1
T H E A S S O C I A T I O N O F KEN W. BALEY M A N I T O B A L A N D S U R V E Y O R S M E M B E R 33 1 - 28WPM 3 2 - 28WPM 2 2 - 28WPM 1 2 - 28WPM 36 1 - 28WPM 32 1 - 28WPM 4 2 - 28WPM 15m. R/W Plan 52896 BLTO 15m. R/W Plan 52896 BLTO 15m. R/W Operator: Legacy Legacy 9-32 Battery Site Legacy 9-32 Flat Cropland Flat Pasture Flat Cropland EOG 4-1 Battery Site Abnd. 13-33 618555 Sask 4-4 (B/H 7-5) EOG 6-4 (B/H 9-4) 5m. R/W Operator: EOG Road Plan 20 BOIS.DIV. - BLTO Road Plan 20 BOIS.DIV. - BLTO 20m. MTS Caveat No. 1115322/2 12.19m. MTS Caveat No. 63279BO/2 Fd. 0.025 Sq. I.B. Fd. 0.025 Sq. I.B. Fd. 0.025 Sq. I.B. Sq. I.B. Sq. I.B. Sq. I.B. Sq. I.B. Sq. I.B. Fd. 0.025 Sq. I.B. Buried Telecom (MTS) in Vicinity Buried Telecom (MTS) in Vicinity $= 804.880 $= 807.953 $= 846.153 $= 194.105 $= 612.808 Fd. 0.025 Sq. I.B. EOG 14-33 (B/H 16-33) 5m. R/W Operator: EOG 804.802 $= 730.930 $= Legacy 2-4 (B/H 4-4) 5m. R/W Operator: EOG 20m. MTS Caveat No. 1115674/2 20m. MTS Caveat No. 1115674/2 5m. R/W Operator: EOG Buried Telecom (MTS) in Vicinity (x2) Overhead Power Line Operator: MB Hydro PP PP PP PP Buried Telecom (MTS) in Vicinity (x2) Overhead Power Line Operator: MB Hydro 20m. MTS Caveat No. 1115323/2 EOG 8-4 (B/H 7-3) 5m. R/W Operator: EOG 15m. R/W Operator: EOG EOG Riser Site 20m. R/W Operator: EOG Operator: Legacy Operator: Legacy Parcel A Plan 36266 BLTO $= 680.308 6 3 4 5 7 8 1 2 6 3 5 7 8 1 2 6 3 4 5 8 6 3 4 5 11 14 10 15 16 9 11 12 13 14 Government Road (6N) Allowance Medium Grade Gravel Road Twp. 2 Twp. 1 Government Road (6N) Allowance Medium Grade Gravel Road Government Road (6N) Allowance Medium Grade Gravel Road Government Road (6N) Allowance Medium Grade Gravel Road Government Road (6N) Allowance Medium Grade Gravel Road Government Road (6N) Allowance Medium Grade Gravel Road Government Road (165W) Allowance Government Road (166W) Allowance Government Road (163W) Allowance Medium Grade Gravel Road Government Road (163W) Allowance Medium Grade Gravel Road 197.89 (Tie Line) 38.54 30.175 (calc.) 85.46 14.28 14.28 593.42 120.02 138.40 26.29 48.10 35.09 94.61 311.70 200.00 646.63 23.90 25.00 256.50 20.00 (calc.) 309.93 (B/H 3-2) 20m. R/W Operator: EOG 20m. R/W Operator: EOG Overhead Power Line Operator: MB Hydro 20m. R/W Operator: EOG 20m. R/W Operator: EOG Fd. 0.025 Fd. 0.025 Sq. I.B. Fd. 0.025 Sq. I.B. Fd. 0.025 837.221 $= 805.075 $= 20m. MTS Caveat No. 1136596/2 20m. MTS Caveat No. 1136596/2 C. of T. 2318595/2 Owner: D.C. Gardiner Ltd. N.E. 1/4 Sec.32-1-28WPM AREA REQUIRED FOR R/W: Within Battery Site 9-32 = 0.077 ha. (0.19 ac.) Without Above = 0.000 ha. (0.00 ac.) Total = 0.077 ha. (0.19 ac.) N.W. 1/4 Sec.33-1-28WPM AREA REQUIRED FOR R/W: = 1.387 ha. (3.43 ac.) AREA REQUIRED FOR TEMPORARY WORKSPACE: = 0.377 ha. (0.93 ac.) 194.105 $= Legacy 9-32 Battery Site Legacy 9-32 MTS Pedistal PP PP 12.19m. MTS Caveat No. 63279BO/2 Buried Telecom (MTS) in Vicinity 612.808 $= 593.42 20.00m. R/W Windorw 20.00m. R/W Government Road (166W) Allowance Medium Grade Gravel Road Low Area (Dry) X1 X2 X3 CAUTION ! Power Line +W P PP PP PP PP Overhead Power Line Operator: MB Hydro 7.5x20m. Temp. Workspace 7.5x20m. Temp. Workspace 20.00m. R/W Low Area (Dry) Low Area (Dry) Fd. 0.025 Sq. I.B. Government Road (166W) Allowance Medium Grade Gravel Road Medium Grade Gravel Road Flat Pasture 103.983 $= PP 593.42 Windorw Fd. 0.025 Sq. I.B. Bush PP 20.00m. R/W 20m. MTS Caveat No. 1115322/2 12.19m. MTS Caveat No. 63279BO/2 Buried Telecom (MTS) in Vicinity 612.808 $= 730.930 $= Buried Telecom (MTS) in Vicinity Overhead Power Line Operator: MB Hydro Government Road (6N) Allowance Medium Grade Gravel Road Overhead Power Line Operator: MB Hydro Government Road (166W) Allowance Medium Grade Gravel Road Buried Telecom (MTS) in Vicinity 20m. MTS Caveat No. 1115674/2 7.5x20m. Temp. Workspace 7.5x20m. Temp. Workspace Government Road (6N) Allowance Medium Grade Gravel Road S.W. 1/4 Sec.4-2-28WPM AREA REQUIRED FOR R/W: = 1.478 ha. (3.65 ac.) AREA REQUIRED FOR TEMPORARY WORKSPACE: = 0.427 ha. (1.06 ac.) S.E. 1/4 Sec.4-2-28WPM AREA REQUIRED FOR R/W: Within Well Site 2-4 (B/H 4-4) = 0.130 ha. (0.32 ac.) Without Above = 1.947 ha. (4.81 ac.) Total = 2.077 ha. (5.13 ac.) Legacy 2-4 (B/H 4-4) Buried Power Cable W/H 2-4 (B/H 4-4) Pump Jack Pad Power Panel Steel Berm Berm Tank Buried Pipe Stairs Berm X3 X2 X1 X4 X5 X6 X7 30.175 (calc.) 20.00m. R/W 287.275 $= 553.709 $= 287.275 $= 553.709 5m. Temp. Workspace 7.5m. Temp. Workspace 7.5m. Temp. Workspace 7.5x20m. Temp. Workspace 7.5x20m. Temp. Workspace 7.5x20m. Temp. Workspace 7.5x20m. Temp. Workspace 20m. R/W Operator: EOG 20m. R/W Operator: EOG C. of T. 1688942/2 Owner: Llewellyn John George Allen C. of T. 2478130/2 Owner: Michel Glenn McNish Owner: Donna Jennifer McNish C. of T. 2478129/2 Owner: Robert Brian McNish Owner: Lorraine Rose McNish S.W. 1/4 Sec.3-2-28WPM AREA REQUIRED FOR R/W: = 1.900 ha. (4.69 ac.) S.E. 1/4 Sec.3-2-28WPM AREA REQUIRED FOR R/W: Within Well Site 1-3 (B/H 3-2) = 0.281 ha. (0.69 ac.) Without Above = 1.414 ha. (3.49 ac.) Total = 1.695 ha. (4.18 ac.) AREA REQUIRED FOR TEMPORARY WORKSPACE: = 0.375 ha. (0.93 ac.) AREA REQUIRED FOR TEMPORARY WORKSPACE: = 0.738 ha. (1.82 ac.) C. of T. 2141481/2 (Parcel 1) Owner: Robert