Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
The following report is filtered by active items, all statuses, all funding sources, and all tags.
GOAL
To implement the Transformational Model
SIG Round 1 Year 2 Goal
4Filing Cabinet Count
SEA Resources Available 0
IMPROVEMENT PLANR. SARRACINO MIDDLE
PROGRESS: 0%(0 of 27 Action Items Complete)
Generated by Web EPSS | July 8, 2011 3:36 PM 1 of 28
ACTION STEP
Align curric and assessments
Under the leadership of a curriculum and instruction coordinator, position created in 09-10 and partially funded by SIG so that initial focus begins at Middle School, develop formative assessments and align curriculum TO grades that precede and follow SMS grades so that SMS students have smooth transitions in and out of the middle school.
Persons Responsible Jean Walker
Start Date 07/01/2011
05/31/2012End Date
Status Not Begun 03/12/2011
SIGTags
0Filing Cabinet Count
Aligned Curriculum
To use data to identify and implement an instructional program that is research-based and vertically aligned from one grade to the next as well as aligned with State Academic standards.
STRATEGY
Filing Cabinet Count 1
IMPROVEMENT PLANR. SARRACINO MIDDLE
PROGRESS: 0%(0 of 27 Action Items Complete)
Generated by Web EPSS | July 8, 2011 3:36 PM 2 of 28
ACTION STEP
Math Intervention Curriculum Implemented
Grades 7 and 8 will be delivering a new math intervention curriculum that is aligned to both the schedule and the standards
Persons Responsible Kim Ortiz
Start Date 08/01/2011
05/31/2012End Date
Status Not Begun 03/12/2011
SIGTags
0Filing Cabinet Count
IMPROVEMENT PLANR. SARRACINO MIDDLE
PROGRESS: 0%(0 of 27 Action Items Complete)
Generated by Web EPSS | July 8, 2011 3:36 PM 3 of 28
ACTION STEP
Scheduling
Schedule for 2011-12 will be changed so that math, like language arts is delivered in a block
Persons Responsible Kim Ortiz
Start Date 07/10/2011
08/19/2011End Date
Status Not Begun 03/12/2011
SIGTags
0Filing Cabinet Count
IMPROVEMENT PLANR. SARRACINO MIDDLE
PROGRESS: 0%(0 of 27 Action Items Complete)
Generated by Web EPSS | July 8, 2011 3:36 PM 4 of 28
ACTION STEP
Sustainability
Ongoing professional development for new staff and planning time to analyze data and monitor progress will be built in to future staffing patterns and Title 1 or 2 professional development plans.
Persons Responsible
Start Date 07/01/2012
07/01/2013End Date
Status In Progress 03/09/2011
REVISED, SIGTags
0Filing Cabinet Count
Data collection and analysis
Continuous use of student data to inform and differentiate instruction in order to meet the academic needs of individual students.
STRATEGY
Filing Cabinet Count 0
IMPROVEMENT PLANR. SARRACINO MIDDLE
PROGRESS: 0%(0 of 27 Action Items Complete)
Generated by Web EPSS | July 8, 2011 3:36 PM 5 of 28
ACTION STEP
Join collaborative to review technology
Work with the PED and other SIG districts to review and possibly select software that allows for better local collection, warehousing, and sorting of student achievement data, along with ease of communicating that data with parents.
Persons Responsible Cheryl Wilson
Start Date 07/01/2010
01/31/2012End Date
Timeline Notes The PED was unable to make this happen this year, but it appears new efforts are being put into the STARS and its Dashboard, which may allow this to happen this year.
Status In Progress 03/09/2011
SIGTags
0Filing Cabinet Count
IMPROVEMENT PLANR. SARRACINO MIDDLE
PROGRESS: 0%(0 of 27 Action Items Complete)
Generated by Web EPSS | July 8, 2011 3:36 PM 6 of 28
ACTION STEP
Professional development on continuous use of data
Part of the overarching professional development and ongoing work done with the outside vendor will be expanding assessments by developing common formative assessments at SMS.
Persons Responsible
Start Date 08/04/2010
08/06/2011End Date
Status In Progress 03/09/2011
REVISED, CLASS, AGP, 2010-2011, SIF, SIG, SIGTags
0Filing Cabinet Count
Effectiveness of Staff
To establish competencies that will be used to measure the effectiveness of staff who will work within the turnaround environment to meet the needs of students.
STRATEGY
Filing Cabinet Count 0
IMPROVEMENT PLANR. SARRACINO MIDDLE
PROGRESS: 0%(0 of 27 Action Items Complete)
Generated by Web EPSS | July 8, 2011 3:36 PM 7 of 28
ACTION STEP
Add 2 content coaches
We intend to hire a math and a reading coach for the middle school.
