Upload
ankit-bhargava
View
215
Download
0
Tags:
Embed Size (px)
DESCRIPTION
3rd project, MSc Urbanism, TU Delft. The group output was restricted to 4 pages, and individual output to 1 a4
Citation preview
Landscape of contrasts
>>> FACTS & FIGURES
Team:Ankit Bhargava Josephine van LohuizenRochelle WolversTess StribosVictor Nyman
Program:net transformation urban area 6300 ha.residential 260 ha.commercial 4090 ha.infrastructure 42 km.water 1100 ha.houses 15000
Type:thematic / integral realistic / idealistic strategy / blueprint
This project speculates the role and position of Haarlemmemeer in the context of the Amsterdam Metropolitan Region (AMR) for the Year 2040. The current visions all show a strong inclination for further strengthening of Amsterdam city as a super centrality drawing no active participation from Haarlemmemeer. In order for urban regions to be competitive and achieve global visibility, they need to create zones of specialized identity, and in AMR Haarlemmeer is a sub-urban service core. However, proximity to urban cores, recreation zones in the periphery, location on regional infrastructure and expansive open space provide immense potential. So, in order to become more attractive, the
project uses 2 strategies. The first is to enhance local qualities by adding new connections and new programmes. This will bring fragmented quality landscape in closer reach and bring new people and businesses. The second strategy is to use the adjacency to Schiphol to develop a symbiotic urbanity through blending of the daily urban system of Schiphol and the city – (opening the box, concept).The ambition is to create a unique/contrasting identity for Haarlemmemmer which will open up the region to a much larger range qualities and interactions. In turn, this will lead to making Randstad a more competitive urban region.
aIrport poLder
Transit
Arrival
coMponents
Water storage Improving mobility within the field of sub-centralities
Golf
Beach
Dunes
Hotel
Flowers
Education centre
schiphol (opening of the box)structuring program by the grid
SLOW CONNECTION
dunes, tulip land-scape, beach, water front
Rotterdam, Leiden, Den HagueUrban centralities
green heart
AmsterdamUrban centralities
FAST CONNECTION
reinforcing tempo
strengthening identities
Airport centric
Industry
Green
Residential
strateGIes
CITYCargo nodeTrade node (fresh supply, exotic range)Terminal (gateway to the world)Special shops (high end, duty free) High end hotelsAirport related programmes80 million usersTransit time - waiting
Prog
ram
mes
Tool
s
1 2 creation of symbiotic daily urban systemenhancing local qualities and upgradation of perepheral sub-centralities
Education centre
Opening up of Schiphol area to enhance visual experience of landscape (sense of arrival)
*Project 3
*Project 4
*Project 5
New connections
New programmes
REGIONAL dAILY
uRBAN SYSTEM
( ) adding to +*Project 1
*Project 2*Project 3
1 2 3 4 5 (km)0
n
Haarlemmemeer Waterfront
This project looks at how two of the available tools (demand for regional water storage and housing) can be used to bring new qualities and make Haarlemmemeer more attractive. The project is to be developed gradually in stages so as to consciously find a new dynamic at local level in which inherent agriculture can also become a part of the urban fabric. The grid is used as a structuring system which defines movement corridors, their tempo and character while the interior pockets are flexible and each can have individual character. The height and slope of the dykes along the grid are to define how water/green are relatable and whether water is for rain-catchment or is deep enough for recreation.
>>> FACTS & FIGURES
Team:Ankit Bhargava
Program:net transformation 1500 haurban area 200 haresidential 15,000 (No.)commercial not decidedinfrastructure not decidedlandscape not decidedwater 1100 ha.houses 12,000 (No.)
Stakeholders involved:Municipalities of Nieuw Vennep, Hoofddorp, Lisse & Hilegom
Aimed effect:Bringing new attractive living qualities, intertwined system of urban agriculture, will keep some agriculture area from desalination, flexible water management system
A C
B D
Hillegom
Haarlem Hoofddorp
nieuw VennepB
Dv
A
C
Fast
Slow
Nieuw Vennep
Hoofddorp
Hillegom
Lisse
n
1 2 3 4 5 (km)0