Brian McNish Owner: Loraine Rose McNish Overhead Power Line Operator: MB Hydro Buried Telecom (MTS) in Vicinity 12.19m. MTS Caveat No. 85-9059/2 30.175 Government Road (165W) Allowance Medium Grade Gravel Road PP Buried Pipe X9 X10 Government Road (6N) Allowance Medium Grade Gravel Road X13 X12 X11 X11 X12 X13 X14 X16 X14 X16 X20 X19 X18 X17 Fd. 0.025 20m. R/W Operator: EOG 20m. R/W Operator: EOG 840.436 $= 5m. R/W Operator: EOG 618555 Sask 12-36 (B/H 10-35) EOG 11-36 (B/H 9-36) 13 12 20m. R/W Operator: EOG 20m. R/W Operator: EOG EOG 14-26 Fd. 0.025 PP Low Area (Dry) Low Area (Dry) Low Area (Dry) PP PP 7.5x20m. Temp. Workspace 7.5x20m. Temp. Workspace CAUTION ! Power Line +W P 20.00m. R/W Fd. 0.025 Sq. I.B. $= $= 544.420 291.327 S.W. 1/4 Sec.1-2-28WPM AREA REQUIRED FOR R/W: = 1.751 ha. (4.33 ac.) AREA REQUIRED FOR TEMPORARY WORKSPACE: = 0.473 ha. (1.17 ac.) PP PP PP 15m. R/W Operator: EOG N.W. 1/4 Sec.36-1-28WPM AREA REQUIRED FOR R/W: Within Riser Site 14-36 = 0.040 ha. (0.10 ac.) Without Above = 0.000 ha. (0.00 ac.) Total = 0.040 ha. (0.10 ac.) 30.175 30.175 30.175 30.175 30.175 30.175 30.175 30.175 30.175 30.175 30.175 30.175 30.175 30.175 30.175 30.175 Fd. 0.025 30.175 30.175 30.175 C. of T. 2446072/2 (Parcel 2) Owner: Arlyn George Fletcher Owner: Gloria Jean Fletcher C. of T. 2008916/2 Owner: James Claire Clark Owner: Patricia Diane Clark EOG 5-1 (B/H 11-2) Overhead Power Line Operator: MB Hydro (Proposed - Power Poles only) TIE IN 5m. R/W Operator: EOG 5m. R/W Operator: EOG Buried Telecom (MTS) in Vicinity (x2) C. of T. 2349502/2 Owner: Raymond Harvey Clark Owner: Penny Ann Clark 20m. MTS Caveat No. 1114932/2 20m. MTS Caveat No. 1114932/2 5m. R/W EOG 1-2 20m. R/W Operator: EOG 20m. R/W Operator: EOG $= 806.697 20m. R/W Operator: EOG Buried Telecom (MTS) in Vicinity (x2) Buried Telecom (MTS) in Vicinity (x2) Buried Telecom (MTS) in Vicinity (x2) Overhead Power Line Operator: MB Hydro Buried Telecom (MTS) in Vicinity (x2) Government Road (164W) Allowance 20m. MTS Caveat No. 1122907/2 20m. MTS Caveat No. 1115325/2 20m. MTS Caveat No. 1115324/2 20m. MTS Caveat No. 1115697/2 S.E. 1/4 Sec.2-2-28WPM AREA REQUIRED FOR R/W: = 1.643 ha. (4.06 ac.) AREA REQUIRED FOR TEMPORARY WORKSPACE: = 0.431 ha. (1.07 ac.) C. of T. 2071946/2 Owner: James Claire Clark Owner: Patricia Diane Clark Riser Site EOG 4-2 20.00m. R/W 20.00m. R/W AREA REQUIRED FOR TEMPORARY WORKSPACE: = 0.425 ha. (1.05 ac.) $= 191.687 $= 644.639 Medium Grade Gravel Road 60.01 50.00 Legacy 1-3 (B/H 3-2) Overhead Power Line Operator: MB Hydro Buried Telecom (MTS) in Vicinity Government Road (164W) Allowance 20m. MTS Caveat No. 1122907/2 $= 191.687 $= 644.639 Buried Telecom (MTS) in Vicinity 7.5x20m. Temp. Workspace 7.5x20m. Temp. Workspace 7.5x20m. Temp. Workspace 20.00m. R/W 20.00m. R/W 840.12 7.5x20m. Temp. Workspace 30.175 CAUTION ! Power Line +W P Medium Grade Gravel Road X17 X18 X19 X20 30.175 30.175 30.175 30.175 DETAIL " " SEE A DETAIL " " SEE B DETAIL " " SEE C DETAIL " " SEE D DETAIL " " SEE E DETAIL " " SEE F DETAIL " " 25 m SCALE - 1:1,000 10 0 5 20 15 A DETAIL " " 25 m SCALE - 1:1,000 10 0 5 20 15 B DETAIL " " 25 m SCALE - 1:1,000 10 0 5 20 15 C DETAIL " " 25 m SCALE - 1:1,000 10 0 5 20 15 D DETAIL " " 25 m SCALE - 1:1,000 10 0 5 20 15 E Pierson Area Twp. 2 - Rge. 28 WPM 2012 Rural Municipality of Edward Twp. 1 - Rge. 28 WPM N.E. 1/4 Sec. 32, CONSTRUCTION PLAN RIGHT-OF-WAY IN of DATE REVISIONS NO. N.W. 1/4 Sec. 33 & N.W. 1/4 Sec. 36 from 9-32-1-28WPM (battery site) to 14-36-1-28WPM (riser site) S.W. 1/4 Sec. 1, S. 1/2 Sec. 2, & S. 1/2 Sec. 3 & S. 1/2 Sec. 4 Description X1 No. Status Drawing X2 X3 X4 X5 X6 X7 Location Scale - 1 : 5000 0 50 100 200 300 400 500m INITIALS 0 Issued CM - TJC - PFS Nov. 15, 2012 1 Revised R/W Route (S.1/2 Sec. 3 & S.1/2 Sec.4) DS/CM - CMF - PFS Dec. 20, 2012 Right - of - Way boundary shown thus: - Right-of-way to be filed is 20.00 metres in perpendicular width throughout unless shown otherwise. Total length of right-of-way along posted boundary : Crossings associated with this drawing: Crossing plans required : km 7.03 30 27 NOTES DISCLAIMER: * The revision stated in the Status column refers to the Construction Plan revision. LEGEND - Azimuths are grid and are referred to UTM projection, NAD 83 (Zone 14) datum and are derived by G.N.S.S. Marker Posts shown thus: Found Survey Monuments shown thus: Mp. Counter Sunk Posts shown thus: c.s. - All Marker Posts placed are 0.3 metres inside the GRA unless shown otherwise This plan represents the best information available at the time of survey. Altus Geomatics Manitoba and its employees take no responsibility for the location of any underground pipes, conduits, or facilities, whether shown on or omitted from this plan. Facilities shown on this plan are for informational purposes only. prior to any construction on lease or access road, LEGACY OIL + GAS INC. , MTS Communications Inc., Manitoba Hydro, and Manitoba Hydro-Gas Operations MUST be contacted for location of any underground facilities that may exist. I certify that the survey represented by this plan is correct to the best of my knowledge, Manitoba Land Surveyor OPERATOR : Client File No: SEGMENT: REV. AFE No: Survey Date : File : 158675PL-R1 Job: