GOLDEN GATE UNIVERSITY
Prepared for: Project TeamGolden Gate University
Prepared by: MKThink
The information contained in this drawing is the sole property of MKThink. Any reproduction in part or as a whole without the written permission of MKThink is prohibited.
W www.mkthink.com
T 415.402.0888 MKThink A RoundhouseOne 1500 Sansome Street, Suite 200 San Francisco, CA 94111
02.25.13SF REMODEL PROJECT - PhASES 7-9
Roundhouse One, 1500 Sansome StreetSan Francisco, CA 94111p 415 402 0888f 415 288 3383mkthink.com
All drawings and written material contained herein constitute original and unpublished work of the Studio and may not be duplicated, used or disclosed without written consent of the Studio. Accuracy of drawings is for design purposes only. Do not scale off drawings.
Golden Gate UniversitySF Remodel Project
Client:Golden Gate University
536 Mission StreetSan Francisco, CA 94105
02/25/13
Prepared By:
Nate GooreEvelyn LeeTiffany ChenMatt Okazaki
Prepared For:
GGU Project Team
Available
Instruction
Office - Staff
Interaction
Outdoor
Library - Study
Library - Book Storage
Library - Staff
User Support
Building Support
Circulation
Informal Interaction
Office - Faculty
Office - Student
2
Instruction
Office - Staff
Interaction
Outdoor
Library - Study
Library - Book Storage
Library - Staff
User Support
Building Support
Circulation
Informal Interaction
Office - Faculty
Office - Student
OUTDOOR480
205 S.F.
OUTDOOR481
205 S.F.
CORRIDOR482
1080 S.F.
CORRIDOR484
1754 S.F.
OUTDOOR485
140 S.F.
MEETING ROOM
PLUSLEARNING ANNEX
COPYROOM
WORK STATION4332A98 S.F.
CORRIDOR485
OFFICECOPYROOM
484A84 S.F.
484A484B
CIRCULATION4312A
650 S.F.
4312B117 S.F.
STORAGE4312C
185 S.F.
463
CIRCULATION4210A44 S.F.
4308B40 S.F.
4308D66 S.F.
CIRCULATION4308C
299 S.F.
430889 S.F.
4312279 S.F.
4337B140 S.F.
4337158 S.F.
4337A53 S.F.
CIRCULATION4337C
636 S.F.
CLASSROOM
Undergraduate Programs
Ageno School of Business PLUS SchoolofLaw
ClassroomTech.Services
ELSLanguageTech.Center
Drop-inComputerLab
Existing Proposed
Undergraduate Programs
Ageno School of Business PLUS SchoolofLaw
AVAILABLE296 S.F.
Phase 7A:
4-West Classrooms
Phase 7A
Scope:SD-DD-CD:Permitting:Begin Construction:End Construction:
4-West ClassroomsFeb-Apr 2013Apr-May 2013May 1, 2013August 1, 2013
Description: Floor 4 - Renovate the West Wing Classrooms.
•Rightsize the classrooms to student enrollment data and class sizes•Add four additional classrooms•Remove old computer labs and switch to ‘mobile’ labs (laptop carts or a laptop checkout sys-tem)•Create an informal gathering space for studying and after-class discussions.•496 SF of available space for new or existing programs. Possible location of new Drop-In Lab.
Phase 7A - Floor 4
Floor 4
12
12
12
12 16 16 24
24 16 24 20 20 16 242424
Seat Count
Roundhouse One, 1500 Sansome StreetSan Francisco, CA 94111p 415 402 0888f 415 288 3383mkthink.com
All drawings and written material contained herein constitute original and unpublished work of the Studio and may not be duplicated, used or disclosed without written consent of the Studio. Accuracy of drawings is for design purposes only. Do not scale off drawings.
