Page 1: GPS III System Architecture Requirements Definition

1

CGSIC IISC

GPS III SARD

GPS IIIGPS IIISystem ArchitectureSystem Architecture

RequirementsRequirementsDefinitionDefinition

David A. TurnerThe Aerospace Corporation

CGSIC IISC Monaco MeetingNovember 30, 2000

Page 2: GPS III System Architecture Requirements Definition

2

CGSIC IISC

GPS III SARD

SUMMARYSUMMARY

u GPS III Program Overviewu System Architecture Requirements

DefinitionuContractor Trade Study TeamsuSARD Government TeamuTrade Study Process and ProductsuGPS III and Galileo

u GPS III Capability Goalsu Conclusion

Page 3: GPS III System Architecture Requirements Definition

3

CGSIC IISC

GPS III SARD

Ensure best GPS system for the nation for the next 30 yearsEnsure best GPS system for the nation for the next 30 years

GPS III PurposeGPS III Purposeu Plan and grow system capabilities to meet future user needs

for precise positioning and timing services– GPS ORD objective values as the target

u Procure most cost-effective system to meet future military andcivilian requirements through 2030– Sustain GPS Service– Reduce Total Ownership Costs– Conscientious cost - benefit analyses for future requirements

u Make optimal use of system augmentations andcomplementary systems

u Re-look at entire GPS system architecture– Identify system-level trades for all system segments - space,

control segment and user equipment

Page 4: GPS III System Architecture Requirements Definition

4

CGSIC IISC

GPS III SARD

GPS-III Program ApproachGPS-III Program Approach

u System Architecture Investigation Studies leading toSystem Requirements Review - November 2000– Architectural trade space definition– Competitive contractor architecture definition– Comprehensive system requirements document

u Preliminary Design & Risk Reduction - Early 2002– Competitive Source Selection– Two qualified sources will compete for system design to reduce

design/production risk

u Design/Production - Mid-year 2004– Down-select to single contractor at Preliminary Design Review

Three phase approach - flexible, allows futurechanges, reduces risk

Three phase approach - flexible, allows futurechanges, reduces risk

Page 5: GPS III System Architecture Requirements Definition

5

CGSIC IISC

GPS III SARD

FY00

Authority toProceed

(August 00)

0301 02

04 0705 06

CompetitiveTrade Studies(Two contractors)

EMD(Single contractor)

PD/RR(Two contractors)

Long Lead Production(MS IIIa)

Critical Design Review

Box/System Qual Tests Integ/Assy/Test

SARD

RFP/SS

PD/RR(con’t)

Design Reviews

RFP/SS

PD/RR ProgramReview (MS I)

ContractAward

Down Select(MS II)

Qual Vehicle TestingComplete

Requirements UpdateJROC

GPS III Acquisition StrategyGPS III Acquisition Strategy

Alternativesystemsreview

Page 6: GPS III System Architecture Requirements Definition

6

CGSIC IISC

GPS III SARD

GPS III SARD Phase - PurposeGPS III SARD Phase - Purpose

u Assess system wide architecturalalternatives to:– Meet ORD requirements– Reduce total ownership costs– Provide flexibility and robustness to meet

evolving military and civil requirements for thenext 30 years

u Principal product of the SARD is a set ofsuggested requirements

u Only the alternative(s) approved by theGovernment will lead to requirements

Page 7: GPS III System Architecture Requirements Definition

7

CGSIC IISC

GPS III SARD

GPS III SARD Phase - Study TeamsGPS III SARD Phase - Study Teams

u Competitive selection of two contractor teams– Proposals reviewed in September and October– Two 12 month Study Contract winners announced

on November 9th

u Government SARD Team– JPO lead ensemble with military and civil agency

participation– Review and blend contractors’ analysis and other

government studies– Form the final baseline and alternatives to be

presented to the Defense Acquisition Board (DAB)

