GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Embed Size (px)

Citation preview

Page 1: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

GIS Integrated Analytics for Preventive Maintenance and Storm Response

Presenter:John Lauletta, CEO/CTO

Sr. Member, IEEE

Page 2: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Preventive Maintenance Decision Process

Budget

Circuit Performance

Page 3: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Non Storm-Related Outages on the Electric Distribution System

Trees / Vegetation32%

Animal Contact18%

Miscellaneous19%

Equipment Failure 31%

Source: U.S. DOE

Page 4: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Preventive Maintenance Decision Process

Grid Design Asset Health Connectivity

Budget

Circuit Performance Optimized Maintenance

PREDICTIVE (PdM)

Vegetation Mgmt.

Page 5: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Predictive Maintenance (PdM)Predictive Maintenance is based upon knowing the condition of equipment in a system.

Predictive Maintenance means using technologies that tell us what will fail in the future, not what is failing right now. Predictions come from monitoring the condition of equipment as it is operating.

Visual Detection

Infrared Detection

Ultrasonic Emission Detection

RF Emission Detection

There are many benefits to conditions-based maintenance including lowering cost, improving system performance and enhancing worker safety. But, how can the condition of all the equipment on the grid be measured?

Measuring the Condition of the Grid

Here are some ways to measure equipment condition.

Page 6: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Based in Columbus, OH

US Strategic Partners:

Int’l Alliance Partners

– Australia, Mexico, Canada

2 US Patents, 7 Int’l Patents

2 million+ Poles Surveyed

3rd Party Validation

– U.S. Dept. of Energy (DOE)

– Nat’l Elec. Testing Lab (NETL)

– The Ohio State University

Exacter, Inc. Provides: Grid Condition Assessment for Improved System Resiliency and Reliability

Page 7: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Initial Research 2004 to 2006Advanced Research Coninues

Research FacilitiesThe Ohio State University High Voltage Laboratory

Page 8: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Test Fixtures

Two views of the test setup

Surge Arrester Being Studied

Page 9: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Lab Workstation

EXACTER® Sensor

Research Analytics

Faraday Cage

Page 10: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Exacter Acquisition and Analysis ProcessData Acquisition &

DiscriminationData Analysis

Actionable Information

RF emissions from arcing (deteriorated) electrical components

Exacter sensor in vehicle/aircraft collects the signals and then discriminates and

GPS locates arcing, tracking and leaking electrical components

Data analyzed for severity, persistence and prevalence, enabling: • Exact locating of failing

component• Replacement prioritization

Precise GPS coordinates and relevant condition-

data transmittedto servers for final

statistical geospatial analysis Reports and GIS compatible

information provided to customer

Page 11: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

The Need: DOE Smart Grid Project Example

http://www.smartgrid.gov/reports

Page 12: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Condition Assessment:Select Circuits and Design Survey

Following the selection of circuits to be included in the

assessment, Exacter Data Specialists design specific survey routes

using public access roadways. The

EXACTER Sensor is sensitive in a 200

meter radius from the vehicle.

Page 13: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Survey Quality ControlCondition Assessment:Monitor Survey Progress

While the survey is underway, the path of the survey vehicle, the

WHITE trace, is monitored to insure

that the circuits being assessed are

completely studied.

Accuracy of results is improved by multiple

passes of the same route over a four week

period.

Page 14: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Condition Assessment:Real-time Failure Signature Analysis

Whenever the EXACTER Sensor

locates a line emission that correlates to a Failure Signature a real-time study is

completed. The 986 RED markers show all

of the studies from the four-week survey

process.

Page 15: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Condition Assessment:EXACTER Condition Assessment Results

The 986 RED Failure Signature Events are studied by EXACTER

Servers to create this result: 25 BLUE

Maintenance Groups where a structure

includes at least one weakened component.

Page 16: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Analytical Process to Locate Deteriorated Equipment

Page 17: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

• Calculates coordinates of a circle which is centered about a point on the globe

• Difficult cone-sphere intersection problem

• Adopted a method described in The Journal of Applied Meteorology by I. Ruff in 1971

Internal Algorithms: Geographic Circle Calculation

Page 18: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Transmission Equipment Deterioration

Aerial Surveys

Page 19: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Prioritized Maintenance Action:Select Equipment to Replace

Specific component(s) that are arcing, leaking

or tracking on those structures that have been prioritized for

repair are identified.

Photographs, Maps, Reports, and GIS Files

are provided.

GIS.SHP File

Page 20: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Example: Project Design

• Projects are designed with utility data to create an optimized price/benefit result

• Utilities:– Set Goals– Perform Maintenance– Measure Results

Vegetation, 32%

Animals and Other, 37%

Selected Prior-ity Feeders to

Assess and Improve Af-

fecting 20% of Out-

ages

Deferred, Less Critical , Low SAIDI Impact Feeders 11% Outage Causes

PredictiveBased

Maintenance

Page 21: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

30%

26%

17%

9%8%

5%

2% 2%1% 0%0.0%

5.0%

10.0%

15.0%

20.0%

25.0%

30.0%

35.0%

-

5,000,000.00

10,000,000.00

15,000,000.00

20,000,000.00

25,000,000.00

1 11 21 31 41 51 61 71 81 91 101 111 121 131 141 151 161 171 181 191 201 211 221 231 241 251

Eastern Division

CMI Impact AnalysisCircuit CMI Contribution

5,950 OVHD Miles

Example: Prioritized Worst Performing Circuit (WPC) Improvement Program

73% of Total CMI – 1,904 miles (32%)

CMI Result ofCurrent Programs

Page 22: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Sum of All Customer Interruption DurationsTotal Number of Customers ServedSAIDI

