39
VISION ZERO IN FORT GREENE / CLINTON HILL January 26, 2016 1

VISION ZERO IN FORT GREENE / CLINTON HILL · 2016 Projects Future Projects 3 Capital Improvements In Progress Future Projects . nyc.gov/dot 3 Vision Zero Overview 1 . nyc.gov/dot

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: VISION ZERO IN FORT GREENE / CLINTON HILL · 2016 Projects Future Projects 3 Capital Improvements In Progress Future Projects . nyc.gov/dot 3 Vision Zero Overview 1 . nyc.gov/dot

VISION ZERO IN

FORT GREENE / CLINTON HILL

January 26, 2016

1

Page 2: VISION ZERO IN FORT GREENE / CLINTON HILL · 2016 Projects Future Projects 3 Capital Improvements In Progress Future Projects . nyc.gov/dot 3 Vision Zero Overview 1 . nyc.gov/dot

nyc.gov/dot

Vision Zero in Fort Greene / Clinton Hill

IN THIS PRESENTATION

2 nyc.gov/dot

1 Vision Zero

Overview

Strategies

Accomplishments

2 Operational

Improvements

Completed Projects

2016 Projects

Future Projects

3 Capital

Improvements

In Progress

Future Projects

Page 3: VISION ZERO IN FORT GREENE / CLINTON HILL · 2016 Projects Future Projects 3 Capital Improvements In Progress Future Projects . nyc.gov/dot 3 Vision Zero Overview 1 . nyc.gov/dot

nyc.gov/dot 3

1 Vision Zero Overview

Page 4: VISION ZERO IN FORT GREENE / CLINTON HILL · 2016 Projects Future Projects 3 Capital Improvements In Progress Future Projects . nyc.gov/dot 3 Vision Zero Overview 1 . nyc.gov/dot

nyc.gov/dot 4

Public Policy + Mindset Change

WHAT IS VISION ZERO?

The goal of Vision Zero

is to protect the public

and end traffic deaths

and injuries.

Death and injury on city streets is not

acceptable, and we will no longer

regard serious crashes as inevitable.

- Mayor Bill de Blasio

Page 5: VISION ZERO IN FORT GREENE / CLINTON HILL · 2016 Projects Future Projects 3 Capital Improvements In Progress Future Projects . nyc.gov/dot 3 Vision Zero Overview 1 . nyc.gov/dot

nyc.gov/dot

Strategies and Tools to Make Streets Safer

ACHIEVING VISION ZERO

5

ENGINEERING ENFORCEMENT EDUCATION

Multi-Agency Involvement led by City Hall

LEGISLATION

Page 6: VISION ZERO IN FORT GREENE / CLINTON HILL · 2016 Projects Future Projects 3 Capital Improvements In Progress Future Projects . nyc.gov/dot 3 Vision Zero Overview 1 . nyc.gov/dot

nyc.gov/dot

2015 ACCOMPLISHMENTS

6

Leading Pedestrian Intervals 16

Speed Bumps 187

Protected Bike Lanes (Miles) 6.5

Failure to Yield Summons 10,808

Speeding Summons 77,828

417

340

12.4

39,852

134,426

2506%

82%

91%

268%

72%

Page 7: VISION ZERO IN FORT GREENE / CLINTON HILL · 2016 Projects Future Projects 3 Capital Improvements In Progress Future Projects . nyc.gov/dot 3 Vision Zero Overview 1 . nyc.gov/dot

nyc.gov/dot

Safer Street Design

ACCOMPLISHMENTS

102 corridor and intersection safety projects at VZ priority locations

137 projects completed overall

Several in Ft. Greene/Clinton Hill Area

7

Page 8: VISION ZERO IN FORT GREENE / CLINTON HILL · 2016 Projects Future Projects 3 Capital Improvements In Progress Future Projects . nyc.gov/dot 3 Vision Zero Overview 1 . nyc.gov/dot

nyc.gov/dot

Safer Streets

ACCOMPLISHMENTS

8

2015:

Fewest traffic deaths recorded

in any year since 1910.