Golden Gate UniversitySF Remodel Project
Client:Golden Gate University
536 Mission StreetSan Francisco, CA 94105
02/25/13
Prepared By:
Nate GooreEvelyn LeeTiffany ChenMatt Okazaki
Prepared For:
GGU Project Team
Available
Instruction
Office - Staff
Interaction
Outdoor
Library - Study
Library - Book Storage
Library - Staff
User Support
Building Support
Circulation
Informal Interaction
Office - Faculty
Office - Student
3
Instruction
Office - Staff
Interaction
Outdoor
Library - Study
Library - Book Storage
Library - Staff
User Support
Building Support
Circulation
Informal Interaction
Office - Faculty
Office - Student
VENDINGMACHINES
1490 S.F.
LOBBY383
1247 S.F.
CORRIDOR384
1553 S.F.
OUTDOOR385
138 S.F.
166 S.F.
331490 S.F.
CIRCULATION3314A
148 S.F.
3310248 S.F.
3310A112 S.F.
3327153 S.F.
3327A55 S.F.
CIRCULATION3327B
287 S.F.
LawRegistration
LLMPrograms
School of LawAdmissionsFinancial AidFaculty Offices
School of Law
StudentServices
CLASSROOM3317
486 S.F.
CLASSROOM3316
486 S.F.
CLASSROOM3324
486 S.F.
CLASSROOM3323
486 S.F.
CLASSROOM3321
486 S.F.
CLASSROOM3320
486 S.F.
LawRegistration
LLMPrograms
School of LawAdmissionsFinancial AidFaculty Offices
School of Law
StudentServices
Floor 3
Existing Proposed
Phase 7B:
3-West Classrooms & Lawyering Skills
Phase 7B
Scope:SD-DD-CD:Permitting:Begin Construction:End Construction:
3-West Classrooms & Lawyering SkillsJun-Aug 2013Sept-Nov 2013Dec 1, 2013Apr 31, 2014
Description: Floor 3 - Convert 4 West Wing classrooms into the Lawyering Skills Program.•Retrofitclassrooms3200,3201,and 3203 to function as prac-tice trial courtrooms. Equip with proper courtroom furniture and furnishings.Allowforflexibleclassroom setups.•Relocate the Baxter Room (2314) to 3205.•Convert 3211 and 3216 into 4 smaller rooms. Net gain of 1 classroom.
Phase 7B - Floor 3
12
12
12
12
642060
58 38 16
Roundhouse One, 1500 Sansome StreetSan Francisco, CA 94111p 415 402 0888f 415 288 3383mkthink.com
All drawings and written material contained herein constitute original and unpublished work of the Studio and may not be duplicated, used or disclosed without written consent of the Studio. Accuracy of drawings is for design purposes only. Do not scale off drawings.
Golden Gate UniversitySF Remodel Project
Client:Golden Gate University
536 Mission StreetSan Francisco, CA 94105
02/25/13
Prepared By:
Nate GooreEvelyn LeeTiffany ChenMatt Okazaki
Prepared For:
GGU Project Team
Available
Instruction
Office - Staff
Interaction
Outdoor
Library - Study
Library - Book Storage
Library - Staff
User Support
Building Support
Circulation
Informal Interaction
Office - Faculty
Office - Student
4
Instruction
Office - Staff
Interaction
Outdoor
Library - Study
Library - Book Storage
Library - Staff
User Support
Building Support
Circulation
Informal Interaction
Office - Faculty
Office - Student
EXTERIORBALCONY
211298 S.F.
185 S.F.
322 S.F.
LOBBY2100
1203 S.F.
OUTDOOR2500
138 S.F.CORRIDOR
26001693 S.F.
STORAGE2002B75 S.F.
STORAGE2002A75 S.F.
JANITOR2600A38 S.F.
COPY
CIRCULATION2322A
344 S.F.
2322154 S.F.
2300C112 S.F.
2300A70 S.F.
CIRCULATION2300B
512 S.F.
CIRCULATION2300D
284 S.F.
54
School of LawDean’s Offices
School of LawFaculty Offices
School of LawFaculty Center
StudentBarAssociation
ABACriminalPracticeFellowOffice
EXTERIORBALCONY
211298 S.F.
185 S.F.
322 S.F.
LOBBY2100
1203 S.F.
STORAGE2002B75 S.F.
STORAGE2002A75 S.F.
LECTURE HALL/MOOT COURT
STAIRS-3
322 S.F.
Floor 2
Existing Proposed
Phase 7C:
2-West Lecture Halls
Phase 7C
Description:
Scope:SD-DD-CD:Permitting:Begin Construction:End Construction:
2-West Lecture HallsSep-Dec 2013Jan-Apr 2014May 1, 2014Aug 1, 2014
Floor 2 - Renovate the West Wing Lecture Halls (2201, 2202, 2203).
