101.1 T PDD Page 1 of 47 Gold Standard for the Global Goals Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017

Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 1 of 47

Gold Standard for the Global Goals

Key Project Information & Project Design Document (PDD)

Version 1.1 – August 2017

Page 2: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 2 of 47

KEY PROJECT INFORMATION Title of Project: Household Biogas plants installed in rural areas

of Uttar Pradesh & Maharashtra Brief description of Project:

The project activity involves bundling 15,702

housefold biogas plants located in Uttar Pradesh and Maharashtra of varying capacities – 2m3, 3m3

and 4m3. All 15,702 plants in the project are commissioned from 06/02/2017 onwards until

01/07/2018. The biogas plants are combination of deenbandhu model and KVIC model . The

purpose of the project is to replace the commonly used inefficient wood fired mud

stoves technology, with clean, sustainable and efficient biogas.

This project leads to reduction of greenhouse gas emissions by displacing conventionally used non renewable biomass with renewable biogas. In addition, the hygienic conditions in the rural areas will be improved by an appropriate disposal of waste. Further, residue from the bio digesters is used as organic fertilizer and will improve soil conditions in rural areas.

Expected Implemetation Date: Expected duration of Project:

07/02/2017 5 years renewable cycle

Project Developer: Aadivasi Khadi Avom Krishi Parishchan Sansthan (AKKPS)

Project Representative: Swiss Carbon Value Ltd. Project Participants and any communities involved:

Aadivasi Khadi Avom Krishi Parishchan Sansthan (AKKPS) Swiss Carbon Value Ltd.

Version of PDD: Date of Version:

01.1 01/10/2018

Host Country / Location: India (Uttar Pradesh and Maharashtra) Certification Pathway (Project Certificatin/Impact Statements & Products

Project Certification

Activity Requirements applied: (mark GS4GG if none relevant)

GS4GG: Community Services Activity Requirements

Methodologies applied: AMS I. E.- Switch from non-renewable biomass for thermal applications by the user, Version 08, EB 97

Product Requirements applied: GS VER Regular/Retroactive: Retroactive SDG Impacts: 1– Good Health and well being (SDG 3)

2- Affordable and clean Energy (SDG 7) 3-Climate Action (SDG 13)

Page 3: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 3 of 47

Estimated amount of SDG Impact Certified 56,508 tCO2/year

Page 4: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 4 of 47

SECTION A. Description of project

A.1. Purpose and general description of project

>> The aim of the project is to replace the commonly used inefficient wood fired mud stoves technology, with clean, sustainable and efficient biogas. The purpose of the project activity is to bundle 2m3, 3m3 and 4m3 plants in Uttar Pradesh & Maharashtra. All 15,702 plants are commissioned in between February 2017 – July 2018 and comprises of total 45,549 m3. Each household will utilize the dung of its cows to feed the digester for the production of biogas for domestic purposes. This leads to reduction of greenhouse gas emissions by displacing conventionally used non renewable biomass with renewable biogas. In addition, the hygienic conditions in the rural areas will be improved by an appropriate disposal of waste. Further, residue from the bio digesters is used as organic fertilizer and will improve soil conditions in rural areas. Project activity will contribute towards sustainable development by replacing firewood with biogas generated from the biodigesters. Baseline Scenario: Household survey was conducted to assess the baseline fuel and quantity used. As per the Survey, firewood was the main fuel used to suffice domestic needs. It was sourced from nearby forests and open market. Families have to walk 2-5 km to collect this firewood. Usage of inefficient firewood leads to indoor pollution and land use patterns have been showing a decrease in forest land cover and increase in degraded land. Increasing pressure from human and livestock population and indiscriminate and illegal exploitation of forest resources are among factors that have lead to further intensification of the problem. A trend of forests turning into open scrubs has been observed. Degradation of forest lands has exacerbated the already existing problem of desertification. There is a need to maintain adequate forest cover in the state to mitigate climate change effects. Project Scenario: Project activity involves bundling of 15,702 plants installed in rural areas of UP & Maharashtra installed between Feb 2017 and July 2018 constructed & maintained by Aadivasi Khadi Avom Krishi Parishchan Sansthan(AKKPS). Project activity involves installation of new biogas plant in the households of UP & Maharashtra and produced biogas will be used in the biogas stoves for thermal energy needs. Hence, the project activity is a Greenfield project activity. Residues from the bio digesters are used as organic fertilizer in the garden area and fields of the local people. Project activity will result in saving of 847,620 tCO2 throughout the project activity with an average saving of 56,508 tCO2/year The size of the biodigesters varies, depending on the number of people and number of cattle available per household. A detailed breakdown of the plants with the respective installed capacity is given below in Table 1.

Page 5: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 5 of 47

Table 1. Breakdown of the plants with the respective instal led capacity

Sr. No Capacity

(m3) Number of plants

Uttar Pradesh Maharashtra 1 2 361 2212 2 3 350 11763 3 4 1,011 5

Total: 15,702

A.2. Eligibil ity of the project under Gold Standard

>> (Describe how the project meets the eligibility criteria as per section 3.1.1 of GS4GG Principles & Requirements document and the relevant activity requirements document)

The project falls under GG4GG Community Services Activity Requirements:

Eligible Project Types & Scope: The projects leads to climate change mitigation by providing

access to resources (biogas) to households. Types of project: The project falls under ‘Renewable

energy” type- Waste management and handling: Management of animal waste (cattle dung) to

deliver biogas.

Project Area, Boundary and Scale: Project Area and Boundary is described under section A.4

below.

Scale: The project falls unde waste handling and disposal with emission reductions 56,508 tCO2

with installed energy output of 36.27 MWthermal (Below the threshold of 45 MWthermal). Hence,

the project falls under small scale projects.

Project Contributes the Sustainable Development Project implementation in rural areas will improve the socio- economic condition of the rural population and reduce GHG emissions. It is expected that this project will contribute to the improvement of the living standard of the population. A detailed Sustainable Development description of the project activity is given in the Gold Standard project design document. The advantages of the projects are given in brief below: Environmental well being

• The project utilizes cow dung & kitchen wastes which in the absence of the project activity would be left to decay and thus leading to substantial methane emissions from anaerobic processes.

• Utilizing biogas as an energy resource contributes to clean environment. • Transformation of organic wastes into high quality fertilizer.

Page 6: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 6 of 47

• Due to the anaerobic processes, the final sludge of the biodigesters has a very high degree of purity, i.e. it contains no parasites. This reduces the danger of parasitic infestations in people and animals

• During fermentation, part of the nitrogen content is changed into the form of ammonium, more easily absorbed by plants. In the direct spreading of unfermented manure, this process takes place in the soil and requires more time. Thus fermented liquid manure can be applied during the growth period of the plants (top dressing): This direct absorption by plants means that the danger of nitrogen seepage is reduced.

• Improvement of hygienic conditions through reduction of pathogens by utilizing the animal and other organic wastes in the bio digesters.

• Contribute to the global environment improvement by reducing deforestation and improving biodiversity.

• It will lead to improvement in soil condition by providing high quality manure. Social – Economic well being

• It leads to improve the economic level of the local community by employing local people during construction of the biogas plant.

• The project will reduce the cooking time, thus providing women to take up other activities. It improves the overall health situation by reducing smoke in the kitchen, thus eliminating health hazards from indoor air pollution.

Technology well being:

• Biogas provides a more convenient, dependable energy source that is renewable and that

reduces cooking time

The slurry produced from the biogas units is a valuable organic fert i l iser that can be applied directly to the f ields.

A.3. Legal ownership of products generated by the project and legal r ights to alter use of resources required to service the project

>> Implementation of the proposed project doesn’t involve any activity that causes alteration of any resource; therefore acquiring any specific legal right to do so is not applicable. However, the entitlement of the emission reductions generated by the project shall be transferred to the project developer from the beneficiary households through a signed covenant.

A.4. Location of project

A.4.1. Host Country

>> India

Page 7: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 7 of 47

A.4.2. Region/State/Province etc.

>> Uttar Pradesh and Maharashtra

A.4.3. City/Town/Community etc.

