Page 1: GREEN INFRASTRUCTUREiwra.org/member/congress/resource/ABSID213_US_MEX_BORDER_C… · context 9 Mexican border population with wastewater treatment from 21 % in 1995 to over 90 % in

w a t e r p u b l i c s p a c e m o b i l i t y b i o d i v e r s i t y

“ r e s i l i e n c y a n d c o m p e t i t i v e n e s s f o r c i t i e s i n t h e b o r d e r b e t w e e n m é x i c o a n d t h e u n i t e d s t a t e s ”

URBAN GREEN INFRASTRUCTURE

An i n i t i a t i ve fo r the US-Mex Bo rder Reg ion

BORDER ENVIRONMENT COOPERATION

COMMISSION

Maria Elena Giner General Manager

Page 2: GREEN INFRASTRUCTUREiwra.org/member/congress/resource/ABSID213_US_MEX_BORDER_C… · context 9 Mexican border population with wastewater treatment from 21 % in 1995 to over 90 % in

co

nte

xt

Mexican border population with wastewater treatment from 21% in 1995 to over 90% in 2012.

The elimination of 450 MGD of untreated wastewater flowing into shared water bodies.

Growth of 50% in population while increasing its urban footprint by 4 times, decreasing infiltration, and significantly increasing runoff.

The key issue to water quality is the threat of stormwater and its impacts of flooding.

Stormwater carries sediments and other pollutants that flow into binational rivers contributing to the pollution of potable water sources.

Page 3: GREEN INFRASTRUCTUREiwra.org/member/congress/resource/ABSID213_US_MEX_BORDER_C… · context 9 Mexican border population with wastewater treatment from 21 % in 1995 to over 90 % in

PROBLEMS

FLOODING

Page 4: GREEN INFRASTRUCTUREiwra.org/member/congress/resource/ABSID213_US_MEX_BORDER_C… · context 9 Mexican border population with wastewater treatment from 21 % in 1995 to over 90 % in

PROBLEMS

AIR QUALITY

Page 5: GREEN INFRASTRUCTUREiwra.org/member/congress/resource/ABSID213_US_MEX_BORDER_C… · context 9 Mexican border population with wastewater treatment from 21 % in 1995 to over 90 % in

Provide local border communities with a comprehensive strategic model for the

integration of GREEN INFRASTRUCTURE(GI)

in their urban planning, as a means to mitigate the environmental, economic, and social

impacts of inadequate stormwater management

pu

rpo

se

Page 6: GREEN INFRASTRUCTUREiwra.org/member/congress/resource/ABSID213_US_MEX_BORDER_C… · context 9 Mexican border population with wastewater treatment from 21 % in 1995 to over 90 % in

¿How does STORMWATER HARVESTING l ink

with watershed health?

RELEVANCY IN THE URBAN CONTEXT

Natural environment

Urban environment

Page 7: GREEN INFRASTRUCTUREiwra.org/member/congress/resource/ABSID213_US_MEX_BORDER_C… · context 9 Mexican border population with wastewater treatment from 21 % in 1995 to over 90 % in

Green infrastructure uses plants, soils, and nature itself to manage stormwater and create healthier urban environments.

Green infrastructure practices can be used to reduce the need for expensive gray infrastructure—pipes, storage facilities, and

treatment systems—because plants and soils soak up, store, and use the rainwater.

Communities also can create or preserve existing vegetated

areas to maintain a high quality of life for residents through flood protection, cleaner air and water, and more appealing

transportation corridors and outdoor spaces.

(EPA, 2015)

de

fin

itio

n

Green infrastructure

Page 8: GREEN INFRASTRUCTUREiwra.org/member/congress/resource/ABSID213_US_MEX_BORDER_C… · context 9 Mexican border population with wastewater treatment from 21 % in 1995 to over 90 % in

Green Infrastructure

Grey Infrastructure

Page 9: GREEN INFRASTRUCTUREiwra.org/member/congress/resource/ABSID213_US_MEX_BORDER_C… · context 9 Mexican border population with wastewater treatment from 21 % in 1995 to over 90 % in

