GEOTHERMAL REGULATION AND POLICY IN INDONESIA
Presented at:
Workshop on Geothermal Bussiness Opportunity in Indonesia
Bandung, February 19th, 2013
DIRECTORATE GENERAL OF NEW RENEWABLE ENERGY AND ENERGY CONSERVATION
MINISTRY OF ENERGY AND MINERAL RESOURCES
by:
Directorate of Geothermal
©2012
Ministry of Energy and Mineral Resources
Directorate General of New Renewable Energy and Energy Conservation
Sustainable, Green, Clean and Environmental Friendly
Direktorat Jenderal
EBTKEMinistry of Energy and Mineral Resources
Directorate General of New Renewable Energy and Energy Conservation
I. Background
II. Geothermal Policy
III. Geothermal Development
IV. Feed in Tariff Mechanism
OUTLINE
Direktorat Jenderal
EBTKEMinistry of Energy and Mineral Resources
Directorate General of New Renewable Energy and Energy Conservation
I. BACKGROUND
Direktorat Jenderal
EBTKEMinistry of Energy and Mineral Resources
Directorate General of New Renewable Energy and Energy Conservation
• Driven by concerns about the sustainability of environment and the security of energy supply, interest in renewable energy is growing all over the world. Indonesia as a country that is highly dependent on fossil fuels to meet its energy needs, has forced to seek for other energy resources to maintain national security of energy supply.
• Geothermal has became a priority energy to ensure national energy security, reducing Indonesia's dependence on fossil fuel and also provide added value in energy diversification.
• Based on latest survey, Indonesia has 28.8 GWe geothermal potential which distributed in 299 locations along the country, yet its utilization has not been optimized. Up to now total installed capacity of geothermal power plant is only reached 1,341 MW.
• The Government of Indonesia (GoI) is concerned in energy development based on green energy, mainly geothermal. Presidential Decree No. 5 / 2006 on National Energy Policy (KEN) has targeted in 2025 electricity from geothermal energy will reach 9500 MW or contribute 5% of national energy consumption
Background
©2012
Ministry of Energy and Mineral Resources
Directorate General of New Renewable Energy and Energy Conservation
INDONESIA’S GEOTHERMAL POTENTIAL
Source : Geological Agency, MEMR 2012
RESOURCES
(MWe)%
RESERVE
(MWe)%
Speculative Hypothetical
42.84%
Possible Probable Proven
57.16%7.472 4.881 13.371 823 2.288
12.353 16.482
28.835
Direktorat Jenderal
EBTKEMinistry of Energy and Mineral Resources
Directorate General of New Renewable Energy and Energy Conservation
Road Map of Geothermal Development 2006 – 2025
Current Condition
2006
852 MW
(Produksi)
2008 2012 2016 2020
2000 MW 3442 MW 4600 MW 6000 MW 9500 MW
(Target)
1148 MW
Existing WKP
1442 MW
Existing WKP
1158 MW
Existing WKP
+ New WKP
1400 MW
New WKP
3500 MW
New WKP
2025
1341 MW
(based on Presidential Decree No. 5/2006 on National Energy Policy)
Direktorat Jenderal
EBTKEMinistry of Energy and Mineral Resources
Directorate General of New Renewable Energy and Energy Conservation
II. GEOTHERMAL POLICY
Direktorat Jenderal
EBTKEMinistry of Energy and Mineral Resources
Directorate General of New Renewable Energy and Energy Conservation
President Decree No 45/1991, No 49/1991, and No 23/1992
Business structure based on JOC and ESC
34% of Net Operating Income (NOI), that had included all kinds of taxes and retribution, except personal tax.
Project Management : Under Pertamina (JOC) and PLN (ESC)
Project Type: Total (Integrated) Project Partial Project
Law No. 27/2003
Business structure in the form of Permit: Geothermal Mining Permit Enterprise Permit for Electricity
Obligation to pay for taxes and royalty
Project Management : Under Permit Holder
Project Type:Total (Integrated) ProjectGWA holder will be granted as generally plan operation
Implementation of Geothermal Policies
Existing GWA New GWA
9
Direktorat Jenderal
EBTKEMinistry of Energy and Mineral Resources
Directorate General of New Renewable Energy and Energy Conservation
GEOTHERMAL POLICIES1. Improvement and harmonization of regulations in Geothermal Business.
