agro-pastoralists Integrated pest & disease management

Inadequate capacity on crop production

Low farm yields Agro-pastoralists Capacity build farmers

Frequent breakdown of water pumps

Low farm yieldsHigh cost of maintenance

Agro-pastoralists Training pump operatorsAcquisition of appropriate pumps

Pastoralist-farmers conflicts

Death &/or injuries of humans Loss of property

Pastoralists Agro-pastoralists

BylawsPatrols by Chiefs, Environmental committeeSensitization & awareness creationDialogue & conflict resolution by peace committee

Poor roads Limited access to farmsLoss of farm produce & income

Pastoralists Agro-pastoralists

Bush clearing, grading of access roads

Poor market for farm produce

Low income Agro-pastoralists Market value chain analysisConstruction of market facilitiesValue additions

Page 74

Page 83: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Annex 4: Challenges on livestock and management of the resource in Saka WRUA

CHALLENGE EFFECTS AFFECTED SOLUTION OPTIONS

Pests and diseases Loss of livestock & livestock products

Pastoralists Agro-pastoralistsWildlife

Vaccination & treatmentsEarly warning systems Sensitization and awareness creation

Page 75

Predators e.g. Hyenas, crocodiles, baboons and lions

Spread of contagious diseases Loss &/or injuries to livestock and humans

Pastoralists Agro-pastoralists

Early warning systems Sensitization and awareness creationCreation of wildlife sanctuaries

Drought Loss and weakening of livestock herds Reduced quality of livestock products

Pastoralists Agro-pastoralists, Settlement dwellers

Grazing management Livelihood diversification Early warning systems Sensitization and awareness creation

Poor market Low income Pastoralists Agro-pastoralists

Market value chain analysisintroduction of market days Value additions

Inadequate extension services e.g. veterinary service

Poor livestock body conditions and livestock productsTrail & error treatments

Pastoralists Agro-pastoralists

Sensitization, training and awareness to community resource persons

Wild fire caused by charcoal burning

Destruction of fodder, pasture and injuries to animals

Pastoralists Agro-pastoralists

BylawsPatrols by community scouts, KFS, KWS, Chiefs, Environmental committeeSensitization & awareness creation

Inadequate pasture

Poor livestock body conditions and/or deathsIncreased incidence of livestock/human-wildlife conflicts

Pastoralists Agro-pastoralists

BylawsPatrols by community scouts, KFS, KWS, Chiefs, Environmental committeeSensitization & awareness creationPasture/fodder productionGrazing management

Influx from neighboring villages

Overgrazing & depletion of waterIncreased conflicts over resourcesIncreased incidence of pests & diseases

Pastoralists Agro-pastoralists

Respect bylawsSensitization & awareness creationGrazing managementConflict resolution

Obstruction of watering corridors

Increased conflicts over access to river waterReduced access to water & overcrowding in accessible corridors

Pastoralists Agro-pastoralists

Respect bylawsSensitization & awareness creationConflict resolutionOpening up of permanent water corridors

Conversion of pasture land into farmlands

Reduced access to pastureIncreased conflicts over pastures

Pastoralists Agro-pastoralists

Respect bylawsSensitization & awareness creationConflict resolution

Inadequate water for livestock use

Poor livestock body conditions and/or deathsIncreased incidence of livestock/human-wildlife conflictsLong trekking distances

Pastoralists Agro-pastoralists

Strategic water sources

Page 84: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Annex 5: Challenges on wildlife and management of the resource in Saka WRUA

CHALLENGE EFFECTS AFFECTED SOLUTION OPTIONS

Inadequate water Death/or weakening of animals Increased human-wildlife conflict due to encroachment to human settlement & farms

WildlifePastoralistAgro-pastoralist Settlement dwellers

Establish strategic water pointsAccess to existing water sourcesOpening up of permanent water corridors to the river

Pests and diseases Loss of animals Spread of diseases to livestock & humans (wild animals as vectors of diseases)

WildlifePastoralistAgro-pastoralist

Vaccination & treatments by KWSEarly warning systems Sensitization and awareness

Conversion of rangelands to cropland

Reduced access to pastureIncreased human/livestock - wildlife conflicts over pastures

WildlifePastoralistAgro-pastoralist

Respect bylawsSensitization & awareness creationConflict resolutionCreate wildlife sanctuaries

Increased human-wildlife conflicts

Death &/or injuries of humans Increased game killings

Agro-pastoralists, pastoralist, settlement dwellers, wildlife

Create wildlife sanctuaries Sensitization and awareness creation

Predation by hyenas and crocodiles

Loss &/or injuries to livestock and humans

WildlifePastoralistAgro-pastoralist Settlement dwellers

Early warning systems Sensitization and awareness creationCreate wildlife sanctuariesCrocodile farming

