GEOTHERMAL ENERGY BANGKITKAN ENERGI NEGERI Insights About Geothermal Development In Indonesia PT Pertamina Geothermal Energy June 2015

Insights About Geothermal Development In Indonesia PT

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

GEOTHERMAL ENERGY

0

BANGKITKAN ENERGI NEGERI

Insights About Geothermal Development

In Indonesia

PT Pertamina Geothermal Energy

June 2015

GEOTHERMAL ENERGY

1

Geothermal capacity target 1

The Government of Indonesia encourages the development of renewable energy, mainly from

geothermal energy.

GW

29 30

131

22 22

20251

100% =

39

7

25

215 MTOE* 400 MTOE

4

3

2015

5

1.8

4.0

7.2

1.4

GapAdditional

Planned

till 2019

Target

2025

Capacity

2014

*) MTOE = Million Tonnes of Oil Equivalent

The government plan to have a geothermal

capacity of ~7.2 GW Years 2025

▪ Additional of geothermal capacity of ~6 GW

necessary for 2025

▪ The capacity development plan is only 1/4 from

the 2025 target

Target of Indonesian energy mix 1

Indonesia Energy Mix

1 Source : Persentation from Geothermal’s Director - Ministry of Energy and Mineral Resources

Hydro

Coal Oil

Geothermal

Others

Gas

GEOTHERMAL ENERGY

2

Pertamina Geothermal Energy (PGE)

Subsidiary of PT PERTAMINA

(PERSERO)

Integrated geothermal

operations in Indonesia

Solid financial profile

Our Vision:

to become a World Class Geothermal

Energy Enterprise

Manages 14 existing geothermal

working area

More than 30 years

experience in geothermal

industry

GEOTHERMAL ENERGY

Gn. Sibual-buali

Sungai Penuh2 x 55 MW

Hululais 2 x 55 MW

Lumut Balai4 x 55 MW

Ulubelu 1&2(110MW)

SUMATERA

JOC Cibeureum Parabakti (377 MW)

JOC Pangalengan(227 MW)

JOC Darajat(271 MW)

Karaha1 x 30 MW

Kamojang 1-4(200 MW)

Iyang Argopuro*

Tabanan

Kotamobagu*

Lahendong 1-4(80 MW)

Legend :

Production (Installed Capacity 402 MW)

Exploration

KALIMANTAN

SULAWESI

MALUKU

PAPUA

Sibayak(12 MW)

Development/proyek

Ulubelu 3&42 x 55 MW

Joint Operating Contract (JOC) (Installed capacity 875 MW)

Lahendong 5&62 x 20 MW

According to Ministry of Energy and

Mineral Resources (MEMR)

No.2067K/30/MEM/2012, PGE

manages 14 Working Areas (“WKP”).

*) WKP Kotamobagu and WKP Iyang

Argopuro had been returned to

Government per 31 Des 2014.Kamojang 51 x 35 MW

Indonesia’s Geothermal Installed Capacity = 1403.5 MW

PGE Installed Capacity (Non-JOC)= 402 MW

PGE’s Working Area

10

GEOTHERMAL ENERGY

110110

110

220

110

11055

55

110

5555

130

130

220

220

110

140

55 55 110

1332

907

797

682

577

437

17

235

30 30

2022

1047

50

200

220

17

130

275

2019

30

110

220

17

130

235

2018

3055

220

17

130

235

2017

30

220

17

125

235

2016

165

17

105

235

2015

11012

80

235

2014

11012

80

200

2021

235

402

17

2020

962Karaha

Sungai Penuh

Hululais

Lumut Balai

Ulubelu

Sibayak

Lahendong

Seulawah

Kamojang

KMJ 5 (35 MW)

UBL 3 (55MW)

LHD 5 (20 MW)

LMB 1 (55 MW)

LHD sc (5 MW)

SBY sc (5 MW)

UBL 4 (55 MW)

LHD 6 (20MW)

LMB 1 (55 MW)

HLS 1 (55 MW)

LMB 2 (55 MW

LHD (5 MW)

SPN 1 (55 MW)

HLS 2 (55 MW)

KMJ-CHR (40 MW)

LMB 3&4 (110 MW)

KRH 2 (20 MW)

HLS 2 (60 MW)

SLW 2 (55 MW)

30

SWL 1

(55 MW)

BDN (30 MW)

SPN 2 (35 MW)

100 MW

17.487BOEPD

19.010BOEPD

25.100BOEPD

29.667BOEPD

34.670BOEPD

39.455BOEPD

57.942BOEPD

4350 BOEPD

41.847BOEPD

45.545BOEPD

Projection of Installed Capacity of PGE 2015-2022