Persons Responsible Vannetta Perry
Start Date 06/01/2011
08/01/2011End Date
Status Not Begun 03/12/2011
SIGTags
0Filing Cabinet Count
IMPROVEMENT PLANR. SARRACINO MIDDLE
PROGRESS: 0%(0 of 27 Action Items Complete)
Generated by Web EPSS | July 8, 2011 3:36 PM 8 of 28
ACTION STEP
Coaching
Differentiate Instruction Trainers (who are also classroom teachers), reading and math coaches will provide classroom based coaching
Persons Responsible
Start Date 08/11/2010
05/26/2011End Date
Tasks 0 of 1 Complete
Coaching training In Progress Due 9/1/2011Jean Walker (District)
While DI trainers have coaching training, they will get more with new coaches. Trainers are invited to observe and give feedback through team meetings as they are currently teachers. Coaches will coach routinely.
Status In Progress 03/09/2011
SIGTags
0Filing Cabinet Count
ACTION STEP
Development additions to state evaluation model
SMS staff and leadership, Associate Superintendent for HR, Superintendent,and union representation will work to link student achievement growth, professional responsibilities, teaming and collaboration, and implementation of new curriculum and strategies to current state-approved teacher evaluation model.
Persons Responsible Cheryl Wilson
Start Date 10/01/2010
09/01/2011End Date
Timeline Notes Delays in finalizing this have occured due to changes in the state
Status In Progress 03/09/2011
REVISED, CLASS, AGP, 2010-2011, SIF, SIG, SIGTags
0Filing Cabinet Count
IMPROVEMENT PLANR. SARRACINO MIDDLE
PROGRESS: 0%(0 of 27 Action Items Complete)
Generated by Web EPSS | July 8, 2011 3:36 PM 9 of 28
Tasks 1 of 7 Complete
Collaborate with UNM In Progress Due 8/31/2012Cheryl Wilson (District)
UNM faculty will be involved in structuring action research that analyzes and informs many elements of this processCreate teacher self-assessment instrument
In Progress Due 9/1/2011
Work to create or locate a teacher self-assessment instrument which specifically requires teachers to analyze student achievment data.Financial rewards for increased achievement
Not Begun Due 9/1/2011
To be determined and implemented after the evaluation model has been developed with stakeholders. Likely to place much emphasis on team progress to inspire increased collaboration vs competition.Orientation for all staff Completed Due 3/10/2011
Cheryl Wilson (District)
Orientation for all staff in goals and procedures of evaluation process
Progressive profess. devel/improvement plans
In Progress Due 9/1/2011
Cheryl Wilson (District)
Formulate plan of improvement/development based on peer feedback, coach direction & formal administrative eval that has specific goals/tasks to be accomplished and incorporates feedback.direction.Tiered-evaluation system In Progress Due 3/11/2011District teamw ill create a tiered system of evaluation that includes team, peer, and formal administrative evaluation.Train staff in peer observation and feedback
In Progress Due 4/1/2011
In order for staff to provide effective observation feedback, training must be given.
administrations, PED leadership, and legislative direction being taken right now.
IMPROVEMENT PLANR. SARRACINO MIDDLE
PROGRESS: 0%(0 of 27 Action Items Complete)
Generated by Web EPSS | July 8, 2011 3:36 PM 10 of 28
ACTION STEP
Interview protocols changed
Interview protocols will be changed to reflect the knowledge, skills and abilities that this transformation demands
Persons Responsible Vannetta Perry
Start Date 05/02/2011
07/31/2011End Date
Status Not Begun 03/12/2011
SIGTags
0Filing Cabinet Count
IMPROVEMENT PLANR. SARRACINO MIDDLE
PROGRESS: 0%(0 of 27 Action Items Complete)
Generated by Web EPSS | July 8, 2011 3:36 PM 11 of 28
ACTION STEP
Support for rapid intervention
Change math to block; provide for EA's to work with and use data to indentify students needing short interventions; and provide for intervention supplies and materials.
Persons Responsible
Start Date 08/02/2010
06/30/2012End Date
Tasks 0 of 1 Complete
Math Intervention Change Not Begun Due 9/1/2011Math Intervention/enrichment will be incorporated directly into the new block of math time so that intervention is timely and effective
Timeline Notes This systemic process should be in place by December 1.