2014:

Fewer people killed or severely injured

in crashes than in any previous year

for which the City has data.

Pedestrian fatalities are also down

but work continues to maintain this

progress.

Page 9: VISION ZERO IN FORT GREENE / CLINTON HILL · 2016 Projects Future Projects 3 Capital Improvements In Progress Future Projects . nyc.gov/dot 3 Vision Zero Overview 1 . nyc.gov/dot

nyc.gov/dot 9

2 Operational Improvements

Page 10: VISION ZERO IN FORT GREENE / CLINTON HILL · 2016 Projects Future Projects 3 Capital Improvements In Progress Future Projects . nyc.gov/dot 3 Vision Zero Overview 1 . nyc.gov/dot

nyc.gov/dot

OVERVIEW

10

Completed

Planned

for 2016

Future

Park Ave

Nassau Ave 4

6

2

3

1

5

13

12

14

15

11

7

8

10

9

1. VZ Pedestrian Safety

2. Bus Lane Upgrade

3. VZ Bike Lane & Shared Lane

4. VZ Pedestrian Access

5. VZ Intersection Safety

6. Neighborhood Slow Zone

7. Bicycle Facility

8. Bike Facility Upgrade

9. Intersection Sidewalk Extension

10. Intersection Turn Lanes

11. Pedestrian Access

12. Intersection Improvements

13. Pedestrian Access

14. Intersection Improvements and

Public Space

15. Intersection Improvements

Page 11: VISION ZERO IN FORT GREENE / CLINTON HILL · 2016 Projects Future Projects 3 Capital Improvements In Progress Future Projects . nyc.gov/dot 3 Vision Zero Overview 1 . nyc.gov/dot

nyc.gov/dot

4

6

3

1

Operational Improvements

SELECT COMPLETED PROJECTS

11

1. Atlantic at Washington

Pedestrian Safety Improvements

3. Franklin between Atlantic and Empire

Bicycle Facilities

4. Gold between Sands and Nassau

Pedestrian Access

6. Clinton Hill Neighborhood Slow Zone

Page 12: VISION ZERO IN FORT GREENE / CLINTON HILL · 2016 Projects Future Projects 3 Capital Improvements In Progress Future Projects . nyc.gov/dot 3 Vision Zero Overview 1 . nyc.gov/dot

nyc.gov/dot 12

Atlantic at

Washington

Pedestrian Safety

Improvements

CO

MP

LE

TE

D

Page 13: VISION ZERO IN FORT GREENE / CLINTON HILL · 2016 Projects Future Projects 3 Capital Improvements In Progress Future Projects . nyc.gov/dot 3 Vision Zero Overview 1 . nyc.gov/dot

nyc.gov/dot

Franklin between

Atlantic and Empire

Bicycle Facilities

13

CO

MP

LE

TE

D

Page 14: VISION ZERO IN FORT GREENE / CLINTON HILL · 2016 Projects Future Projects 3 Capital Improvements In Progress Future Projects . nyc.gov/dot 3 Vision Zero Overview 1 . nyc.gov/dot

nyc.gov/dot

Gold between Sands

and Nassau

Pedestrian Access

14

CO

MP

LE

TE

D

Page 15: VISION ZERO IN FORT GREENE / CLINTON HILL · 2016 Projects Future Projects 3 Capital Improvements In Progress Future Projects . nyc.gov/dot 3 Vision Zero Overview 1 . nyc.gov/dot

nyc.gov/dot

Clinton Hill

Neighborhood Slow Zone

15

CO

MP

LE

TE

D

Page 16: VISION ZERO IN FORT GREENE / CLINTON HILL · 2016 Projects Future Projects 3 Capital Improvements In Progress Future Projects . nyc.gov/dot 3 Vision Zero Overview 1 . nyc.gov/dot