>> In Uttar Pradesh nine districts (Lakhimpur, Sahjahanpur, Rampur, Bareli, Sitapur, Faizabad, Sultanpur, Pilibhit, Sonbhadra, Varanasi, Mirjapur, Chandola, Urai, Deoria, Kushinagar, Mathura, Unnav, Raibareli, Jhansi, Muzzafarnagar and Ballia) were surveyed and in Maharashtra seven districts (Kolhapur, Bhandara, Gondiya, Gharchiroli, Chandrapur, Tiroda and Nagpur).

A.4.4. Physical/Geographical location

>> (Include information allowing the unique identification of this project.) Coordinates

Latitude(UP & Maharashtra) 27° 40'00” N & 23° 00'00” N

Longitude (UP & Maharashtra) 80° 00'00” E & 72° 00' 00" E Uttar Pradesh

Page 8: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 8 of 47

Maharshtra

A.5. Technologies and/or measures

>> (Describe the technologies and measures to be employed and/or implemented by the project, including a list of the facilities, systems and equipment that will be installed and/or modified by the project. Include information essential to understand the purpose of the project and how it will contribute positively to three SDGs.)

As described above project activity involves bundling of household bio-digesters with Deenbandhu model & KVIC model technology installed in rural areas of UP & Maharashtra. There is no technology transfer involved in the project activity. All plants are built by local mesons and the NGOs Details of working given below: Deenbandhu Model: The major feed cow dung and other organic waste material is mixed with water and fed into the plant through the inlet chamber of the plant. This waste is converted into biogas with the help of a special type of anaerobic bacteria. The digested material, which comes out of the plant, is enriched manure. The main feature of a Deenbandhu biogas plant is the fixed underground digester chamber, constructed with a layer of bricks and an additional layer of cement mortar forming the roof above. Connected to the underground chamber is an inlet tank (labelled on diagram as “Mixing Tank”), through which manure is fed into the plant. The manure then ferments separating the slurry from the methane gas which rises and collects at the top of the digester tank, and is released through the gas outlet pipe. The slurry passes into the outlet tank where it is ejected from the plant and can be used as fertilizer on the field

Page 9: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 9 of 47

Figure1: Deenbandhu type Biogas plant

KVIC f loating model: KVIC model, consists of a deep well, and a floating drum, usually made of mild steel. The system collects the gas, which is kept at a relatively constant pressure. As more gas is produced, the drum gas holder consequently rises. As the gas is consumed, the drum then falls. The biomass slurry moves through the system, as the inlet is higher than the outlet tank, creating hydrostatic pressure. Only completely digested material can flow up a partition wall, which prevents fresh material from 'short-circuiting' the system, before flowing into the outlet tank. Figure 2: KVIC type Biogas plant

The project contributes directly in achieving the SDG#3 &7 in addition to SDG#13 as required by

Principle- 1 of GS4GG. The project will have following benefits:

•  Environmental Benefits: Reduction in firewood consumption and emission of greenhouse gases, forest and biodiversity conservation (SDG#13).

• Economic Benefits: Employment creation and saving of health cost (SDG#3). • Health Benefits: Sufficiently enhance indoor air quality thereby improving health of

Page 10: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 10 of 47

family members and reducing incidences of smoke and fire related injuries (SDG#3). • Social Benefits: The project will provide affordable and clean fuel copared to baseline

scenario (SDG #7)

A.6. Scale of the project

>> (Define whether project is micro scale, small scale or others. Justify the scale referring to relevant activity requirement.) The project falls unde waste handling and disposal with emission reductions of 56,508 tCO2 per annum with installed energy output of 36.27 MWthermal (Below the threshold of 45 MWthermal). Hence, the project falls under small scale projects.

A.7. Funding sources of project

>>

No public funding from parties included in Annex I to the UNFCCC, is available to the project. No

Official Development Assistance involves in the project activity. The end users invest in procuring

biogas technology with special assiatnce given by AKKPS.

A.8. Assessment that project complies with ‘gender sensit ive’ requirements

>> (Answer the four mandatory questions included under Step 1 to 3 in “Gold Standard Gender Equality Guidelines and Requirements” available here.) Proposed project is developed pursuant to the “gender sensitive” requirements outlined in the “Gold Standard Gender Equality Guidelines and Requirements”. As required for the purpose of the PDD as specified in the guidance note to this section, the project participants presents the assessment to questions included in step 1 to 3 in the respective guidelines and requirements. 1M) Does the project reflect the key issues and requirements of gender-sensit ive

design and implementation as outl ined in the gender policy? Explain how. The project respects the key gender issues and requirements of gender-sensitive design and implementation of the project. SDG#5 is one of the impact areas of the project. The project is aimed to avail the clean cooking solutions to the households. Biogas project will result in cutting down the firewood consumption. Therefore, the project will support environmentally sustainable consumption of firewood. In the overwhelming majority of the households in Uttar Pradesh and Maharashtra, the kitchen chores (including the sourcing of fuel, cooking and cleaning) are handled by women. While getting involved most of the time with the kitchen related activities, women are more exposed to the indoor air pollution and the associated hazard. Situation is more aggravated with a fact that the women are also responsible for taking care of the children and the children who normally need mother’s support to perform their activities are bound to accompany their mother in kitchen. This situation has led to enhanced exposure of the women and children to kitchen smoke and associated health consequences. Since the project aims to displace the polluting firewood from the kitchen, the primary beneficiary would be the women and children. Furthermore, the project is

Page 11: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 11 of 47

focused to the socially disadvantaged group of people, which also justifies the dimension of social inclusion in the project design. On the implementation side, the project has trained and deployed women in the marketing and construction of the biogas plant. Project implementer opines that promotional activities are better addressed with women in the forefront. During the life of the project, the project participant believes to create a conducive environment where women are ably capacitated todiscuss the needof a technology, create awareness of the product and process, and in long run, to organize themselves and create business opportunities for themselves. This women prioritized mode of project development and implementation helps address gender equality issues; in the meantime, addressing issues related to environmental sustainability and natural resource management. 2M. Does the project al ign with exist ing country policies, strategies and best

practices? Explain how. The project respects all the rights to the women conferred to them by the Republic of India. The constitution embraces the principle of “positive discrimination” to enhance women’s participation in all state organs. Article 18 of the constitution hights the “right to equality”, article 38 outlines the “rights of women”, article 40 outlines “rights of dalits”, article 42 outlines “right to social justice”, and article 43 outlines “rights to social security”. All these articles embrace the gender equality and social inclusion principles in a way or other. Similarly, the project also respects the spirit of international convention on “women” to which India is a party. The project shall be implemented in the households of dalits and backward community where the women are the primary beneficiary. Further to it, the project involves women in the forefront of the supply chain that helps fostering their entrepreneurial skills and capacitates them to be part in social dialogue. Doing this, the project fully embraces the spirit of “positive discrimination” held by the constitution. 3M. Does the project address the questions raised in the Gold Standard

Safeguarding Principles & Requirements document? Explain how. The project doesn’t trigger key Safeguarding Principles and Requirements adopted by the Gold Standard. Table-1 highlights the project participant’s assessment of the key questions on GS Safeguarding Principles & Requirements. The following safeguarding principles and requirements are triggered by the project. SOCIAL & ECONOMIC SAFEGUARDING PRINCIPLES 1. Principle 2 - Gender Equality and Women’s Rights ENVIRONMENTAL & ECOLOGICAL SAFEGUARDING PRINCIPLES Principle 1 - Climate and Energy

Page 12: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 12 of 47

SECTION B. Application of selected approved Gold Standard methodology

B.1. Reference of approved methodology

>> The relevant project type and category is: Type I. RENEWABLE ENERGY PROJECTS, Category I.E. - Switch from non-renewable biomass for thermal applications by the user, Version 08, EB 97. Reference: https://cdm.unfccc.int/methodologies/DB/SO8OOGYGWHMXM287RBNKEYAMN9EUN0

B.2. Applicabil ity of methodology

>> (Justify the choice of the selected methodology(ies) by demonstrating that the project meets each applicability condition of the applied methodology(ies)) Justification for the choice of methodology is given below table:

Criterion Conditions Applicabil ity

1

This category comprises activities to displace the use of non-renewable biomass by introducing renewable energy technologies. Examples of these technologies include, but are not limited to biogas stoves, solar cookers, passive solar homes, renewable energy based drinking water treatment technologies (e.g. sand filters followed by solar water disinfection; water boiling using renewable biomass).