1). Revising the law No. 27/2003 on Geothermal. The main purpose of this revision are:
- Geothermal activities can be carried out in conservation forest area.
- To accomadate “Participating Interest “ issue which demanded by local goverment.
- To amend GWA’s tender mechanism.
2). Revising GR No. 59/2007 on Geothermal Business Activities, mainly to revise GWA’s tender mechanism. Based on proposed regulation, the winner of GWA’s tender is determined by work programs and exploration commitments.
3). Preparing Technical Guidelines as the implementation of the MR no 22/2012.
2. The government provides fiscal incentives for geothermal development (based on Government Regulation No. 62/2008 jo No. 1/2007; MR of MoF No. 177/PMK.011/2007; and MR of MoF No. 22/PMK.011/2011)
• 30% of corporate income tax;• 10% of added-value tax paid by the GoI;• Custom duties exemption for geothermal developer;• 25% per year depreciation for 8 years with double declining balance method; and• Investment tax credit 5% per year for 6 years
3. Related to Forestry Issues, currently MEMR and Ministry of Forest have signed the MoU regarding the acceleration of geothermal utilization permit within production forest, protected forest, and conservation forest
Direktorat Jenderal
EBTKEMinistry of Energy and Mineral Resources
Directorate General of New Renewable Energy and Energy Conservation
GEOTHERMAL POLICIES ............(2)
4. Feed-in Tariff MechanismGovernment sets the price of electricity from geothermal power plant which is final and can not be negotiated by PT. PLN. This mechanism is expected to reduce the main obstacle in geothermal development related to price uncertainty that usually requires a long time for negotiation.
5. Financial support and Government guaranteeGovernment guarantee on the feasibility of PT. PLN; “Geothermal Fund" for geothermal exploration; Green Banking Program, etc
Direktorat Jenderal
EBTKEMinistry of Energy and Mineral Resources
Directorate General of New Renewable Energy and Energy Conservation
1. Law No. 27/2003 on Geothermal
2. Government Regulation No. 59/2007 on Geothermal Business Activities, asamanded in GR No. 70/2010
3. Government Regulation No. 62/2008 jo. GR No. 1/2007 on Income Tax Facilitiesfor Investment in Certain Business Areas and / or in Specific Regions
4. GR No. 9/2012 on Types And Tariffs On Non-tax State Revenue Applicable to TheMinistry Of Energy And Mineral Resources
5. GR No. 04/2010 on Assignment to PT. PLN (Persero) to Accelerate TheDevelopment of Power Plant from Renewable Energy, Coal and Gas
6. Ministry Regulation of Minister Energy And Mineral Resources
1). MR No. 11/2008 on the Procedure for Determination GWA2). MR No. 02/2009 on Guidelines for Geothermal Preliminary Survey
Assignment (as amendment of MR. 05/2007)3). MR No. 11/2009 on Guidelines for Implementation of Geothermal Business ,
jo. MR No. 18/2012
GEOTHERMAL REGULATION(After Law No. 27/2003)
Direktorat Jenderal
EBTKEMinistry of Energy and Mineral Resources
Directorate General of New Renewable Energy and Energy Conservation
4). MR No. 01/2012 on Revision of MR No. 15/2010 on The List of Power Plant Acceleration Projects Using Renewable Energy, Coal, and Gas and Related Transmission
5). MR No. 22/2012 on Assignment to PT PLN (Persero) to Purchase Electricity from Geothermal Power Plant and Geothermal Power Purchase Benchmark Price by PT PLN (Persero)
