Greening the Grid (GTG) Program
A Partnership between USAID/India and Government of India
Greening the Grid
AGC Workshop
Vijaywada
Date: May 15, 2018
Greening the Grid - U.S.-India Joint Partnership
Goal: Enhance efforts to manage large-scale RE grid integration
Robust analysis of challenges and solutions
Integration pilots to validate scalable reforms
Sharing of knowledge and best practices
Power System Planning - Progress• Completed a National grid integration study and 2 regional grid integration studies
jointly by POSOCO and NREL
• Released the National grid integration report (July 2017) and 5 state reports in Tamil
Nadu, Rajasthan, Gujarat, Maharashtra, and Karnataka (October – December).
Rajasthan Maharashtra Karnataka Gujarat
New Delhi
4
Power System Planning – Next steps
• Ultra-mega RE parks - evaluate operational impacts of proposed RE parks, and
options to reduce variability and uncertainty to improve balancing.
• Analysis to support the grid integration pilots
Renewable Integration and Sustainable Energy (RISE)
1/3/2019 6
Coal Based Flexible Power Generation with NTPC
and GSECL
Pilot Scope
• Examine techno economic feasibility of faster ramp rates and lower technical minimum
in two (2) units each at NTPC (Jhajjar & Ramagundam TPS) and GSECL (Ukai TPS)
• Support implementation of recommended measures by NTPC and GSECL for
achieving flexible operations of the units
Outcomes
• Specific recommendations for changes to O&M procedures/standards and required
design modifications based on Indian grid conditions
• Optimize plant availability and efficiency (including part load efficiencies)
• Evaluation of incremental cost of generation due to cyclic operation
• Regulatory/policy advocacy & implementation strategy for identified interventions
• Scalability for fleet-wide implementation of flexibility across units of NTPC and GSECL
Scope & Outcome
1/3/2019 8
Progress so far
Way forward
Milestones achieved Timeline
Concept Notes approval and MoU signing (GSECL) April 2017-August 2017
RFP selection process and onboarding of Technical Consultant (Intertek,
USA) for NTPC, GSECL pilots
May 2017 – December 2017
Data gathered from NTPC and GSECL units Feb. 2018- May 2018
Data Analysis for As-Is Review In Progress
Milestones Planned Timeline
Inception report covering As-Is review, probable cyclic regime and successful
global case studies on cycling
May-June 2018
Site visits for NTPC & GSECL units May – June, 2018
Technical Due Diligence Report on flexibility options and associated costs June 2018
Knowledge Dissemination Workshops June-July 2018
Support in seeking investment and regulator approvals August-September 2018
Pilot Implementation Phase October 2018 onwards
1/3/2019 9
Grid Connected Battery Energy Storage System
(BESS) with PGCIL
1/3/2019 10
Scope & Outcome
Pilot Scope
• Enhancement of existing BESS facility at Puducherry and assessment of economic value
of storage systems.
• Technical design and demonstration of array of BESS applications viz. dynamic
frequency regulation, Renewable energy time shift, capacity firming etc. in providing
grid support.
• Detailed modelling study on the need, quantity and location of storage systems in India
in sub-15 minute time scale.
Outcomes
• Specific recommendations for operation of battery energy storage system and required
enhancements based on Indian grid conditions
• Optimize usability of BESS under the capacity and limitation of the battery.
• Economic evaluation of BESS operation in grid support.
• Development of a scalable roadmap for policy makers and regulators
1/3/2019 11
Progress so far
Way forward
Milestones achieved Timeline
Concept Note submitted and approved by PGCIL May, 2017
Logical Outline / Functional Specifications (DPR) for additional Use
Cases framed and finalized with PGCIL
April, 2018
Selection of Systems Implementer for additional Use Cases
implementation initiated
May 2018
Milestones Planned Timeline
Assess/evaluate the proposals received against the RFAs June, 2018
Finalize the grantee subcontract and start pilot implementation July, 2018
Implementation of Use Cases planned over 4 months + 3 months
of demonstration and data support.