Page 8: GPS III System Architecture Requirements Definition

8

CGSIC IISC

GPS III SARD

Competitive Contractor Study TeamsCompetitive Contractor Study Teams

Boeing Government Info & Comm Systems Boeing Satellite Systems (Hughes Space & Comm) Computer Sciences Corporation

Lockheed Martin Management & Data Systems Raytheon Company

Lockheed Martin Space Systems

ITT Industries

Rockwell Collins

Ball Aerospace

aaaaaaaaaaaaaaaaaaaaAAaaaa

Page 9: GPS III System Architecture Requirements Definition

9

CGSIC IISC

GPS III SARD

Government SARD TeamGovernment SARD Team

u Government Technical Oversight– U.S. Air Force GPS Joint Program Office– Additional Input from IGEB Agencies

u Principal Technical Support– The Aerospace Corporation– MITRE Corporation

•Command, Control, Communications & Intelligence (C3I)•Center For Advanced Aviation Systems Design (CAASD)

u Additional Technical Support– National Security Agency– US Naval Observatory– Systems Engineering Technical Assistance (SETA)

Contractors

Page 10: GPS III System Architecture Requirements Definition

10

CGSIC IISC

GPS III SARD

The Questions to AnswerThe Questions to Answer

u What can be added to a system that deliversPNT services, that, for some marginaladditional cost, will yield much greaterbenefit?

u How can the existing needs be met withgreater reliability, margin and quality atlower cost and within schedule?

u How (and when) can the newcapabilities/architectural elements betransitioned from the current configuration?

u What synergies with other systems can beutilized to achieve all of the above?

Page 11: GPS III System Architecture Requirements Definition

11

CGSIC IISC

GPS III SARD

Alternative FuturesAlternative Futures

u Technical/programmatic alternatives motivatedby economic and policy-related considerations

u Civil possibilities include:– Current -- core GPS plus external augmentations– GPS program managing augmentations– Enhanced core incorporating augmentations– GPS incorporating or partnering with future civil

satellite navigation elements

u Military possibilities include– GPS/NDS only– Multi-mission platform– Shared functions with other platforms

Page 12: GPS III System Architecture Requirements Definition

12

CGSIC IISC

GPS III SARD

GPS Space-Only Solution with User BasedGPS Space-Only Solution with User BasedAugmentationsAugmentations

GPSSystem Requirements

Space Only

Aviation Needs

TerrestrialPrecision

Needs

High AJ Needs

Augm

t.

Augm

t.

Augm

t.

Nav. related Comm.

Needs Augm

t.

POS/NAV/TIME

Page 13: GPS III System Architecture Requirements Definition

13

CGSIC IISC

GPS III SARD

Civil SpacePlatform

GPSSystem Requirements

Space Only

Aviation Needs

TerrestrialPrecision

Needs

High AJ Needs

Augm

t.

Augm

t.

Augm

t.

Nav. related Comm.

Needs Augm

t.

GPS/Civil Independent Space-Only Solution with UserGPS/Civil Independent Space-Only Solution with UserBased AugmentationsBased Augmentations

POS/NAV//TIME

Page 14: GPS III System Architecture Requirements Definition

14

CGSIC IISC

GPS III SARD

CivilSpace

Platform

GPSSystem Requirements

Space Only

Aviation Needs

TerrestrialPrecision

Needs

High AJ Needs

Augm

t.

POS/NAV/TIME

Augm

t.

Augm

t.

Nav. related Comm.

Needs

Augm

t.

*

GPS/Civil Interoperable Space-Only Solution with UserGPS/Civil Interoperable Space-Only Solution with UserBased AugmentationsBased Augmentations

* Possible cooperative monitoring, crosslinks, satellite control, etc...

Page 15: GPS III System Architecture Requirements Definition

15

CGSIC IISC

GPS III SARD

GPS Total SolutionGPS Total SolutionAugmentations and Additional MissionsAugmentations and Additional Missions

OtherDoD

Space Platform Req.s

GPSSystem Requirements

AviationNeeds

TerrestrialPrecision

Needs

High AJNeeds

Augmt .