7. Ministry Regulation of Minister of Finance
1). No. 139/PMK.011/2011 on Procedures for Granting Business-Feasibility Guarantee to PT PLN (Persero) for The Development or Renewable Energy, Coal and Gas-Fueled Power Plants Through Cooperation With The Independent Power Producers
2) No. 03/PMK.011/2012 on Procedures for the Management and Accountability Geothermal Facility Fund
GEOTHERMAL REGULATION..Continue
Direktorat Jenderal
EBTKEMinistry of Energy and Mineral Resources
Directorate General of New Renewable Energy and Energy Conservation
III. GEOTHERMAL DEVELOPMENT
Direktorat Jenderal
EBTKEMinistry of Energy and Mineral Resources
Directorate General of New Renewable Energy and Energy Conservation
Development 2010 2011 2012 2013 2014 2015
Geothermal Development
1. Added Capacity (MW) 37 115 3 375 1.797
2. Installed Capacity (MW) 1.189 1.226 1.341 1.344 1.719 3.516
GEOTHERMAL PROGRAMPOWER PLANT DEVELOPMENT 2010 – 2015
Note:
- Capacity Factor of Geothermal Power Plant = 90%
Direktorat Jenderal
EBTKEMinistry of Energy and Mineral Resources
Directorate General of New Renewable Energy and Energy Conservation
No Geothermal Working Area (GWA) LocationPotential
Capacity (MW)
1 Gn. Talang West Sumatera 36
2 Songa Wayaua North Maluku 140
3 Danau RanauLampung & South
Sumatera210
4 Mataloko East Nusa Tenggara 63
5 Gn. Endut Banten 80
6 Way Ratai Lampung 105
7 Candi Umbul Telomoyo Central Java 120
8 Simbolon Samosir North Sumatera 155
9 Bora Pulu Central Sulawesi 123
10 Gn. Lawu Central Java 195
11 Kepahiang Bengkulu 180
12 Sembalun NTB 100
13 Oka ile Ange NTT 40
GEOTHERMAL WORKING AREA FOR TENDER
Direktorat Jenderal
EBTKEMinistry of Energy and Mineral Resources
Directorate General of New Renewable Energy and Energy Conservation
PRELIMINARY SURVEY ASSIGNMENT’S AREA
NoGeothermal Working Area
(GWA)District/ City Province
1 Sungai Betung Kerinci and Pesisir SelatanJambi and West
Sumatera
2 Sungai Tenang Merangin Jambi
3 Ciseeng Bogor and Lebak West Java and Banten
4 MalawaMaros, Pangkajene Kepulauan, Bone and
BarruSouth Sulawesi
5 Gn. Dua Saudara Bitung North Sulawesi
6 Ulumbu Manggarai NTT
7 Gn. Gede/Pangrango* Bogor, Sukabumi, and Cianjur West Java
8 Gn. Hamiding West Halmahera, North Halmahera North Maluku
9 Pentadio Gorontalo, Bone Bolango, Gorontalo City Gorontalo
10 Graho Nyabu Merangin, Kerinci, Muko-Muko Jambi and Bengkulu
11 Gn. WilisPonorogo, Madiun, Nganjuk, Kediri,
Tulungagung, TrenggalekEast Java
12 Gn. Geureudong Central Aceh, Bener Meriah, North AcehNanggroe Aceh
Darussalam
* Pre Survey Assignment is being carried out
Direktorat Jenderal
EBTKEMinistry of Energy and Mineral Resources
Directorate General of New Renewable Energy and Energy Conservation
18
ACEH 2 WKP
Jaboi: 70 MW
Seulawah Agam: 130 MW
NORTH SUMATERA 5 WKP
Sibayak – Sinabung: 130 MW
Sibual – Buali: 750 MW
Sipaholon Ria-ria: 75 MW
Sorik Marapi: 200 MW
Simbolon Samosir : 155 MW
JAMBI 1 WKP
Sungai Penuh: 70 MW
SOUTH SUMATERA 3 WKP
Lumut Balai: 250 MW
Rantau Dedap: 106 MW
Danau Ranau: 210 MW
BANTEN 2 WKP
Kaldera Danau Banten: 115 MW
G. Endut: 80 MW
WEST SUMATERA 4 WKP
Bukit Kili: 83 MW
Gn Talang: 35 MW
Liki Pinangawan: 400 MW
Bonjol: 200 MW
BENGKULU 2 WKP
Tmbg Sawah-Hululais: 873 MW
Kepahiyang : 180 MW
LAMPUNG 4 WKP
Gn.Rajabasa: 91 MW
Suoh Sekincau: 230 MW
Waypanas – Ulubelu: 556 MW
Danau Ranau: 210 MW
Way Ratai :105 MW
WEST JAVA 10 WKP
Ciater - Tgkban Perahu: 60 MW