Project activity involves installation of biodigesters and biogas thus produced will replace non renewable firewood used to suffice thermal energy needs.

2

Project participants are able to show that non-renewable biomass has been used since 31 December 1989, using survey methods or referring to published literature, official reports or statistics.

Survey was conducted to check since when villagers were using firewood. It is evident from the survey that all villagers have been using firewood as a cooking fuel since 31 December 1989.

Eligible Project Types: Renewable energy Supply- Project activity falls into this category as it involves generation of biogas from cow dung and other organic waste. Therefore, replacing non-renewable firewood used in the absence of the project activity to suffice domestic needs. Hence meets the criterion. Project Types and Eligibil ity criterion:- Project activity fal ls under below project type-

Page 13: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 13 of 47

Project Type: Improved distr ibuted heating and cooking devices (e.g. biodigesters, cook-stoves), and distr ibuted micro-scale electricity generation units(e.g. micro-hydro and PV for Households) Project activity involves installation of household biodigesters and thereby replacing firewood. Biogas thus generated will be used for domestic thermal needs. AKKPS has an agreement with all the plant owners involved in the project activity stating transferring of rights to AKKPS and will share the revenue generated from carbon credits sale. Revenue sharing arrangement was discussed with stakeholders during live stakeholder feedback round. Every stakeholder was aware of the arrangement and ownership of the credits. Hence meeting the GS criterion.

B.3. Project boundary

>> (Present a flow diagram of the project boundary, physically delineating the project, based on the description provided in section A.5 above.)

As per “AMS I.E-Switch from non-renewable biomass for thermal applications by the user” methodology the project boundary is: The project boundary is the physical, geographical site of the use of biomass or the renewable energy. Therefore, the project boundary encompasses the sum of all the 18,673 physical geographical sites of all individual biogas plants (digester system, pipe leading to the stove and the stove itself) realized by the project activity. However, the baseline emissions from methane avoidance source have been excluded to be conservative.

Page 14: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 14 of 47

For the purpose of GHG mitigation/sequestration following table shall be completed (delete if not required)

Source GHGs Included? Justif ication/Explanation

Bas

eli

ne

sce

nar

io

Thermal Energy Need

CO2 Yes The major source of emissions in the baseline due to burning of firewood

CH4 No Excluded for simplification, this is conservative.

N2O No Not applicable for the project activity Animal waste handling and storage

CO2 No Not Availed, as baseline emissions from “feed” are not considered

CH4 No Not Availed, as baseline emissions from “feed” are not considered

N2O No Not Availed, as baseline emissions from “feed” are not considered

Pro

ject

sc

en

ario

Direct emissions from the biodigester

CO2 No Excluded as CO2 emissions from biogas incineration are CO2 neutral

CH4 No Excluded for simplification N2O No Excluded for simplification

Leak

age

The use/diversion of non-renewable woody biomass saved under the project activity by non-project households/users

CO2 Yes Source of leakages due to diversion of firewood saved under project activity.

B.4. Establishment and description of baseline scenario

>> (Explain how the baseline scenario is established in accordance with guidelines provided in GS4GG Principles & Requirements and the selected methodology(ies). In case suppressed demand baseline is used then same should be explained and justified.) As per “AMS I.E. Switch from non-renewable biomass for thermal applications by the user, Version 08, EB 97” ‘A baseline scenario would be the use of fossil fuels for meeting similar thermal energy needs’. The proposed project activity involves the installation of anaerobic bio-digesters for the production of biogas which will replace non-renewable biomass, used as a fuel for household cooking purposes. The baseline parameter were identified using a survey of samples in line with the guideline “Sampling and surveys for CDM project activities and programme of activities” version 04. As per baseline survey 100% of the households were using firewood and 3 stone fire as baseline stove. In Uttar Pradesh nine districts (Lakhimpur, Sahjahanpur, Rampur, Bareli, Sitapur, Faizabad, Sultanpur, Pilibhit, Sonbhadra, Varanasi, Mirjapur, Chandola, Urai, Deoria, Kushinagar, Mathura, Unnav, Raibareli, Jhansi, Muzzafarnagar and Ballia) were surveyed and in Maharashtra seven

Page 15: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 15 of 47

districts (Kolhapur, Bhandara, Gondiya, Gharchiroli, Chandrapur, Tiroda and Nagpur). These districts were having all size of plants included in project activity which are 2 m3, 3m3 and 4 m3. The details of the survey from the study are as follows: Uttar Pradesh:

S.No No. of Plants Surveyed

Capacity of Biogas plant(m3)

Net Saving of firewood (kg/month)

No. of cattle

Whether included in any other CDM project activity

1 37 2 223 2 No 2 92 3 325 3 No 3 110 4 420 3 No

The survey report revealed the woody biomass consumption for respective capacities as below:

Capacity(m3) Firewood

consumption (kg/month/plant)

No. of Plants

Total f irewood consumption (kg/year)

2 223 485 1,297,860 3 325 482 1,879,800 4 420 1,733 8,734,320 Total 11,911,980

In Maharashtra:

S.No No. of Plants Surveyed

Capacity of Biogas plant(m3)

Net Saving of f irewood (kg/month)

No. of cattles

Whether included in any other CDM project activity

1 133 2 230 2 No 2 76 3 334 2 No 3 41 4 434 3 No

The survey report revealed the woody biomass consumption for respective capacities as below:

Capacity(m3) Firewood

consumption (kg/month/plant)

No. of Plants

Total f irewood consumption (kg/year)

2 230 3014 8,318,640 3 334 12952 51,911,616 4 434 7 36,456 Total 60,266,712

B.5. Demonstration of additionality

>> (If the proposed project is not a type of project that is deemed additional, as stated below, then follow guidelines in section 3.5.1 of GS4GG Principles & Requirements to demonstrate additionality.)

Page 16: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 16 of 47

The additionality of the project is demonstrated by following the criteria outlined in “Guidelines for demonstrating additionality of small scale project activities” (version 10), Annex 14, EB 83. The paragraph 2(c) of this guideline states: Based on the guidelines, the table below discusses the applicability of the project under discussion as additional.

Specify the methodology or activity requirement or product requirement that establish deemed additionality for the proposed project (including the version number and the specific paragraph, if applicable).

Guidelines for demonstrating additionality of small scale project activities” (version 10), Annex 14, EB 83. Paragraph 11 (c) defines additionality if “Project activities solely composed of isolated units where the users of the technology/measure are households or communities or Small and Medium Enterprises (SMEs) and where the size of each unit is no larger than 5% of the small-scale CDM thresholds.”

Describe how the proposed project meets the criteria for deemed additionality.

! The annual energy saving per unit biogas is 0.005 GWh thermal which is less than 9 MWhth (i.e. less than 5% of the small scale CDM threshold)

! Project is considered additional provided that the project is limited to 60 Giga-watt hours of savings per year, which is equivalent to 180 Giga-watt hours thermal per year. Thus, because the project cannot exceed 180 Giga-watt hour thermal energy savings per year, as stated in the eligibility criteria, the project is considered additional.

B.6. Sustainable Development Goals (SDG) outcomes

B.6.1. Relevant target for each of the three SDGs

>> (Specify the relevant SDG target for each of three SDGs addressed by the project. Refer most recent version of targets here .) Table below discusses the relevant SDG target for each three SDGs addressed by the project.

SDGs Targets

The project will contribute to the SDG goal “By 2030, substantially reduce the number of deaths and illnesses from hazardous chemicals and air, water and soil pollution and contamination”. The project replaces firewood consumption with biogas. Therefore, the indoor air quality at user point will improve and will contribute to the SDG goal.