MEMBER 158675-V 1 LEGACY OIL + GAS INC. S03072 Placed Wooden Hub / Deflection Point show thus: PIPE SPECIFICATIONS Design Standard Pipe Material Pipe Type Pipeline from (LSD): Pipe Grade Max. Operating Pressure Nominal Pipe Size Internal Protection Joint Type kPa. O.D. mm. mm. W.T. Note: Pipeline to (LSD): Length km. Min. Ground Coverage ADDITIONAL COMMENTS Production processed at: (gas plant/battery) Location (LSD): STEM INFORMATION Normal Operating Pressure kPa. Material Being Conveyed Method of installation m. Altus Geomatics Toll Free: 1-800-465-6233 www.altusgeomaticsmb.com Manitoba PP PP PP PP Government Road (163W) Allowance Medium Grade Gravel Road 200.00 646.63 $= $= 544.420 291.327 Buried Telecom (MTS) in Vicinity 20.00m. R/W 20m. R/W Operator: EOG 20m. MTS Caveat No. 1114932/2 20.00m. R/W Buried Pipe Buried Telecom (MTS) in Vicinity X8 X9 X10 X11 X12 X13 X14 X15 X16 X17 X18 X19 X20 X21 X22 X23 X24 Gently Rolling Hayland Pasture Windrow Windrow Windrow Bush Abnd. 3-4 Windrow CAUTION ! Power Line +W P Flat Cropland CAUTION ! Power Line +W P AREA REQUIRED FOR TEMPORARY WORKSPACE: = 0.549 ha. (1.36 ac.) 4 (Not Constructed) (Not Constructed) Flat Cropland Flat Cropland Windrow Slough (Dry) Low Area Dry South Edge of Ravine Drainage X15 X15 C/L of Truck Trail 7.5x20m. Temp. Workspace 7.5x20m. Temp. Workspace Workspace 7.5x20m. Temp. Workspace Flat Cropland Flat Cropland Flat Cropland Flat Cropland Windrow Windrow Low Area (Seasonally Windrow Low Area (Dry) X21 Westman 1-2 (B/H 3-1) Operator: EOG 20m. R/W Operator: EOG Windrow Windrow Windrow Windrow Windrow Windrow Windrow Windrow Windrow Windrow 30.175 C. of T. 2590710/2 (Parcel 2) Owner: William Prescott Bird Owner: Audrey Jane BIrd 12.19m. MTS Caveat No. 85-9059/2 Buried Telecom (MTS) in Vicinity Overhead Power Line Operator: MB Hydro Shrubs Shrubs South Edge of Coulee North Edge of Coulee X25 X26 Overhead Power Line Operator: MB Hydro X22 X23 X24 X25 Overhead Power Line Operator: MB Hydro (Proposed - Power Poles only) OIL + GAS INC. Gainsborough Creek Gainsborough Creek Gainsborough Creek Gainsborough Creek DETAIL " " 25 m SCALE - 1:1,000 10 0 5 20 15 F Low Area (Dry) Fd. 0.025 Sq. I.B. Flat Cropland Flat Cropland Flat Cropland Flat Cropland Flat Cropland Flat Cropland Manitoba Land Surveyor 7 2 1 20.00m. R/W 30.175 (calc.) 30.175 (calc.) PIPE SPECIFICATIONS Design Standard Pipe Material Pipe Type Pipeline from (LSD): Pipe Grade Max. Operating Pressure Nominal Pipe Size Internal Protection Joint Type kPa. O.D. mm. mm. W.T. Note: Pipeline to (LSD): Length km. Min. Ground Coverage ADDITIONAL COMMENTS Production processed at: (gas plant/battery) Location (LSD): STEM INFORMATION Normal Operating Pressure kPa. Material Being Conveyed Method of installation m. Twp. 2 Twp. 2 Twp. 1 Twp. 1 Twp. 1 X27 X8 1/4 Line 1/4 Line 1/4 Line 1/4 Line 1/4 Line 1/4 Line 1/4 Line 1/4 Line 1/4 Line 1/4 Line 1/4 Line 1/4 Line 1/4 Line 1/4 Line 1/4 Line 1/4 Line 1/4 Line 157.86 (Tie Line) $= 156.588 Riser Site 30.175 X8 X7 X6 X5 X4 Twp. 2 Twp. 1 Twp. 2 Twp. 1 Twp. 2 Twp. 1 Twp. 2 Twp. 1 840.12 Manmade Drainage P :LGH P 'HHS Wet) 7.5m. Temp. Workspace 7.5m. Temp. Workspace 7.5m. Temp. Workspace 15.00 (calc.) 19.75 (calc.) Flat Cropland P :LGH Pasture MB Hydro 8.20 S.W. 1/4 Sec.2-2-28WPM AREA REQUIRED FOR R/W: = 1.620 ha. (4.00 ac.) 7.5x20m. Temp. Medium Grade Gravel Road 20.00 (calc.) Flat Cropland Flat Pasture Flat Cropland Pasture MB Hydro 9.00 Flat Cropland MB Hydro 7.50 MB Hydro 6.50 MB Hydro 8.10 $= EOG 1-4 (B/H 3-3) X26 X26 X25 X24 X23 X22 X29 X28 X27 X28 X29 Operator: MB Hydro Overhead Power Line 177.96 (Tie Line) 20.00m. R/W 20.00m. R/W 20.00m. R/W 25.00m. R/W 40.18 21.96 21.96 701.15 Twp. 2 Twp. 1 20.00 (calc.) 7.5m. Temp. Workspace 7.5m. Temp. Workspace 5m. Temp. Workspace 5m. Temp. Workspace 5m. Temp. Workspace 5m. Temp. Workspace 701.15 5m. Temp. Workspace 5m. Temp. Workspace 5m. Temp. Workspace 5m. Temp. Workspace 5m. Temp. Workspace 5m. Temp. Workspace 20.00m. R/W 5m. Temp. Workspace 5m. Temp. Workspace 7.5x20m. Temp. Workspace 7.5x20m. Temp. Workspace 75.00 Windrow 102.71 416.86 416.86 5m. Temp. Workspace Slough (Dry) (calc.) 30.175 7.5m. Temp. Workspace 22.00 95.08 212.51 308.31 308.31 5m. Temp. Workspace 15m. R/W Operator: EOG 20.00 (calc.) 20.00 (calc.) 17.55 (calc.) 5m. R/W Operator: EOG Buried Power Cable Buried Pipes (x2) 5m. Temp. Workspace 5m. Temp. Workspace 7.5m. Temp. Workspace 7.5m. Temp. Workspace DETAIL " " 25 m SCALE - 1:1,000 10 0 5 20 15 G 20.00m. R/W DETAIL " " SEE G EOG 1-4 (B/H 3-3) Low Area Dry Workspace 37m. Temp. 26.21 30.73 115.99 Pasture 122.26 20.00m. R/W 7.5m. Temp. Workspace 7.5m. Temp. Workspace Workspace 7.5m. Temp. 5m. Temp. Workspace 25m. Temp. Workspace 10.01 (calc.) 5m. Temp. Workspace 5m. Temp. Workspace Tank Legacy 1-3 (B/H 3-2) Windrow 5m. Temp. Workspace 5m. Temp. Workspace 20.00m. R/W W/H 1-3 (B/H 3-2) Buried Pipe Steel Berm Stairs Truck Load C/L Trail Chemical Stand Pump Jack Pad 20m. R/W Operator: EOG Buried Pipe DETAIL " " 25 m SCALE - 1:1,000 10 0 5 20 15 H DETAIL " " SEE H 60.01 50.00 156.47 14.28 122.26 14.28 120.02 156.47 Witness Legacy 1-3 5m. Temp. Workspace Riser Riser 20.00 (calc.) Twp. 2 Flat Cropland X30 102.71 X30 581.17 X30 R/W 20.00m.