Destruction of crops and fruits by elephants and Hippos

Loss of farm produce Loss/injury to humans, livestock & wildlife

WildlifePastoralistAgro-pastoralist Settlement dwellers

Electric fence Beekeeping Patrols by community scouts, KWS, Chiefs, Environmental committee

No direct income from wildlife

Increased hatred for KWS and wild animalsIncreased human – wildlife conflict

WildlifePastoralistAgro-pastoralist Settlement dwellers

Sensitization and awareness creation on importance of wildlife in local economyPromotion of game farming & ecotourism in the areaCreate wildlife sanctuaries Game scoutsWildlife clubs

Page 76

Page 85: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Annex 6: Challenge on fodder and pasture and management of the resource in Saka WRUA

CHALLENGE EFFECTS AFFECTED SOLUTION OPTIONS

Frequent drought Loss/inadequate pasture and fodderConflicts over natural resourcesInflux and overgrazing

PastoralistsAgro-pastoralists, Wildlife

Diversification of livelihoodsBylaws on conflict resolutionsPasture and fodder production and conservationReseeding Promotion of natural regeneration on degraded sites

Wild fire Reduced pasture & fodderReduced biodiversity

PastoralistAgro-pastoralist Settlement dwellers Wildlife

BylawsPatrols by community scouts, KFS, KWS, Chiefs, Environmental committeeSensitization & awareness creationFire breaks and grazing management

Overgrazing Reduced pastures and fodder coverage Soil erosion

PastoralistAgro-pastoralist Settlement dwellers Wildlife

BylawsPatrols by community scouts, KFS, KWS, Chiefs, Environmental committeeSensitization & awareness creationGrazing management

De-vegetation Reduced vegetation coverInadequate fodder

PastoralistAgro-pastoralist Settlement dwellers Wildlife

AfforestationReforestationReseeding BylawsPatrols by community scouts, KFS, KWS, Chiefs, Environmental committeeSensitization & awareness creation

Mushrooming of settlement and inland water sources

Reduced vegetation cover – poles and withies for shelter, firewood, charcoalInadequate fodder and loss of pasture lands

PastoralistAgro-pastoralist Settlement dwellers Wildlife

Sensitization & awareness creationNo new settlements and unnecessary inland water sources

Invasive weeds e.g. P. juliflora

Competition with indigenous species Loss plant biodiversity Loss pastures

PastoralistAgro-pastoralist Settlement dwellers Wildlife

Control and management of the weeds

Inadequate water to access far away pastures

Poor livestock body conditions and/or deathsLong trekking distances

Agro-pastoralists, Pastoralists

Strategic water sources

Livestock influx especially those for Garissa market

OvergrazingSpread of pests and diseasesConflicts on resource use

PastoralistAgro-pastoralist Settlement dwellers Wildlife

BylawsPatrols by community scouts, KFS, KWS, Chiefs, Environmental committeeSensitization & awareness creation of Garissa livestock traders

Wildlife-livestock conflict especially during the dry spell

Death &/or injuries of livestockIncreased game killings

PastoralistAgro-pastoralist Settlement dwellers Wildlife

Sanctuary for wildlife Sensitization and awarenessConflict resolution

Page 77

Page 86: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Annex 7: Challenges on minerals and management of the resource in Saka WRUA

CHALLENGE EFFECTS AFFECTED SOLUTION OPTIONS

Erosion Loss or depletion of minerals PastoralistAgro-pastoralist Settlement dwellers

Building pans???Rehabilitation of the degraded sites

Poor management and market

Low investment and exploitation Low income Degradation

PastoralistAgro-pastoralist Settlement dwellers

Market value chain analysisValue additions

Poor market for building blocks, hardcore and gravels

Low investment and exploitation Low income

PastoralistAgro-pastoralist Settlement dwellers

Market value chain analysis Value additions

Inadequate skills to exploit

Low exploitation levels Health impacts

Miners, settlement dwellers

Capacity building on skills and safe technologies Sensitization and awareness on impacts of exploitation

Page 78

Page 87: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Annex 8: Challenges on shallow wells and management of the resource in Saka WRUA

CHALLENGE EFFECTS AFFECTED SOLUTION OPTIONS

Collapsing of walls Deaths and injuries to humans, livestock and wildlife Reduced access to water

PastoralistAgro-pastoralist Settlement dwellers

sensitization and awareness creation Avoid digging deep wells

Polluted and contaminated water

Diseases and malfunctions Death Reduced productivity

PastoralistAgro-pastoralist Settlement dwellers

Treatment of water Alternative sources for domestic water

Conflicts between wildlife, human and livestock

Death/or injuries to humans, livestock and wildlife

PastoralistAgro-pastoralist

Create wildlife sanctuaries Construction of watering points for wildlifeGranting wildlife access to existing water sources