Page 17: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 17 of 47

The project will contribute towards below SGD goals: • By 2030, ensure universal access to affordable, reliable and

modern energy services • By 2030, increase substantially the share of renewable energy in

the global energy mix

The project will contribute towards below SGD goals: ! Improve education, awareness-raising and human and

institutional capacity on climate change mitigation, adaptation, impact reduction and early warning

! Integrate climate change measures into national policies,

strategies and planning �

B.6.2. Explanation of methodological choices/approaches for estimating the SDG outcome

>> (Explain how the methodological steps in the selected methodology(ies) or proposed approach for calculating baseline and project outcomes are applied. Clearly state which equations will be used in calculating net benefit.) As per “AMS I.E- Switch from non-renewable biomass for thermal applications by the user, Version 08, EB 97” The emission reductions would be calculated as:

𝐵𝐸! = 𝐵!×𝑓!"#,!×𝑁𝐶𝑉!"#$%&&×𝐸𝐹!"#$%&'%(_!"##$%_!"#$ Equation (1)

Where:

𝐵𝐸! = Baseline emissions during the year y in t CO2e

𝐵! = Quantity of woody biomass that is substituted or displaced in tonnes

𝑓!"#,! = Fraction of woody biomass used in the absence of the project activity in year y that can be established as non-renewable biomass (fNRB)1

𝑁𝐶𝑉!"#$%&& = Net calorific value of the non-renewable woody biomass that is substituted (IPCC default for wood fuel, 0.0156 TJ/tonne)

𝐸𝐹!"#$%&'%(_!"##$% !"#$ = Emission factor for the substitution of non-renewable woody biomass by similar consumers. Use a value of 63.7 t CO2/TJ2

1 Default values endorsed by designated national authorities and approved by the Board are available at

<http://cdm.unfccc.int/methodologies/standard_base/index.html>.

2 This value represents the emission factor of the substitution fuels likely to be used by similar users, on a weighted average basis. The value is calculated, based on the global average ratio of cooking fuels (the normalized ratio of kerosene and liquefied petroleum gas (LPG) excluding coal), i.e. 9 per cent for kerosene (71.5 t CO2/TJ) and 91 per cent for LPG (63.0 t CO2/TJ).

Page 18: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 18 of 47

yB is determined by using option (a) paragraph 15 of the methodology as follows:

(a) Calculated as the product of the number of households multiplied by the estimate of average annual consumption of woody biomass per household that is displaced by the project activity (tonnes/household/year);

𝐵! = 𝑁!!×(𝐵𝐶!",!!,! − 𝐵𝐶!",!!,!) Equation (2)

Where: 𝑁!! = Number of households in the project activity, number

𝐵𝐶!",!!,! = Average annual consumption of woody biomass per household before the start of the project activity, tonnes/household/year

𝐵𝐶!",!!,! =

If it is found that pre-project devices were not completely displaced but continue to be used to some extent, average annual consumption of woody biomass per household in the pre-project devices during the project activity, tonnes/household/year

BCBL,HH,y has been determined as per third party survey for the sample of households explained in section B.4 above.

Fraction of woody biomass used in the absence of the project activity in year y that can be established as non-renewable biomass (fNRB,y) is determined as per methodological tool ‘Calculation of the fraction of non-renewable biomass’ version 01 as follows: The fraction of woody biomass that can be established as non-renewable, is:

fNRB = NRBNRB+ RB

Where: fNRB = Fraction of non-renewable biomass (fraction or %) NRB = Quantity of non-renewable biomass (t/yr) RB = Quantity of renewable biomass (t/yr)

Estimation of consumption of woody biomass (H/Bold,total) is done following paragraph 12 (a) of

the tool ‘Official Statistics’.

As per Forest Survey of India report 2011, Annual fuelwood consumption in household sector and

consumption of wood in House construction, Furniture and Agriculture is given below:

(a) States (b) Uttar Pradesh (c) Maharashtra Annual woodfuel consumption in household sector (Ton/year)

20357000 14035000

Non-domestic wood consumption (ton/year)

147925800 157404330

Total wood consumption (ton/year)

168282800 171439330

Page 19: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 19 of 47

Procedure to estimate RB: Renewable biomass (RB) in the country/region/area is estimated using

the equation below:

Where: MAIforest,i = Mean Annual Increment of woody biomass growth per hectare in

subcategory i of forest areas (t/ha/yr). For this parameter report from Ministry of Environment and

Forest, Govt. of India has been referred3

MAIother,i = Mean Annual Increment of woody biomass growth per hectare in subcategory i of

other wooded land areas (t/ha/yr). This value is not considered due to non availability of data.

Fforest,i = Extent of forest in sub-category i (ha). India state of of forest report, 2017 has been

referred for this parameter.

Fother,i = Extent of other wooded land in sub-category i (ha). This is not used following footnote

4 of the tool.

Pforest = Extent of non-accessible area (e.g. protected area where extraction of wood is

prohibited, geographically remote area) within forest areas (ha). This parameter is optional and

not considered.

Pother = Extent of non-accessible area (e.g. protected area where extraction of wood is

prohibited, geographically remote area) within other wooded land areas (ha). This parameter is

optional and not considered.

i = Sub-category i of forest areas and other wooded land areas

States (d) Uttar Pradesh (e) Maharashtra

MAIforest,i 0.5 0.5 Fforest,i4 1,658,000 5,206,000 RB 829,000 2,603,000

Accordingly, the fNRB would be:,

( f ) States H

(g) RB (h) NRB (H-RB)

( i ) fNRB

Uttar Pradesh 44260000 829,000 167453800 100% Maharashtra 50246100 2603000 168836330 98%

3 http://www.moef.nic.in/sites/default/files/Pacific.pdf

4 http://fsi.nic.in/forest-report-2017

Page 20: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 20 of 47

Project Emissions (PEy): As per applied methodology AMS-I.E, version 08, project emissions are accounted for below activities: a) CO2 emissions from on-site consumption of fossil fuels due to the project activity b) CO2 emissions from electricity consumption by the project activity c) Methane emission from solid waste disposal or waste water d) Project emissions related to cultivation of feedstock e) Project emissions from transportation The project activity does not involve any of the above activity and hence, project emisions for the project activity is not applicable. Leakage As per AMS-I.E, version 08, “Leakage related to the non-renewable woody biomass saved by the project activity shall be assessed based on ex-post surveys of users and the areas from which this woody biomass is sourced (using 90/30 precision for a selection of samples). The following potential source of leakage shall be considered:

a) The use/diversion of non-renewable woody biomass saved under the project activity by non-project households/users that previously used renewable energy sources. If this leakage assessment quantifies an increase in the use of nonrenewable woody biomass used by the non-project households/users, that is attributable to the project activity, then By is adjusted to account for the quantified leakage. Alternatively, By is multiplied by a net to gross adjustment factor of 0.95 to account for leakages, in which case surveys are not required.

The gross NRB has been multipl ied by 0.95 and the resulted value has been taken as net value to calculate the emission reductions. Hence no yearly monitoring surveys are required and the saved time of the project personnel can be used in other aspects related to the project .

b) If the equipment currently being utilised is transferred from outside the boundary to the project boundary, leakage is to be considered.

There is no equipment transferred from outside the boundary to the project boundary. All project equipment are new equipment. Hence, leakage is not considered.

B.6.3. Data and parameters f ixed ex ante for monitoring contribution to each of the three SDGs

(Include a compilation of information on the data and parameters that are not monitored during the crediting period but are determined before the design certification and remain fixed throughout the crediting period like IPCC defaults and other methodology defaults. Copy this table for each piece of data and parameter.)