•Decrease slope of tiered seating.•Improve acoustic quality of rooms.•Convert 2203 into a signature Moot Courtroom for the Law School. Provide appropriate furni-ture and furnishings.
Phase 7C - Floor 2
EXTERIORBALCONY
211298 S.F.
185 S.F.
322 S.F.
LOBBY2100
1203 S.F.
OUTDOOR2500
138 S.F.CORRIDOR
26001693 S.F.
STORAGE2002B75 S.F.
STORAGE2002A75 S.F.
JANITOR2600A38 S.F.
COPY
CIRCULATION2322A
344 S.F.
2322154 S.F.
2300C112 S.F.
2300A70 S.F.
CIRCULATION2300B
512 S.F.
CIRCULATION2300D
284 S.F.
54
School of LawDean’s Offices
School of LawFaculty Offices
School of LawFaculty Center
StudentBarAssociation
ABACriminalPracticeFellowOffice
94 83 84
Roundhouse One, 1500 Sansome StreetSan Francisco, CA 94111p 415 402 0888f 415 288 3383mkthink.com
All drawings and written material contained herein constitute original and unpublished work of the Studio and may not be duplicated, used or disclosed without written consent of the Studio. Accuracy of drawings is for design purposes only. Do not scale off drawings.
Golden Gate UniversitySF Remodel Project
Client:Golden Gate University
536 Mission StreetSan Francisco, CA 94105
02/25/13
Prepared By:
Nate GooreEvelyn LeeTiffany ChenMatt Okazaki
Prepared For:
GGU Project Team
Available
Instruction
Office - Staff
Interaction
Outdoor
Library - Study
Library - Book Storage
Library - Staff
User Support
Building Support
Circulation
Informal Interaction
Office - Faculty
Office - Student
5
Instruction
Office - Staff
Interaction
Outdoor
Library - Study
Library - Book Storage
Library - Staff
User Support
Building Support
Circulation
Informal Interaction
Office - Faculty
Office - Student
5324A
5221A
5221E5221D
5221C 5221B
OUTDOOR585
138 S.F.
OUTDOOR581
271 S.F.
OUTDOOR580
286 S.F.
LOBBY583
1247 S.F.
CORRIDOR584
1376 S.F.JANITORIAL
CLOSEST5323
25 S.F.
CORRIDOR582
933 S.F.
OFFICE
OFFICE
STORAGE
CIRCULATION5300C
742 S.F.
OFFICE5300
88 S.F.
CIRCULATION5314A
218 S.F.
OFFICE5314
88 S.F.
OFFICES5324
232 S.F.
OFFICES5324
84 S.F.
CIRCULATION5324C
534 S.F.
CIRCULATION5221G
199 S.F.
522124 S.F.
5221F18 S.F.
STAIRS-3
322 S.F.
School of Taxation
ELSLanguageCenter
School of Accounting
CyberCampus
Floor 5
Existing Proposed
CIRCULATION5300C
742 S.F.
OFFICE5300
88 S.F.
CIRCULATION5314A
218 S.F.
OFFICE5314
88 S.F.
OFFICES5324
232 S.F.
OFFICES5324
84 S.F.
CIRCULATION5324C
534 S.F.
STAIRS-3
322 S.F.
School of Taxation School of Accounting
CyberCampus
CIRCULATION5221G
199 S.F.
522124 S.F.
5221F18 S.F.
ELSLanguageCenter
Phase 7D:
5-West Classrooms & Faculty Center(Includes new 5th Floor Auditorium &Digital Signage)
Phase 7D
Description:
Scope:
SD-DD-CD:Permitting:Begin Construction:End Construction:
5-West Classrooms & Faculty Center(Includes new 5th Floor Auditorium &Digital Signage)June-Aug 2014Sept-Nov 2014Dec 1, 2014Apr 31, 2015
Floor 5 - Relocate 5th Floor Audito-rium to 5-West
•Convert 5200, 5205, 5210 to four classrooms.•New classrooms will have move-able walls to create a larger audi-torium room.•Renovation of East Wing doors to meet building code.
