Liam Newcombe BCS Data Centre Specialist Group - Secretary. Towards Low Carbon ICT Simulating the Financial and Environmental Costs of Operating a Data Centre. Towards Low Carbon ICT. Recognising the Problem IT Devices The Data Centre DCSG Data Centre Model Lessons Learned. - PowerPoint PPT Presentation
Citation preview
Liam NewcombeBCS Data Centre Specialist Group - Secretary
Towards Low Carbon ICT Simulating the Financial and
Environmental Costs of Operating a Data Centre
Recognising the Problem
IT Devices
The Data Centre
DCSG Data Centre Model
Lessons Learned
Towards Low Carbon ICT
Recognising the Problem
Towards Low Carbon ICT
Two Kinds of Energy Use
Recognising the Problem
In Use Energy• Power Drawn by
Device• Data Centre
Overheads
Embedded Energy• Manufacturing• Distribution• Packaging• Disposal
Recognising the Problem
Drivers for Green Computing• Initially about Financial Costs
– Cheap IT kit against the Rising Cost of Power– Cost of M&E Exceeds Both
• Counting the Cost of Carbon– EU ETS, Cap and Trade / Offset Cost– Corporate Social Responsibility / Brand Value
• Choosing the ‘Lowest Cost’ Solution– Lowest overall cost = £ + £(CO2)
Recognising the Problem - Technology
Power Loss Chain Power Station – Data Centre
95% 2.5%
2.5%
Transmission Losses
Transformer Losses
Data Centre
100%Power Station Output
Power Station
Data Centre
95% of Power Station Power
Recognising the Problem - TechnologyPower Loss Chain
Data Centre - Equipment
95% 2.5%
2.5%
Transmission Losses
Transformer Losses
Data Centre
40% 25% 35%Cooling LossesPower Infrastructure LossesIT Equipment
38% of Power Station Power
Data Centre
Equipment
Recognising the Problem - TechnologyPower Loss Chain
Data Centre - Servers
95% 2.5%
2.5%
Transmission Losses
Transformer Losses
Data Centre
40% 25% 35%Cooling LossesPower Infrastructure LossesIT Equipment
25% of Power Station Power
65% 20% 15%Network Equipment
Storage Equipment
Servers
Data Centre
Equipment
Servers
Recognising the Problem - TechnologyPower Loss Chain - Data Centre - CPU
95% 2.5%
2.5%
Transmission Losses
Transformer Losses
Data Centre
40% 25% 35%Cooling LossesPower Infrastructure LossesIT Equipment
7.5% of Power Station Power
65% 20% 15%Network Equipment
Storage Equipment
Servers
30% 45% 25%Power Supply
Other Components
CPU
Data Centre
Equipment
Servers
CPU
Recognising the Problem - TechnologyPower Loss Chain - Data Centre – CPU Used
95% 2.5%
2.5%
Transmission LossesTransformer Losses
Data Centre
40% 25% 35%Cooling LossesPower Infrastructure LossesIT Equipment
1.5% of Power Station Power
65% 20% 15%Network Equipment
Storage Equipment
Servers
30% 45% 25%Power Supply
Other Components
CPU
20% 80%Idle Time Power
CPU Load Power
Data Centre
Equipment
Servers
CPU
CPU Utilisation
Recognising the Problem - TechnologyPower Loss Chain – Fossil Fuel – CPU Used
95% 2.5%
2.5%
Transmission LossesTransformer LossesData Centre
40% 25% 35%Cooling LossesPower InfrastructureIT Equipment
0.5% of Fossil Fuel Energy
65% 20% 15%Network EquipmentStorage EquipmentServers
30% 45% 25%Power SupplyOther ComponentsCPU
20% 80%Idle Time Power
CPU Load Power
35% 65% Heat ExhaustedElectricity GeneratedFossil Fuel
Data Centre
Equipment
Servers
CPU
CPU Utilisation
What Programs Already Exist? • BCS Carbon Footprint Working Group• The Green Grid• EU Data Centre Code of Conduct• US Dept. of Energy / Energy Star • Too Many Others to List
Recognising the Problem - Programs
Recognising the Problem - Metrics
Energy
Delivered IT Services
Fixe
d an
d Pr
opor
tiona
l
DC
iE /
PUE
Dat
a C
ente
r Pr
oduc
tivity
Use
ful W
ork
Per B
usin
ess
Proc
ess
/ Ser
vice
Acc
ount
ing
Reporting Metrics
Whole Building
Expose the Issue
Apply Targets
Create Incentive to Change
Analysis Metrics
Detailed Breakdown
Why is my IT Inefficient?