71.1861.33 63.92

23.38

Aggregate Customer Experience

IEEE 1366

Page 23: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Total # of Customer InterruptionsTotal Number of Customers ServedSAIFI

1.52 1.48 1.53

1.03

Aggregate Customer Experience

Page 24: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Sum of All Customer Interruptions Total Number of Customer Interruptions CAIDI

Aggregate Customer Experience

46.73 41.32 41.90

22.78

Relatively No Change in the Customer Experience

Page 25: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Non Storm-Related Outages on the Electric Distribution System

Trees / Vegetation32%

Animal Contact18%

Miscellaneous19%

Equipment Failure 31%

Source: U.S. DOE

Page 26: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Flat Response = Challenges & Opportunities

0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 50

50

100

150

200

250

300

350

400

450

500

SAIFI

CAID

I

Page 27: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Flat Response = Challenges & Opportunities

0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 50

50

100

150

200

250

300

350

400

450

500

SAIFI

CAID

I

Page 28: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Target Performance

0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 50

50

100

150

200

250

300

350

400

450

500

SAIFI

CAID

I

Page 29: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Top Decile20 Years of Design Excellence

0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 50

50

100

150

200

250

300

350

400

450

500

SAIFI

CAID

I

Page 30: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

SAIDI FocusO&M – Workforce Deployment

0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 50

50

100

150

200

250

300

350

400

450

500

SAIFI

CAID

I

Page 31: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

SAIFI FocusCapital Intensive Programs

0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 50

50

100

150

200

250

300

350

400

450

500

SAIFI

CAID

I

Page 32: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Typical Strategies

0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 50

50

100

150

200

250

300

350

400

450

500

SAIFI

CAID

I Tree Trimming

Automat ion

60% – 70%Out of ROW

Page 33: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Replace Deteriorated Equipment

0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 50

50

100

150

200

250

300

350

400

450

500

SAIFI

CAID

I Tree Trimming

Automat ion

Predictive Equipment Maintenance

Page 34: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

0 0.5 1 1.5 2 2.5 3 3.5 4 4.5 50

50

100

150

200

250

300

350

400

450

500

SAIFI

CAID

IWhat is The Strategy to Improve?

How Good Is Good Enough?

• SAIDI (CMI)

• SAIFI (Number of outages)

• CAIDI (CMI)

• CEMI (Number of outages)

• Targeted Performance: 1st Quartile or Decile

• Stay Ahead of the Bear

Page 35: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

What is Urgent and Important?

Page 36: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Informed Maintenance Decisions

Circuit A Circuit B Circuit C Circuit D0

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

CMICMI (

100,

000)

Page 37: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Optimized Selection

Circuit A Circuit B Circuit C Circuit D0

0.5

1

1.5

2

2.5

3

3.5

4

4.5

5

CMICMI / Mile

CMI (

100,

000)

Page 38: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Circuit Connectivity

1,000 Customers

CMI1 = CMI2

120 Customers

Circuit 1

Circuit 2

Page 39: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Circuit Physical Design

9 miles of OH 1 mile of UG

9 miles of UG1 mile of OH

CMI1 = CMI2

Circuit 1

Circuit 2

Page 40: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Circuit Critical Connectivity

100 Customers

100 Customers

CMI1 = CMI2

Circuit 1

Circuit 2

Page 41: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Grid Operation Importance

Smart Grid Control element

Residential Distribution

CMI1 = CMI2

Circuit 1

Circuit 2

Page 42: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

CMI Reduction Project

Page 43: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Preventive Maintenance Decision Process

Budget

Circuit Performance

Page 44: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Preventive Maintenance

Customer Complaints

Page 45: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Improved Measurements Effective Results

00.5

11.5

22.5

33.5

44.5

Cost per Outcome

Cost of Program

Des

ired

Out

com

e

0

1

2

3

4

5

Cost per Outcome

Cost of Program

Des

ired

Out

com

e

Lift

OpportunityTo Lower

O&M Expense

Page 46: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Preventive Maintenance Decision Process

Grid Design Asset Health Critical Load Connectivity

Budget

Circuit Performance Optimized Maintenance

PREDICTIVE (PdM)

Page 47: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Optimized Maintenance

Page 48: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Deteriorated Equipment Impact on Grid Resiliency

1. THE GRID IS OLD—AND IT'S ONLY MAKING MATTERS WORSEAccording to the DOE report: "70% of the grid’s transmission lines and power transformers are now over 25 years old and the average age of power plants is over 30 years."As a result, "the age of the grid’s components has contributed to an increased incidence of weather-related power outages.“. . . Utility Dive

Page 49: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

http://nca2009.globalchange.gov/significant-weather-related-us-electric-grid-disturbances

Storm Influence on Transmission

Page 50: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Storm Impact on Reliability

2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 -

200,000

400,000

600,000

800,000

1,000,000

1,200,000

Correlation: OH EQ CMI against MEDs

System MEDs Total OH EQ CMI

Cu

sto

mer

Min

ute

s o

f In

terr

up

tio

n (

CM

I)

Page 51: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Predictive Analytics Effective Conditions-based Maintenance

• Long Term Improvement in Reliability– Measurable– Documented– Repeatable

• Additional Value– GIS Data– OMS Systems– Software

• Complete Solution– Vegetation– Asset Data Collection– Condition Assessment– Predictive Maintenance

CONFIDENTIAL

Page 52: GIS Integrated Analytics for Preventive Maintenance and Storm Response Presenter: John Lauletta, CEO/CTO Sr. Member, IEEE

Questions?

[email protected]

@EXACTERINC