Phase 7D - Floor 5
Floor 5 - Convert classroom 5207 into Faculty/Staff Lounge.
Floor 5 - Renovate the West Wing Classrooms
•Rightsize classrooms to student enrollment data and class sizes.
16
24
40
24 32
24 20 32 16 20 40
Roundhouse One, 1500 Sansome StreetSan Francisco, CA 94111p 415 402 0888f 415 288 3383mkthink.com
All drawings and written material contained herein constitute original and unpublished work of the Studio and may not be duplicated, used or disclosed without written consent of the Studio. Accuracy of drawings is for design purposes only. Do not scale off drawings.
Golden Gate UniversitySF Remodel Project
Client:Golden Gate University
536 Mission StreetSan Francisco, CA 94105
02/25/13
Prepared By:
Nate GooreEvelyn LeeTiffany ChenMatt Okazaki
Prepared For:
GGU Project Team
Available
Instruction
Office - Staff
Interaction
Outdoor
Library - Study
Library - Book Storage
Library - Staff
User Support
Building Support
Circulation
Informal Interaction
Office - Faculty
Office - Student
6
5324A
5221A
5221E5221D
5221C 5221B
OUTDOOR585
138 S.F.
OUTDOOR581
271 S.F.
OUTDOOR580
286 S.F.
LOBBY583
1247 S.F.
CORRIDOR584
1376 S.F.JANITORIAL
CLOSEST5323
25 S.F.
CORRIDOR582
933 S.F.
OFFICE
OFFICE
STORAGE
CIRCULATION5300C
742 S.F.
OFFICE5300
88 S.F.
CIRCULATION5314A
218 S.F.
OFFICE5314
88 S.F.
OFFICES5324
232 S.F.
OFFICES5324
84 S.F.
CIRCULATION5324C
534 S.F.
CIRCULATION5221G
199 S.F.
522124 S.F.
5221F18 S.F.
STAIRS-3
322 S.F.
School of Taxation
ELSLanguageCenter
School of Accounting
CyberCampus
OUTDOOR480
205 S.F.
OUTDOOR481
205 S.F.
CORRIDOR482
1080 S.F.
CORRIDOR484
1754 S.F.
OUTDOOR485
140 S.F.
MEETING ROOM
PLUSLEARNING ANNEX
COPYROOM
WORK STATION4332A98 S.F.
CORRIDOR485
OFFICECOPYROOM
484A84 S.F.
484A484B
CIRCULATION4312A
650 S.F.
4312B117 S.F.
STORAGE4312C
185 S.F.
463
CIRCULATION4210A44 S.F.
4308B40 S.F.
4308D66 S.F.
CIRCULATION4308C
299 S.F.
430889 S.F.
4312279 S.F.
4337B140 S.F.
4337158 S.F.
4337A53 S.F.
CIRCULATION4337C
636 S.F.
CLASSROOM
Undergraduate Programs
Ageno School of Business PLUS SchoolofLaw
ClassroomTech.Services
ELSLanguageTech.Center
Drop-inComputerLab
VENDINGMACHINES
1490 S.F.
LOBBY383
1247 S.F.
CORRIDOR384
1553 S.F.
OUTDOOR385
138 S.F.
166 S.F.
331490 S.F.
CIRCULATION3314A
148 S.F.
3310248 S.F.
3310A112 S.F.
3327153 S.F.
3327A55 S.F.
CIRCULATION3327B
287 S.F.
LawRegistration
LLMPrograms
School of LawAdmissionsFinancial AidFaculty Offices
School of Law
StudentServices
EXTERIORBALCONY
211298 S.F.
185 S.F.
322 S.F.
LOBBY2100
1203 S.F.
OUTDOOR2500
138 S.F.CORRIDOR
26001693 S.F.
STORAGE2002B75 S.F.
STORAGE2002A75 S.F.
JANITOR2600A38 S.F.
COPY
CIRCULATION2322A
344 S.F.
2322154 S.F.
2300C112 S.F.
2300A70 S.F.
