18
Grand Grand Army Plaza Army Plaza Southeastern Southeastern Improvements Improvements March 2007 March 2007

Grand Army Plaza - Welcome to NYC.gov | City of New York · GAP – DOT History of Improvement ’99/’00 – Major Changes in Signs, Markings, Signals ’02-’04-- Island at Library

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Grand Army Plaza - Welcome to NYC.gov | City of New York · GAP – DOT History of Improvement ’99/’00 – Major Changes in Signs, Markings, Signals ’02-’04-- Island at Library

Grand Grand Army PlazaArmy Plaza

Southeastern Southeastern ImprovementsImprovements

March 2007March 2007

Page 2: Grand Army Plaza - Welcome to NYC.gov | City of New York · GAP – DOT History of Improvement ’99/’00 – Major Changes in Signs, Markings, Signals ’02-’04-- Island at Library

Park Slope

Prospect Heights

Grand Army Plaza

Prospect Park

Library, Gardens, Museum

Page 3: Grand Army Plaza - Welcome to NYC.gov | City of New York · GAP – DOT History of Improvement ’99/’00 – Major Changes in Signs, Markings, Signals ’02-’04-- Island at Library

Flatbush AveProspect Park West Park

Drives

Union St

Eastern Parkway

Vanderbilt Ave

Plaza Sts

Page 4: Grand Army Plaza - Welcome to NYC.gov | City of New York · GAP – DOT History of Improvement ’99/’00 – Major Changes in Signs, Markings, Signals ’02-’04-- Island at Library

GAP GAP –– DOT History of ImprovementDOT History of Improvement

’’99/’0099/’00 –– Major Changes in Signs, Major Changes in Signs, Markings, SignalsMarkings, Signals’02’02--’04’04 ---- Island at Library enlarged, Island at Library enlarged, protected, other signal changesprotected, other signal changes’04’04 –– Plaza Street Bicycle LanesPlaza Street Bicycle Lanes’03’03--0606 –– Park Auto Hrs Significantly Park Auto Hrs Significantly ReducedReduced’05’05 –– Approval of Eastern Parkway Approval of Eastern Parkway redesignredesign’06’06 –– Vanderbilt Avenue traffic Vanderbilt Avenue traffic calmingcalming’06 ’06 –– Doubled Crossing Time of Doubled Crossing Time of Prospect Park WestProspect Park West’07’07 –– ……

Page 5: Grand Army Plaza - Welcome to NYC.gov | City of New York · GAP – DOT History of Improvement ’99/’00 – Major Changes in Signs, Markings, Signals ’02-’04-- Island at Library

Bailey Fountain

Memorial Arch

Greenmarket

•Built 1932

•Restored for $1.5 million in 2004

•Built 1892

•Restored in 2000

•Thousands of users each weekend

•At Capacity –Seeking Growth

The Oval/Plaza

Page 6: Grand Army Plaza - Welcome to NYC.gov | City of New York · GAP – DOT History of Improvement ’99/’00 – Major Changes in Signs, Markings, Signals ’02-’04-- Island at Library

Southestern Area Existing Conditions

Large Areas of Roadbed and Marked Islands

No bicycle connection from

Park to Plaza Street Bike Lane

Lack of Pedestrian Connections

Traffic Entering Plaza at High Speeds

Page 7: Grand Army Plaza - Welcome to NYC.gov | City of New York · GAP – DOT History of Improvement ’99/’00 – Major Changes in Signs, Markings, Signals ’02-’04-- Island at Library
Page 8: Grand Army Plaza - Welcome to NYC.gov | City of New York · GAP – DOT History of Improvement ’99/’00 – Major Changes in Signs, Markings, Signals ’02-’04-- Island at Library
Page 9: Grand Army Plaza - Welcome to NYC.gov | City of New York · GAP – DOT History of Improvement ’99/’00 – Major Changes in Signs, Markings, Signals ’02-’04-- Island at Library

Existing Conditions

Page 10: Grand Army Plaza - Welcome to NYC.gov | City of New York · GAP – DOT History of Improvement ’99/’00 – Major Changes in Signs, Markings, Signals ’02-’04-- Island at Library

Reclaimed Road Space

New Planting Beds (2,300 sq. ft.)

Three Concrete Raised Pedestrian Islands (5,900 sq. ft.)

Page 11: Grand Army Plaza - Welcome to NYC.gov | City of New York · GAP – DOT History of Improvement ’99/’00 – Major Changes in Signs, Markings, Signals ’02-’04-- Island at Library
Page 12: Grand Army Plaza - Welcome to NYC.gov | City of New York · GAP – DOT History of Improvement ’99/’00 – Major Changes in Signs, Markings, Signals ’02-’04-- Island at Library

Complete Pedestrian Circulation Network

5 New Crosswalks

Page 13: Grand Army Plaza - Welcome to NYC.gov | City of New York · GAP – DOT History of Improvement ’99/’00 – Major Changes in Signs, Markings, Signals ’02-’04-- Island at Library
Page 14: Grand Army Plaza - Welcome to NYC.gov | City of New York · GAP – DOT History of Improvement ’99/’00 – Major Changes in Signs, Markings, Signals ’02-’04-- Island at Library

Bicycle Connection

Bike Path Between Park and Plaza

Street Bike Lane

Page 15: Grand Army Plaza - Welcome to NYC.gov | City of New York · GAP – DOT History of Improvement ’99/’00 – Major Changes in Signs, Markings, Signals ’02-’04-- Island at Library

Existing Conditions

Page 16: Grand Army Plaza - Welcome to NYC.gov | City of New York · GAP – DOT History of Improvement ’99/’00 – Major Changes in Signs, Markings, Signals ’02-’04-- Island at Library

Exiting park: Right-turn only lane for Eastern Parkway and

Flatbush Avenue

Traffic Calming

Westbound Eastern Parkway

reduced from 3 to 2 lanes

North from Prospect Park reduced from 3 to 2 lanes

Reduced Roadbed

Page 17: Grand Army Plaza - Welcome to NYC.gov | City of New York · GAP – DOT History of Improvement ’99/’00 – Major Changes in Signs, Markings, Signals ’02-’04-- Island at Library

Artist rendering with built improvements

Page 18: Grand Army Plaza - Welcome to NYC.gov | City of New York · GAP – DOT History of Improvement ’99/’00 – Major Changes in Signs, Markings, Signals ’02-’04-- Island at Library

Close Unused Road During Weekend Hours

Existing Unused Roadspace During

Auto-Free PP Hours

Existing Pedestrian Space During Auto

Free Hrs

Essentially Unused Roadspace During

Auto-Free PP Hours

New Reclaimed Ped Space During Weekend Hours

Combined Area Sufficient for Significant Programing

Weekend Pedestrian Space