Story so far… Current context
• 43 bnboe recovered
• Up to 20 bnboe remaining
• 1.6 mmboed in 2015
• £11.6bn capex in 2015
• £338bn production tax to date
• £35bn supply chain revenue pa
• Regarded as a mature basin
• Ageing infrastructure
• Diverse investors
• Low levels of exploration
• Reducing operating costs
• Improving production efficiency
OGA focus is strategic and prioritized to MERUK
About the OGA
1
PROTECTIVE MARKING (as appropriate)
Building the OGA
Q2 16 Q1 16 Dec Nov Oct Sept Aug July
Establish DECC OGA sponsor team
June 15
Lay Levy Regulations before Parliament
Publish MER UK Strategy consultation
Lay MER UK Strategy before Parliament
Introduce Levy
Introduce Energy Bill into House of Lords
Energy Bill Committee Stage
Energy Bill 3rd reading in House of Lords
Energy Bill Royal Assent
12.05.2016
Energy Bill MER UK Strategy
Energy Bill 2nd reading in
House of Commons
MERUK Strategy & Energy Bill approved
DECC
EDU
LED
Historically From 1 April 3Q 2016
OGA
Executive Agency
(Civil Service)
DECC
OGA
Independent
Authority
DECC
Fra
me
wo
rk
Do
cu
me
nt
En
erg
y B
ill
20
15
Q2 16
Governance
Q2 16 Q1 16
Q2 16
Q3 16
Independent Authority
MER UK Strategy 18.03.2016
Q2 16 Q1 16
2
PROTECTIVE MARKING (as appropriate)
5.0
0
1.5
Oil mmbo/d
Gas mmboe/d
1973 2022 2015
Produced Reserves
CNS
NNS
SNS
IS
WOS
43bnboe
Upside
OGA Data Base
Production increased in 2015 due to new developments & improved PE
3
PROTECTIVE MARKING (as appropriate) Cost & Production Efficiency
Significant improvements in increasing production & managing costs
1970 2015
1.6 mmboe/day
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
1970 2016
Majors Others
Production
Production Efficiency
L
ifti
ng
Co
st
$/b
oe
2015 UKCS Average $21/boe
29.3 21.0 17.0
L
ifti
ng
Co
st
$/b
oe
2016 UKCS
Target $15/boe
P
rod
ucti
on
mm
bo
e/d
4
OGA Data Base
Production Lifting Costs
PROTECTIVE MARKING (as appropriate)
Culzean
Mariner
Solan
Scolty/
Crathes
Kraken
Conwy
Cygnus
Catcher Stella/
Harrier
Western
Isles
Clair Ridge
Edradour/
Glenlivet
Laggan
Tormore
Schiehallion/
Loyal
ETAP
Flyndre/
Cawdor
Cayley/ Shaw
Developed & Sanctioned Reserves
CNS
NNS
WOS
SNS
6.5bnboe
More than 300,000 boepd under development
OGA Data Base
5
PROTECTIVE MARKING (as appropriate) Project Timing & CAPEX
50%
100%
150%
200%
250%
300%
350%
-1.0 -0.5 0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5
CAPEX compared with FDP
Tim
ing
co
mp
are
d w
ith
FD
P
Current Projects
Completed Projects
350%
3.5
-50%
Completed projects 40% over budget and 75% delivered late
OGA Data Base
6
PROTECTIVE MARKING (as appropriate)
NNS
WOS
SNS
CNS
4.4 bnboe
OGA Monthly Performance Pack 2015
Unsanctioned Resources
Technology and cost reduction will unlock value
OGA Data Base
Reserv
es m
mb
oe
Producing fields
Ongoing developments
Currently locked fields WOS
10 pools
SMALL POOLS TOTAL
More than 210 pools
(1 – 1.6 bnboe resources)
MORAY FIRTH
46 pools
CNS
69 pools
NNS
34 pools
SNS
40 pools
EIS
9 pools
7
PROTECTIVE MARKING (as appropriate) Small Pools Initiative
Industry & OGA Small Pools task group working issue
Spooled pipe products
Mechanical/Grouted
Hot tap tees
Subsea fluid
injection skid
Steel /Composite spooled pipe
8
Technology Application SNS Cluster Pilot
PROTECTIVE MARKING (as appropriate)
OGA Monthly Performance Pack 2015
Significant additional potential in mature areas
Mature Yet-to-Find
c
NNS
WOS
SNS
OGA Data Base
CNS
NNS
WOS
SNS
Number of Wells
NNS
CNS
WOS
SNS
9 bnboe
9
PROTECTIVE MARKING (as appropriate)
Appraisal Wells
Exploration Wells
Mature Exploration
Requirement to stimulate infrastructure led exploration
OGA Data Base
In Year Discovered & Sanctioned Reserves (mmboe)
Sanctioned
Discovered
Production (mmboe) 2
01
6
20
17
• High well cost, mis-alignment &
lack of funding are key issues
• Well cost reduction being worked
• OGA working exploration hub
approach & improving alignment
• Active engagement of investors
• Industry looking at setting up 3D
seismic group shoots
• Discussions ongoing with
government
10
PROTECTIVE MARKING (as appropriate)
OGA Competition to Define Potential
• £1m prize money shared between 2015 & 2016
for best project and interpretation
New World-Class Visualization Facility
• £700,000 funding Lyell Centre in Edinburgh which
is a JV between BGS and Herriot Watt University
Post-Doctoral Appointments
• £750,000 for three post-doctoral appointments
in geoscience and reservoir engineering
2015 & 2016 Seismic Acquisition Programs
• £40m UK government funding seeking to promote
underexplored areas of UKCS
The UKCS North Sea has both mature and frontier potential
Frontier Exploration 11
PROTECTIVE MARKING (as appropriate)
OGA Monthly Performance Pack 2015
• Update cost estimates & share plan and demand profile
• Demand-led profile to develop low cost capability & capacity
• Develop new business and contracting models for decommissioning
• Scope programme & secure technology funding
• Identify optimal policy and regulatory conditions
Decommissioning
Avoid premature decommissioning and improve cost efficiency
OGA Data Base
12
PROTECTIVE MARKING (as appropriate)
Improving Asset Stewardship
Develop Stewardship Expectations
Exploration &
Appraisal
Major Projects &
Developments Licencing
Reservoir
Management
Base Management
Technology
Late Life
Decommission
Information Management
Improving Efficiency & Performance to deliver MERUK
Framework
2016 2017
Interviews Strategy Survey Reviews Benchmark Survey Coach
Benchmarking
Expectations
Reviews
Surveys
13
PROTECTIVE MARKING (as appropriate)
• OGA working closely with Industry & Government
to deliver MERUK
OGA Monthly Performance Pack 2015
Key Messages
Considerable potential still exists in UKCS & open for business
• Considerable progress has been made ranging
from exploration to decommissioning
• OGA beginning to develop plans and regional
models to underpin MERUK strategy
• Collaboration exists but behaviours and commercial
complexity are causing drag
14