Relevant SDG Indicator

13 (Climate Action)

Data/parameter fNRB,y

Unit %

Page 21: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 21 of 47

Description Fraction of woody biomass saved by the project activity during year y that

can be established as non-renewable biomass

Source of data Calculated following requiremnets of Methodological tool: Calculation of

the fraction of non-renewable biomass, version 01

Value(s) applied

( j ) State fNRB

(k) Uttar Pradesh (l) 100%

(m) Maharashtra (n) 98%

Choice of data or Measurement methods and procedures

(o) Methodological tool: Calculation of the fraction of non-renewable

biomass, version 01

Purpose of data Baseline emissions

Additional comment

Relevant SDG Indicator

13 (Climate Action)

Data/parameter NH,H

Unit Number

Description Number of households in the project activity in year y

Source of data As per PP’s project database

Value(s) applied

Uttar Pradesh Maharashtra

2m3 361 2212

3m3 350 11763

4m3 1011 5

Choice of data or Measurement methods and procedures

Project database as per the commissioning reports and end user agreements

Purpose of data Baseline emissions estimation

Page 22: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 22 of 47

Additional comment

Relevant SDG Indicator

13 (Climate Action)

Data/parameter BCBL,HH,y

Unit Tonnes/household/year

Description Average annual consumption of woody biomass per household before the start of the project activity

Source of data Baseline survey

Value(s) applied Uttar Pradesh Maharashtra

2m3 223 230

3m3 325 334

4m3 420 434

Choice of data or Measurement methods and procedures

Third party survey was conducted to know the firewood consumption

pattern in line with the methodology. Survey was conducted following

UNFCCC sampling standard ‘Sampling and surveys for CDM project

activities and programmes of activities’ version 07 and guideline ‘Sampling

and surveys for CDM project activities and programmes of activities’ version

04. A 90% confidence interval and 10% error margin applied.

Purpose of data Baseline emissions estimation

Additional comment

Not Applicable

Relevant SDG Indicator

13 (Climate Action)

Data/parameter EFprojected_fossilfuel

Unit tCO2/TJ

Description Emission factor for the substitution of non-renewable woody biomass

Source of data Default value as per AMS-I.E, version 08

Value(s) applied 63.7 tCO2/TJ

Choice of data or Measurement methods and procedures

Default Value obtained from methodology “AMS-IE, Switch from non-renewable biomass for thermal applications by the user”, Ver-08

Purpose of data Baseline emissions estimation

Page 23: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 23 of 47

Additional comment

Not Applicable

Relevant SDG Indicator

13 (Climate Action)

Data/parameter NCVbiomass

Unit TJ/tonne

Description Net calorific value of the non-renewable woody biomass that is substituted

Source of data Default value as per AMS-I.E, version 08

Value(s) applied 0.0156 TJ/tonne

Choice of data or Measurement methods and procedures

IPCC default for wood fuel

Purpose of data Baseline emissions estimation

Additional comment

Not Applicable

B.6.4. Ex ante estimation of outcomes l inked to each of the three SDGs

>> (Provide a transparent ex ante calculation of baseline and project outcomes (or, where applicable, direct calculation of net benefit) during the crediting period, applying all relevant equations provided in the selected methodology(ies) or as per proposed approach. For data or parameters available before design certification, use values contained in the table in section B.6.3 above. For data/parameters not available before design certification and monitored during the crediting period, use estimates contained in the table in section B.7.1 below) The amount of firewood saved due to the project activity will be the baseline for calculating the emission reductions. The annual baseline emissions (ERy) in tCO2, during each year of the crediting period are expressed as follows:

𝐵𝐸! = 𝐵!×𝑓!"#,!×𝑁𝐶𝑉!"#$%&&×𝐸𝐹!"#$%&'%(_!"##$%_!"#$ Equation (3)

Estimation of By (Quantity of woody biomass that is substituted or displaced in tonnes):

Uttar Pradesh

Capacity (m3)

Firewood consumption (kg/month/plant)

No. of Plants

Total f irewood consumption (kg/year)

2 223 361 966036

Page 24: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 24 of 47

3 325 350 1365000

4 420 1011 5095440 Total 1722 7426476

Maharashtra

Capacity(m3) Firewood consumption (kg/month/plant)

No. of Plants

Total f irewood consumption (kg/year)

2 230 2212 6105120

3 334 11763 47146104

4 434 5 26040

Total 13980 53277264 Hence, By = 7426.476 ton/year (Uttar Pradesh) and 53277.264 ton/year (Maharashtra) Leakage: In line with the methodology (AMS-I.E, version 08): By is multiplied by a net to gross adjustment factor of 0.95 to account for leakages, in which case surveys are not required. Accordingly ERy is estimated as below:

Maharashtra Uttar Pradesh

By *0.95 (p) 50,613 (q) 7,055

fNRB,y (r) 98% (s) 100%

NCVbiomass(TJ/tonnes) 0.0156 (t) 0.0156

EFCO2i(tCO2/TJ) (u) 63.7 (v) 63.7

ERy (tCO2e/year) (w) 49,532 (x) 6,976

Total baseline emissions = (49,532+6,976) tCO2e = 56,508 tCO2

B.6.5. Summary of ex ante estimates of each SDG outcome

Year Baseline estimate

Project estimate

Net benefit

Year 1 56,508 0 56,508

Page 25: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 25 of 47

Year 2 56,508 0 56,508

Year 3 56,508 0 56,508

Year 4 56,508 0 56,508

Year 5 56,508 0 56,508

Total 282,540 0 282,540

Total number of credit ing years

5

Annual average over the credit ing period

56,508 0 56,508

B.7. Monitoring plan

B.7.1. Data and parameters to be monitored

(Include specific information on how the data and parameters that need to be monitored in the selected methodology(ies) or proposed approaches or as per mitigation measures from safeguarding principles assessment or as per feedback from stakeholder consultations would actually be collected during monitoring. Copy this table for each piece of data and parameter.)

Page 26: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 26 of 47

Relevant SDG Indicator

13 (Climate Action)

Data / Parameter BCPJ,HH,y

Unit (y) Tonnes/household/year

Description Average annual consumption of woody biomass per household in the pre- project devices during the project activity, if it is found that preproject devices were not completely displaced but continue to be used to some extent.

Source of data Survey

Value(s) applied (z) To be monitored

Measurement methods and procedures

Monitoring shall consist of estimation of all project devices or a representative sample thereof, at least once every two years (biennial)

Monitoring frequency (aa) At least once every two years (biennial)

QA/QC procedures

Third party survey to be conducted following standard sampling approach.

Purpose of data (bb) Baseline Emissions estimations

Additional comment

Page 27: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 27 of 47

Relevant SDG Indicator

13 (Climate Action)

Data / Parameter NHH,y

Unit Number

Description Number of households (biogas system) in the project activity in operational per year.

Source of data Survey

Value(s) applied To be monitored

Measurement methods and procedures

Monitoring consist of checking of representative sample, to ensure that biodidgesters operating

Monitoring frequency

At least once every two years (biennial)

QA/QC procedures

Third party survey to be conducted following standard sampling approach.

Purpose of data Baseline Emissions estimations

Additional comment

Relevant SDG Indicator

1- Good health and well being (SDG 3)

Data / Parameter (cc) Improvement in health and decrease in illness

Unit Qualitative

Description Improvement in health and decrease in illness

Source of data Sampling survey/annual usage survey/monitoring survey

Value(s) applied To be monitored

Measurement methods and procedures

Improvement in health and decrease in illness will be assessed through interview with end users due to project implementation. Publicly available results may be referred. In addition, training to the operationa and maintenance technicians and field supervisors to be provided to increase awareness in safe operation and handling emergency situations.

Monitoring frequency

Annual

QA/QC procedures

Sample number shall be determined using UNFCCC sample standard. Publicly available data may referred.

Purpose of data Sustaiable development assessment

Additional comment

Page 28: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 28 of 47

Relevant SDG Indicator

2- Good health and well being (SDG 3)

Data / Parameter Quantitative employment and income generation

Unit Numbers

Description Number of employment generation and income from the project activity

Source of data Project Participant/Project proponent

Value(s) applied To be monitored

Measurement methods and procedures

Monitoring shall provide exact number of employment generated due to the project activity beyond the project and other employment/jobs created due to the project activity (as an effect generated in design, construction, distribution or start-up or decommissioning of the project).

Monitoring frequency

Annual

QA/QC procedures

Job records, payment records etc. shall be used to ensure QC.

Purpose of data Sustaiable development assessment

Additional comment

Page 29: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 29 of 47

Relevant SDG Indicator

3- Affordable and clean energy (SDG 7)

Data / Parameter Access to affordable and clean energy services

Unit Numbers

Description Number of biogas system operational under the project activity

Source of data Project Participant/Project proponent

Value(s) applied To be monitored

Measurement methods and procedures

Sample survey to confirm if project biogas systems are operational. Operational status will confirm that the users are accessed to affordable and clean energy.