Green Infrastructure

Grey Infrastructure

Page 10: GREEN INFRASTRUCTUREiwra.org/member/congress/resource/ABSID213_US_MEX_BORDER_C… · context 9 Mexican border population with wastewater treatment from 21 % in 1995 to over 90 % in

green Infrastructure

Improves WATER QUALITY by reducing polluted runoff entering waterways

Conserves water by RECYCLING and using captured rainwater

Controls stormwater FLOODING

Modulates URBAN CLIMATE (heat islands) and reduces GHG

EMISSIONS

Improves AIR QUALITYand reduces noise pollution

Recovers BIODIVERSITY in urban development

ENVIRONMENTAL benefits

ECONOMIC benefits

Strengthens LOCAL ECONOMY

Road maintainance COSTS

REDUCTIONS

ENERGY consumption costs reduction

LAND VALUE increase

Public health and medical COSTS

SAVINGS

Enchances community and infrastructure RESILIENCY

Promotes physical and mental HEALTH

Pedestrians and cyclists COMFORT

Natural spaces for CITIZENS

ENCOUNTERS

SOCIAL benefits

Page 11: GREEN INFRASTRUCTUREiwra.org/member/congress/resource/ABSID213_US_MEX_BORDER_C… · context 9 Mexican border population with wastewater treatment from 21 % in 1995 to over 90 % in

Ma

na

ge

me

nt

mo

de

l Bottoms up approach Community involvement - regulation of codes

Composed of three elements: institutional capacity building, technical and legal.

Page 12: GREEN INFRASTRUCTUREiwra.org/member/congress/resource/ABSID213_US_MEX_BORDER_C… · context 9 Mexican border population with wastewater treatment from 21 % in 1995 to over 90 % in

resu

lts More tan 800 participants on 3 Forums: Chihuahua, Arizona and Coahuila

More tan 300 people trained on 6 Project implementation workshops

Page 13: GREEN INFRASTRUCTUREiwra.org/member/congress/resource/ABSID213_US_MEX_BORDER_C… · context 9 Mexican border population with wastewater treatment from 21 % in 1995 to over 90 % in

Capacity Building Phase I: Training

I Border Green Infrastructure Forum/Chihuahua 231 participants / 84 by Webinar

II Border Green Infrastructure Forum/Arizona 200 participants/113 by Webinar

Training workshops and demonstrative projects in 3 cities: San Luis Rio Colorado, Saltillo and Ramos Arizpe Over 150 volunteers trained

Green Infrastructure and Tourism Economic Development Seminar / Chihuahua 95 participants in a 10 week program

III Border Green Infrastructure Forum / Coahuila 150 participants / 44 by Webinar

Training workshops and demonstrative projects in 3 cities: Saltillo, Monterrey and Hermosillo Over 120 volunteers trained

Rainwater Harvesting Certification by Watershed Management Group 6 municipal authorities certified

2015

2014

2016

IV Border Green Infrastructure Forum/ Texas – Aug. 2017 Green Infrastructure Series of events in Sonora, Nuevo León and

Tamaulipas / May-Aug 2017 Rainwater Harvesting Certification by Watershed Management Group

5 municipal staff certified

2017

Page 14: GREEN INFRASTRUCTUREiwra.org/member/congress/resource/ABSID213_US_MEX_BORDER_C… · context 9 Mexican border population with wastewater treatment from 21 % in 1995 to over 90 % in

Training content

FORUMS

Technical aspects Impacts on health and well-

being Impacts on Economic

Development

WORKSHOPS

GI opportunities identification

Stormwater collection basin design

Native vegetation Hands-on training

CERTIFICATION PROGRAM

Train the trainer Rainwater Harvesting

Page 15: GREEN INFRASTRUCTUREiwra.org/member/congress/resource/ABSID213_US_MEX_BORDER_C… · context 9 Mexican border population with wastewater treatment from 21 % in 1995 to over 90 % in

Information disemination

Page 16: GREEN INFRASTRUCTUREiwra.org/member/congress/resource/ABSID213_US_MEX_BORDER_C… · context 9 Mexican border population with wastewater treatment from 21 % in 1995 to over 90 % in

Before

Blvd. García Morales – Hermosillo, Sonora

Phase II: Project implementation

Page 17: GREEN INFRASTRUCTUREiwra.org/member/congress/resource/ABSID213_US_MEX_BORDER_C… · context 9 Mexican border population with wastewater treatment from 21 % in 1995 to over 90 % in