Status In Progress 03/09/2011
SIGTags
0Filing Cabinet Count
IMPROVEMENT PLANR. SARRACINO MIDDLE
PROGRESS: 0%(0 of 27 Action Items Complete)
Generated by Web EPSS | July 8, 2011 3:36 PM 12 of 28
ACTION STEP
Sustainability
The initiative of this action step are clearly alighned with Title II, so will be funded after this funding period ends. In fact, costs will begin to shift during the funding cycle. Further, team planning time has been funded already for 2 years.
Persons Responsible
Start Date 07/01/2011
07/01/2013End Date
Status In Progress 03/09/2011
REVISED, SIGTags
0Filing Cabinet Count
Increased learning time for studentsIncreased learning time for students and creating community-oriented school.
STRATEGY
Filing Cabinet Count 0
IMPROVEMENT PLANR. SARRACINO MIDDLE
PROGRESS: 0%(0 of 27 Action Items Complete)
Generated by Web EPSS | July 8, 2011 3:36 PM 13 of 28
ACTION STEP
Community Oriented School
Socorro will work with a vendor to engage the communtiy more in our schools, beginning with Sarracino Middle School. See detail in the strategy on non-academic support.
Persons Responsible
Start Date 07/01/2010
06/30/2011End Date
Status In Progress 03/09/2011
REVISED, SIGTags
0Filing Cabinet Count
IMPROVEMENT PLANR. SARRACINO MIDDLE
PROGRESS: 0%(0 of 27 Action Items Complete)
Generated by Web EPSS | July 8, 2011 3:36 PM 14 of 28
ACTION STEP
Continue and modify schedule
SMS will continue with 45 minutes of additional instruction that will continue to allow for two periods of language arts and of math. Like language arts, this year math will be blocked as well.
Persons Responsible
Start Date 08/01/2011
05/31/2012End Date
Tasks 0 of 2 Complete
Additional bussing time In Progress Due 7/1/2012Extended day leads to extending some drivers' hours.
Continue staffing In Progress Due 7/1/2012 - Cheryl Wilson (District)Vannetta Perry (District)
Extended school day and double math classes require that we continue with 4 additional FTE
Status In Progress 03/12/2011
0Filing Cabinet Count
Instructional Reform StrategiesInstructional Reform Strategies
STRATEGY
Filing Cabinet Count 0
IMPROVEMENT PLANR. SARRACINO MIDDLE
PROGRESS: 0%(0 of 27 Action Items Complete)
Generated by Web EPSS | July 8, 2011 3:36 PM 15 of 28
ACTION STEP
Instructional Reform Planning and Implementing
SMS and the school district will work with an outside vendor (see Action Steps in job embedded professional development and aligned curriculum) to support schoolwide instructional reform as detailed below.
Persons Responsible
Start Date 05/10/2010
05/25/2012End Date
Tasks 2 of 4 Complete
Develop RFP Completed Due 5/14/2010Develop RFP focused on aligning standards with instruction and assessment, using data to drive instruction, implementing effective interventions, creating learning climates and building capacityPD outside of contract Not Begun Due 12/1/20113 days of professional development will also be scheduled outside the regular contract calendarTalk with vendors Completed Due 5/7/2010Speak with multiple vendors to form clear sense of scope of owrk and assistance availableTeam planning time/subs Not Begun Due 5/31/2012In 2011-2012 , team planning time will be utilitzed even more effectively with support from vendors, admin and coaches to continue focused improvement efforts. Subs may be utilized on free teachers to observe, study, and work together.
Timeline Notes Work will be front loaded into year 1 with follow up in year 2.
Status In Progress 03/08/2011
REVISED, SIGTags
0Filing Cabinet Count
IMPROVEMENT PLANR. SARRACINO MIDDLE
PROGRESS: 0%(0 of 27 Action Items Complete)
Generated by Web EPSS | July 8, 2011 3:36 PM 16 of 28
ACTION STEP
Sustainability/Capacity Building
Principal and district leadership team will ensure that major focus of vendors for overarching plan and for professional development will be building capacity.
Persons Responsible
Start Date 06/01/2010
06/30/2011End Date
Status In Progress 03/08/2011
REVISED, CLASS, AGP, 2010-2011, SIF, SIG, SIGTags
0Filing Cabinet Count
Job-embedded professional developmentTo provide staff ongoing, high-quality, job embedded professional development that will facilitate effective teaching and learning in achieving school reform strategies.