Monitoring frequency

Annual

QA/QC procedures

Reqired sample size shall be determined following UNFCCC sampling standard

Purpose of data Sustaiable development assessment

Additional comment

B.7.2. Sampling plan

>> (If data and parameters monitored in section B.7.1 above are to be determined by a sampling approach, provide a description of the sampling plan.)

a) SamplingApproach: i. Objectives and rel iabil ity requirements: The objective of the sampling plan is to

achieve unbiased and reliable estimates of the proportion or the mean value of the key variables over the crediting period. The methodology applied for the project (AMS.I.E version 08) requires the project proponent achieving 95 percent confidence interval and a 10 percent margin of error when biennial inspection is chosen and when annual inspection is chosed 90 per cent. The table below provides the monitoring parameters that will be monitored annually:

Page 30: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 30 of 47

(dd) Parameter (ee) Type (ff ) Description

(gg) NHH (hh) Propotional parameter (ii) Number of households (biogas system) in the project activity in operational per year

(jj) BCPJ,HH,y (kk) Mean value parameter (ll) Average annual consumption of woody biomass per household in the pre-project devices during the project activity, if it is found that preproject devices were not completely displaced but continue to be used to some extent.

ii. Target Population: The target population for different parameters discussed in the

table above are given below: • For the proportional parameter; the target population is the bio-digester users listed

in the project database. • For the mean value parameter; the target population is the total number of

operational biogas digester for which the emission reductions will be accounted for the monitoring period in question.

iii. Sampling frame: All the households with biogas digester within the project will be the sampling frame.

iv. Sampling Method: A simple random sampling will be adopted for estimating the sample size for the monitoring surveys. Simple random sampling is suited to populations that are homogenous (EB 75 annex 08).

v. Sample Size: The calculation of the required sample size for each parameter will be calculated at 90/10 confidence/precision as required for the annual monitoring. The sample size is determined using the Guidelines for Sampling and Surveys for CDM Project activities and Programme of Activities Ver. V4.0 (EB86, Annex 4).

The minimum sample size to determine number of biogas system in operation using the procedure outlined in para 12 of appendix 1, EB 86 Annex 4, Guidelines for Sampling and Surveys for CDM Project activites and Programme of Activities Ver. 4.0.

Where: N = Sample size N = Total number of biogas system of type i installed under the project

Page 31: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 31 of 47

p = expected proportion (0.8). Based on experience from project developer and age of biogas plants, it is expected that 80% plants will be in operation upto the monitoring period. 1.645 = represents the 90% confidence required 0.1 = represents the 10% relative precision (0.1x0.8=0.08 = 8% points either side of p)

b) Data: i . Field Measurements:

1. Checking of a representative sample of biogas system within the project to ensure that they are still operating (NHH). Samples are first allocated based on share of total population in each state as given in below:

(mm) State

(nn) 2m3

(oo) 3m3

(pp) 4m3

(qq) Total

(rr ) Share of total

(ss) Sample size

(tt) Uttar Pradesh

(uu) 361

(vv) 350 (ww) 1011

(xx) 1722

11% (yy) 8

(zz) Maharashtra

(aaa) 2212

(bbb) 11763

(ccc) 5 (ddd) 13980

(eee) 89%

(fff) 60

(ggg) 1

5,702

(hhh) 100%

(iii) 68

The selection of households are done using online tool ‘Stattrek random number’ ( http://stattrek.com/statistics/random-number-generator.aspx).

2. Determine average annual consumption of woody biomass per household in the pre- project devices during the project activity, if it is found that pre-project devices were not completely displaced but continue to be used to some extent.

3. The survey will be conducted annually with the objective to target 10 percent precision and to achieve 90 percent confidence.

i i . Quality Assurance/Quality Control:

A survey questionnaire will be prepared to seek responses of operating status (yes or no) of biogas digesters within the project activity.The survey will be performed by the project developer appointing a third party. During the survey, in order to anticipate any low response rate and answers bias, 10% oversampling will be applied. i i i . Analysis:

Page 32: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 32 of 47

The project developer will collect, compile and analyze the data to derive the number of bio- digesters within the project still operational and avenarge firewood consumption at each bio- digester user (if any). The developer will prepare “monitoring report” based on the survey report.

c) Implementation: The survey questionnaire will be prepared, pre-tested and field personnel will be trained in conducting the survey to ensure the quality of data collected and the survey will be carried out as per defined frequency covering required data information. The schedule for implementing the sampling effort shall be defined prior to the field activity.

B.7.3. Other elements of monitoring plan

>> Third party survey will be conducted to monitor all the monitoring parameters required as per the methodology and will also include monitoring of all non neutral sustainable parameters. AKKPS will provide regular service to the plant owners. In case of malfunctioning of the biodigester, plant owner will inform AKKPS or any of its representatives. AKKPS will inspect the plant and resolve the problem at earliest. All the data required for verification and issuance will be kept for two years after the end of the crediting period.

SECTION C. Duration and credit ing period

C.1. Duration of project

C.1.1. Start date of project

>> 06/02/2017 is considered as start date of the project. The date represents first batch of biogas

digesters installed within the project activity. PP has submitted initial documents for preliminary

review with realization of review fees on 06/02/2018. Therefore, as per clause 3.4.7 under

principle and requirement one year prior to first submission date is taken as start date of the

project activity. Conservatively, biogas plants commissioned from 06/02/2017 is taken considering

06/02/2017 to be the start date of the project activity.

C.1.2. Expected operational l i fetime of project

>> 15 years5

C.2. Credit ing period of project

5 https://www.researchgate.net/publication/282284360_BIOGAS_DIGESTERS_IN_INDIA_A_REVIEW

Page 33: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 33 of 47

C.2.1. Start date of credit ing period

>> 06/02/2017 first biogas plant commissioning date.

C.2.2. Total length of credit ing period

>> 5 years renewable

SECTION D. Safeguarding principles assessment

D.1. Analysis of social, economic and environmental impacts

>> (Refer the GS4GG Safeguarding Principles and Requirements document for detailed guidance on carrying out this assessment.)

Safegaurding principle

Description of relevance to the project

Assessment (Yes/Potential ly/No)

Mitigation Measures

( j j j ) SOCIAL & ECONOMIC SAFEGUARDING PRINCIPLES

(kkk) Principle 1 - Human Rights a) Recognises the centrality of human rights to sustainable development, poverty alleviation and ensuring fair distribution of development opportunities and benefits; and supports “universal respect for, and observance of, human rights and fundamental freedoms for all”.

The project replaces conventional firewood usage with biogas for domestic cooking and heating purpose. Therefore, it provides development opportunity to all section of people proving cleaner fuel, better livelihood and empowering specially rural women. Hence, the project positively recognizes human rights to sustainable development.

No Not Applicable

(b) Does not recognise or support Projects that contribute to violations of a state’s human rights obligations and the core international human rights treaties, and seeks to support the protection and fulfilment of human rights.

India adopted ‘The protection of human rights Act’ 1993 and the project is bound to follow the rules and ruglation of host country. Hence, the project does violate human rights obligations adopted by the host country.

No Not Applicable

Page 34: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 34 of 47

(c) Upholds the principles of accountability and the rule of law, participation and inclusion, and equality and non-discrimination, noting that prohibited grounds of discrimination include race, ethnicity, gender, age, language, disability, sexual orientation, religion, political or other opinion, national or social or geographical origin, property, birth or other status including as an indigenous person or as a member of a minority.

The constitution of India Article 14 sates ‘the government shall not deny to any person equality before law or the equal protection of the laws’; Article 15 declares that government shall not discriminate against any citizen on the ground of sex; Article 16 guarantees that no citizen shall be discriminated against in matters of public employment on the grounds of sex religion, caste, creed, sex, descent, place of birth, residence. Therefore, the project being in India upholds the principles of accountability and the rule of law, participation and inclusion, and equality and non-discrimination.