Jan, 2019
Systemic Value modelling to be taken up FY20
Guidance note to policy makers, regulators based on findings of
the systemic valuation of storage in Indian context
FY20
1/3/2019 12
Dynamic Compensation for Large RE Integration
with RVPN
1/3/2019 13
Scope & Outcome
Pilot Scope
• Power quality measurement and development of mitigation strategy;
• Evaluation of dynamic reactive power compensation including comparative analysis of
reactive power support from Solar Invertors, installation of medium sized STATCOMs
at RE parks and need for grid connected large sized STATCOMs.
Outcomes
• Provide insights for interconnection standards, invertor specifications and regulatory
mechanisms for dynamic reactive control and compensation.
• Help States to develop/improve the appropriate standards and commercial frameworks
to support greater RE integration into the grid.
1/3/2019 14
Progress so far
Milestones achieved Timeline
Workshop held in Rajasthan to develop a shared vision on the Pilot scope Sep, 2017
Submission of DPR to RVPN for agreement Feb, 2018
In-principle approval by NTPC for partnering on their solar plant for inverter
enhancement
March, 2018
Acceptance of DPR by RVPN April, 2018
Way forward
Milestones Planned Timeline
Issue RFA and complete the grantee subcontracting process June, 2018
Pilot implementation July- Dec, 2018
Report on insights for interconnection standards, invertor specifications and
regulatory mechanisms for dynamic reactive control and compensation.
FY20
1/3/2019 15
Automatic Generation Control (AGC) with
POSOCO, KPCL, KPTCL, and APTRANSCO
Pilot Scope
• Evaluate AGC in providing secondary response in southern India to supplement
adoption of AGC for ancillary market.
• Cover both hydel and renewable power plants and identify technical requirements and
compensation mechanisms for generation units that participate in the AGC secondary
reserve market.
Outcomes
• Inputs to CERC for developing regulations for AGC's phased implementation with
accompanying compensation mechanisms.
• Demonstrate benefits of AGC to grid operators and assist SERC in setting appropriate
levels of incentives in retail tariffs.
Scope & Outcome
1/3/2019 17
Progress so far
Way forward
Milestones achieved Timeline
Workshop on AGC fundamentals and pilot held in Bangalore August, 2017
In principal approvals from KPCL and KPTCL for the pilot at hydel (Varahi
and Sharavati) and Shivasamudram solar power plants.
October, 2017
Pre-feasibility studies by GTG-RISE on requirements for software/hardware
retrofits for enabling AGC capabilities at these plants
December,2017
Milestones Planned Timeline
Release RFAs for selection of vendors/OEMs for AGC implementation May 2018
Complete the grantee subcontracting process June, 2018
Pilot implementation July, 2018
Testing of AGC in high hydro and high wind season and development of a
scalable roadmap for policy makers and regulators.
August 2018-
January 2019
1/3/2019 18
Real-time monitoring of rooftop solar PV and net-
load forecasting with BESCOM
Pilot Scope
• Enabling real-time monitoring of DERs on a pilot basis and improving net
load forecasting ability of Discoms. Work out the synergies of UDAY’s
smart meters mandate with net-metering systems
• Assist BESCOM in procurement and implementation of net-load (i.e. net of
DER generation) forecasting systems in coordination with REMC/SLDC
• Provide inputs to CEA / FOR towards harmonizing net-metering for
DERs/prosumers with smart meters for consumers
Outcomes
• Inputs to upgrade guidelines on metering, communication and rooftop PV
and net load forecasting
• Significant scalibility potential among DISCOMs
Scope & Outcome
1/3/2019 20
Progress so far
Way forward
Milestones achieved Timeline
Discussions with TPDDL and BESCOM on pilot scope Sep - Dec, 2017
MoU signed with BESCOM considering the sizeable rooftop
penetration in the license area and their willingness to partner
May, 2018
Milestones Planned Timeline
Undertake Pre-feasibility study June, 2018
Release RFA for Net-Load Forecasting Systems provider to be
issued
Sep, 2018
Pilot Implementation Oct, 2018 – Mar, 2019
1/3/2019 21
Regional Platform for Reserves Sharing with
POSOCO and CERC
Pilot Scope
• Benefits modelling and demonstration to States for buy-in options for various intra-day
products and gate-closure options.
