Engagement on the Reduction of
Construction and Demolition Waste
Green Policy in Public Works
Projects
Development Bureau
26 February 2013
5/21/2018 Green Policy in Public Works Projects (2)
2/12
2
Current Situation
Construction industry generates about 3,331 tonnes ofconstruction and demolition (C&D) waste per day for
disposal of at landfills in 2011.
Disposal of construction and
demolition materials by
destination
Disposal of solid waste at
landfills
5/21/2018 Green Policy in Public Works Projects (2)
3/12
3
The Trend
Disposal of solid waste at landfills in
1991 - 2011
Quantities of construction and
demolition materials in 1991 - 2011
5/21/2018 Green Policy in Public Works Projects (2)
4/12
4
Construction Waste Management Policy
Planning and Design Stage:
Measures to minimise
generation and maximiserecycling and reusing ofconstruction waste to be set outin a Construction andDemolition MaterialManagement Plan for approvalsince 2002
Planning&Design
Tseung Kwan O - Lam Tin
Tunnel & associated works
5/21/2018 Green Policy in Public Works Projects (2)
5/12
5
Tendering Stage:
extra credits for C&D wastereduction measures
innovation and creativityscreening (ICS) for public works
consultancies and contracts
Tendering
Construction Waste Management Policy
Kwun Tong Promenade (Stage 2)
5/21/2018 Green Policy in Public Works Projects (2)
6/12
6
Construction Stage:
Waste Management Plan required since November
2000
setting out waste reduction measures, targets and
arrangement for on-site sorting of C&D materials
On-site sorting of C&D materials included in the Pay for
Safety and Environment Scheme since 2006
Construction
Construction Waste Management Policy
5/21/2018 Green Policy in Public Works Projects (2)
7/12
7
Other Green Policies for Public Works
Mandating the use of concrete paving blocks with recycledglass (or eco-pavers) in road maintenance contracts since
October 2010.
Pilots / studies being undertaken for other recycled glassusages, e.g. partition walls, glassphalt, use of recycled glass asfill materials, the use of recycled sub-base in pavements
5/21/2018 Green Policy in Public Works Projects (2)
8/12
8
Other Green Policies for Public Works
Restricting the use of timber products inpublic works projects
All site hoardings and signboardsshall be metallic, with the use of boltsand nuts to join the panels
Contractors required to proposealternatives to hardwoods forformwork / falsework and trenchsupport, e.g. metal, precast concrete
5/21/2018 Green Policy in Public Works Projects (2)
9/12
9
Considerate Contractors Site Award Scheme
Encouraging contractors to implement innovative
waste reduction measures
Environmentally
Friendly Site Office
5/21/2018 Green Policy in Public Works Projects (2)
10/12
1 0
Considerate Contractors Site Award Scheme
Reuse of waste rubber tyres
Reuse of waste
material for sitehoarding and
fencing
Recycle to produce
compost material
5/21/2018 Green Policy in Public Works Projects (2)
11/12
1 1
Looking Ahead
We encourage innovative and creative ideas to reduce
construction waste.
DEVB stands ready to join hands with government
departments, developers, trade/professional
associations, consultants, contractors and otherpractitioners in the industry to promote the three-Rs :
Reduce, Recycle and Reuse in our construction
industry.
5/21/2018 Green Policy in Public Works Projects (2)
12/12
1 2
Thank You