No Not Applicable

The Project Developer and the Project shall respect internationally proclaimed human rights and shall not be complicit in violence or human rights abuses of any kind as defined in the Universal Declaration of Human Rights

India adopted ‘The protection of human rights Act’ 1993 and the project is bound to follow the rules and ruglation of host country. In addition, India has ratified ‘International Convention on the Elimination of All Forms of Racial Discrimination :1969’ ‘International Covenant on Civil and Political Rights :1976’, ‘International Covenant on Economic, Social and Cultural Rights :1976’ ‘Convention on the Elimination of All Forms of Discrimination against Women :1981’. Therefore, the project developer and the project do respect nationally and internationaly proclaimed human rights

No Not Applicable

Page 35: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 35 of 47

and shall not be complicit in violence or human rights abuses of any kind.

The Project shall not discriminate with regards to participation and inclusion.

India has ratified ‘International Convention on the Elimination of All Forms of Racial Discrimination :1969’, ‘Convention on the Elimination of All Forms of Discrimination against Women :1981’ in addition to its national human rights Act’ 1993. Therefore, the project will not discriminate with regards to participation and inclusion.

No Not Applicable

( l l l ) Principle 2 - Gender Equality and Women’s Rights (i) Promotes gender equality and the empowerment of women.

Ministry of women & child development, govt. of India has taken various measures for gender equality/socio-economic development/empowerment of women6. Out of these, the project positively contributes towards the national mission for empowerment of women through improvement of health and attaining vision for empowerment of wowen under national policy for women 2016 (Women participation will be ensured in the efficient use and spreading the use of solar

No Not Applicable

6 http://pib.nic.in/newsite/PrintRelease.aspx?relid=132945

Page 36: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 36 of 47

energy, biogas, smokeless chulas and other technological applications to have positive influence on their life styles and a long term impact on meeting sustainable development goals)7.

(ii) Does not recognise Projects that contribute to discrimination against women or reinforce gender-based discrimination and/or inequalities.

As explained above the project does not contribute to discrimination against women or reinforce gender-based discrimination and/or inequalities.

No Not Applicable

(iii) Recognises and seeks to contribute to SDG 5, (Achieve gender equality and empower all women and girls).

Project compliance to SDG 5 is explained in section A.8 above.

No Not Applicable

(mmm) Mandatory requirements:

(nnn) 1. The Project shall complete the following gender assessment questions

Is there a possibility that the Project might reduce or put at risk women’s access to or control of resources, entitlements and benefits?

No. The project uses cattle dung as resource to generate biogas. Therefore, it does not put any risk to women’s access or control of resources, entitlements and benefits.

No Not Applicable

Is there a possibility that the Project can adversely affect men and women in marginalised or vulnerable communities (e.g., potential increased burden on

No. Thr project happens in households where users were using firewood and conventional cooking stoves. The project replaces the conventional cooking practice with clean biogas based system. Hence, the

No Not Applicable

7http://wcd.nic.in/sites/default/files/women%20empowerment%20poliy_Final_17May.pdf

Page 37: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 37 of 47

women or social isolation of men)?

project does not affect any marginalized or vulnerable communities.

Is there a possibility that the Project might not take into account gender roles and the abilities of women or men to participate in the decisions/designs of the project’s activities (such as lack of time, child care duties, low literacy or educational levels, or societal discrimination)?

No. The project actually takes care the upliftment of women and men who otherwise spent more time in sourcing firewood which in the project case not needed, This provides more time to the users. Also biogas being clean fuel, leads to low smoke generation resulting health benefits to end users.

No Not Applicable

Does the Project take into account gender roles and the abilities of women or men to benefit from the Project’s activities (e.g., Does the project criteria ensure that it includes minority groups or landless peoples)?

Yes. The project takes care the role of women in cooking. Due to the project women (generally the caretaker of cooking) spend less time in sourcing firewood and can utilize the saved time in other productive works. Also due to clean nature of the fuel, smoke related health issues are reduced due to the project activity.

No Not Applicable

Does the Project design contribute to an increase in women’s workload that adds to their care responsibilities or that prevents them from engaging in other activities?

No. The project takes care the role of women in cooking. Due to the project women (generally the caretaker of cooking) spend less time in sourcing firewood and can utilize the saved time in other productive works. Also due to clean nature of the fuel, smoke related health issues are reduced due to the project activity.

No Not Applicable

Would the Project potentially reproduce or further deepen

No. The project does not have any scope which may result to discrimination

No Not Applicable

Page 38: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 38 of 47

discrimination against women based on gender, for instance, regarding their full participation in design and implementation or access to opportunities and benefits?

against women. The project contributes positively to uplift women in its work culture.

Would the Project potentially limit women’s ability to use, develop and protect natural resources, taking into account different roles and priorities of women and men in accessing and managing environmental goods and services?

No. The project helps in protecting NRB. The project does not limit women’s ability to use or protecting natural resources.

No Not Applicable

Is there a likelihood that the proposed Project would expose women and girls to further risks or hazards?

No. The project replaces conventional cooking system with clean biogas. Biogas is safe to use and handle. Compared to firewood based cookimg system the likelihood of fire hazrd is negligible in the project scenario. It also provide someless cooking system. Hence, project does not lead to more hazaradous conditions.

No Not Applicable

(ooo) 2. The Project shall not directly or indirectly lead to/contribute to adverse impacts on gender equality and/or the situation of women. Specif ical ly, this shall include (not exhaustive):

Sexual harassment and/or any forms of violence against women - address the multiple risks of gender-based violence, including sexual exploitation or human trafficking

The project happens in individual households. It does not involve any women workforce which may lead to sexual harassment.

Not Applicable

Page 39: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 39 of 47

Slavery, imprisonment, physical and mental drudgery, punishment or coercion of women and girls.

No. The project happens in individual households. It does not involve any women workforce which may lead to sexual harassment.

No Not Applicable

Restriction of women’s rights or access to resources (natural or economic).

No. The project actually takes care the upliftment of women and men who otherwise spent more time in sourcing firewood which in the project case not needed, This provides more time to the users. Also biogas being clean fuel, leads to low smoke generation resulting health benefits to end users.

No Not Applicable

Recognise women’s ownership rights regardless of marital status - adopt project measures where possible to support to women’s access to inherit and own land, homes, and other assets or natural resources

Yes. The project does not has any scope which needs to recognise the women’s ownership rights. The project replaces conventional firewood based cooking system with clean biogas. This helps women to have access to cleaner cooking technologies.

No Not Applicable

(ppp) 3. Projects shall apply the principles of nondiscrimination, equal treatment, and equal pay for equal work, specif ical ly

Where appropriate for the implementation of a Project, paid, volunteer work or community contributions will be organised to provide the conditions for equitable participation of men and women in the identified tasks/activities

Yes. The project involves construction of biogas digesters at households. Trained labours are used for the same. Local people are engaged for the same. No discrimination either in gender or any other form is followed to engage local people.

No Not Applicable

Introduce conditions that ensure the participation of women or men in Project

This is not applicable. The project does not have any scope of men and women participation where project

No Not Applicable

Page 40: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 40 of 47

activities and benefits based on pregnancy, maternity/paternity leave, or marital status

developer has to ensure condition of benefits related to pregnancy, maternity/paternity leave, or marital status .

Ensure that these conditions do not limit the access of women or men, as the case may be, to Project participation and benefits

Not applicable. Project happens at individual households where household people operate the biogas system as per their requirements.

No Not Applicable

4. The Project shall refer to the country’s national gender strategy or equivalent national commitment to aid in assessing gender risks

The project does not has any scope to apply gender strategy as such. Although the project positively contributes towards the national mission for empowerment of women through improvement of health and attaining vision for empowerment of wowen under national policy for women 2016.

No Not Applicable

(qqq) Principle 3 - Community Health, Safety and Working Conditions (a) Requires Projects to anticipate and avoid adverse impacts on the health and safety of affected communities during the Project's life cycle from both routine and non-routine circumstances

The project leads to safe working condition and improvement in health as it will replace firwood as fuel with biogas which is clean and safe.

No Not Applicable

b) Requires Projects to provide workers with safe and healthy working conditions and to prevent accidents, injuries, and disease.