Human conflicts Death and/or injuries Displacement Reduced productivity

PastoralistAgro-pastoralist Settlement dwellers

Conflict resolution by peace committee Sensitization and awareness creation

Spread and transmission of pest and diseases

Increased incidence of disease Rapid spread and transmission of infectious and contagious diseases

PastoralistAgro-pastoralist Settlement dwellers Wildlife

Vaccination and treatment of livestock and wildlife Sensitization and awareness creation

Lagha waters filling shallow wells with eroded materials

Reduced access to water Increased contamination and pollution

PastoralistAgro-pastoralist Settlement dwellers

Strategic construction of shallow/infiltration wells

Labor intensive Time consuming PastoralistAgro-pastoralist Settlement dwellers

Provision of digging equipment’sTraining on new technologies

Page 79

Page 88: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Page 80

Annex 9: List Participants for Adapted SCMP-SAKANo. PARTICIPANTS NAME INSTITUTION TITLE

1 ABDINOOR D. ABDIRAHMAN NDMA DEPUTY-DMO

2. JUSTUS MUSEE MWI DWO-BALAMBALA

3. NAOMI YATICH WRMA TECHNICAL OFFICER

4. JOHN MUREFI KWS DEPUTY WARDEN

5. BENARD MUSYOKA MOA DAO-BALAMBALA

6. ERIC MWATUNI MOLD DLPO-BALAMBALA

7. HASSAN HAJI FARAH SAKA WRUA CHAIRMAN

8. ADEN DAGANE GEDI SAKA WRUA SECRETARY

9. YUSSUF ADEN GEDI SAKA WRUA MEMBER

10. HALIMA BASHIR ELMOGE SAKA WRUA MEMBER

11. GEDI DIRIYE SAKA WRUA MEMBER

12. MOHAMEDQANI FARAH SAKA WRUA MEMBER

13. ABDI SALAT SAKA WRUA MEMBER

14. MUSE FARAH MUHUMED SAKA WRUA MEMBER

15. HUSSEIN OSMAN SAKA WRUA MEMBER

16. ABDI TORJI ABIKRA SAKA WRUA MEMBER

17. NOOR ADEN SAKA WRUA MEMBER

18. DAUD AHMED KORANE SAKA WRUA MEMBER

19. HASSAN MOHAMED MERIR SAKA WRUA MEMBER

20. DAHIR MOHAMED AHMED SAKA WRUA MEMBER

21. AHMED MUKTAR ALI SAKA WRUA MEMBER

22. ABDULLAHI ABDI NOOR SAKA WRUA MEMBER

23. MOAHMED DUBAT SABAL SAKA WRUA MEMBER

24. ABDULLAHI HUSSEIN SAKA WRUA MEMBER

25. ABDULLAHI AHMED YAROW SAKA WRUA MEMBER

26. MOHAMED IBRAHIM HIRMOGE SAKA WRUA MEMBER

27. ASHA BARE SAKA WRUA MEMBER

28. ATHAN KUNE HUSSEIN SAKA WRUA MEMBER

29. IDRIS ABDIKADIR SAKA WRUA MEMBER

30. BUROW DUBAT SAKA WRUA MEMBER

31. ADAN GABANE SAKA WRUA MEMBER

32. SAHARA ADEN SAKA WRUA MEMBER

33. HUSSEIN SULTAN SAKA WRUA MEMBER

34. KHEIR DAKANE SAKA WRUA MEMBER

35. ABDI GEDI SAKA WRUA MEMBER

36. IBRAHIM KUNE SAKA WRUA MEMBER

37. DR. AHMED MOHAMED IUCN PROGRAMME OFFICER- WATER AND WETLANDS

38. JAAFARSADIQ HASSAN FaIDA NRM OFFICER

Page 89: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Annex 10: Coordinates of Major Centres in Saka Sub-Catchment-from transact drives/walks

No. Name of centre Coordinates

1. Hirbai S 00005’339’’ E 039011’976’’ Altitude 221m

2. Hadley S 000 06’452’’ E 0390 14’619’’ Altitude 208m

3. Qabobey S 00007’088’’ E 039017’456’’ Altitude 198m

4. Saka S 00008’013’’ E 039019’644’’ Attitude 192m

5. Mathahlibah S 00008’290’’ E 039019’663’’ Attitude 189m

6. Magatho S 00009’162’’ E 039023’242’’ Altitude 190m

7. Daley S 00010’612’’ E 039024’136’ Altitude 179

8. Darderey S 00010’904’ E 039025’555’’ Altitude 174m

9. SakaJunction N 00002’071’ E 039022’538’’ Altitude 296m

Page 81

Page 90: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Page 82

Annex 11: Coordinates of Major Laghas and Water Pans in the Sub-Catchment from transact drives/walks