MEMBER H E AS SOCIAT IO N O F KEN W. BALEY M A N I T O B ALANDSUR V E Y O R S MEMBER 33 1 - 28WPM 3 2 - 28WPM 2 2 - 28WPM 1 2 - 28WPM 36 1 - 28WPM 32 1 - 28WPM 4 2 - 28WPM 15m. R/W

  • Upload
    lydan

  • View
    213

  • Download
    0

Embed Size (px)

Citation preview

THE ASSOCIATION

OF

KEN W.BALEY

MA

NITOBA LAND SURVEY

ORS

M E M B E R

331 - 28WPM

32 - 28WPM 2

2 - 28WPM 12 - 28WPM

361 - 28WPM

321 - 28WPM

42 - 28WPM

15m. R/WPlan 52896 BLTO

15m

. R/W

Pla

n 52

896

BLT

O

15m. R/WOperator: Legacy

Legacy 9-32Battery Site

Legacy9-32

Flat

Cropland

Flat

Pasture

Flat

Cropland

EOG 4-1Battery Site

Abnd.13-33

618555 Sask 4-4(B/H 7-5)

EOG 6-4(B/H 9-4)

5m. R

/WO

pera

tor:

EO

GRoad Plan 20BOIS.DIV. - BLTO

Road Plan 20BOIS.DIV. - BLTO

20m

. MTS

Cav

eat

No.

111

5322

/2

12.19m. MTS CaveatNo. 63279BO/2

Fd. 0.025Sq. I.B.

Fd. 0.025Sq. I.B.

Fd. 0.025Sq. I.B.

Sq. I.B.Sq. I.B.

Sq. I.B.Sq. I.B.

Sq. I.B.

Fd. 0.025Sq. I.B.

Buried Telecom(MTS) in Vicinity

Buried Telecom(MTS) in Vicinity

AZ = 91°24'45"804.880

AZ = 1°34'15"

807.

953

AZ = 1°36'50"

846.

153

AZ = 1°32'45"194.105

AZ = 1°32'45"

612.

808

Fd. 0.025Sq. I.B.

EOG 14-33(B/H 16-33)

5m. R/WOperator: EOG

804.802AZ = 91°26'50"

730.930AZ = 91°27'10"

Legacy 2-4(B/H 4-4)

5m. R/WOperator: EOG

20m

. MTS

Cav

eat

No.