Cibeureum–Parabakti: 485 MW
Cibuni: 140 MW
Cisolok Cisukarame: 45 MW
Gn. Tampomas: 50 MW
Gn. Tgkuban Perahu: 100 MW
Kamojang-Darajat: 1465 MW
Karaha Cakrabuana: 725 MW
Pangalengan: 1106 MW
G. Ciremai: 150 MW
CENTRAL JAVA 5 WKP
Baturaden: 175 MW
Dataran Tinggi Dieng: 780 MW
Guci: 79 MW
Gn. Ungaran: 100 MW
Umbul Telomoyo : 120 MW
EAST JAVA 4 WKP
Blawan – Ijen: 270 MW
Gn. Iyang Argopuro: 295 MW
Telaga Ngebel: 120 MW
Gn. Lawu: 195 MW
BALI 1 WKP
Tabanan: 276 MW
WEST NUSA
TENGGARA 2 WKP
Hu'u Daha: 65 MW
Sembalun : 100 MW
EAST NUSA TENGGARA 5 WKP
Atadei: 40 MW
Sokoria: 30 MW
Ulumbu: 199 MW
Mataloko: 63 MW
Oka Ile Ange : 40 MW
MALUKU 1 WKP
Tulehu: 100 MW
NORTH MALUKU 2 WKP
Jailolo: 75 MW
Songa Wayaua: 140 MW
NORTH SULAWESI 2 WKP
Kotamobagu: 410 MW
Lahendong-Tompaso: 358 MW
GORONTALO 1 WKP
Suwawa: 110 MW
CENTRAL SULAWESI 2 WKP
Marana: 35 MW
Bora Pulu : 152 MW
Total : 58 GWA
Distribution of GWA
GEOTHERMAL DEVELOPMENT
Lisence – Issued : 38 GWAs
Tender on Progress : 2 GWAs
Tender Preparation : 13 GWAs
Tender – Failed : 5 GWAs
Direktorat Jenderal
EBTKEMinistry of Energy and Mineral Resources
Directorate General of New Renewable Energy and Energy Conservation
Presidential Regulation No. 04/2010 on Assignment to PT. PLN to Accelerate Power
Plant Development Using Renewable Energy, Coal and Gas
MEMR Regulation No. 01/2012 as revised in Ministerial Regulation No. 15/2010 on
Projects List of Power Plant Accelerated Development using Renewable Energy, Coal
and Gas as well as Related Transmission
Target for Geothermal Power Plant Development on Crash Program 10.000 MW
Phase II
Existing field : 2000 MW
New Geothermal Working Area : 2925 MW
Total of Geothermal Development 4925 MW
GEOTHERMAL DEVELOPMENT TARGET
(2010 - 2014)
Direktorat Jenderal
EBTKEMinistry of Energy and Mineral Resources
Directorate General of New Renewable Energy and Energy Conservation
GEOTHERMAL POWER PLANT PROJECTS
INCLUDED IN CRASH PROGRAM PHASE II
(Based on MEMR Regulaton No. 01/2012)
NO.GEOTHERMAL POWER
PLANT PROJECTSTATUS PROVINCE
ESTIMATION OF
CAPACITY (MW)
INSTALLED
CAPACITY
2014 (MW)
REQUIRED
FINANCING
2014 (US$
MILLION)
1 Sungai Penuh Existing WKP Jambi 2x55 110 330
2 Hululais Existing WKP Bengkulu 2x55 110 330
3 Kotamobagu 1 and 2 Existing WKP North Sulawesi 2x20 40 120
4 Kotamobagu 3 and 4 Existing WKP North Sulawesi 2x20 40 120
5 Sembalun Open Area West Nusa Tenggara 2x10 20 60
6 Tulehu Existing WKP Maluku 2x10 20 60
7 Tangkuban Perahu I New WKP West Java 2x55 110 330
8 Kamojang 5 and 6 Existing WKP West Java 1 x30 1 x60 90 270
9 Ijen New WKP East Java 2x55 110 330
10 Iyang Argopuro Existing WKP East Java 1 x55 55 165
11 Ngebel New WKP East Java 3x55 165 495
12 Gunung Endut New WKP Banten 1 x55 55 165
13 Rawa Dano New WKP Banten 1 x 110 110 330
14 Cibuni Existing WKP West Java 1 x 10 10 30
15 Cisolok-Cisukarame New WKP West Java 1 x50 50 150
16 Karaha Bodas Existing WKP West Java 1 x30 2x55 140 420
17 Patuha Existing WKP West Java 3x60 180 540
18 Tampomas New WKP West Java 1 x45 45 135
19 Tangkuban Perahu II Existing WKP West Java 2x30 60 180
20 Wayang Windu Unit 3 and 4 Existing WKP West Java 2x 110 220 660
21 Gunung Ciremai New WKP West Java 2 x 55 110 330
22 Baturaden New WKP Central Java 2x 110 220 660
23 Dieng Existing WKP Central Java 1 x55 1 x60 115 345
24 Guci New WKP Central Java 1 x55 55 165
25 Ungaran New WKP Central Java 1 x55 55 165
26 Seulawah Agam New WKP Aceh 1X55 55 165
NO.