Name of Lahga Coordinates

Start EndFadiweyne S00007’255’’ S00006’816’’ E039015’664’’ E039013’015’’ Altitude 190m Altitude 210m

Qabobey S00007’425’’ S00007’369’’ E039016’729’’ E039016’940’’ Altitude 191m Altitude 189m

Habarow S00007’492’’ E039018’796’’ Altitude 192

Hadley S00006’164’’ E039013’544’’ Altitude 207m

Masala S00008’290’’ E039019’663’’ Altitude 190m

Mathahlibah S00008’578’’ E039021’414’’ Altitude 189m

Higle S00002’540’’ E039020’540’’ Altitude 273m

Durdarane S00008’747’’ E039022’167’’ Altitude 192m

Abdikadir S00010’824’’ E039025’222’’ Altitude 173m

Suban S00010’982’’ E039025’934’’ Altitude 172m

Jilarba S00011’238’’ E039026’315’’ Altitude 172m

Name of water pan Coordinates Gesilay-Saka junction N00001’628’’ E039022’064’’ Altitude 300m

Nageye-CARE pan N00002’567’’ E039022’635’’ Altitude 297m

Page 91: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Annex 12: Coordinates of minerals sites- from transact drives/walks

Type of mineral Coordinates

Mud stone S00009’768’’ E039023’122’’ Altitude

Ballast and white sand S00006’219’’ E039020’066’’ Altitude 214

Hardcore and red sand S00001’782’’ E039020’746’’ Altitude 306m

Sand and stone S00005’238’’ E039011’334’’ Altitude 212

Page 83

Page 92: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Page 84

Annex 13: Plant species (Trees, shrubs and herbs) in Saka

 

110  

Annex 13 Plant species (Trees, shrubs and herbs) in Saka

No. Botanical name Common Name Local name (Somali) 1. Acacia tortilis Umbrella thorn Abaq 2. A. Seyal Fulai 3. A. Senegal Gum Arabic tree Edad 4. A. elatior Bura 5. A. nilotica Nile thorn Tuwer 6. A. mellifera Honey acacia Biliil 7. A. paolii Gomor-jerin 8. A. reficiens Riig 9. A. horrida Sarmaan 10. Azadirachta indica Neem tree Gedqarerow 11. Balanites aegyptica Desert dates Kulanbadhed 12. B. rotundifolia Kulan 13. Boscia coriacea Qalanqal 14. B. minimifolia Megag 15. Maerua sp Dumai 16. Boswellia neglecta Frankincense Mirefur 17. Commiphora africana Hamesa 18. C. erythrea Hagar ad 19. C. rostarata Jinow 20. Commiphora sp Damaje 21. Delonix elata Lebi 22. Cordia sinensis Marerwebi 23. C. quercifolia Marer 24. Dobera glabra Garas 25. Grewia tenax Deka 26. G. villosa Kamasha 27. Hyphaene compressa Doum palm Baar 28. Maerua decumbens Abarmog 29. Salvadora persica Toothbrush, Adhey 30. Terminalia polycarpa Hareri 31. Indigofera spp Dirqe 32. Seracocomopsis pallida Balamabal 33. Ipomea donaldsonii Bariborti 34. Tephrosia spp35. Anistosis tannensis Mirdis 36. Duospermum sp Seerin 37. Chrysopogon aucheri Deremo 38. Chloris roxburghiana 39. Sprobolus helvolus Jerbi 40. Dactyloctenium aegyptium Oosdanaan 41. Entropogon macrostachyus 42. Litepes senegalensis Ilmoqor 43. Bleriperisperum spp Banya  

Page 93: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

 

111 

 ANNEX

 14 

HABA

ROW – SAKA

 ADAPT

ED SUB‐CA

TCHMEN

T MANAGEM

ENT PLAN: SUMMARY

 WORK

 PLA

N AND BUDGET

 (201

2/20

17) 

CH 

TOPIC 

ACT

IVITY  

SET 

BUDGET

 (Kshs) 

FINANCING 

TIMEFRA

ME ( 2

012‐2017)

2012

 20

13 

2014

 20

15 

2016

 20

17 

WDC 

FUNDS

WRU

FUNDS

WRU

IN‐KIND

OTH

ER 

FUNDS

Q3 

Q4 

Q1 

Q2 

Q3 

Q4 

Q1 

Q2 

Q3 

Q4 

Q1 

Q2 

Q3 

Q4 

Q1 

Q2 

Q3 

Q4 

Q1 

Q2 

3 Ca

tchm

ent C

haracteristics  

  

 Target: O

btain adeq

uate natural re

source data 

  

  

  

  

  

  

  

  

  

  

  

  

Outpu

t: Reliable curren

t natural re

source data compiled 

  