CIRCULATION2300B
512 S.F.
CIRCULATION2300D
284 S.F.
54
School of LawDean’s Offices
School of LawFaculty Offices
School of LawFaculty Center
StudentBarAssociation
ABACriminalPracticeFellowOffice
Existing - Floor 2
Existing - Floor 4 Existing - Floor 5
Existing - Floor 3
Description:
Scope:
SD-DD-CD:Permitting:Begin Construction:End Construction:
Phase 8:
2-East, 3-East, 4-East, and 5-East Academic Suites & Offices
Phase 8
2-East, 3-East, 4-East, and 5-East AcademicSuites&OfficesTBDTBDTBDTBDFloor 2, 3, 4, 5 - Renovate the East WingAcademicSuites&Offices
•Createastandardizedofficeplanlayout.•Rightsizeofficesaccordingtoadministration space standards, faculty and staff directory, and growth projections. Create a widervarietyofoffice/workstationspaces.•Create a single reception/entry intotheofficesuitesoneachfloor.•Introduce more meeting/confer-enceroomsperfloor.•Move all classrooms off of the East Wing.
Phase 8 - Floors 2-5
Floors 2-5
Roundhouse One, 1500 Sansome StreetSan Francisco, CA 94111p 415 402 0888f 415 288 3383mkthink.com
All drawings and written material contained herein constitute original and unpublished work of the Studio and may not be duplicated, used or disclosed without written consent of the Studio. Accuracy of drawings is for design purposes only. Do not scale off drawings.
Golden Gate UniversitySF Remodel Project
Client:Golden Gate University
536 Mission StreetSan Francisco, CA 94105
02/25/13
Prepared By:
Nate GooreEvelyn LeeTiffany ChenMatt Okazaki
Prepared For:
GGU Project Team
Available
Instruction
Office - Staff
Interaction
Outdoor
Library - Study
Library - Book Storage
Library - Staff
User Support
Building Support
Circulation
Informal Interaction
Office - Faculty
Office - Student
7
STAIRS-3
322 S.F.
Office Plan A
PrivateOffice-175SF:PrivateOffice-144SF:PrivateOffice-110SF:Open Workstations - 64 SF:
Touchdown Workstations:Meeting Rooms:Mini Break Rooms:
12
242653
8 31
STAIRS-3
322 S.F.
Office Plan B
PrivateOffice-175SF:PrivateOffice-144SF:PrivateOffice-110SF:Open Workstations - 64 SF:
Touchdown Workstations:Meeting Rooms:Mini Break Rooms:
12
361352
1 31Proposed - Office Plan B
Proposed - Office Plan A
Description:
Scope:
SD-DD-CD:Permitting:Begin Construction:End Construction:
Phase 8:
2-East, 3-East, 4-East, and 5-East Academic Suites & Offices
Phase 8
2-East, 3-East, 4-East, and 5-East AcademicSuites&OfficesTBDTBDTBDTBDFloor 2, 3, 4, 5 - Renovate the East WingAcademicSuites&Offices
•Createastandardizedofficeplanlayout.•Rightsizeofficesaccordingtoadministration space standards, faculty and staff directory, and growth projections. Create a widervarietyofoffice/workstationspaces.•Create a single reception/entry intotheofficesuitesoneachfloor.•Introduce more meeting/confer-enceroomsperfloor.•Move all classrooms off of the East Wing.
Phase 8 - Floors 2-5
Roundhouse One, 1500 Sansome StreetSan Francisco, CA 94111p 415 402 0888f 415 288 3383mkthink.com
All drawings and written material contained herein constitute original and unpublished work of the Studio and may not be duplicated, used or disclosed without written consent of the Studio. Accuracy of drawings is for design purposes only. Do not scale off drawings.