STRATEGY
Filing Cabinet Count 0
IMPROVEMENT PLANR. SARRACINO MIDDLE
PROGRESS: 0%(0 of 27 Action Items Complete)
Generated by Web EPSS | July 8, 2011 3:36 PM 17 of 28
ACTION STEP
Coaches
Coaches will coordinate these efforts in conjunction with school leadership team. (DI as well as content coaches)
Persons Responsible Kim Ortiz
Start Date 07/01/2011
05/31/2012End Date
Status Not Begun 03/12/2011
SIGTags
1Filing Cabinet Count
IMPROVEMENT PLANR. SARRACINO MIDDLE
PROGRESS: 0%(0 of 27 Action Items Complete)
Generated by Web EPSS | July 8, 2011 3:36 PM 18 of 28
ACTION STEP
Needs assessment to reprioritize
Begin with data from CLASS assessment, SIG quarterly reviews, SEDL and student achievement to determine areas of needed focus and areas of effectiveness.
Persons Responsible Kim Ortiz
Start Date 12/18/2009
06/01/2012End Date
Status In Progress 03/09/2011
SIGTags
0Filing Cabinet Count
IMPROVEMENT PLANR. SARRACINO MIDDLE
PROGRESS: 0%(0 of 27 Action Items Complete)
Generated by Web EPSS | July 8, 2011 3:36 PM 19 of 28
ACTION STEP
Three-year commitment to schoolwide p.d.
SMS will use an outside facilitator (currently communicating with Doug Reeves' Leadership and Learning, JBMH with Renaissance Learning and Southern REgional Education Boards Making Middle Grades Work) to develop schoolwide, research-based models of curriculum delivery, intervention, and infrastructure to assure increased student achievement.
Persons Responsible
Start Date 08/01/2010
05/26/2012End Date
Tasks 0 of 1 Complete
3 days of professional development Not Begun Due 12/1/2011Teachers will receive 3 days of professional development above and beyond their normal contract.
Timeline Notes This professional development will begin with 2 days in August and will include at least monthly meetings throughout the first year. Second year will have 3 days outside of contract.
Status In Progress 03/09/2011
REVISED, CLASS, AGP, 2010-2011, SIF, SIG, SIGTags
0Filing Cabinet Count
New governance structure/TurnaroundTo establish necessary elements in the new governance structure of the Turnaround School.
STRATEGY
Filing Cabinet Count 0
IMPROVEMENT PLANR. SARRACINO MIDDLE
PROGRESS: 0%(0 of 27 Action Items Complete)
Generated by Web EPSS | July 8, 2011 3:36 PM 20 of 28
ACTION STEP
Communication Improvements
The Socorro School District will be focusing efforts on improved communication and informing all SMS stakeholders about school improvement efforts and progress will be front and center.
Persons Responsible Vannetta Perry
Start Date 08/01/2011
05/31/2012End Date
Tasks 0 of 2 Complete
Parent Liaison Coordinator In Progress Due 6/30/2012As we did in 2010-2011, we will continue to assign Mr. Salome to SMS at least one day per week to coordinate parent and community involvment and communication efforts. Goals will be established in conjunction with the district and school leadership team.Turnaround coordinator In Progress Due 6/30/2012
Vannetta Perry (District)
As in 2010-2011, we will continue to reassign part of Dr. Perry's time to supporting turnaround efforts at SMS, largely through improved and expedited communication on behalf of SMS. Goals will be established in conjunction with the dist/sch lead teams
Status Not Begun 03/12/2011
SIGTags
0Filing Cabinet Count
IMPROVEMENT PLANR. SARRACINO MIDDLE
PROGRESS: 0%(0 of 27 Action Items Complete)
Generated by Web EPSS | July 8, 2011 3:36 PM 21 of 28
ACTION STEP
Improved professional practice
Principal will work with Director of HR to assure that progressive process is used to effectively if teacher evaluation after peer feedback and curriculum coordinator coaching still show professional practice is not improving.
Persons Responsible
Start Date 03/01/2011
03/01/2013End Date
Status In Progress 03/09/2011
REVISED, SIGTags
0Filing Cabinet Count
IMPROVEMENT PLANR. SARRACINO MIDDLE
PROGRESS: 0%(0 of 27 Action Items Complete)
Generated by Web EPSS | July 8, 2011 3:36 PM 22 of 28
ACTION STEP
School Leadership Team
The school leadership team with representation from all grade levels and the Encore area will meet routinely and accept the responsibility of direction-setting, monitoring, and communicating to all stakeholders.
Persons Responsible Kim Ortiz
Start Date 07/01/2011
05/31/2012End Date
Status Not Begun 03/12/2011
SIGTags
0Filing Cabinet Count
Non-academic support for studentsAppropriate social-emotional and community-oriented services and supports for students.