 Activity 1  Ba

seline survey to

 establish the extent of d

eforestatio

n 50

0,00

  

2 Ch

arcoal survey 

 50

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

 3 

Cond

uct g

eological survey 

 8,20

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

 4 

Cond

uct p

asture survey 

800,00

  

 5 

Baseline survey on water re

sources  

700,00

  

 6 

Stud

y on

 causes of river cou

rse change 

 50

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

  

7 Stud

y causes of b

anks erosion

 40

0,00

  

 8 

Floo

d assessmen

t and

 causes 

500,00

  

 9 

Analysis of the

 quality of water from

 all sources 

 70

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

  

10 Effects of crocodile on pe

ople and

 livestock  

 50

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

  

11 Assessmen

t of causes an

d control of w

ildfires 

500,00

  

 12

 Assessmen

t of settle

men

t patterns 

500,00

  

 13

 Assessmen

t of P

rosopis coverage, threat a

nd con

trol/ m

anagem

ent 

 50

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

  

14 Co

nduct irrigation infrastructure status and ne

eds assessmen

t  survey

500,00

  

 15

 Co

nduct h

uman

 – wildlife conflict a

ssessm

ent survey 

 50

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

  

16 Market chain survey and value chain analysis 

 70

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

  

 To

tal 

 16

,500,000

  

  

  

  

  

  

  

  

  

  

  

  

 4 

Man

agem

ent a

pproach 

  

 Target :To

 build com

mun

ity re

silience and en

hance sustainable resource use and

 managem

ent in the Tu

la sub

‐catchm

ent to be

 spe

arhe

aded

 by WRU

A mem

bers and

 other stakeho

lders 

  

  

  

  

  

  

  

  

  

  

  

  

Outpu

t :The commun

ity with

in th

e sub‐catchm

ent u

nderstand the ecological, com

mercial and

 livelihoo

d  zon

es and

 approp

riate m

echanism

s to solve th

e existin

g resource challenges 

  

  

Q3 

Q4 

Q1 

Q2 

Q3 

Q4 

Q1 

Q2 

Q3 

Q4 

Q1 

Q2 

Q3 

Q4 

Q1 

Q2 

Q3 

Q4 

Q1 

Q2 

 Activity 1  Capacity building of W

RUA and commun

ity m

embe

rs  on

 natural resou

rce 

managem

ent to solve water scarcity

  

1,10

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

 

 2 

Mapping

 the sub‐catchm

ent into managem

ent u

nit 

 1,20

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

 3 

Sustainable charcoal produ

ction 

 1,50

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

 4 

Regulate and

 guide

 dry and

 wet season grazing  

4,90

0,00

  

5 Managem

ent o

f natural disasters  

12,100

,000

  

 6 

Strengthen

 existing pe

ace committees to re

duce con

flict over resou

rces during 

drou

ght p

eriods 

 6,50

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

 

7 Re

duce hum

an‐w

ildlife conflict 

 1,50

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

 8 

Form

ation/ stren

gthe

n of institu

tions and

 by‐laws on

 the managem

ent a

nd 

use/resource sharin

g  of n

atural re

sources 

 5,00

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

 

9 Prom

ote biod

iversity con

servation 

 4,00

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

 

  

Total 

 37

,800,000

  

  

  

  

  

  

  

  

  

  

  

  

 5 

Resource availability an

d de

man

d  

  

  

  

  

  

  

  

  

  

  

  

  

  

Target: Establish natural resou

rce de

mand and supp

ly fo

r Saka Sub‐catchm

ent 

  

  

  

  

  

  

  

  

  

  

  

  

Outpu

t:Ad

equate date on

 natural re

source dem

and an

d supp

ly establishe

d  

  

Activity 1 

Assessmen

t of w

ater  potentia

l, reserve and balance for d

omestic, irrigation 

and livestock 

 1,60

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

 

2 Assessmen

t of p

asture/fod

der  po

tential, reserve and balance for livestock and

 wild

 herbivores 

 1,10

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

 

 4 

Assessmen

t of land use/cover 

1,10

0,00

  

 5 

Assessmen

t of crop and agroforestry produ

ction po

tential 

 1,10

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

  

6 Assessmen

t of forest/woo

dlands status 

1,40

0,00

  

 7 

Clim

atic change im

pact assessm

ent 

1,10

0,00

  

 8 

Exploration and assessmen

t of m

inerals in th

e sub‐catchm

ent  

 1,10

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

  

 To

tal 

 8,50

0,000 

  

  

  

  

  

  

  

  

  

  

  

  

Ann

ex 1

4:

Hab

arow

– S

aka

Ad

apte

d S

ub-C

atch

men

t M

anag

emen

t P

lan:

Sum

mar

y W

ork

Pla

n an

d B

udge

t (2

012/

2017

)