111

5674

/2

20m. MTS CaveatNo. 1115674/2 5m

. R/W

Ope

rato

r: E

OG

Buried Telecom(MTS) in Vicinity (x2)

Overhead Power LineOperator: MB Hydro

PPPP

PP

PP

Buried Telecom(MTS) in Vicinity (x2)

Overhead Power LineOperator: MB Hydro

20m

. MTS

Cav

eat

No.

111

5323

/2

EOG 8-4(B/H 7-3)

5m. R/WOperator: EOG

15m. R/WOperator: EOG

EOGRiser Site

20m

. R/W

Ope

rato

r: EO

G

Operator: Legacy

Ope

rato

r: Le

gacy

Parcel APlan 36266 BLTO

AZ = 91°27'40"680.308

6

34

57 8

126

3

57 8

126

34

58

6

34

5

11

14

10

15 16

91112

13 14

Government Road (6N) AllowanceMedium Grade Gravel Road

Twp. 2

Twp. 1Government Road (6N) Allowance

Medium Grade Gravel RoadGovernment Road (6N) Allowance Medium Grade Gravel Road

Government Road (6N) AllowanceMedium Grade Gravel Road

Government Road (6N) AllowanceMedium Grade Gravel Road

Government Road (6N) AllowanceMedium Grade Gravel Road

Gov

ernm

ent R

oad

(165

W) A

llow

ance

Gov

ernm

ent R

oad

(166

W) A

llow

ance

Gov

ernm

ent R

oad

(163

W) A

llow

ance

Med

ium

Gra

de G

rave

l Roa

dG

over

nmen

t Roa

d (1

63W

) Allo

wan

ceM

ediu

m G

rade

Gra

vel R

oad

350°18'50"197.89 (Tie Line)

91°32'45"38.54

30.175(calc.)

85.4691°32'45"

14.28

61°27'1

5"

14.2

831°27'05"

1°27'10"

593.

42

120.0291°37'25" 138.40

91°37'25"

26.29

62°48'4

0"

48.1

034°00'00"

35.09

62°42'1

5"

94.6191°24'20"

91°11'00"

73°49'10"

311.70

91°33'55"200.00 91°33'55"

646.63121°33'45"

23.90

151°33'45"25.00

256.

50181°27'40"

20.00181°27'40"

(calc.)

309.93

(B/H 3-2)

20m. R/WOperator: EOG

20m

. R/W

Opera

tor:

EOG

Overhead Power LineOperator: MB Hydro

20m

. R/W

Ope

rato

r: E

OG

20m

. R/W

Ope

rato

r: E

OG

Fd. 0.025Fd. 0.025

Sq. I.B.Fd. 0.025Sq. I.B.

Fd. 0.025

837.221AZ = 91°23'45" 805.075

AZ = 91°23'45"

20m

. MTS

Cav

eat

No.

113

6596

/2

20m

. MTS

Cav

eat

No.

113

6596

/2

C. of T. 2318595/2Owner: D.C. Gardiner Ltd.

N.E. 1/4 Sec.32-1-28WPMAREA REQUIRED FOR R/W:

Within Battery Site 9-32 = 0.077 ha. (0.19 ac.)Without Above = 0.000 ha. (0.00 ac.)

Total = 0.077 ha. (0.19 ac.)

N.W. 1/4 Sec.33-1-28WPMAREA REQUIRED FOR R/W:

= 1.387 ha. (3.43 ac.)AREA REQUIRED FOR TEMPORARY WORKSPACE:

= 0.377 ha. (0.93 ac.)

194.

105

AZ = 1°32'45"Legacy 9-32

Battery Site

Legacy9-32

MTSPedistal

PP

PP

12.19m. MTS CaveatNo. 63279BO/2

Bur

ied

Tele

com

(MTS

) in

Vic

inity

612.

808

AZ = 1°32'45"

593.

421°27'10"

20.00m.R/W

Win

dorw

20.0

0m.

R/W

Gov

ernm

ent R

oad

(166

W) A

llow

ance

Med

ium

Gra

de G

rave

l Roa

d Low Area(Dry)

X1

X2

X3

CAUTION !

Power Line(Ht=± m.)PP

PP

PP

PP

Overhead Power LineOperator: MB Hydro

7.5x20m. Temp.Workspace

7.5x20m. Temp.Workspace

20.00m.R/W

Low Area(Dry)

Low Area(Dry)

Fd. 0.025Sq. I.B.

Gov

ernm

ent R

oad

(166

W) A

llow

ance

Med

ium

Gra

de G

rave

l Roa

dM

ediu

m G

rade

Gra

vel R

oad

Flat

Pasture

103.983AZ = 91°27'10"

PP

1°27'10"593.42

Win

dorw

Fd. 0.025Sq. I.B.

Bush

PP

20.00m.R/W

20m

. MTS

Cav

eat

No.

111

5322

/2

12.19m. MTS CaveatNo. 63279BO/2

Buried Telecom(MTS) in Vicinity

612.

808

AZ = 1°32'45"

730.930AZ = 91°27'10"

Buried Telecom(MTS) in Vicinity

Overhead Power LineOperator: MB Hydro

Government Road (6N) AllowanceMedium Grade Gravel Road

Overhead Power LineOperator: MB Hydro

Gov

ernm

ent R

oad

(166

W) A

llow

ance

Med

ium

Gra

de G

rave

l Roa

d

Buried Telecom(MTS) in Vicinity

20m

. MTS

Cav

eat

No.

111

5674

/2

7.5x20m. Temp.Workspace 7.5x20m. Temp.

Workspace

Government Road (6N) Allowance Medium Grade Gravel Road

S.W. 1/4 Sec.4-2-28WPMAREA REQUIRED FOR R/W:

= 1.478 ha. (3.65 ac.)AREA REQUIRED FOR TEMPORARY WORKSPACE:

= 0.427 ha. (1.06 ac.)

S.E. 1/4 Sec.4-2-28WPMAREA REQUIRED FOR R/W:

Within Well Site 2-4 (B/H 4-4) = 0.130 ha. (0.32 ac.)Without Above = 1.947 ha. (4.81 ac.)

Total = 2.077 ha. (5.13 ac.)

Legacy 2-4(B/H 4-4)

Buried Power C

able

W/H 2-4(B/H 4-4)

Pump JackPad

PowerPanel

SteelBerm

BermTank

BuriedPipe

Stairs

Berm

X3X2X1

X4

X5

X6

X7

30.1

75(c

alc.

)

20.0

0m.

R/W

287.

275

AZ = 1°37'25"

553.