After

Blvd. García Morales – Hermosillo, Sonora

Phase II: Project implementation

Page 18: GREEN INFRASTRUCTUREiwra.org/member/congress/resource/ABSID213_US_MEX_BORDER_C… · context 9 Mexican border population with wastewater treatment from 21 % in 1995 to over 90 % in

Construction Process Hermosillo, Sonora

Page 19: GREEN INFRASTRUCTUREiwra.org/member/congress/resource/ABSID213_US_MEX_BORDER_C… · context 9 Mexican border population with wastewater treatment from 21 % in 1995 to over 90 % in

System Evolution Nogales, Sonora

Page 20: GREEN INFRASTRUCTUREiwra.org/member/congress/resource/ABSID213_US_MEX_BORDER_C… · context 9 Mexican border population with wastewater treatment from 21 % in 1995 to over 90 % in

System Evolution Ciudad Juárez, Chihuahua

Page 21: GREEN INFRASTRUCTUREiwra.org/member/congress/resource/ABSID213_US_MEX_BORDER_C… · context 9 Mexican border population with wastewater treatment from 21 % in 1995 to over 90 % in

Construction Process and System Evolution

Hermosillo, Sonora

Page 22: GREEN INFRASTRUCTUREiwra.org/member/congress/resource/ABSID213_US_MEX_BORDER_C… · context 9 Mexican border population with wastewater treatment from 21 % in 1995 to over 90 % in

Legal Framework Adjustments

1. GREEN INFRASTRUCTURE DESIGN GUIDELINES

MANUAL FOR BORDER MUNICIPALITIES

2. MUNICIPAL CODES

Revision of municipal codes and

introduction Green Infrastructure concepts: Nogales, Sonora

Tijuana, Baja California

Ciudad Juárez, Chihuahua

3. STATE LEGISLATURE/ SONORA

Introduction of Green Infrastructure concept into the State´s Ley

del Equilibrio Ecológico y la Protección al Ambiente, as well as

onto the Ley del Ordenamiento Territorial Promoted by the President of the Energy and Environment Commission from the

State Congress

Page 23: GREEN INFRASTRUCTUREiwra.org/member/congress/resource/ABSID213_US_MEX_BORDER_C… · context 9 Mexican border population with wastewater treatment from 21 % in 1995 to over 90 % in

Design Guidelines Manual

Glossary of terms

1. Green Infrastructure; definition and

development models

2. Green Infrastructure relevance in the Urban Context

i. Management models examples ii. Green infrastructure benefits

3. Green infrastructure design principles

4. Micro-scale green infrastructure i. Design phase

ii. Construction phase iii. Green infrastructure Techniques

5. Macro-scale green infrastructure (urban level,

watershed level)

6. Methodology for green infrastructure implementation i. Master plans

ii. Monitoring and assessment

co

nte

nt

Page 24: GREEN INFRASTRUCTUREiwra.org/member/congress/resource/ABSID213_US_MEX_BORDER_C… · context 9 Mexican border population with wastewater treatment from 21 % in 1995 to over 90 % in

Tijuana, Baja California Nogales and Hermosillo, Sonora

Ciudad Juárez, Chihuahua

Proposed reform of construction codes and urban development norms

Introduction of basic GI concepts

Green Infrastructure in the municipal codes

Rain Gardens

Green Walls

Pervious Pavements

Stormwater Collection Systems

Green Roofs

Green Areas

Establishment of the mandatory nature of implementing GI elements in Project development

Focuses in private residential

development as well as public areas

Page 25: GREEN INFRASTRUCTUREiwra.org/member/congress/resource/ABSID213_US_MEX_BORDER_C… · context 9 Mexican border population with wastewater treatment from 21 % in 1995 to over 90 % in

Shift in paradigm in the development of conventional stormwater infrastructure

Intended to influence public policy at the local level Replicable and scalable

Resulting in more livable cities, improved water quality, stronger binational environmental health, and the

development of innovative public policies

co

nc

lusio

n

Page 26: GREEN INFRASTRUCTUREiwra.org/member/congress/resource/ABSID213_US_MEX_BORDER_C… · context 9 Mexican border population with wastewater treatment from 21 % in 1995 to over 90 % in

C o n t a c t

BORDER ENVIRONMENT COOPERATION

COMMISSION

Blvd. Tomas Fernandez 8069

Cd. Juarez, Chihuahua, 32470

Tel: (915) 688.4600; 1-877-277-1703

www.becc.org