Page 85

Page 94: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Page 86

 

112 

 

6 Natural re

sources a

llocatio

n for sustainab

le, equ

itable an

d efficient use by commun

ities

Q3

Q4 

Q1 

Q2 

Q3

Q4

Q1

Q2

Q3

Q4

Q1

Q2

Q3

Q4

Q1

Q2

Q3

Q4

Q1

Q2

Target:T

o de

velop natural resou

rce allocatio

n plans 

  

  

  

  

  

  

  

  

  

  

  

  

  

Outpu

t:Natural re

source allocatio

n plans in place 

  

  

  

Activ

ity 1  Develop

men

t of w

ater allocatio

n plans  

2,10

0,00

0  

  

2 Develop

men

t of p

asture/fod

der  plan

 1,60

0,00

  

3 Develop

men

t of  land

 use/cover plan 

 1,10

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

 

4 Forest/w

oodlands m

anagem

ent p

lan 

1,60

0,00

  

5 Develop

men

t of p

hysical plans 

 1,60

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

 6 

Develop

men

t of p

lan for e

xploratio

n and exploitatio

n of m

inerals 

 2,10

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

  

7 Re

source sh

aring and conflict resolution  plann

ing 

2,10

0,00

  

  To

tal 

 12

,200,000

  

  

  

  

  

  

  

  

  

  

  

  

 7 

Resource protection 

  

  

  

  

  

  

  

  

  

  

  

  

  

Target: Protection of th

e existin

g natural resou

rces in

 order to

 achieve desire

d services   

  

  

  

  

  

  

  

  

  

  

  

  

  

Outpu

t:Catchm

ent m

aintain ability to

 provide

 requ

ired services 

Activ

ity 1 River b

ank protectio

n 50

0,00

  

2 Im

prove governance on managem

ent o

f water so

urces 

 1,00

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

 3 

Pollutio

n survey 

 1,90

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

 4 

Redu

ce risks to collapse of sh

allow wells 

300,00

  

5 Supp

ort the

 con

servation of pasture and

 forest re

sources 

4,10

0,00

  

6 Co

ntrol m

ushroo

ming settlemen

ts and

 establishm

ent o

f inland water so

urces 

 10

,500

,000

  

  

  

  

  

  

  

  

  

  

  

  

 7 

Strengthen

 wildlife managem

ent w

ithin th

e sub‐catchm

ent 

3,20

0,00

  

 8 

Prom

ote participatory mineral use 

500,00

  

  To

tal 

 22

,000,000

  

  

  

  

  

  

  

  

  

  

  

  

 8 

Implem

entatio

n of catchmen

t protection activ

ities 

  

  

  

Q3 

Q4 

Q1 

Q2 

Q3 

Q4 

Q1 

Q2 

Q3 

Q4 

Q1 

Q2 

Q3 

Q4 

Q1 

Q2 

Q3 

Q4 

Q1 

Q2 

Target:To redu

ce catchmen

t degradatio

n through  integration of protection and conservatio

n approach  

  

 Outpu

t:Re

habilitated

 catchmen

t that h

as ability to offer  a balanced ecosystem se

rvices

  

 Ac

tivity

 1 River b

ank stabilizatio

n  

 8,00

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

 2 

Prom

ote pasture conservatio

n on

 com

mun

al land

s and

 farm

s 5,00

0,00

  

3 Re

forestation, affo

restation and reseed

ing  with

 prio

rity to local spe

cies

3,00

0,00

  

4 Co

ntrol and

 managem

ent o

f Prosopis juliflora 

 3,00

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

 5 

Prom

ote legalized

 gam

e farm

ing & com

mun

ity m

anaged

 sanctuaries 

 4,50

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

  

6 Im

prove farm

 produ

ctivity

 to re

duce cropland expansion and redu

ce crop 

prod

uctio

n – wildlife conflict 

 11

1,00

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

 

 7 

Improve prod

uctivity

 through livestock m

arketin

g, access to water, breed

ing 

and coordinatio

n  

7,00

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

 

  To

tal 

 14

1,500,00

0  

  

  

  

  

  

  

  

  

  

  

  

 9 

Capa

city building of com

mun

ities and

 partners on

 ada

pted

 SCM

P  

  

  

  

  

  

  

  

  

  

  

  

 Target: Enh

ance th

e capacity of the

 com

mun

ity and

 WRU

A on

 activity

 implem

entatio

n through ne

tworking

 and

 partne

rship 

  

  

  

  

  

  

  

  

  

  

  

  

Outpu

t:Im

proved

 capacity

 to  overcom

e  existing challenges and

 capita

lise on

 existing op

portun

ities 

  

  

  

  

  

  

  

  

  

  

  

  

  

Activ

ity 1 Co

nduct capacity

 needs assessm

ent a

nd train on

 coo

rdination 

1,50

0,00

  