• Implementation of a day-ahead IT platform for unscheduled generation capacity in
intra-state generating stations in the Southern/ Western Region (as a pilot).
• Implementation of an IT system for automating processes of NLDC approvals in the
intra-day energy market
Outcomes
• Re-organization of the intra-day market with periodic collective auctions and gate
closures
• Substantial reduction in response time for open access approvals and enablement of
the intra-day market to operate much more flexibly with increased volumes of
balancing energy trade across states at short notices.
• Facilitate higher RE capacity development in resource-rich states.
Scope & Outcome
1/3/2019 23
Way forward
Milestones achieved Timeline
Prototype for benefits demonstration simulation November 2017
Approval from CERC for the pilot January 2018
Visit to Gujarat SLDC to understand Open access automation system
(EASS)February 2018
Request for sharing of data from concerned states February 2018 – ongoing
Presentation of draft Open Access registry process maps to POSOCO April 2018
Preparation of simulation ready formats (4 states) April 2018 - ongoing
Milestones Planned Timeline
Benefits demonstration for concerned states through Python based
optimization model (4 states)May/June, 2018
Workshop with RLDCs on Open Access registry process maps June 2018
AS-IS study andTO-BE design of IT landscape at POSOCO September 2018
Release of RFA and selection of Implementation partner January 2019
Execution andValidation of software January 2020
Progress so far
1/3/2019 24
White Paper 1: Mechanisms to Incentivize Inter-
State Trading of Renewable Energy
Objective
• Harness maximum RE potential in the country
through an efficient framework for inter-state
RE trading so that RE rich and deficit states can
contribute together
• Critical review of existing regulatory, policy,
commercial, and infrastructural constraints to
identify key challenges and potential measures
that need to be addressed
• Incentivize inter-state trading of RE
• First draft due in September 2018
1/3/2019 25
Peer-to-Peer Partnerships
• 4 boot camps organized jointly with POSOCO
• 3 Study Tours organized (last one in March 2018)
• Peer review of 4 Indian System Operator by U.S. experts
• Next steps: Establish Utilities Partnership between Indian and U.S. coal generators,
Study tour to U.S and Exchange visit from U.S. coal operators to India (on coal
flexibility); Boot camps (Topic to be decided)
26
System Operator Partnership
1/3/2019 27
India Regulatory Partnership
India Regulatory Partnership
• First Regulatory Exchange in August 2016
• Regulatory Primer on RE forecasting, scheduling and dispatch with focus at
National and state level (Rajasthan and Tamil Nadu)
• Training Tour in February to U.S. on 3 case studies
• Next Steps: Regulatory Guideline focused on long term contracts and their
transition to energy markets (September 2018); 2 regulatory exchanges
28
Idam Infrastructure Advisory
Pvt. Ltd.
29
WBDPR for SAMAST Implementation
PB• DPR for SAMAST
Implementation,• F&S & DSM Regulations
HR• DPR for SAMAST
Implementation• F&S & DSM
Regulations• Draft Scheduling
Despatch Code
TelanganaF&S Regulations
Tamil NaduF&S & DSM Regulations
North-East• DPR for SAMAST
Implementation• F&S & DSM
Regulations• Draft Scheduling
Despatch Code
FOR Technical Committee has requested to expand the existing scope to cover more states
Regulatory Support
Support to FOR Technical committee
• Preparation of Model DSM Regulations at State level
and regulations for Forecasting and Scheduling (F&S)
for RE.
• Implementation of Scheduling, Accounting, Metering
and Settlement of Transactions in Electricity
(SAMAST) Framework at State level
• Assistance to States in preparation of DPR for
SAMAST Implementation
• Assistance to the States for implementation of State
level Energy Deviation Mechanism (DSM) and F&S
• 5 states supported
1/3/2019 30
• RISE Contracting Officer Representative: Monali Zeya Hazra, USAID India, [email protected]
• Chief of Party: Shubhranshu Patnaik, RISE, [email protected]