GEOTHERMAL
POWER PLANT
PROJECT
STATUS
INSTALLED
CAPACITY
(MW)
REQUIRED
FINANCING
(US$
MILLION)
27 Jaboi New WKP 10 30
28 Sarulla 1 Existing WKP 330 990
29 Sarulla 2 Existing WKP 110 330
30 Umbul Telumoyo New WKP 55 165
31 Simbolon Samosir Open Area 110 330
32 Sipoholon Ria-Ria New WKP 55 165
33 Sorik Marapi New WKP 240 720
34 Muaralaboh New WKP 220 660
35 Bonjol New WKP 165 495
36 Lumut Balai Existing WKP 220 660
37 Rantau Dadap New WKP 220 660
38 Rajabasa New WKP 220 660
39 Ulubelu 3 and 4 Existing WKP 110 330
40 Suoh Sekincau New WKP 220 660
41 Wai Ratai Open Area 55 165
42 Danau Ranau New WKP 110 330
43 Lahendong 5 dan 6 Existing WKP 40 120
44 Bora Open Area 5 15
45 Marana/Masaingi New WKP 20 60
46 Hu'u New WKP 20 60
47 Atadei New WKP 5 15
48 Sokoria New WKP 15 45
49 Mataloko New WKP 5 15
50 Jailolo New WKP 10 30
51 Songa Wayaua New WKP 5 15
4.925 14.775TOTAL PLANNED INSTALLED CAPACITY
GEOTHERMAL PROGRAM
Direktorat Jenderal
EBTKEMinistry of Energy and Mineral Resources
Directorate General of New Renewable Energy and Energy Conservation
V. FEED IN TARIFF MECHANISM
Direktorat Jenderal
EBTKEMinistry of Energy and Mineral Resources
Directorate General of New Renewable Energy and Energy Conservation
• In order to encourage the utilization of geothermal in national electricity supply, GoI have
made some efforts to increase investment by creating competitive and attractive business
climate, including simplifying GWA tender process and improve geothermal energy price
structure through Feed In Tariff (FIT) Mechanism.
• In FIT mechanism, the Government set the price of electricity from geothermal power plant
which is final and can’t be negotiated by PT. PLN. The FIT mechanism is determined with
consideration of:
1. Energy resources avaibility;
2. Environment capacity;
3. Economics.
• Feed-in Tariff is applied for new GWA and for extensions or capacity additions.
• This mechanism is expected to reduce the main obstacle in geothermal development related
to price uncertainty that usually requires a long time for negotiation.
• The tariff is applied based on location and available transmission of a certain area.
GEOTHERMAL FEED-IN TARIFF MECHANISM(Based On Ministrial Regulation of MEMR No. 22 / 2012)
Direktorat Jenderal
EBTKEMinistry of Energy and Mineral Resources
Directorate General of New Renewable Energy and Energy Conservation
The Feed-in Tariffs mechanism will be applied to :
a. geothermal license holders (IUP holder) after the issuance of MinisterRegulation No. 22/2012;
b. mining right holders, license holder or concession holder that existed beforethe enactment of Law No. 27 Year 2003 on Geothermal who already havePower Purchase Agreement (PPA), which will increase power plant capacityon the existing agreement (PPA);
c. mining right holders, license holder or concession holder that existed beforethe enactment of Law No. 27 Year 2003 on Geothermal who will extendtheir expired PPA;
d. mining right holders, license holder or concession holder that existed before the enactment of Law No. 27 Year 2003 on Geothermal who already have PPA, for both who have produced or not yet produced electricity or steam, as long as all parties involved agree upon the amendment on sales price of electricity or steam; or
e. IUP holder who will undertake PPA, as long as agreed by the partiesinvolved and allowed by PPA to be agreed by the parties.