 2 

Capacity building on

 water m

anagem

ent 

 2,90

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

  

3 Capacity building on

 agriculture – crop prod

uctio

n and agroforestry

2,90

0,00

  

 4 

Capacity building on

 livestock managem

ent 

2,40

0,00

  

 5 

Capacity building on

 wildlife managem

ent 

 1,60

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

  

6 Capacity building on

 mineral use and

 managem

ent 

 1,90

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

  

7 Capacity build on pasture and fodd

er produ

ction 

2,00

0,00

  

  To

tal 

 15

,200,00 

  

  

  

  

  

  

  

  

  

  

  

  

10 

Infrastructure develop

men

t to bo

ost resou

rce conservatio

n an

d mitigate against disasters 

and conflicts 

  

  

  

Target: Increase availability and accessibility to

 natural re

sources w

ithin th

e sub‐catchm

ent 

  

  

  

  

  

  

  

  

  

  

  

  

  

Outpu

t:Im

prove infrastructure to

 access a

nd utilise

 natural re

sources w

ithin th

e sub‐

catchm

ent    

  

  

  

  

  

  

  

  

  

  

  

  

  

Activ

ity 1 Establish

 early warning

 system

 for d

rought 

2,60

0,00

  

2 Establish

 early warning

 system

 for flood

s 1,80

0,00

  

Page 95: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

 

113 

 

10 

Infrastructure develop

men

t to bo

ost resou

rce conservatio

n an

d mitigate against disasters 

and conflicts 

  

  

  

Target: Increase availability and accessibility to

 natural re

sources w

ithin th

e sub‐catchm

ent

  

 Outpu

t:Im

prove infrastructure to

 access a

nd utilise

 natural re

sources w

ithin th

e sub‐

catchm

ent    

  

  

  

  

  

  

  

  

  

  

  

  

  

Activ

ity 1 Establish

 early warning

 system

 for d

rought 

 2,60

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

 2 

Establish

 early warning

 system

 for flood

s 1,80

0,00

  

3 Strengthen

 con

flict re

solutio

ns 

 1,00

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

 4 

Improve availability of water fo

r dom

estic

 and

 livestock use 

 85

,000

,000

  

  

  

  

  

  

  

  

  

  

  

  

 5 

Strengthen

 WRU

A as a coo

rdination un

it  

300,00

0  

  

  

  

  

  

  

  

  

  

  

  

 6 

Improve roads 

200,00

0,00

  

7 Im

prove access to

 markets and

 value

 add

ition

 29

,800

,000

  

 9 

Total 

 32

0,500,00

0  

  

  

  

  

  

  

  

  

  

  

  

 11

 Stakeh

olde

r analysis

 for right based

 app

roach and po

verty redu

ction  

Target: Foster coo

rdination and collabo

ratio

n of stakeh

olde

rs to

 redu

ce poverty and

 overcome barriers in accessin

g and managing land

 and

 water re

sources 

  

  

  

  

  

  

  

  

  

  

  

  

  

Outpu

t:Strengthen

ed coo

rdination and collabo

ratio

n to equ

itably access and

 manage 

natural resou

rces 

  

  

  

  

  

  

  

  

  

  

  

  

  

Activ

ity 1 Im

prove coordinatio

n and gend

er parity

 in decision making 

7,00

0,00

  

2 Im

prove inform

ation dissem

ination 

 1,00

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

 3 

Prom

otion of alte

rnative livelihoo

ds to

 redu

ce pressure on

 natural re

sources 

and redu

ce sp

iralling

 poverty 

 6,90

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

 

  To

tal 

14,900,000

  

 12

 Pa

rticipatory mon

itorin

g an

d evalua

tion 

Target: Establish and strengthen

 participatory mon

itorin

g and evaluatio

n for sustainable 

managem

ent o

f natural re

sources a

nd re

liable database 

  

  

  

  

  

  

  

  

  

  

  

  

  

Outpu

t:Enhanced

 participatory mon

itorin

g and evaluatio

n system

 and

 natural re

source data 

availed at all levels 

  

  

  

  

  

  

  

  

  

  

  

  

  

Activ

ity 1 Joint p

lann

ing for m

onito

ring 

 50

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

 2 

Joint m

onito

ring of water so

urces 

 1,00

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

  

3 Joint m

onito

ring of pasture and

 forest re

sources 

 1,50

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

  

4 Joint m

onito

ring of wildlife activities 

 1,00

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

  

5 Joint m

onito

ring of farm

land

 activities 

 1,00

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

  

6 Joint m

onito

ring of livestock activities 

 1,00

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

  

7 Joint m

onito

ring of infrastructure 

 1,00

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

  

8 Internal evaluation by

 implem

entin

g partne

rs 

 2,00

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

  