How do I Change?
Should I buy Product X?
How much £/CO2 will I Save?
Publicise and Measure Understand and Improve
Target Demand as well as Supply
Recognising the Problem
Existing Metrics• Target IT Department• Little Control• Sell Changes to the
Business
BCS Approach• Per Service
Accounting• Target Demand• Compare Cost with
Delivered Value
IT Devices
Towards Low Carbon ICT
IT Devices
Server Workloads
Typical Utilisation of Servers
Sleep 20.0 40.0 60.0 80.0 100.0
Percent Load
Prop
ortio
n
Single Server
Virtualised Server
Grid / HPC Server
IT Devices
Server Power vs. Workload
Commodity x86 Power Utilisation by Load
0
100
200
300
400
500
0% 20% 40% 60% 80% 100%
Load
Wat
ts
IT Devices
Server Efficiency vs. Workload
'Commodity x86' Server Normalised Overall Efficiency
12%
48%72%
0%
50%
100%
Single Server Virtualised Server Grid Server
The Data Centre
Towards Low Carbon ICT
The Data Centre
Data Centre Power - Where does it go?
Overall Power Transfer Functions
0
500
1,000
1,500
2,000
2,500
0 200 400 600 800 1,000
kW
IT Electrical Load (kW)
Dat
a C
entr
e In
put P
ower
Transformer
Chiller
CRAC
UPS
PDU
Cabling &SwitchgearLinear IT LoadPower
The Data Centre
Fixed and Proportional Loads
Data Centre Power Transfer as Fixed plus Proportional
0
500
1,000
1,500
2,000
2,500
0% 20% 40% 60% 80% 100%
kW
IT Electrical Load
Util
ity P
ower
Proportional LoadFixed Load
The Data Centre
Put the Server in a Data Centre• What Power is Drawn at the Utility Feed?
Server Power Draw by Fixed and Proportional Overheads
0
250
500
750
1000
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
IT Workload
Pow
er D
raw
n (W
atts
) Fixed Data CentreLosses
Proportional DataCentre Losses
Server InputPower
Server TotalPower at Utility
DCSG Data Centre Model
A Holistic Approach to Data Centre Energy Efficiency
Towards Low Carbon ICT
DCSG Data Centre Model
DCSG Model• Data Centre Power
Transfer Function
• Server Load to Power Function
• IT WorkloadTypical Utilisation of Servers
0 20 40 60 80 100
Percent Load
Prop
ortio
n
Commodity x86 Power Utilisation by Load
0
100
200
300
400
500
0% 20% 40% 60% 80% 100%Load
Wat
ts
Data Centre Power Transfer
0
500
1,000
1,500
2,000
2,500
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
Thou
sand
s
IT Power Draw
Util
ity F
eed
Dra
w
Example Scenario
DCSG Data Centre Model
Current Commodity x86 ServerOld Tier 4 Data Centre
Nameplate ProvisioningRising Power Cost
DCSG Data Centre Model
Old Tier 4 Data Centre, Nameplate Provisioning
Commodity x86 Overall Cost
£0
£200,000
£400,000
£600,000
£800,000
£1,000,000
Single Server Virtualised Grid / HPC
Fixed Power Cost
ProportionalPower Cost
Facility PowerOver-Provisioning
Facility PowerUsed
MaintenanceContracts
Servers CapitalCost
DCSG Data Centre Model
Old Tier 4 Data Centre, Nameplate Provisioning
Commodity x86 Lifecycle Energy Use
0
500
1,000
1,500
2,000
2,500
Single Server Virtualised Grid / HPC
Thou
sand
s
Life
cycl
e Po
wer
Util
isat
ion
(kW
h) Proportional PowerOverhead (kWh)