nyc.gov/dot

Operational Improvements

PLANNED PROJECTS 2016

16

Lafayette

between Fulton

and Classon

Bike Facility

Upgrade

Lafayette at

Cumberland

Sidewalk

Extension

Clinton between

Flushing and

Atlantic

Bicycle Facility

Gold between

Sands and York

Pedestrian

Access

Bedford at

Fulton

Turn Lanes

and Sidewalk

Extension

Page 17: VISION ZERO IN FORT GREENE / CLINTON HILL · 2016 Projects Future Projects 3 Capital Improvements In Progress Future Projects . nyc.gov/dot 3 Vision Zero Overview 1 . nyc.gov/dot

nyc.gov/dot

Lafayette between

Fulton and Classon

Bike Facility Upgrade

17

Widen parking lane next to remaining

general traffic lane

Upgrade existing facility and Install buffered bicycle lane Accommodates bus traffic

and high bike volumes

20

16

Page 18: VISION ZERO IN FORT GREENE / CLINTON HILL · 2016 Projects Future Projects 3 Capital Improvements In Progress Future Projects . nyc.gov/dot 3 Vision Zero Overview 1 . nyc.gov/dot

nyc.gov/dot

Lafayette between

Fulton and Classon

18

20

16

Page 19: VISION ZERO IN FORT GREENE / CLINTON HILL · 2016 Projects Future Projects 3 Capital Improvements In Progress Future Projects . nyc.gov/dot 3 Vision Zero Overview 1 . nyc.gov/dot

nyc.gov/dot

Lafayette at

Cumberland

Sidewalk Extension

19

Add Sidewalk Extension

Existing Conditions

20

16

Page 20: VISION ZERO IN FORT GREENE / CLINTON HILL · 2016 Projects Future Projects 3 Capital Improvements In Progress Future Projects . nyc.gov/dot 3 Vision Zero Overview 1 . nyc.gov/dot

nyc.gov/dot

Gold between Sands and York

Pedestrian Access

20

Expand existing median

Add parking along median

Add midblock crosswalk

Pedestrian refuge at intersections

EXISTING CONDITIONS

20

16

Remove one moving lane in each direction

Page 21: VISION ZERO IN FORT GREENE / CLINTON HILL · 2016 Projects Future Projects 3 Capital Improvements In Progress Future Projects . nyc.gov/dot 3 Vision Zero Overview 1 . nyc.gov/dot

nyc.gov/dot

Bedford at Fulton

Turn Lanes and

Sidewalk Extension

21

• Create left turn lane • Align through movement • Minimize back pressure • Shorten crossing distance • Pending CB outreach

20

16

Page 22: VISION ZERO IN FORT GREENE / CLINTON HILL · 2016 Projects Future Projects 3 Capital Improvements In Progress Future Projects . nyc.gov/dot 3 Vision Zero Overview 1 . nyc.gov/dot

nyc.gov/dot

Clinton between

Flushing and Atlantic

Bicycle Facility

22

• Investigate converting Clinton Avenue to one-way northbound to install a two-way parking protected bicycle lane on east curb

• Potential to include landscaped pedestrian islands

• Pending outreach and final feasibility analysis

EXISTING CONDITIONS

PO

TE

NT

IAL

2016

POTENTIAL

Page 23: VISION ZERO IN FORT GREENE / CLINTON HILL · 2016 Projects Future Projects 3 Capital Improvements In Progress Future Projects . nyc.gov/dot 3 Vision Zero Overview 1 . nyc.gov/dot

nyc.gov/dot

Clinton between

Flushing and Atlantic

Bicycle Facility

23

Clinton Avenue Vehicle Volumes

Northbound midweek peak

• 146 VPH

• 2188 AADT

Southbound midweek peak

• 290 VPH

• 2762 AADT

Vanderbilt Avenue Bike Volumes (Existing Shared Lane Connector)

