13
Global Data Centers Design Considerations – Data Center Continuous October 2014 Warrick Gibbens

Global Data Centers Design Considerations – Data Center Continuous October 2014 Warrick Gibbens

Embed Size (px)

Citation preview

Page 1: Global Data Centers Design Considerations – Data Center Continuous October 2014 Warrick Gibbens

Global Data Centers

Design Considerations – Data Center Continuous

October 2014Warrick Gibbens

Page 2: Global Data Centers Design Considerations – Data Center Continuous October 2014 Warrick Gibbens

10/30/2014 Cummins Confidential2

Content

Data Center Drivers

Market Dynamics

Classifications & Definitions

Design Considerations

Choice of Supplier

Key Value Proposition Elements

Customer Value

Page 3: Global Data Centers Design Considerations – Data Center Continuous October 2014 Warrick Gibbens

Data Center Drivers

Real World Impact of Digitization– Mobile Devices– VoD– E-Commerce– Social Media– Big Data

10/30/2014 Cummins Confidential3

Page 4: Global Data Centers Design Considerations – Data Center Continuous October 2014 Warrick Gibbens

Market Dynamics – Power Demand

Cummins Confidential

More (& larger) facilities need to support our “connected world”

– Mobile devices (3G/4G), VoIP, the cloud, virtualization

Increasing power within facilities– Power Density of Servers (5kw 20kw

per rack)

– Cooling growing less rapidly – load profile changes

– This will increase w/ technology refreshes

30/10/2014

Power demand increasing 11% Globally to 2016

4

Page 5: Global Data Centers Design Considerations – Data Center Continuous October 2014 Warrick Gibbens

10/30/2014 Cummins Confidential5

Uptime Tier Classifications & ISO DefinitionsDescription Tier I Tier II Tier III Tier IV

Design Basic Redundant Capacity

Concurrently Maintainable

Fault Tolerant

Disruption - Planned Yes Yes No No

Disruption - Unplanned Yes Yes Yes No

Capacity N N+1 N+1 2N

Annual Outages 28.8 hrs 22 hrs 1.6 hrs 0.8 hrs

Primary Power Source Utility Utility Generator Generator

ISO Generator Rating

Run Time Limitations Load Rating

COP No Limit on run-time at 100% load Constant Load

PRP No Limit on run-time at 70% load/24hrs ave

Variable Load

ESP 200hrs /per year Variable Load

Page 6: Global Data Centers Design Considerations – Data Center Continuous October 2014 Warrick Gibbens

10/30/2014 Cummins Confidential6

Top Five Considerations for Specifying Data Center Power Systems

Achieving the five nines……………………99,999% uptime

1. Ensure Redundancy, Avoid Duplicity (pre fuel filters vs. oil/coolant filters)

2. Seek Long Term Reliability to Maximize Uptime (selection of proven, tested and reliable equipment procured within an integrated system)

3. Limit Vendor Sources for Ease of Installation (Single Vendor w.r.t installation, trouble shooting and integration)

4. Select a Vendor with a Proven Installation/Service Record (available access to reliable services and accurate diagnostics)

5. Deploy a Focused Product Portfolio (understand equipment capabilities vs. non linear/linear load portfolio’s)

Warrick Gibbens
Page 7: Global Data Centers Design Considerations – Data Center Continuous October 2014 Warrick Gibbens

10/30/2014 Cummins Confidential7

DCC vs. PRP – No Limit on Run Time

Description DCC PRP

Units 4 x 2500kW 5 x 2500kW

Loading over 24 hrs 100% load / 24 hrs 70% ave load / 24 hrs

Available Load 10 000kW 8 750kW

Page 8: Global Data Centers Design Considerations – Data Center Continuous October 2014 Warrick Gibbens

10/30/2014 Cummins Confidential8

DCC vs. COP – Oversized Generators

Description DCC COP

Standby Unit Size 5 x 1800kWe (2567BHP) 5 x 2000kW (2875BHP)

Actual Unit Size 5 x 1600kWe 5 x 1600kWe

Minimum Load (30%) < 2900kWe < 3300kWe

Load Profile36-39%

Page 9: Global Data Centers Design Considerations – Data Center Continuous October 2014 Warrick Gibbens

10/30/2014 Cummins Confidential9

Key Factors Driving Choice of Supplier

Aftermarket support

•Reliability, services, experience, cost of coverage

Page 10: Global Data Centers Design Considerations – Data Center Continuous October 2014 Warrick Gibbens

Key Value Proposition Elements

10/30/2014 Cummins Confidential10

Cummins leverages application expertise, system design experience, an industry-leading sales and service network to build a reliable long-term partnership with our customers. We're there

with you before data processing starts and we'll ensure it continues throughout the life of the data center

Relationships

Reliability

Execution

Example:

Page 11: Global Data Centers Design Considerations – Data Center Continuous October 2014 Warrick Gibbens

What do customers value?

10/30/2014 Cummins Confidential11

1. Aftermarket– Our 7x24x365 service call center and customized escalation process means you

do not need to worry about downtime. Our fully trained service technicians are equipped and ready to respond when you need it most

2. Global Coverage– Customers want to be supported wherever their business takes them and

Cummins global distribution network is unmatched. Cummins owns over 80% of its Distribution network – so you can be assured that they are properly trained and backed by Cummins whenever and wherever

3. Distributor Capabilities– Our Distribution Network is equipped to support customers in all facets. From

application engineering, to project management to fully trained service personnel. It takes experience and detailed application knowledge to design, install and maintain critical power systems

Disclaimer – variability exists across & within regions

Page 12: Global Data Centers Design Considerations – Data Center Continuous October 2014 Warrick Gibbens

What do customers value?

10/30/2014 Cummins Confidential12

4. Power of One• The Power of One goes beyond being a supplier of gensets, ats, switchgear and controls.

It is about being a solutions provider equipped to support the customer throughout the value chain.

5. Customized solutions– CPG offers our data center customer with customized and reliable solutions to suit their

needs. From data center continuous ratings, standard redundant offerings to Uptime Tier III/IV system designs, CPG has the application knowledge and expertise to design, test and service these solutions.

6. Application engineering– It takes application knowledge to ensure the power system is designed to fully integrate

with the rest of the facility and meets unique location challenges. This ensure complete power availability when you need it most.

7. Supply chain efficiencies1. Colocation and cloud providers utilize a “just in time” build cycle, which drives the lead

time for back up power systems down. We can align our supply chains to support our customers business goals. Industry-leading lead time for custom products and ensuring that all of the components of an Integrated System (gensets, switchgear, ATS, etc) arrive at the right time.

Page 13: Global Data Centers Design Considerations – Data Center Continuous October 2014 Warrick Gibbens

10/30/2014 Cummins Confidential13

Questions?

Please visit Stand # 20