Golden Gate UniversitySF Remodel Project
Client:Golden Gate University
536 Mission StreetSan Francisco, CA 94105
02/25/13
Prepared By:
Nate GooreEvelyn LeeTiffany ChenMatt Okazaki
Prepared For:
GGU Project Team
Available
Instruction
Office - Staff
Interaction
Outdoor
Library - Study
Library - Book Storage
Library - Staff
User Support
Building Support
Circulation
Informal Interaction
Office - Faculty
Office - Student
8
QUAD & EVENT SPACE
2053 S.F.
Law
CONCIERGE
56 S.F.
UNISEXTOILET
45 S.F.
161 S.F.
1414 S.F.
74 S.F.
MOVEABLEWALL
PLANTER
UNISEXTOILET
45 S.F.
UNISEXTOILET
45 S.F.
UNISEXTOILET
45 S.F.
LIBRARYENTRANCE
Instruction
Office - Staff
Interaction
Outdoor
Library - Study
Library - Book Storage
Library - Staff
User Support
Building Support
Circulation
Informal Interaction
Office - Faculty
Office - Student
Floor 1
Existing Proposed
1003
1200D
1200C
1200A
CIRCULATION1100
1157 S.F.
ENTRY PROMENADE150
MEETING/WORKROOM
TELECOM1500A94 S.F.
OUTDOOR1600A
186 S.F.
236 S.F
CIRCULATION
OFFICE OFFICE OFFICE OFFICE
OFFICE OFFICE
ATM
1218A
LearningSupportServices
Law Library
University Library
Phase 9A:
Learning Commons
The Hub
Phase 9A
Scope:
SD-DD-CD:Permitting:Begin Construction:End Construction:
Learning CommonsThe HubTBDTBDTBDTBD
Floor 1, Mezzanine - Convert the University Library into the Learning Commons.
Description:
•Create 12 group study rooms.•Open up new entrance to Ecker Place.•Add 2 unisex restrooms.•Co-locatestaffofficesandservicepoints.
Floor 1 - Expand the Main Lobby to create the Hub.•Remove north wall of Main Lobby and add moveable wall.•Add 2 unisex restrooms, kitchen/prep area, and storage room.
Phase 9A - Floor 1
Roundhouse One, 1500 Sansome StreetSan Francisco, CA 94111p 415 402 0888f 415 288 3383mkthink.com
All drawings and written material contained herein constitute original and unpublished work of the Studio and may not be duplicated, used or disclosed without written consent of the Studio. Accuracy of drawings is for design purposes only. Do not scale off drawings.
Golden Gate UniversitySF Remodel Project
Client:Golden Gate University
536 Mission StreetSan Francisco, CA 94105
02/25/13
Prepared By:
Nate GooreEvelyn LeeTiffany ChenMatt Okazaki
Prepared For:
GGU Project Team
Available
Instruction
Office - Staff
Interaction
Outdoor
Library - Study
Library - Book Storage
Library - Staff
User Support
Building Support
Circulation
Informal Interaction
Office - Faculty
Office - Student
9
Instruction
Office - Staff
Interaction
Outdoor
Library - Study
Library - Book Storage
Library - Staff
User Support
Building Support
Circulation
Informal Interaction
Office - Faculty
Office - Student
Mezzanine
Existing Proposed
STORAGE
OFFICE
M-52
OUTDOORM-50
127 S.F.
CONTRACTOROFFICE
M-93188 S.F.
37 S.F.
317 S.F.
387 S.F.
M2008335 S.F.
49 S.F. 343 S.F.
TOOL ROOM
University LibraryTechnical Services Dana &
Teresa WaldmanReading Room
Phase 9A:
Learning Commons
The Hub
Phase 9A
Scope:
SD-DD-CD:Permitting:Begin Construction:End Construction:
Learning CommonsThe HubTBDTBDTBDTBD
Floor 1, Mezzanine - Convert the University Library into the Learning Commons.
Description:
•Create 12 group study rooms.•Open up new entrance to Ecker Place.•Add 2 unisex restrooms.•Co-locatestaffofficesandservicepoints.
Floor 1 - Expand the Main Lobby to create the Hub.•Remove north wall of Main Lobby and add moveable wall.•Add 2 unisex restrooms, kitchen/prep area, and storage room.
Phase 9A - Mezzanine
Roundhouse One, 1500 Sansome StreetSan Francisco, CA 94111p 415 402 0888f 415 288 3383mkthink.com
All drawings and written material contained herein constitute original and unpublished work of the Studio and may not be duplicated, used or disclosed without written consent of the Studio. Accuracy of drawings is for design purposes only. Do not scale off drawings.