Feed in Tariff Mechanism
Direktorat Jenderal
EBTKEMinistry of Energy and Mineral Resources
Directorate General of New Renewable Energy and Energy Conservation
No Area
Price
(cent US$/kWh)
High Voltage Medium Voltage
1 Sumatera 10 11,5
2 Java, Madura and Bali 11 12,5
3South Sulawesi, West Sulawesi, and Southeast
Sulawesi
12 13,5
4 North Sulawesi, Central Sulawesi, and Gorontalo 13 14,5
5 West Nusa Tenggara, and East Nusa Tenggara 15 16,5
6 Maluku and Papua 17 18,5
GEOTHERMAL FEED-IN TARIFF
Direktorat Jenderal
EBTKEMinistry of Energy and Mineral Resources
Directorate General of New Renewable Energy and Energy Conservation
`
Go Green Indonesia !Geothermal, Energy Solution for Better Future
www.ebtke.esdm.go.idwww.indogeothermal.or.id
Jalan Jenderal Gatot Subroto, Kav. 49 Jakarta 12950; Telp/Faks : 021-5250575
MINISTRY OF ENERGY AND MINERAL RESOURCES
DIRECTORATE GENERAL OF NEW RENEWABLE ENERGY AND ENERGY CONSERVATION
THANK YOU
Direktorat Jenderal
EBTKEMinistry of Energy and Mineral Resources
Directorate General of New Renewable Energy and Energy Conservation
ATTACHMENTS
Direktorat Jenderal
EBTKEMinistry of Energy and Mineral Resources
Directorate General of New Renewable Energy and Energy Conservation
No. Geothermal Working
Area/ LocationLicense Holder Developer Power Plant
Installed
Capacity
(MW)
1Sibayak – Sinabung, NORTH
SUMATERA
PT. Pertamina Geothermal
Energy (PGE)
PT. Pertamina Geothermal
Energy (PGE)Sibayak 12
2Cibeureum – Parabakti,
WEST JAVA
PT. Pertamina Geothermal
Energy (PGE)
KOB - Chevron Geothermal
Salak, Ltd (CGS)Salak 377
3Pangalengan,
WEST JAVA
PT. Pertamina Geothermal
Energy (PGE)
KOB - Star Energy Geothermal
Wayang Windu, Ltd (SEGWWL)Wayang Windu 227
4Kamojang – Darajat, WEST
JAVA
PT. Pertamina Geothermal
Energy (PGE)
PT. Pertamina Geothermal
Energy (PGE)Kamojang 200
5Kamojang – Darajat, WEST
JAVA
PT. Pertamina Geothermal
Energy (PGE)
KOB - Chevron Geothermal
Indonesia, Ltd (CGI)Darajat 270
6Dataran Tinggi Dieng,
CENTRAL JAVA
PT. Pertamina Geothermal
Energy (PGE)PT. Geo Dipa Energi (GDE) Dieng 60
7Lahendong – Tompaso,
NORTH SULAWESI
PT. Pertamina Geothermal
Energy (PGE)
PT. Pertamina Geothermal
Energy (PGE)Lahendong 80
8Ulubelu,
LAMPUNG
PT. Pertamina Geothermal
Energy (PGE)
PT. Pertamina Geothermal
Energy (PGE)Ulubelu 110
9Ulumbu,
NTTPT. PLN Geothermal PT. PLN Geothermal Ulumbu 5
1.34127
INSTALLED GEOTHERMAL POWER PLANT CAPACITY 2012
Direktorat Jenderal
EBTKEMinistry of Energy and Mineral Resources
Directorate General of New Renewable Energy and Energy Conservation
MEMR
Prov.
Govmt.
Corporation
PLN
WKP
DeterminationPre-SurveyWKP
Tendering
IUP
Issuance
Electricity
Price
Rep
ort o
f
Ten
derin
g
Pro
cess
Geo
therm
al
Po
tential
Potential
MapSurvey
APBN
Survey
APBD
Prov.