Server PowerDrawn (kWh)
Fixed Load PowerOverhead (kWh)
Example Scenario
DCSG Data Centre Model
New Load to Power Linear x86 ServerOld Tier 4 Data Centre
Nameplate Power ProvisioningRising Power Cost
DCSG Data Centre Model
Old Tier 4 Data Centre, Nameplate Provisioning
New Load-to-Power Linear x86 Server Overall Cost
£0
£200,000
£400,000
£600,000
£800,000
£1,000,000
Single Server Virtualised Grid / HPC
Fixed Power Cost
ProportionalPower Cost
Facility PowerOver-Provisioning
Facility PowerUsed
MaintenanceContracts
Servers CapitalCost
DCSG Data Centre Model
Old Tier 4 Data Centre, Nameplate Provisioning
New Load-to-Power Linear x86 Lifecycle Energy Use
0
500
1,000
1,500
2,000
2,500
Single Server Virtualised Grid / HPC
Thou
sand
s
Life
cycl
e Po
wer
Util
isat
ion
(kW
h) Proportional PowerOverhead (kWh)
Server PowerDrawn (kWh)
Fixed Load PowerOverhead (kWh)
Example Scenario
DCSG Data Centre Model
New Load to Power Linear x86 ServerNew, Efficient Tier 3 Data Centre
Peak Power ProvisioningRising Power Cost
DCSG Data Centre Model
Efficient Data Centre, Peak ProvisioningNew Load-to-Power Linear x86 Server Overall Cost
£0
£200,000
£400,000
£600,000
£800,000
£1,000,000
Single Server Virtualised Grid / HPC
Fixed Power Cost
ProportionalPower Cost
Facility PowerOver-Provisioning
Facility PowerUsed
MaintenanceContracts
Servers CapitalCost
DCSG Data Centre Model
Efficient Data Centre, Peak ProvisioningNew Load-to-Power Linear x86 Lifecycle Energy Use
0
500
1,000
1,500
2,000
2,500
Single Server Virtualised Grid / HPC
Thou
sand
s
Life
cycl
e Po
wer
Util
isat
ion
(kW
h) Proportional PowerOverhead (kWh)
Server PowerDrawn (kWh)
Fixed Load PowerOverhead (kWh)
Lessons Learned
Towards Low Carbon ICT
What has our analysis told us about DC Operations?
• Data Centres are not individual components, they are complex systems, view them as such
• Component Improvements can be masked• Consider Merging your IT and M&E
groups now
Lessons Learned
What has our analysis told us about DC Operations?
• Buy servers by Performance / Watt not Performance / £• One-App per server - buy the lowest power servers• Build lower Tier data centres and achieve reliability at the
systems / network level• Build modular data centres to keep the utilisation levels
high• Crop Rotate your data centre to sweep out the disused
equipment
Lessons Learned
Lessons Learned
What has our analysis told us about Data Centres? • Energy Use and Cost are Correlated
Overall Cost vs Lifecycle Power
0
500,000
1,000,000
1,500,000
2,000,000
2,500,000
£0 £200,000 £400,000 £600,000 £800,000
Overall Cost
Life
cycl
e Po
wer
kW
h
Commodity x86 Single Server
High Efficiency Single Server
Power Linear Single Server
Load Optimised Single Server
Commodit x86 Virtualised
High Efficiency Virtualised
Power Linear Virtualised
Load Optimised Virtualised
Commodity x86 Grid
High Efficiency Grid
Power Linear Grid
Load Optimised Grid
Thank you
Find out more
Data Centre Specialist Group
http://dcsg.bcs.org