3
EMERGENCY ANDBAG HELTER: UICK RAINING UIDE 1) Collect he tools above. 2) Prepare he earth mix which s stabilized with cement, ime, or asphalt emulsion. 3 ) Add enough water o ball ogether when squeezed, et not leave he hand wet. lf no cement, ime or barbed wire s available, se raw earth (clay-sand) or a temporary helter. Experimental: ry snow n bags and compact.) otu*#@* o EXTRY %' DOME PLAN EMERGENCY HELTER 4) Place he door away rom wind and rain. 5) Dig he foundation rench L2 (3O cm) deep. 6) Level and compact he trench. 7) Place he bag n the trench, old the end under o close, and start fillingupright ¡ke a short column using ong ubing o r standard andbags). he oundation will be 2-3 completed ag rows. 8) Always ut i n 2-3 cans of earth and shake o the end. 9) Use gravity's help by sloping he bag o n your eg, and walking backwards s it fills. Do not strain (if it is hard and eels heavy ou are not doing t right). Let he bag ill as full as possible an check he position with he compass ool. 10) Twist and uck under he bag ends o close. 11) Compact he illed bag a s hard as can using tamper, o make a smooth, olid, Only ompacted a m p earth becomes trong. 2 ) Attach ontinuous arbed ire: 1 wire or domes p o 12 ft (3.7m), wires or arger omes. Wher breaks ccur, verlap he wires b y 2ft. (65 cm). 13) Continue oiling ags. &,x fuit* ct N a & r Y lz lzXz Ca3-Y,a*12 **tittst* - *qww r,atrea:l¡

Guia Rapida Super Adobe

Embed Size (px)

Citation preview

Page 1: Guia Rapida Super Adobe

8/11/2019 Guia Rapida Super Adobe

http://slidepdf.com/reader/full/guia-rapida-super-adobe 1/3

EMERGENCY

ANDBAG

HELTER:

UICK

RAININGUIDE

1) Collect

he tools

above.

2) Preparehe earth mix which

s stabilized

with cement,

ime,or asphaltemulsion.

3)

A

water o

ball ogether

when squeezed,

et

not leave he hand

wet. lf no cement,

ime or

barbedwire s available,

(clay-sand)

or a

temporary helter.

Experimental:

ry

snow

n

bags

and compact.)

otu*#@*

tü o

EXTRY

%'

DOME PLAN

EMERGENCY

HELTER

4)

Place

he door

away rom

wind and rain.5) Dig

he

foundation

rench

L2

(3O

cm) deep.

6) Leveland compact

7) Place

he

bag

n

the

trench,

old

the end under o close,

and start

f i l l ing upright

¡kea short

column

using

ong

standard

andbags).

he oundation

wil l

be

2-3

completed

ag

rows.

8) Always

ut

in

2-3 cans of earth and shake o the end.

9) Use

gravity's

help by sloping he bag

on

your

eg, and

backwards

s

it f i l ls.

Do not strain

(if

it is

hardand eels

heavy

ou

are

not doing

t right).Let he

bag i l l as

full as

check

he

position

with he compass ool.

10)

Twistand

uck under

he bag ends

o close.

11)

Compact

he

illedbagas

hardas

you

can

using

tamper,

o make

a smooth, olid,

uniform lock.

Only om

earth

becomes

trong.

2)Attach ontinuousarbed

ire:1 wire

ordomes

p o 12 ft

(3.7m),

wires

or arger

breaks

ccur,

verlap

he wiresby

2ft.

(65

cm).13)Continue

oil ing

ags.

Page 2: Guia Rapida Super Adobe

8/11/2019 Guia Rapida Super Adobe

http://slidepdf.com/reader/full/guia-rapida-super-adobe 2/3

14

15

CenterCompass

Height

Compass

1,4, 5) You

must use 2 Compasses o

make

he dome

shape.

Use

chainsor other

non-stretchy able-rope. ttachon

center CenterCompass), nd extend h e lengthat every owaccordingo a secondone at the perimeter HeightCom

bagsdo not conform

o the comoass

emove

hem and re-build.

16) Pre-cut ags

or a dooruray

nock-out

anel,

or for

windows.

f

stabilized,he earth

must be cut

after ampingat e

don't let the

cut bags stick

ogether

a$ain.

7)

Punch

out

pre-cut anels

o open he door or

window

after at

least

5 b

aboveare completed.

8) Insert

pipes

or vents

or windows,

loped o

outside or rain.

19) Coil upper

ows,but

don't stand

on the wet

bag. 20) Fi lland

place

each bag

parallel

o the

row

belowand

work t

nwards

o meet he compass

circle

pull

or tamp).Tamp

he bag with a

gentle

slope o the outside.Close he top or

l

skylight.

1) Add a

protect¡ve

ntrance

door

vault)

o

buttress he door opening.

Entry s archedor sloped,short

or

ta

22) Plaster

he exteriorbeforebagsdlsintegrate

nd 23) waterproofwith ocally uitablematerials o resist

moisture

a

24) On op,

finish

with

a

water-resistant

ementor lime

plaster

such as Reptile

stabil¡zed

arth mud-balls)

ayered ro

:cp, or

25) a smooth

cementor l ime

plaster

in ish.

r

q

f

, ,k

{.- T-T,ertfussti|tst*

,¡;',t'.

Page 3: Guia Rapida Super Adobe

8/11/2019 Guia Rapida Super Adobe

http://slidepdf.com/reader/full/guia-rapida-super-adobe 3/3

Left:

Axonometric

f the

dome co

better

show

he domed

shape,

h

walls,

door ault,

andwindow

ye

not

shown n

this

drawing.)

3i*3

. t ,

.

n? ñ

i'

  ,{

i¡ .

'

-*.

, r . .

- ,

;.$*

¡-

q

üARKER

R¡NGS

Above:

Using

he wo chain

omp

tt

í r&.

,'J

, ,

(

f.

,

t

t

i

24 Dome rows (

.

-$p¡i¡gli¡¿

2 Base ows

3 Foundationro

4¿¿

rn

Emergency

Shelter:

l0

ft.

/

3.0 m. interior

diameter

dome

(same

or

8

-

12 t.

I

Z.S 3.7

m range)

Compass

section,

Springline,

and

essential dimensions

,

,{

*

t

h. '

' , i

'

t

i '

(

l ' t

'q ' { '

| ;'

,i

l

.:¡,)

.\',r'

i

'

-

.

,'.

'

-

i

u*r , ' . l l -

,^ '

,

* ' r

.1 . ;

l

l i r.

C>

,.¡

+

o

o

E

,g

t

tl

I

+

(o

o

Trench or

foundation

ows

* ru-q,9-9