Golden Gate UniversitySF Remodel Project
Client:Golden Gate University
536 Mission StreetSan Francisco, CA 94105
02/25/13
Prepared By:
Nate GooreEvelyn LeeTiffany ChenMatt Okazaki
Prepared For:
GGU Project Team
Available
Instruction
Office - Staff
Interaction
Outdoor
Library - Study
Library - Book Storage
Library - Staff
User Support
Building Support
Circulation
Informal Interaction
Office - Faculty
Office - Student
10
CORRIDOR
STUDY
OFFICE
STORAGE
OUTDOOR PLAZAP-150
293 S.F.
28 S.F.
ELJ
75 S.F.
P-2T
P-63A
StudentGovernmentAssociation
Enterprise Technology Services
Business Services& Facilities
Law Library
CORRIDOR
OFFICE
OFFICE
STORAGE
293 S.F.
28 S.F.
ELJ
75 S.F.
P-2T
P-63A
STUDENT ORG.OFFICE
UNISEXTOILET
PG&EVAULT
T-COMM
pool tableping-pong
table
STUDENT ORG.OFFICE
vending machines
vending machines
Instruction
Office - Staff
Interaction
Outdoor
Library - Study
Library - Book Storage
Library - Staff
User Support
Building Support
Circulation
Informal Interaction
Office - Faculty
Office - Student
Plaza
Existing Proposed
Phase 9B:
Plaza Courtyard Student Union
6th Floor Moot Court & Storage Relocation
Phase 9B
Scope:
SD-DD-CD:Permitting:Begin Construction:End Construction:
Plaza Courtyard Student Union6th Moot Court & Storage RelocationTBDTBDTBDTBD
Plaza, Floor 1 - Enclose Plaza Courtyard to create the Student Union.
Description:
•Add transparent roof covering to allow for daylighting.•Expand kitchen in existing SGA Lounge.•Convert storage room P-9B into unisex restroom.•Re-locate lockers to Plaza Courtyard.•Enclose stairwell leading to Plaza Courtyard.
Floor 6 - Convert Moot Courtroom into storage and available space.•Remove vending machines. Relo-cate to Plaza Courtyard Student Union.•Relocate storage room 6200A to part of room 6224 (639 SF).•Convert Moot Courtroom (6224) to relocated storage room 6200A and available space (522 SF).
Phase 9B - Plaza
19
Roundhouse One, 1500 Sansome StreetSan Francisco, CA 94111p 415 402 0888f 415 288 3383mkthink.com
All drawings and written material contained herein constitute original and unpublished work of the Studio and may not be duplicated, used or disclosed without written consent of the Studio. Accuracy of drawings is for design purposes only. Do not scale off drawings.
Golden Gate UniversitySF Remodel Project
Client:Golden Gate University
536 Mission StreetSan Francisco, CA 94105
02/25/13
Prepared By:
Nate GooreEvelyn LeeTiffany ChenMatt Okazaki
Prepared For:
GGU Project Team
Available
Instruction
Office - Staff
Interaction
Outdoor
Library - Study
Library - Book Storage
Library - Staff
User Support
Building Support
Circulation
Informal Interaction
Office - Faculty
Office - Student
11
QUAD & EVENT SPACE
2053 S.F.
Law
CONCIERGE
56 S.F.
UNISEXTOILET
45 S.F.
161 S.F.
1414 S.F.
74 S.F.
MOVEABLEWALL
PLANTER
UNISEXTOILET
45 S.F.
UNISEXTOILET
45 S.F.
UNISEXTOILET
45 S.F.
LIBRARYENTRANCE
Instruction
Office - Staff
Interaction
Outdoor
Library - Study
Library - Book Storage
Library - Staff
User Support
Building Support
Circulation
Informal Interaction
Office - Faculty
Office - Student
Floor 1
Existing Proposed
1003
1200D
1200C
1200A
CIRCULATION1100
1157 S.F.
ENTRY PROMENADE150
MEETING/WORKROOM
TELECOM1500A94 S.F.
