12
All rights reserved © Copyright 2018 Ecospray Technologies s.r.l. txt Emanuele Gariboldi – Managing Director Athens - November 13, 2018 Considerations on Exhaust Gas Cleaning Systems Retrofit Greener Shipping Summit 2018

Greener Shipping Summit 2018conference14.diorama.gr/images/presentations/[email protected] Thank you . Created Date: 11/14/2018 9:04:56 AM

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Greener Shipping Summit 2018conference14.diorama.gr/images/presentations/Emanuele-Gariboldi.pdfgariboldi@ecospray.eu Thank you . Created Date: 11/14/2018 9:04:56 AM

All rights reserved © Copyright 2018 Ecospray Technologies s.r.l.

txt

Emanuele Gariboldi – Managing Director Athens - November 13, 2018

Considerations on Exhaust Gas Cleaning Systems Retrofit Greener Shipping Summit 2018

Page 2: Greener Shipping Summit 2018conference14.diorama.gr/images/presentations/Emanuele-Gariboldi.pdfgariboldi@ecospray.eu Thank you . Created Date: 11/14/2018 9:04:56 AM

All rights reserved © Copyright 2018 Ecospray Technologies s.r.l. 2

Global Sulphur Cap

•  The Global Sulphur Cap deadline is approaching

•  Is there still time to be a early adopter?

•  When is late too late?

•  What are the most important considerations when

retrofitting an EGCS?

Page 3: Greener Shipping Summit 2018conference14.diorama.gr/images/presentations/Emanuele-Gariboldi.pdfgariboldi@ecospray.eu Thank you . Created Date: 11/14/2018 9:04:56 AM

All rights reserved © Copyright 2018 Ecospray Technologies s.r.l. 3

Ecospray Facts & Figures (updated 31.08.2018)

CRUISE

70%

CERTIFIED AND OPERATING SHIPS

81

CERTIFIED EGC SYSTEMS

223 20% NEW BUILD

80% REFIT

FERRIES

10%

CARGO VESSELS

20%

Page 4: Greener Shipping Summit 2018conference14.diorama.gr/images/presentations/Emanuele-Gariboldi.pdfgariboldi@ecospray.eu Thank you . Created Date: 11/14/2018 9:04:56 AM

All rights reserved © Copyright 2018 Ecospray Technologies s.r.l. 4

Retrofit Focus

•  What are the important considerations for a successful

retrofit?

•  What are the main factors that can make/break a retrofit

project?

•  What are the considerations for EGCS maker selection

for retrofit beyond price?

Page 5: Greener Shipping Summit 2018conference14.diorama.gr/images/presentations/Emanuele-Gariboldi.pdfgariboldi@ecospray.eu Thank you . Created Date: 11/14/2018 9:04:56 AM

All rights reserved © Copyright 2018 Ecospray Technologies s.r.l. 5

Actors Involved in a EGCS retrofit project

Installation Engineering

Firm

Shipyard Installer EGCS Maker

Class / Flag

Page 6: Greener Shipping Summit 2018conference14.diorama.gr/images/presentations/Emanuele-Gariboldi.pdfgariboldi@ecospray.eu Thank you . Created Date: 11/14/2018 9:04:56 AM

All rights reserved © Copyright 2018 Ecospray Technologies s.r.l. 6

Installation Engineering: Attention Points

•  3D-scan of vessel

•  Ship survey & feasibility study

•  Detailed engineering

•  (installation supervision?)

Page 7: Greener Shipping Summit 2018conference14.diorama.gr/images/presentations/Emanuele-Gariboldi.pdfgariboldi@ecospray.eu Thank you . Created Date: 11/14/2018 9:04:56 AM

All rights reserved © Copyright 2018 Ecospray Technologies s.r.l. 7

Installation: Attention Points

•  Close relationship with installation engineering firm

•  Supply of components not provided by Maker or Yard

•  Preparation work onboard and prefabrication ashore

•  Installer and shipyard relationship

•  Travelling teams for both pre- and post-Yard work

•  Drydock versus wetdock

•  In-service installation option

Page 8: Greener Shipping Summit 2018conference14.diorama.gr/images/presentations/Emanuele-Gariboldi.pdfgariboldi@ecospray.eu Thank you . Created Date: 11/14/2018 9:04:56 AM

All rights reserved © Copyright 2018 Ecospray Technologies s.r.l. 8

Where is the money?

MAKER

ENGINEERING

INSTALLER

SHIPYARD CLASS

Page 9: Greener Shipping Summit 2018conference14.diorama.gr/images/presentations/Emanuele-Gariboldi.pdfgariboldi@ecospray.eu Thank you . Created Date: 11/14/2018 9:04:56 AM

All rights reserved © Copyright 2018 Ecospray Technologies s.r.l. 9

Considerations for successful retrofit

•  Close gaps among Maker, Engineering Firm and Installer

•  Early decisions reap long-term benefits

•  Owner-supply choices are not pure procurement exercises

•  Maker decision likely predates installation location, therefore

logistics is key

•  Time out of service might be less than some think

Page 10: Greener Shipping Summit 2018conference14.diorama.gr/images/presentations/Emanuele-Gariboldi.pdfgariboldi@ecospray.eu Thank you . Created Date: 11/14/2018 9:04:56 AM

All rights reserved © Copyright 2018 Ecospray Technologies s.r.l. 10

Maker Selection Considerations

•  Depth. How many systems has a maker delivered?

•  Breadth. In how many different configurations / profiles?

•  Proven reliability. What are the availability and usage

rates?

•  Beyond the tangibles. What about the soft part of EGCS?

•  Will somebody answer the phone beyond 2020?

Page 11: Greener Shipping Summit 2018conference14.diorama.gr/images/presentations/Emanuele-Gariboldi.pdfgariboldi@ecospray.eu Thank you . Created Date: 11/14/2018 9:04:56 AM

All rights reserved © Copyright 2018 Ecospray Technologies s.r.l. 11

Some final thoughts

•  Some makers still have availability in 2019-2020

•  When possible, make deals at least one year in advance

•  Consider export credit-backed financing

•  Reduce the number of players to maker, installer, yard.

•  ‘Turn-key’ deals are now available: in Europe, Asia,

Caribbean

•  Cost and installation time may be less than you think

Page 12: Greener Shipping Summit 2018conference14.diorama.gr/images/presentations/Emanuele-Gariboldi.pdfgariboldi@ecospray.eu Thank you . Created Date: 11/14/2018 9:04:56 AM

All rights reserved © Copyright 2018 Ecospray Technologies s.r.l.

www.ecospray.eu ECOSPRAY TECHNOLOGIES s.r.l. Via Circonvallazione, 14 15050 Alzano Scrivia - AL - Italy

[email protected]

Thank you