Other
Parties
Assignment
Evaluation WKPReport WKP-N
WKP-P
WKP-K
(S3-N)
(S3-P)
(S3-K)
IUP-N
IUP-P
IUP-K
(S4-N)
(S4-P)
(S4-K)
Tender Winner
GEOTHERMAL VALUE CHAIN
(S-1) (S-2) (S-3) (S-4) (S-5)
PPA
(S-6)
Assignment
Exp
loratio
n
(S-7)
Exp
lora
tio
n
(Current Regulations)
(S-0)
BUSINESS STADIUM (S-X)
Survey
APBD
Kab./
Kota
Local
Govmt.
(Regent/
City)
© DJEBTKE – KESDM 2010
Units
Potential/
Stadium Exp
loitatio
n
FSProduction/
Utilization
(S-8) (S-9) (S-10)
FS
Exp
loit
atio
n
Pro
du
ctio
n/
Uti
liza
tio
n
Updated : 6 Sept 2010
Tender Winner
Tender Winner
Report
©2012
Ministry of Energy and Mineral Resources
Directorate General of New Renewable Energy and Energy Conservation
No. GWA POWER PLANT REGION / CITY PROVINCEPOTENTIAL
(MW)
INSTALLED CAP.
(MW)
1 Sibayak-Sinabung Sibayak Karo North Sumatera 124 12
2 Cibeureum - Parabakti (Gn. Salak) Gunung Salak Bogor & Sukabumi West Java 952 377
Wayang Bandung West Java 400 227
Patuha Bandung West Java 706 -
Kamojang Garut West Java 855 200
Darajat Garut West Java 610 270
5 Dieng Dieng Wonosobo & Banjarnegara Central Java 780 60
6 Lahendong-Tompaso Lahendong Tomohon & Minahasa North Sulawesi 358 80
7 Sibual-Buali Sibual-Buali North Tapanuli & South Tapanuli North Sumatera 1146 -
8 Tambang Sawah - Hululais Hululais Rejang Lebong Bengkulu 873 -
9 Lumut Balai Lumut Balai Ogan Komering Ulu South Sumatera 1066 -
10 Sungaipenuh Sungaipenuh Kerinci Jambi 208 -
11 Ulubelu Ulubelu Tanggamus Lampung 556 110
12 Karaha-Cakrabuana Karaha-Cakrabuana Bandung & Tasikmalaya West Java 725 -
13 Buyan Bratan (Bedugul) Bedugul Tabanan Bali 276 -
14 Ulumbu Ulumbu Manggarai East Nusa Tenggara 199 -
15 Tulehu Tulehu Ambon Maluku 100 -
16 Cibuni Cibuni Bandung West Java 140 5
17 Iyang-Argopuro Iyang-Argopuro Porbolinggo East Java 295 -
18 Kotamobagu Kotamobagu Bolaang Mongondow & Minahasa North Sulawesi 410 -
19 Ciater Ciater Subang West Java 90 -
10,869 1,341Total
GWAs BEFORE LAW NO. 27/2003
4 Kamojang-Darajat
3 Pengalengan
©2012
Ministry of Energy and Mineral Resources
Directorate General of New Renewable Energy and Energy Conservation
1 LIKI PINANGAWAN MUARALABOH,
WEST SUMATERA
400 220 9.4 ¢ USD License - Issued PT. Supreme Energy Muaralaboh
2 GN. RAJABASA,
LAMPUNG
91 220 9.5 ¢ USD License - Issued PT. Supreme Energy Rajabasa
3 JABOI,
NAD
50 10 Rp. 1705 License - Issued PT. Sabang Geothermal Energi
4 SORIK MARAPI-ROBURAN-
SAMPURAGA, NORTH SUMATERA
200 240 8.10 ¢ USD License - Issued PT. Sorik Marapi Geothermal Power
5 CISOLOK CISUKARAME,
WEST JAVA
30 - 45 40 Rp. 630,00 License - Issued PT. Jabar Rekind Geothermal
6 GN. TANGKUBAN PERAHU,
WEST JAVA
100 120 Rp. 533,60 License - Issued PT. Tangkuban Perahu
Geothermal Power
7 GN. TAMPOMAS,
WEST JAVA
20 - 50 45 Rp. 598,00 License - Issued PT. Wijaya Karya Jabar Power
8 GN. UNGARAN,
CENTRAL JAVA