Between Fulton and Atlantic

• 1,962 weekday

• 1,338 weekend

Between Dekalb and Lafayette

• 933 weekday

• 632 weekend

PO

TE

NT

IAL

2016

Page 24: VISION ZERO IN FORT GREENE / CLINTON HILL · 2016 Projects Future Projects 3 Capital Improvements In Progress Future Projects . nyc.gov/dot 3 Vision Zero Overview 1 . nyc.gov/dot

nyc.gov/dot

Operational Projects In Planning

FUTURE PROJECTS

24

Atlantic between

6th and Waverly

Intersection

Improvements

Park between Navy

and Ryerson

Pedestrian Access

Park Avenue, Existing Conditions

Page 25: VISION ZERO IN FORT GREENE / CLINTON HILL · 2016 Projects Future Projects 3 Capital Improvements In Progress Future Projects . nyc.gov/dot 3 Vision Zero Overview 1 . nyc.gov/dot

nyc.gov/dot

Operational Projects In Planning

Ongoing Construction Constraints

FUTURE PROJECTS

25

Flatbush at

3rd/Lafayette

Intersection

Improvements and

Public Space

Flatbush and

Atlantic

Intersection

Improvements

Flatbush Corridor Walkthrough

October 2015

Page 26: VISION ZERO IN FORT GREENE / CLINTON HILL · 2016 Projects Future Projects 3 Capital Improvements In Progress Future Projects . nyc.gov/dot 3 Vision Zero Overview 1 . nyc.gov/dot

nyc.gov/dot

3 Capital Improvements

26

Page 27: VISION ZERO IN FORT GREENE / CLINTON HILL · 2016 Projects Future Projects 3 Capital Improvements In Progress Future Projects . nyc.gov/dot 3 Vision Zero Overview 1 . nyc.gov/dot

nyc.gov/dot

OVERVIEW

27

In Progress

Future

1. Atlantic between Flatbush and 6th

Corridor upgrades

2. Myrtle Ave

Public Space and Intersection

Improvements

3. Fowler Square

Plaza Upgrades

4. Flatbush between DeKalb and State

Median Installation

5. Fulton Street

Sidewalk Extensions

6. Times Plaza

Public Space Upgrades

7. Gates at Fulton

Intersection Improvements

8. Flatbush from 6th Ave to 8th Ave

Intersection Improvements

9. Putnam Plaza

Public Space Upgrades

1

2

3

6

7

4

5

8

9

Page 28: VISION ZERO IN FORT GREENE / CLINTON HILL · 2016 Projects Future Projects 3 Capital Improvements In Progress Future Projects . nyc.gov/dot 3 Vision Zero Overview 1 . nyc.gov/dot

nyc.gov/dot

• Median • Shorter Safer Crossings • Traffic Calming • Slower Turns at S. Portland/6th Ave • Midblock Crosswalk

Corridor Upgrades

ATLANTIC BETWEEN

FLATBUSH AND 6TH AVE.

IN P

RO

GR

ES

S

28

Page 29: VISION ZERO IN FORT GREENE / CLINTON HILL · 2016 Projects Future Projects 3 Capital Improvements In Progress Future Projects . nyc.gov/dot 3 Vision Zero Overview 1 . nyc.gov/dot

nyc.gov/dot

• New Public Space • Shorter Crossings • Closed Slip Road • Reduced Conflicts

MYRTLE AVE PLAZA

Public Space and Intersection

Improvements

IN P

RO

GR

ES

S

29

Page 30: VISION ZERO IN FORT GREENE / CLINTON HILL · 2016 Projects Future Projects 3 Capital Improvements In Progress Future Projects . nyc.gov/dot 3 Vision Zero Overview 1 . nyc.gov/dot