709

AZ = 1°37'25"

287.

275

AZ = 1°37'25"

553.

709

5m. T

emp.

Wor

kspa

ce

7.5m. Temp.

Workspace

7.5m

. Tem

p.W

orks

pace

7.5x20m. Temp.Workspace

7.5x20m. Temp.Workspace

7.5x20m. Temp.Workspace

7.5x20m. Temp.Workspace

20m

. R/W

Ope

rato

r: E

OG

20m

. R/W

Ope

rato

r: E

OG

C. of T. 1688942/2Owner: Llewellyn John George Allen

C. of T. 2478130/2Owner: Michel Glenn McNish

Owner: Donna Jennifer McNish

C. of T. 2478129/2Owner: Robert Brian McNish

Owner: Lorraine Rose McNish

S.W. 1/4 Sec.3-2-28WPMAREA REQUIRED FOR R/W:

= 1.900 ha. (4.69 ac.)

S.E. 1/4 Sec.3-2-28WPMAREA REQUIRED FOR R/W:

Within Well Site 1-3 (B/H 3-2) = 0.281 ha. (0.69 ac.)Without Above = 1.414 ha. (3.49 ac.)

Total = 1.695 ha. (4.18 ac.)AREA REQUIRED FOR TEMPORARY WORKSPACE:

= 0.375 ha. (0.93 ac.)AREA REQUIRED FOR TEMPORARY WORKSPACE:= 0.738 ha. (1.82 ac.)

C. of T. 2141481/2 (Parcel 1)Owner: Robert Brian McNishOwner: Loraine Rose McNish

Overhead Power LineOperator: MB Hydro

Buried Telecom(MTS) in Vicinity

12.19m. MTS CaveatNo. 85-9059/2

30.1

75 G

over

nmen

t Roa

d (1

65W

) Allo

wan

ce

Med

ium

Gra

de G

rave

l Roa

d

PP

Buried Pipe

X9X10

Government Road (6N) Allowance Medium Grade Gravel Road

X13X12X11

X11

X12

X13

X14

X16

X14

X16

X20X19X18X17

91°11'00"

Fd. 0.025

20m

. R/W

Ope

rato

r: E

OG

20m

. R/W

Ope

rato

r: E

OG 840.436

AZ = 91°27'35"

5m. R/WOperator: EOG

618555 Sask 12-36(B/H 10-35)

EOG 11-36(B/H 9-36)

13

12

20m. R/WOperator: EOG

20m

. R/W

Ope

rato

r: E

OG

EOG 14-26

Fd. 0.025

PP

Low Area(Dry)

Low Area(Dry)Low Area

(Dry)

PPPP

7.5x20m. Temp.Workspace

7.5x20m. Temp.Workspace

CAUTION !

Power Line(Ht=± m.)

20.0

0m.

R/W

Fd. 0.025Sq. I.B.

AZ = 1°33'55"

AZ = 1°33'55"

544.

420

291.

327

S.W. 1/4 Sec.1-2-28WPMAREA REQUIRED FOR R/W:

= 1.751 ha. (4.33 ac.)AREA REQUIRED FOR TEMPORARY WORKSPACE:

= 0.473 ha. (1.17 ac.)

PP

PP

PP

15m. R/WOperator: EOG

N.W. 1/4 Sec.36-1-28WPMAREA REQUIRED FOR R/W:

Within Riser Site 14-36 = 0.040 ha. (0.10 ac.)Without Above = 0.000 ha. (0.00 ac.)

Total = 0.040 ha. (0.10 ac.)

30.1

7530

.175

30.1

75

30.1

75

30.1

75

30.1

75

30.1

75

30.1

75

30.1

75

30.175

30.17530.175

30.17530.175

30.17530.175Fd. 0.025

30.175

30.1

75

30.175

C. of T. 2446072/2 (Parcel 2)Owner: Arlyn George FletcherOwner: Gloria Jean Fletcher

C. of T. 2008916/2Owner: James Claire ClarkOwner: Patricia Diane Clark

EOG 5-1(B/H 11-2)

Overhead Power LineOperator: MB Hydro(Proposed - Power Poles only)

TIE IN

5m. R

/WO

pera

tor:

EO

G

5m. R/WOperator: EOG

Buried Telecom(MTS) in Vicinity (x2)

C. of T. 2349502/2Owner: Raymond Harvey Clark

Owner: Penny Ann Clark

20m. MTS CaveatNo. 1114932/2

20m

. MTS

Cav

eat

No.

111

4932

/2

5m. R/W

EOG1-2

20m

. R/W

Ope

rato

r: E

OG

20m

. R/W

Ope

rato

r: E

OG

AZ = 91°27'35"806.697

20m

. R/W

Ope

rato

r: E

OG

Buried Telecom(MTS) in Vicinity (x2) Buried Telecom

(MTS) in Vicinity (x2) Buried Telecom(MTS) in Vicinity (x2)

Overhead Power LineOperator: MB Hydro

Buried Telecom(MTS) in Vicinity (x2)

Gov

ernm

ent R

oad

(164

W) A

llow

ance

20m. MTS CaveatNo. 1122907/2

20m

. MTS

Cav

eat

No.

111

5325

/2

20m

. MTS

Cav

eat

No.

111

5324

/2

20m

. MTS

Cav

eat

No.

111

5697

/2

S.E. 1/4 Sec.2-2-28WPMAREA REQUIRED FOR R/W:

= 1.643 ha. (4.06 ac.)AREA REQUIRED FOR TEMPORARY WORKSPACE:

= 0.431 ha. (1.07 ac.)

C. of T. 2071946/2Owner: James Claire ClarkOwner: Patricia Diane Clark

Riser SiteEOG 4-2

20.00m.

R/W

20.0

0m.

R/W

AREA REQUIRED FOR TEMPORARY WORKSPACE:= 0.425 ha. (1.05 ac.)

AZ = 1°38'10"191.687

AZ = 1°38'10"

644.

639

Med

ium

Gra

de G

rave

l Roa

d

96°13'35"60.01

50.0091°38'10"

Legacy 1-3(B/H 3-2)

Overhead Power LineOperator: MB Hydro

Buried Telecom(MTS) in Vicinity

Gov

ernm

ent R

oad

(164

W) A

llow

ance

20m. MTS CaveatNo. 1122907/2

AZ = 1°38'10"

191.

687

AZ = 1°38'10"

644.