OUTDOOR1600A
186 S.F.
236 S.F
CIRCULATION
OFFICE OFFICE OFFICE OFFICE
OFFICE OFFICE
ATM
1218A
LearningSupportServices
Law Library
University Library
Phase 9B:
Plaza Courtyard Student Union
6th Floor Moot Court & Storage Relocation
Phase 9B
Scope:
SD-DD-CD:Permitting:Begin Construction:End Construction:
Plaza Courtyard Student Union6th Moot Court & Storage RelocationTBDTBDTBDTBD
Plaza, Floor 1 - Enclose Plaza Courtyard to create the Student Union.
Description:
•Add transparent roof covering to allow for daylighting.•Expand kitchen in existing SGA Lounge.•Convert storage room P-9B into unisex restroom.•Re-locate lockers to Plaza Courtyard.•Enclose stairwell leading to Plaza Courtyard.
Floor 6 - Convert Moot Courtroom into storage and available space.•Remove vending machines. Relo-cate to Plaza Courtyard Student Union.•Relocate storage room 6200A to part of room 6224 (639 SF).•Convert Moot Courtroom (6224) to relocated storage room 6200A and available space (522 SF).
Phase 9B - Floor 1
Roundhouse One, 1500 Sansome StreetSan Francisco, CA 94111p 415 402 0888f 415 288 3383mkthink.com
All drawings and written material contained herein constitute original and unpublished work of the Studio and may not be duplicated, used or disclosed without written consent of the Studio. Accuracy of drawings is for design purposes only. Do not scale off drawings.
Golden Gate UniversitySF Remodel Project
Client:Golden Gate University
536 Mission StreetSan Francisco, CA 94105
02/25/13
Prepared By:
Nate GooreEvelyn LeeTiffany ChenMatt Okazaki
Prepared For:
GGU Project Team
Available
Instruction
Office - Staff
Interaction
Outdoor
Library - Study
Library - Book Storage
Library - Staff
User Support
Building Support
Circulation
Informal Interaction
Office - Faculty
Office - Student
12
Instruction
Office - Staff
Interaction
Outdoor
Library - Study
Library - Book Storage
Library - Staff
User Support
Building Support
Circulation
Informal Interaction
Office - Faculty
Office - Student
Floor 6
Existing Proposed
LOBBY683
1247 S.F.
CORRIDOR682
934 S.F.OUTDOOR
681278 S.F.
OUTDOOR679
254 S.F.
OUTDOOR680
693 S.F.
ROOF6300
11,287 S.F.
684
245 S.F.
CIRCULATION6202F
336 S.F.
6202E70 S.F.6202
170 S.F.
CIRCULATION6217A
177 S.F.
6217104 S.F.
2068 S.F.
STORAGE
639 S.F.
AVAILABLE
522 S.F.
LSS
UNIVERSITY
Office of the President
Office of theVice PresidentofAcademicAffairs
LOBBY683
1247 S.F.
CORRIDOR682
934 S.F.OUTDOOR
681278 S.F.
OUTDOOR679
254 S.F.
OUTDOOR680
693 S.F.
ROOF6300
11,287 S.F.
684
245 S.F.
CIRCULATION6202F
336 S.F.
6202E70 S.F.6202
170 S.F.
CIRCULATION6217A
177 S.F.
6217104 S.F.
WILLIAM RANDOLPH HEARST
UNIVERSITY
Office of the President
Office of theVice PresidentofAcademicAffairs
Phase 9B:
Plaza Courtyard Student Union
6th Floor Moot Court & Storage Relocation
Phase 9B
Scope:
SD-DD-CD:Permitting:Begin Construction:End Construction:
Plaza Courtyard Student Union6th Moot Court & Storage RelocationTBDTBDTBDTBD
Plaza, Floor 1 - Enclose Plaza Courtyard to create the Student Union.
Description:
•Add transparent roof covering to allow for daylighting.•Expand kitchen in existing SGA Lounge.•Convert storage room P-9B into unisex restroom.•Re-locate lockers to Plaza Courtyard.•Enclose stairwell leading to Plaza Courtyard.
Floor 6 - Convert Moot Courtroom into storage and available space.•Remove vending machines. Relo-cate to Plaza Courtyard Student Union.•Relocate storage room 6200A to part of room 6224 (639 SF).•Convert Moot Courtroom (6224) to relocated storage room 6200A and available space (522 SF).
Phase 9B - Floor 6