nyc.gov/dot

30

IN P

RO

GR

ES

S

Page 31: VISION ZERO IN FORT GREENE / CLINTON HILL · 2016 Projects Future Projects 3 Capital Improvements In Progress Future Projects . nyc.gov/dot 3 Vision Zero Overview 1 . nyc.gov/dot

nyc.gov/dot

• Plaza Upgrade • New Sidewalk

Extension on S. Elliot and Fulton

FOWLER SQUARE

Plaza Upgrades

IN P

RO

GR

ES

S

31

Page 32: VISION ZERO IN FORT GREENE / CLINTON HILL · 2016 Projects Future Projects 3 Capital Improvements In Progress Future Projects . nyc.gov/dot 3 Vision Zero Overview 1 . nyc.gov/dot

nyc.gov/dot

• Landscaped Median • Extension of Existing

Project • Currently Unfunded

FLATBUSH BETWEEN

DEKALB AND STATE

Median Installation

FU

TU

RE

32

Page 33: VISION ZERO IN FORT GREENE / CLINTON HILL · 2016 Projects Future Projects 3 Capital Improvements In Progress Future Projects . nyc.gov/dot 3 Vision Zero Overview 1 . nyc.gov/dot

nyc.gov/dot

Atlantic Ave

4th A

ve

4th A

ve

Atlantic Ave

• Plaza Upgrade • Planning workshop tomorrow

• Wednesday, January 27th • 6:30pm • YWCA Brooklyn, 30 Third Ave

TIMES PLAZA

Public Space Upgrades

FU

TU

RE

33

Design Concept

Page 34: VISION ZERO IN FORT GREENE / CLINTON HILL · 2016 Projects Future Projects 3 Capital Improvements In Progress Future Projects . nyc.gov/dot 3 Vision Zero Overview 1 . nyc.gov/dot

nyc.gov/dot

• Sidewalk Extensions at Select Intersections

• Including S. Portland • In Development

FULTON STREET

SIDEWALK EXTENSIONS

Intersection Improvements

FU

TU

RE

34

DRAFT

Page 35: VISION ZERO IN FORT GREENE / CLINTON HILL · 2016 Projects Future Projects 3 Capital Improvements In Progress Future Projects . nyc.gov/dot 3 Vision Zero Overview 1 . nyc.gov/dot

nyc.gov/dot

• Enlarged sidewalk • Shorter Crossings • Normalizes intersection

GATES AVE

SIDEWALK EXTENSION

Intersection Improvements

FU

TU

RE

35

Page 36: VISION ZERO IN FORT GREENE / CLINTON HILL · 2016 Projects Future Projects 3 Capital Improvements In Progress Future Projects . nyc.gov/dot 3 Vision Zero Overview 1 . nyc.gov/dot

nyc.gov/dot

• Plaza Upgrade • New Sidewalk

Extension on Grand Ave

PUTNAM PLAZA

Plaza Upgrades

36

FU

TU

RE

Page 37: VISION ZERO IN FORT GREENE / CLINTON HILL · 2016 Projects Future Projects 3 Capital Improvements In Progress Future Projects . nyc.gov/dot 3 Vision Zero Overview 1 . nyc.gov/dot

nyc.gov/dot

FLATBUSH AT 6TH AVE.

Corridor Improvements

FU

TU

RE

37

Page 38: VISION ZERO IN FORT GREENE / CLINTON HILL · 2016 Projects Future Projects 3 Capital Improvements In Progress Future Projects . nyc.gov/dot 3 Vision Zero Overview 1 . nyc.gov/dot

nyc.gov/dot

FLATBUSH AT 7TH AVE.

Corridor Improvements

38

FU

TU

RE

Page 39: VISION ZERO IN FORT GREENE / CLINTON HILL · 2016 Projects Future Projects 3 Capital Improvements In Progress Future Projects . nyc.gov/dot 3 Vision Zero Overview 1 . nyc.gov/dot

nyc.gov/dot 39

THANK YOU!

NYC DOT NYC DOT nyc_dot NYC DOT