STRATEGY
Filing Cabinet Count 0
IMPROVEMENT PLANR. SARRACINO MIDDLE
PROGRESS: 0%(0 of 27 Action Items Complete)
Generated by Web EPSS | July 8, 2011 3:36 PM 23 of 28
ACTION STEP
Continue 0.5 FTE counselor addition
Prior to SIG, SMS had only 1.5 counseling/testing FTE as the two staff also served our rural elementary schools part time. We will continue with a separate part-time counselor there to allow 2 FTE at SMS.
Persons Responsible
Start Date 08/10/2010
06/20/2013End Date
Tasks 0 of 1 Complete
Counselor support to SIG Not Begun Counselors will provide data analysis for both grades and student behavior, coordinate positive behavior support efforts and assist in communication.
Status Not Begun 03/15/2011
SIGTags
0Filing Cabinet Count
IMPROVEMENT PLANR. SARRACINO MIDDLE
PROGRESS: 0%(0 of 27 Action Items Complete)
Generated by Web EPSS | July 8, 2011 3:36 PM 24 of 28
ACTION STEP
Positive Behavior Supports
Some staff were trained in positive behavior supports last summer and worked to implement throughout the year, but much more support is needed for it to become institutionalized.
Persons Responsible
Start Date 07/01/2010
04/01/2011End Date
Tasks 0 of 3 Complete
Data analyzed and plans made Not Begun Due 11/4/2011Kim Ortiz (District)Data from 2010-2011 will be analyzed
along with first quarter, 2011 to determine what schoolwide plans need to implemented or modified.Substitutes to support teacher release
Not Begun Due 6/30/2012
Teachers will be released to monitor and track student behaviors and discipline data to improve the plans.Training for all Not Begun Due 8/15/2011
Kim Ortiz (District) - Vannetta Perry (District)
All staff will be trained in PBS
Status In Progress 03/09/2011
SIGTags
0Filing Cabinet Count
IMPROVEMENT PLANR. SARRACINO MIDDLE
PROGRESS: 0%(0 of 27 Action Items Complete)
Generated by Web EPSS | July 8, 2011 3:36 PM 25 of 28
ACTION STEP
SRO
Continue to integrate the SRO into effective schoolwide behavior support and work with Sheriff's department to find sustainable funding.
Persons Responsible Kim Ortiz, Cheryl Wilson
Start Date 07/01/2011
05/31/2012End Date
Status Not Begun 03/12/2011
SIGTags
0Filing Cabinet Count
IMPROVEMENT PLANR. SARRACINO MIDDLE
PROGRESS: 0%(0 of 27 Action Items Complete)
Generated by Web EPSS | July 8, 2011 3:36 PM 26 of 28
ACTION STEP
Redesign interview protocols
See staff effectiveness section
Persons Responsible Vannetta Perry
Start Date 05/01/2011
08/31/2011End Date
Status Not Begun 03/12/2011
SIGTags
0Filing Cabinet Count
Recruitment and retention of staffTo recruit, replace, and retain staff with the skills necessary to meet the needs of the students in the Turnaround school.
STRATEGY
Filing Cabinet Count 0
IMPROVEMENT PLANR. SARRACINO MIDDLE
PROGRESS: 0%(0 of 27 Action Items Complete)
Generated by Web EPSS | July 8, 2011 3:36 PM 27 of 28
ACTION STEP
Direct Line to Superintendent
In addition to the two monthly administrative team meetings scheduled with the superintendent, the middle school principal will have two scheduled individual meetings per month in the first semester and one per month in the second semester. Additional meetings can and will be scheduled as needed to assure that the principal has support and flexibility understood throughout the district to make change as needed.
Persons Responsible
Start Date 07/01/2010
06/30/2011End Date
Tasks 0 of 2 Complete
Program application implementation
In Progress Due 4/1/2011
Vannetta Perry (District)
If the new principal discovers challenges in the way the grant was written, she will work with the central office who will work with the PED regarding amendments and adjustments.Supt. Support In Progress Due 4/1/2011
Cheryl Wilson (District)
In schedule changes, staffing needs, budget priorities cause some variance from standard operating procedures, the superintendent will let directors know to accomodate if prinicpal makes a reasoned argument to her.
Status In Progress 03/08/2011
SIGTags
0Filing Cabinet Count
Support to building principalTo provide flexibility and support to the building Principal that will serve to substantially improve student achievement outcomes and increases high school graduation rates.
STRATEGY
Filing Cabinet Count 0
Estimated $0.00
Budgeted $0.00
$0.00Actual
$0.00TOTAL PLAN FUNDS:
IMPROVEMENT PLANR. SARRACINO MIDDLE
PROGRESS: 0%(0 of 27 Action Items Complete)
Generated by Web EPSS | July 8, 2011 3:36 PM 28 of 28