639 B

urie

d Te

leco

m(M

TS) i

n V

icin

ity

7.5x20m. Temp.Workspace

7.5x20m. Temp.Workspace

7.5x

20m

. Tem

p.W

orks

pace

20.0

0m.

R/W

20.0

0m.

R/W

840.1291°11'00"

7.5x

20m

. Tem

p.W

orks

pace

30.175

CAUTION !

Power Line(Ht=± m.)

Med

ium

Gra

de G

rave

l Roa

d

X17

X18

X19

X20

30.175

30.175

30.175

30.1

75

DETAIL " "SEE

A

DETAIL " "SEE

B

DETAIL " "SEE

C

DETAIL " "SEE

D

DETAIL " "SEE

E

DETAIL " "SEE

F

DETAIL " "25 m

SCALE - 1:1,000100 5 2015

A

DETAIL " "25 m

SCALE - 1:1,000100 5 2015

BDETAIL " "25 m

SCALE - 1:1,000100 5 2015

C

DETAIL " "25 m

SCALE - 1:1,000100 5 2015

D

DETAIL " "25 m

SCALE - 1:1,000100 5 2015

E

Pierson Area

Twp. 2 - Rge. 28 WPM

2012Rural Municipality of Edward

Twp. 1 - Rge. 28 WPM

N.E. 1/4 Sec. 32,

CONSTRUCTION PLANRIGHT-OF-WAY

IN

of

DATEREVISIONSNO.

N.W. 1/4 Sec. 33 & N.W. 1/4 Sec. 36

from 9-32-1-28WPM (battery site) to 14-36-1-28WPM (riser site)

S.W. 1/4 Sec. 1, S. 1/2 Sec. 2,&

S. 1/2 Sec. 3 & S. 1/2 Sec. 4

Description

X1No. StatusDrawing

X2X3X4X5X6X7

Location

Scale - 1 : 5000

0 50 100 200 300 400 500m

INITIALS

0 Issued CM - TJC - PFS Nov. 15, 2012

1 Revised R/W Route (S.1/2 Sec. 3 & S.1/2 Sec.4) DS/CM - CMF - PFS Dec. 20, 2012

Right - of - Way boundary shown thus:

- Right-of-way to be filed is 20.00 metres in perpendicular width throughout unless shown otherwise.

Total length of right-of-way along posted boundary :Crossings associated with this drawing:

Crossing plans required :

km7.033027

NOTES

DISCLAIMER:

* The revision stated in the Status column refers to the Construction Plan revision.

LEGEND

- Azimuths are grid and are referred to UTM projection, NAD 83 (Zone 14) datum and are derived by G.N.S.S.

Marker Posts shown thus:

Found Survey Monuments shown thus:Mp.

Counter Sunk Posts shown thus: c.s.

- All Marker Posts placed are 0.3 metres inside the GRA unless shown otherwise

This plan represents the best information available at the time of survey. Altus Geomatics Manitoba and its employees take noresponsibility for the location of any underground pipes, conduits, or facilities, whether shown on or omitted from this plan.Facilities shown on this plan are for informational purposes only. prior to any construction on lease or access road, LEGACYOIL + GAS INC. , MTS Communications Inc., Manitoba Hydro, and Manitoba Hydro-Gas Operations MUST be contacted forlocation of any underground facilities that may exist.

I certify that the survey represented by thisplan is correct to the best of my knowledge,

Manitoba Land Surveyor

OPERATOR :

Client File No: SEGMENT: REV.

AFE No:

Survey Date :

File : 158675PL-R1 Job:MEMBER

158675-V

1

LEGACY OIL + GAS INC.

S03072

Placed Wooden Hub / Deflection Point show thus:

PIPE SPECIFICATIONS

Design Standard

Pipe Material

Pipe Type

Pipeline from (LSD):

Pipe Grade

Max. Operating Pressure

Nominal Pipe Size

Internal Protection

Joint Type

kPa.

O.D. mm.

mm.W.T.

Note:

Pipeline to (LSD):

Length km.

Min. Ground Coverage

ADDITIONAL COMMENTSProduction processed at: (gas plant/battery) Location (LSD):

STEM INFORMATION

Normal Operating Pressure kPa.

Material Being Conveyed Method of installation

m.

Altus GeomaticsToll Free: 1-800-465-6233

www.altusgeomaticsmb.com

Manitoba

PP

PP

PP

PP

Gov

ernm

ent R

oad

(163

W) A

llow

ance

Med

ium

Gra

de G

rave

l Roa

d

200.0091°33'55" 646.63

91°33'55"

AZ = 1°33'55"

AZ = 1°33'55"

544.

420

291.

327

Bur

ied

Tele

com

(MTS

) in

Vic

inity

20.0

0m.

R/W

20m. R/WOperator: EOG

20m. MTS CaveatNo. 1114932/2

20.0

0m.

R/W

Bur

ied

Pip

e

Bur

ied

Tele

com

(MTS

) in

Vic

inity

X8X9

X10X11X12X13X14X15X16X17X18X19X20X21X22X23X24

Gently

Rolling

Hayland

Pasture

WindrowWindrow

Windrow

Bush

Abnd.3-4

Windrow

CAUTION !

Power Line(Ht=± m.)

Flat

Cropland

CAUTION !

Power Line(Ht=± m.)

AREA REQUIRED FOR TEMPORARY WORKSPACE:= 0.549 ha. (1.36 ac.)

4

(Not Constructed)

(Not

Con

stru

cted

)

Flat

Cropland

Flat

Cropland

Windrow

Slough(Dry)

Low AreaDry South Edge

of Ravine

Drainage

X15

X15

C/L of TruckTrail

7.5x20m. Temp.Workspace

7.5x20m. Temp.Workspace

Workspace

7.5x20m. Temp.Workspace

Flat

CroplandFlat

Cropland

Flat

Cropland

Flat

Cropland

Windrow Windrow

Low Area(Seasonally

Windrow

Low Area(Dry)

X21

Westman 1-2(B/H 3-1)

Operator: EOG

20m. R/WOperator: EOG

Windrow

Windrow

Windrow

WindrowWindrow

Windrow

Windrow

WindrowWindrow

Windrow

30.175

C. of T. 2590710/2 (Parcel 2)Owner: William Prescott Bird

Owner: Audrey Jane BIrd

12.19m. MTS CaveatNo. 85-9059/2

Buried Telecom(MTS) in Vicinity

Overhead Power LineOperator: MB Hydro

Shrubs Shrubs

South Edgeof Coulee North Edge

of Coulee

X25X26

Overhead Power LineOperator: MB Hydro

X22X23

X24

X25

Overhead Power LineOperator: MB Hydro(Proposed - Power Poles only)

OIL + GAS INC.