100 110 8.09 ¢ USD License - Issued PT. Giri Indah Sejahtera
9 SOKORIA,
EAST NUSA TENGGARA
30 30 Rp. 1.250,69 License - Issued PT. Sokoria Geothermal Indonesia
10 ATADEI,
EAST NUSA TENGGARA
40 10 9.5 ¢ USD License - Issued PT. Westindo Utama Karya
11 JAILOLO,
NORTH MALUKU
75 10 Rp. 1.727,54 License - Issued PT. Star Energy Geothermal Halmahera
12 SUOH SEKINCAU,
LAMPUNG
230 220 6.9 ¢ USD License - Issued PT. Chevron Geothermal Suoh
Sekincau
Proposed
Capacity (MW)No. GWA, LOCATION
Possible Reserve
(MWe)Price (/KWh) Status Licence Holder
GWAs AFTER LAW Np. 27/2003
©2012
Ministry of Energy and Mineral Resources
Directorate General of New Renewable Energy and Energy Conservation
13 RANTAU DEDAP, SOUTH SUMATERA 106 220 8.86 ¢ USD License - Issued PT. Supreme Energy Rantau Dedap
14 BATURADEN, CENTRAL JAVA 175 220 9.47¢ USD License - Issued PT. Sejahtera Alam Energy
15 GUCI, CENTRAL JAVA 79 55 9.09 ¢ USD License - Issued PT. Spring Energi Sentosa
16 HU'U DAHA, WEST NUSA TENGGARA 65 20 9.65 ¢ USDLooking forward for the
licensePT. Pacific Geo Energy
17 KALDERA DANAU BANTEN, BANTEN 115 110 8.39 ¢ USDLooking forward for the
licenseKonsorsium PT. Banten Global Sinergi
18 BLAWAN - IJEN, EAST JAVA 270 110 8.58 ¢ USDLooking forward for the
licensePT. Cahaya Ijen Energy
19 TELAGA NGEBEL, EAST JAVA 120 165 7.55 ¢ USDLooking forward for the
licensePT. Bakrie Power
20 SEULAWAH AGAM, NAD 160 55 - Tender on proggress -
21 SUWAWA, GORONTALO 110 - Tender - Failed -
22 GUNUNG TALANG, WEST SUMATERA 36 - Tender preparation -
23 SONGA WAYAUA, NORTH MALUKU 140 - Tender preparation -
24SIPAHOLON RIA-RIA,
NORTH SUMATERA75 - Tender - Failed -
25 MARANA, CENTRAL SULAWESI 36 - Tender - Failed -
26 BUKIT KILI, WEST SUMATERA 83 - Tender - Failed -
27 BONJOL, WEST SUMATERA 200 - - Tender - Failed -
28 DANAU RANAU, WEST JAVA 210 - - Tender preparation
29 MATALOKO, EAST NUSA TENGGARA 63 - - Tender preparation
30 GN. CIREMAI, WEST JAVA 150 - - Tender on proggress
31 GN. ENDUT, BANTEN 80 - - Tender preparation
No. GWA, LOCATIONPossible Reserve
(MWe)
Proposed
Capacity (MW)Price (/KWh) Status Licence Holder
Continued…………GWAs AFTER LAW NO. 27/2003
©2012
Ministry of Energy and Mineral Resources
Directorate General of New Renewable Energy and Energy Conservation
32 SIMBOLON SAMOSIR, SUMUT 155 - Tender preparation -
33 WAY RATAI, LAMPUNG 105 - Tender preparation -
34CANDI UMBUL TELOMOYO,
JATENG 72 - - Tender preparation -
35 BORA PULU, SUMUT 123 - - Tender preparation
36 GN.LAWU,JATENG-JATIM 195 - - Tender preparation
37 KEPAHIYANG, BENGKULU 180 - - Tender preparation
38OKA ILE ANGE, EAST NUSA
TENGGARA40 - - Tender preparation
39SEMBALUN, WEST NUSA
TENGGARA100 - - Tender preparation
No. GWA, LOCATIONPossible
Reserve (MWe)
Proposed
Capacity (MW)Price (/KWh) Status Licence Holder
Continued…………GWAs AFTER LAW NO. 27/2003