 To

tal 

 9,00

0,000 

  

  

  

  

  

  

  

  

  

  

  

  

13 

Fina

nce an

d im

plem

entatio

n of project activities 

  

  

  

 Target: C

apacity

 build W

RUA on

 finance and resource m

obilizatio

n (both internal and

 external) for su

ccessful executio

n of plann

ed ASCMP activities 

  

  

  

  

  

  

  

  

  

  

  

  

  

 Outpu

t: A financially strong

  and

 proactive WRU

A that im

plem

ents plann

ed activities on tim

e in place 

  

  

  

  

  

  

  

  

  

  

  

  

  

 Ac

tivity

 1 Capacity build W

RUA on

 propo

sal develop

men

t  

900,00

0  

  

  

  

  

  

  

  

  

  

  

  

  

2 Capacity build W

RUA on

 resource mob

ilizatio

n  

900,00

0  

  

  

  

  

  

  

  

  

  

  

  

  

3 Capacity build W

RUA on

 record keeping

 2,60

0,00

  

 4 

Capacity build W

RUA on

 inform

ation sharing and ne

tworking

 90

0,00

  

 5 

Capacity build W

RUA on

 procuremen

t and

 finance 

 40

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

  

6 Capacity build W

RUA on

 operatio

n and mainten

ance of e

quipmen

t  

600,00

0  

  

  

  

  

  

  

  

  

  

  

  

  

7 Capacity build W

RUA on

 leadership and

 governance 

900,00

  

  To

tal 

7,20

0,000

  

 

  

Page 87

Page 96: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

 

114 

 

14 

Mainstreaming an

d up

‐scalin

g of th

e AS

CMP ap

proa

ch 

  

  

Target: M

ainstream and

 scale up

 the AS

CMP approach to

 sub‐catchm

ents in

 Garissa and 

othe

r cou

nties w

ith similar e

nviro

nmen

t  

  

  

 

 Outpu

t:Ad

apted SCMP approach m

ainstreamed

 into cou

nty planning

 process and

 ado

pted

 by

 cou

nties a

nd W

RUAs

  

  

  

  

  

  

  

  

  

  

  

  

  

 

 Ac

tivity

 1 Harmon

ize ASCMP activities with

 season

al plans of Saka Co

mmun

ity 

 30

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

  

2 Mainstream ASCMP into cou

nty planning

 processes  

  

  

3 Upscale A

SCMP to cou

nties and sub‐catchm

ents w

ith sim

ilar en

vironm

ent 

through  

skills d

evelop

men

t  and form

ulation of policies o

n adapted SCMP 

 2,90

0,00

0  

  

  

  

  

  

  

  

  

  

  

  

 

  To

tal 

3,60

0,000

  

 TO

TAL BU

DGET

   

  

  

  

  

  

  

  

  

  

  

  

  

 SU

MMAR

Y  

  

  

  

  

  

  

  

  

  

  

  

  

  

Total Bud

get A

ctivity

 Set 

  

Total Bud

get A

ctivity

 Set 

  

Total Bud

get A

ctivity

 Set 

3 16

.5M 

  

  

  

  

  

  

  

  

  

  

  

  

Total Bud

get A

ctivity

 Set 

4 37

.8M 

  

  

  

  

  

  

  

  

  

  

  

  

Total Bud

get A

ctivity

 Set 

58.5M

  

 To

tal Bud

get A

ctivity

 Set 

612

.2M

  

 To

tal Bud

get A

ctivity

 Set 

7 22

  

  

  

  

  

  

  

  

  

  

  

  

Total Bud

get A

ctivity

 Set 

814

1.5M

  

 To

tal Bud

get A

ctivity

 Set 

9 15

.2M 

  

  

  

  

  

  

  

  

  

  

  

  

Total Bud

get A

ctivity

 Set 

10 

320.5M

  

  

  

  

  

  

  

  

  

  

  

  

 To

tal Bud

get A

ctivity

 Set 

11 

14.9M 

  

  

  

  

  

  

  

  

  

  

  

  

Total Bud

get A

ctivity

 Set 

129M

  

 To

tal Bud

get A

ctivity

 Set 

137.2M

  

 To

tal Bud

get A

ctivity

 Set 

14 

3.6M

  

  

  

  

  

  

  

  

  

  

  

  

 To

tal 

608.9M

  

 

Page 88

Page 97: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Annex 15: Field visit photos

Page 89

Wildlife of Saka – dung beetle, birds and reticulated giraffe

River bank erosion along Lagha Habarow and overgrazing in communal pastures near Saka Junction

Haphazard settlement and water tankering in Saka

Page 98: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa

Page 90

Page 99: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa
Page 100: Habarow-Saka Adapted Sub-Catchment Management Plan, Garissa