The project leads to safe working condition and improvement in health as it will replace firwood as fuel with biogas which is clean and safe. Further, periodic maintenance by implementing agency ensure prevention of any unsafe working condition.

No Not Applicable

Page 41: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 41 of 47

(rrr ) Principle 4 - Cultural Heritage, Indigenous Peoples, Displacement and Resettlement

Does the Project Area include sites, structures, or objects with historical, cultural, artistic, traditional or religious values or intangible forms of culture (e.g., knowledge, innovations, or practices)?

The project area covers households which does not have any structures, or objects with historical, cultural, artistic, traditional or religious values or intangible forms of culture. Hence, not applicable.

No Not Applicable

Does the Project require or cause the physical or economic relocation of peoples (temporary or permanent, full or partial)?

The project area covers households which does not require relocation of peoples; hence not applicable.

No Not Applicable

Does the Project require any change to land tenure arrangements and/or other rights?

No. The project does not require any change to land tenure arrangements and/or other rights?

No Not Applicable

For Projects involving land-use tenure, are there any uncertainties with regards land tenure, access rights, usage rights or land ownership?

No. The project does not invove any land use which will have issues related to land tenure or access right.

No Not Applicable

Are indigenous peoples present in or within the area of influence of the Project and/or is the Project located on land/territory claimed by indigenous peoples?

No. The project involves household biogas digesters. Therefore, it does not involve any influence towards indigenous people.

No Not Applicable

(sss) Principle 5 – Corruption The Project shall not involve, be complicit in or inadvertently contribute to or

The project benefits households with clean fuel (biogas). Therere is no corruption provision in the

No (ttt) Not

Applicable

Page 42: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 42 of 47

reinforce corruption or corrupt Projects

project activity.

(uuu) Principle 6 - Economic Impacts Labour Rights: The Project Developer shall ensure that there is no forced labour and that all employment is in compliance with national labour and occupational health and safety laws, with obligations under international law, and consistency with the principles and standards embodied in the International Labour Organization (ILO) fundamental conventions. Where these are contradictory and a breach of one or other cannot be avoided, then guidance shall be sought from Gold Standard

The project does not require labour force for implementation of the project. Trained technicians6 are involved in construction and operation and maintence of plants. Therefore, no forced labour is involved in the project. No child labour is involved.

No Not Applicable

(vvv) ENVIRONMENTAL & ECOLOGICAL SAFEGUARDING PRINCIPLES

(www) Principle 1 - Climate and Energy Emissions: Will the Project increase greenhouse gas emissions over the Baseline Scenario?

No. The project will replace firewood use with biogas. Hence, it will reduce greenhouse gas emissions over the Baseline Scenario.

No Not Applicable

Energy Supply: Will the Project use energy from a local grid or power supply (i.e., not connected to a national or regional grid) or fuel resource (such as wood, biomass) that provides for other local users?

No. The project uses inhouse cattle dung only.

No Not Applicable

Page 43: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 43 of 47

(xxx) Principle 2 – Water Will the Project affect the natural or pre-existing pattern of watercourses, ground-water and/or the watershed(s) such as high seasonal flow variability, flooding potential, lack of aquatic connectivity or water scarcity?

No. Water in huge quantity is not required for the project which can impact the ground water level or any seasonal flow.

No Not Applicable

Erosion and/or Water Body Instability: Could the Project directly or indirectly cause additional erosion and/or water body instability or disrupt the natural pattern of erosion? If ‘Yes’ or ‘Potentially’ proceed to question 2.

No. Water in huge quantity is not required for the project which can impact the ground water level or any seasonal flow.

No Not Applicable

(yyy) Principle 3 – Environment, ecology and land use

(zzz) Landscape Modification and Soil Does the Project involve the use of land and soil for production of crops or other products?

No. The project does not involve any crop production.

No Not Applicable

(aaaa) Vulnerabil ity to Natural Disaster Will the Project be susceptible to or lead to increased vulnerability to wind, earthquakes, subsidence, landslides, erosion, flooding, drought or other extreme climatic conditions?

No. The project happens at individual households. There is no activity which can affect adversely the natural system to cause earthquake, landslides, erosion, flooding, draught or other extreme climatic conditions.

No Not Applicable

Page 44: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 44 of 47

(bbbb) Genetic Resources Could the Project be negatively impacted by the use of genetically modified organisms or GMOs (e.g., contamination, collection and/or harvesting, commercial development)?

Not applicable. The project does not involve any crop production or cultivation.

No Not Applicable

(cccc) Release of pollutants Could the Project potentially result in the release of pollutants to the environment?

No. The project doe not release any pollutants to the environment.

No Not Applicable

(dddd) Hazardous and Non-hazardous Waste Will the Project involve the manufacture, trade, release, and/ or use of hazardous and non-hazardous chemicals and/or materials?

Not applicable. The project does not invlve any production process.

No Not Applicable

(eeee) Pesticides & Ferti l isers Will the Project involve the application of pesticides and/or fertilisers?

Not applicable. The project does not involve any crop production or cultivation.

No Not Applicable

(ff f f ) Harvesting of Forests Will the Project involve the harvesting of forests?

Not applicable. The project happens at individual households.

No Not Applicable

Food: Does the Project modify the quantity or nutritional quality of food available such as through crop regime alteration or export or economic incentives?

Not applicable No Not Applicable

Animal husbandry: Will the Project involve animal husbandry?

No No Not Applicable

Page 45: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 45 of 47

(gggg) High Conservation Value Areas and Crit ical Habitats Does the Project physically affect or alter largely intact or High Conservation Value (HCV) ecosystems, critical habitats, landscapes, key biodiversity areas or sites identified?

Not Applicable No Not Applicable

Endangered Species: Are there any endangered species identified as potentially being present within the Project boundary (including those that may route through the area)?

Not Applicable No Not Applicable

SECTION E. Local stakeholder consultation

E.1. Solicitation of comments from stakeholders

>> (Describe how stakeholder consultation was conducted in accordance with GS4GG Stakeholder Procedure Requirements and Guidelines.)

Attached stakeholder consulstation report.

E.2. Summary of comments received

>> (Provide a summary of key comments received during the consultation process.)

No negative comment received.

E.3. Report on consideration of comments received

>> (Describe how the comments have been addressed by providing a clarification to the stakeholder or by altering the design of the project or by proposing to monitor any anticipated negative impacts etc.)

No negative comment received.

Page 46: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 46 of 47

Appendix 1. Contact information of project participants

Organization name Aadivasi Khadi Avom Krishi Parishchan Sansthan (AKKPS)

Registration number with relevant authority

Street/P.O. Box Village Bhamodi, Barghat Road

Building Reyyan Towers

City Seoni

State/Region Madhya Pradesh

Postcode 480661

Country India

Telephone +91 9424966002

Fax 07692-224998

E-mail [email protected]

Website

Contact person Rameshwar Pardhi

Tit le Secretary

Salutation Mr.

Last name Pardhi

Middle name

First name Rameshwar

Department

Mobile +91 9424966002

Direct fax 07692-224998

Direct tel.

Personal e-mail [email protected]

Organization name Swiss Carbon Value Ltd.

Registration number with relevant authority

Street/P.O. Box Technoparkstrasse 1

Building

City Zurich

State/Region Switzerland

Postcode

Country Switzerland

Telephone

Fax

E-mail [email protected]

Page 47: Gold Standard for the Global Goals Key Project Information ...Key Project Information & Project Design Document (PDD) Version 1.1 – August 2017 . 101.1 T PDD Page 2 of 47 ... Each

101.1 T PDD Page 47 of 47

Website www.southpole.com

Contact person Tanushree Bagh

Tit le Chief Financial Officer

Salutation Mr.

Last name Grobbel

Middle name

First name Christoph

Department

Mobile

Direct fax

Direct tel.

Personal e-mail [email protected]

Appendix 2. Summary of post registration design changes

Not Applicable

Revision History

Version Date Remarks 1.1 24 August 2017 Updated to include section A.8 on ‘gender sensitive’

requirements 1 10 July 2017 Initial adoption