NATIONAL INSTITUTUL FOR RESEARCH AND DEVELOPMENT OF IZOTOPIC AND MOLECULAR TECHNOLOGY. GRID and IT at INCDTIM Cluj-Napoca. Recent Progress and Prospects Ing. Farcas Felix. Project IFIN for GRID ATLAS – 4 Servers Pentium 4 Dual procesor, Dual core, 3 Ghz, 8 GBRam ,. Projekt IFIN GRID ATLAS - PowerPoint PPT Presentation
Citation preview
GRID and IT atGRID and IT atINCDTIM Cluj-NapocaINCDTIM Cluj-Napoca
Recent Progress and Recent Progress and ProspectsProspects
Ing. Farcas FelixIng. Farcas Felix
NATIONAL INSTITUTUL FOR RESEARCH AND DEVELOPMENT OF IZOTOPIC AND MOLECULAR TECHNOLOGY
HistoryHistory
20052005 20062006 20072007
Projekt IFIN GRID ATLAS
2 Servers Pentium 4 Dual procesor, Dual core, 3 Ghz, 4 GbRam,
Project IFIN for GRID ATLAS – 4 Servers Pentium 4 Dual procesor, Dual core, 3 Ghz, 8 GBRam,
N
E
X
T 2
0
0
7
Click Next
Present days – in INCDTIMPresent days – in INCDTIM
Link between main buildings at 1 Gbps Link between main buildings at 1 Gbps through a modern networking system through a modern networking system
based upon UTP Cat6 cable and FObased upon UTP Cat6 cable and FO
Cat6 UTP
Patch FO
Cisco Linksys 10/100/1000
2 server Pentium 4, 2 server Pentium 4, Processor 3 Ghz, 2 GBRam, HDD 150 GBProcessor 3 Ghz, 2 GBRam, HDD 150 GB
- a communication /web / mail server- a communication /web / mail server- a Database server- a Database server
SO Linux Centos
Switch Layer 3 Cisco 3750Switch Layer 3 Cisco 3750
Module 1 Gbps
Connection Module 1/10 Gbps
A link to the main RoEduNet Cluj – A link to the main RoEduNet Cluj – Napoca Napoca nodenode with a speed of with a speed of 1 Gbps1 Gbps
~ Dark Fiber ~~ Dark Fiber ~
Link activ in tests
Fibra optica single mode
Present – in GRIDPresent – in GRID
12 servers dual processor 12 servers dual processor dual coredual core
6 servers dual processor 6 servers dual processor quad corequad core
dual coredual core
quad quad corecore
2 Rack, 42U2 Rack, 42U
Model to be bought in the near future, till the end of the year
Rack in use without walls
UPS 5000 VaUPS 5000 Va
front view Back
view
Storage Area NetworkStorage Area NetworkCapacity 4 TBCapacity 4 TB
SAN
Server – Pentium 4, single processor 1.6 Gb, HDD 2x80 Gb
Future is looking brightFuture is looking bright
Projekt for a New WebsiteProjekt for a New Website
Finishing the Finishing the DatacenterDatacenter
15.11.2007
23.11.200726.11.200
7
Obtaining the certificates Obtaining the certificates for User, Host & RA – for User, Host & RA –
ManagerManager
Starting RO-ITIM-CJ Grid SiteStarting RO-ITIM-CJ Grid Site
New technology with the possibility to be used in GRID
in the very near future
• BLADE system
• Less power use
• Less space occupied
• Less management cost
• Virtualization
Blade TechnologyBlade Technology
Thank you for your time
Your question and comments will be very appreciated