Augmt .

Augmt .NAV/POS/TIME

*

* Examples: crosslinks,SAR, Nav. related Comm., etc.

Page 16: GPS III System Architecture Requirements Definition

16

CGSIC IISC

GPS III SARD

Outline of the SARD ProcessOutline of the SARD Process

ALTERNATIVE 1

DERIVE INITIAL SET OF TOP-LEVEL

REQUIREMENTS

SYNTHESIZE ARCHITECTURAL

AND PROGRAMMATIC ELEMENTS / CONOPS

TO MEET/EXCEEDREQUIREMENTS

VALIDATE ARCHITECTUREAND PROGRAM AND CONDUCT

BEST-VALUETRADE STUDIES

SYSTEM LEVELSEGMENT LEVELSUB-SYSTEM LEVEL

CURRENT SYSTEM/TRANSITION

POST IOCPOST FOC

23

4

Page 17: GPS III System Architecture Requirements Definition

17

CGSIC IISC

GPS III SARD

The SARD Phase ProductThe SARD Phase Product

u Comprehensive System Requirements thatare performance-based

– System Requirements Document

– Technical Requirements Document

u Used to Develop a Request for Proposal

– Competitive Source Selection to award twocontracts to enter the Preliminary Design & RiskReduction Phase - October 2001

Page 18: GPS III System Architecture Requirements Definition

18

CGSIC IISC

GPS III SARD

GPS III and GalileoGPS III and Galileo

u USG is postured to cooperate with Europe inpursuing a fully interoperable GNSS based on:– Agreement to principles outlined in a draft agreement

provided to the European Commission– A decision by Europe to go ahead with Galileo

u However:– GPS III architectural solutions should stand on their own– Premature to incorporate Galileo concepts into the GPS III

architecture as EU has not yet made a decision– Advantageous to US Government to understand benefits of

potential future systems like Galileo

u GPS III contractors may seek insight into the Galileoconcepts by contacting potential Galileo contractors

Page 19: GPS III System Architecture Requirements Definition

19

CGSIC IISC

GPS III SARD

GPS III Capability GoalsGPS III Capability Goals2000 GPS ORDSystem

Characteristic Threshold ObjectiveCivil PNT

(Appendix F - 2000 ORD)Accuracy

Horizontal 6.3m (95%)

30.0m (99.9%)

1.0m (95%) –civilian

2.1m (95%) –military

0.01m

Vertical 13.6m (95%)40.0m (99.9%)

4.0m (95%) 0.04m

Timing 20.0nsec (95%) 10.0nsec (95%) 0.3 nanosecond (threshold)1.0 picosecond (objective)

Availability 90.0% 99.9% 100.0%

IntegrityPHMI TBD TBD 1-2x10-9 per approach

Time-to-alarm TBD TBD 1 secondContinuity ofService

TBD TBD 1-10-4 per hour and1-8 x 10-6 per 15 sec and

1-6x10-6 per 30 sec

Page 20: GPS III System Architecture Requirements Definition

20

CGSIC IISC

GPS III SARD

CONCLUSIONCONCLUSIONu GPS III will follow Block IIR and IIF modernization

– Three phase approach -- System Architecture RequirementsDefinition Studies; Preliminary Design & Risk Reduction;Design/Production

u SARD Studies will assess system wide architecturalalternatives resulting in system/technicalrequirements to achieve Objective OperationalRequirements– Two Contractors and a Government Team are in place– SARD phase will consider potential future satellite navigation

systems but it is premature to incorporate specific systemcharacteristics into architectural alternatives

The Goal -- Procure a cost-effective system to sustainGPS services and meet future military and civil

PNT requirements through 2030

The Goal -- Procure a cost-effective system to sustainGPS services and meet future military and civil

PNT requirements through 2030