GainsboroughCreek

Gainsborough

Creek

Gainsborough

Creek

Gainsborough

Creek

DETAIL " "25 m

SCALE - 1:1,000100 5 2015

F

Low Area(Dry)

Fd. 0.025Sq. I.B.

Flat

Cropland

Flat

Cropland

Flat

Cropland

Flat

Cropland

Flat

Cropland

Flat

Cropland

Manitoba Land Surveyor

7

2 1

20.0

0m.

R/W

30.175(calc.)

30.175(calc.)

PIPE SPECIFICATIONS

Design Standard

Pipe Material

Pipe Type

Pipeline from (LSD):

Pipe Grade

Max. Operating Pressure

Nominal Pipe Size

Internal Protection

Joint Type

kPa.

O.D. mm.

mm.W.T.

Note:

Pipeline to (LSD):

Length km.

Min. Ground Coverage

ADDITIONAL COMMENTSProduction processed at: (gas plant/battery) Location (LSD):

STEM INFORMATION

Normal Operating Pressure kPa.

Material Being Conveyed Method of installation

m.

Twp. 2

Twp. 2

Twp. 1

Twp. 1

Twp. 1

X27

X8

1/4 Line1/4 Line

1/4 Line

1/4 Line

1/4 Line

1/4 Line

1/4 Line

1/4 Line

1/4 Line

1/4 Line

1/4

Line

1/4

Line

1/4

Line

1/4

Line

1/4

Line

1/4

Line

1/4

Line

157.86 (Tie Line)

84°10'50"

AZ = 91°27'40"156.588

Riser Site

30.175

X8X7X6X5X4

Twp. 2

Twp. 1Twp. 2

Twp. 1Twp. 2

Twp. 1

Twp. 2

Twp. 1

840.12

ManmadeDrainage

(±3m. Wide)(±1m. Deep)

Wet)

7.5m

. Tem

p.W

orks

pace

7.5m

. Tem

p.W

orks

pace7.5m

. Temp.

Workspace

15.0

0(c

alc.)

19.75(calc.)

Flat

Cropland(±6m. Wide)

Pasture

MB Hydro

8.20

S.W. 1/4 Sec.2-2-28WPMAREA REQUIRED FOR R/W:

= 1.620 ha. (4.00 ac.)

7.5x20m. Temp.

Med

ium

Gra

de G

rave

l Roa

d

20.00(calc.)

Flat

Cropland

Flat

Pasture

Flat

Cropland

Pasture

MB Hydro

9.00

Flat

Cropland

MB Hydro

7.50

MB Hydro

6.50

MB Hydro

8.10

AZ = 1°37'25"

EOG 1-4(B/H 3-3)

X26

X26X25X24X23X22

X29X28X27

X28X29

Operator: MB HydroOverhead Power Line

216°47'00" 177.96 (Tie Line)

20.0

0m.

R/W

20.00m.R/W

20.0

0m.

R/W

25.00m.

R/W

1°27'10"

40.1

831°27'10"

21.9

6

61°27'1

0"

21.96

91°27'10"701.15

Twp. 2

Twp. 1

20.00(calc.)

7.5m. Tem

p.

Workspace

7.5m. Temp.Workspace

5m. Temp.Workspace

5m. Temp.Workspace

5m. Temp.Workspace

5m. T

emp.

Wor

kspa

ce

91°27'10"701.15

5m. T

emp.

Wor

kspa

ce

5m. T

emp.

Wor

kspa

ce

5m. T

emp.

Wor

kspa

ce

5m. T

emp.

Wor

kspa

ce

5m. T

emp.

Wor

kspa

ce

5m. Temp.Workspace

20.0

0m.

R/W 5m

. Tem

p.W

orks

pace

5m. T

emp.

Wor

kspa

ce

7.5x20m. Temp.Workspace

7.5x20m. Temp.Workspace

1°26'50"

75.0

0

Windrow

102.7191°26'50"

91°26'50"416.86

416.8691°26'50"

5m. T

emp.

Wor

kspa

ce

Slough(Dry)

(calc.)30.175

7.5m. Temp.

Workspace

121°24'20"22.00

95.08

161°24'20"

91°23'45"212.51

124°00'00"308.31

308.31124°00'00"

5m. Temp.

Workspace

15m. R/WOperator: EOG

20.00

(calc.)

20.00

(calc.)

17.55

(calc.)

5m. R/WOperator: EOG

Buried PowerCable

Buried Pipes (x2)

5m. Tem

p.

Workspace

5m. Tem

p.

Workspace7.5m

. Temp.

Workspace

7.5m. Tem

p.

Workspace

DETAIL " "25 m

SCALE - 1:1,000100 5 2015

G

20.00m.

R/W

DETAIL " "SEE

G

EOG 1-4(B/H 3-3)

Low AreaDry

Workspace

37m. Tem

p.

26.2

131°26'45"

30.73

45°54'40"

115.99

75°54'40"

Pasture

122.

261°26'50"

20.00m.

R/W

7.5m. Tem

p.

Workspace

7.5m. Tem

p.

Workspace

Workspace

7.5m. Tem

p.

5m. T

emp.

Wor

kspa

ce

25m

. Tem

p.W

orks

pace

10.01(calc.)

5m. T

emp.

Wor

kspa

ce

5m. T

emp.

Wor

kspa

ce

Tank

Legacy 1-3(B/H 3-2)

Windrow

5m. Temp.

Workspace

5m. T

emp.

Wor

kspa

ce

20.00m.

R/W

W/H 1-3(B/H 3-2)

BuriedPipe Steel

Berm

StairsTruck Load

C/L Trail

ChemicalStand

Pump JackPad

20m

. R/W

Ope

rato

r: E

OG

Buried Pipe

DETAIL " "25 m

SCALE - 1:1,000100 5 2015

H

DETAIL " "SEE

H

96°13'35"60.01

50.0091°38'10"

48°21'25"

156.47

31°26'50"14.28

1°26'50"122.26

61°26'50"14.28

91°37'25"120.02

48°21'25"156.47

Witness

Legacy 1-3

5m. T

emp.

Wor

kspa

ce

RiserRiser

20.00(calc.)

Twp. 2

Flat

Cropland

X30

91°26'50"102.71

X30

91°23'45"581.17

X30

R/W

20.0

0m.