GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON RECONSTRUCTION AND RECONFIGURATION RONALD REAGAN WASHINGTON NATIONAL AIRPORT (DCA) MWAA CONTRACT NO. 1-15-C076, TASK ORDER 2 RBB Project No. 16879-0 VA

GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON RECONSTRUCTION AND RECONFIGURATION

RONALD REAGAN WASHINGTON NATIONAL AIRPORT (DCA) MWAA CONTRACT NO. 1-15-C076, TASK ORDER 2

RBB Project No. 16879-0 VA

Page 2: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

Scale: NTS Date: Jan 2018 Plate 1

Project No. 16879-0SITE VICINITY MAP

THE ROBERT B. BALTER COMPANY®

Geotechnical and Geo-environmental Engineers

Taxiway B Hold ApronRonald Reagan Washington

National Airport

Page 3: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

Date: January 2018 Plate 2

Project No. 16879-0BORING LOCATION PLAN

THE ROBERT B. BALTER COMPANY®

Geotechnical and Geo-environmental Engineers

Taxiway B Hold Apron

Ronald Reagan Washington

National Airport Scale: As Shown

C-2

4

KCrist
Line
KCrist
Typewritten Text
A
KCrist
Typewritten Text
A'
KCrist
Line
KCrist
Typewritten Text
B
KCrist
Typewritten Text
B'
KCrist
Line
KCrist
Typewritten Text
C
KCrist
Typewritten Text
C'
Page 4: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous
Page 5: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous
Page 6: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous
Page 7: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

 

B-25

Page 8: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

The Robert B. Balter Company 16879-0 rpt_r2

APPENDIX A

BORING LOGS

Page 9: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

THE ROBERT B. BALTER COMPANY IDENTIFICATION OF SOIL SAMPLES

Soils are described in the boring logs according to the following criteria with the principal constituents written in capital letters. Other constituents are preceded by descriptive terminology that is used to denote the percentage of weight of each component. Soil descriptions are determined visually except where laboratory classification test data are available. Classifications are based on The Robert B. Balter Company’s interpretation of ASTM D 2487-00.

Well Graded GW GRAVEL 0 to 5% Fines

Poorly Graded GP GRAVEL Well Graded GW-GM GRAVEL with Silt

Silty Fines Poorly Graded GP-GM GRAVEL with Silt Well Graded GW-GC GRAVEL with Clay

6 to 12% Fines Clayey Fines

Poorly Graded GP-GC GRAVEL with Clay Silty Fines GM Silty GRAVEL Silty Clay Fines GC-GM Silty, Clayey GRAVEL

GR

AV

EL

13 to 50% Fines Clayey Fines GC Clayey GRAVEL Well Graded SW SAND

0 to 5% Fines Poorly Graded SP SAND

Well Graded SW-SM SAND with Silt Silty Fines

Poorly Graded SP-SM SAND with Silt Well Graded SW-SC SAND with Clay

6 to 12% Fines Clayey Fines

Poorly Graded SP-SC SAND with Clay Silty Fines SM Silty SAND Silty, Clayey Fines SC-SM Silty, Clayey SAND

CO

AR

SE G

RA

INE

D S

OIL

>

50%

Ret

aine

d on

No.

200

Sie

ve

SAN

D

13 to 50% Fines Clayey Fines SC Clayey SAND

Low Plastic Fines, PI<4 Plots below “A” line ML SILT Low Plastic Fines, 4≤PI≤7 Plots on or above “A” line CL-ML Silty CLAY Plastic Fines, PI>7 Plots on or above “A” line CL Lean CLAY Significant Organics, PI<4 Plots below “A” line OL Organic SILT SI

LT

&

CL

AY

(lL

L<5

0)

Significant Organics, PI≥4 Plots on or above “A” line OL Organic CLAY Elastic Fines Plots below “A” line MH Elastic SILT Plastic Fines Plots on or above “A” line CH Fat CLAY Significant Organics Plots below “A” line OH Organic SILT FI

NE

GR

AIN

ED

SO

IL

≥ 50

% P

assi

ng N

o. 2

00 S

ieve

SIL

T &

C

LA

Y

(LL≥5

0)

Significant Organics Plots on or above “A” line OH Organic CLAY HIGHLY

ORGANIC SOIL Dark, highly organic, decomposed vegetative tissue PT PEAT

ADDITIONAL TERMINOLOGY:

Fill materials are placed by man, and may be identified by unnatural artifacts, unnatural mixed grain sizes or layering, or trustworthy documentation of fill placement. Possible Fill materials are difficult to distinguish from natural soils, exhibiting minor distinctions. Decomposed Rock consists of residual soil with SPT N-values between 50 blows per foot and blows per 4 inches (50/4”). Highly Weathered Rock consists of residual soil with SPT N-values between 50/3” and 50/1”.

Descriptive Components Descriptive Terms Proportions

Trace 1 - 5% Little (Sand, Gravel) 6 - 14% With (Sand, Gravel) 15 – 30%

With (Silt, Clay) 6 – 12% Adjective Form

(Sandy, Gravelly) 31 - 50%

Adjective Form (Silty, Clayey) 13 - 50%

Density or Consistency SAND and GRAVEL SILT and CLAY

N-Value Density N-Value Consistency 0-4 Very Loose 0-1 Very Soft

5-10 Loose 2-4 Soft 11-30 Medium Dense 5-8 Medium Stiff 31-50 Dense 9-15 Stiff > 50 Very Dense 16-30 Very Stiff

> 30 Hard

Page 10: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

3730

1.012.0

4.09.05.27.8

12.01.0

27.0-14.0

33.0-20.0

SC

CL

ML

SM

SM

7

(1)

12

3

2

1

1

2

3

11

27

S1

S2

S3

S4

S5

S6

S7

S8

S9

Bituminous Concrete/P-401 (12-inches)

Aggregate Base/P-209 (36 inches)

Wet, Loose, Brown Clayey SAND, trace wood fragments(Fill)Wet, Soft, Gray Silty CLAY (Fill)

Wet, Very Soft, Gray SILT with Sand

Wet, Medium Dense, Brown Silty SAND, thin zones ofSilty Clay

Wet, Medium Dense, Gray-Brown Silty SAND with Gravel

77

57

47

65

52

0.20

0.50

0.00

0.00

0.20

5-7-5

1-2-1

WOH-1-1

WOH-WOH-

1

WOH-WOH-

1

WOH-1-1

1-2-1

2-4-7

6-13-

COMPLETED 11/2/17DATE STARTED 11/2/17

DRILLER Dennis Strawderman

METHOD Hollow Stem Auger

WATER LEVELS

DATE

RIG Dietrich D-50 Truck AUTO? YesFALL: 30"

HELPER Andre Wills

SURFACE EL = 13.0 ft

ELAPSEDHOURS

SAMPLER: 2-in OD SS HAMMER: 140#

BULK SAMPLES 1-6'

SITE DELAYS

TIME

LOCATION As Staked

REVIEWED BY Kristopher Crist

CASINGDEPTH (ft)

HOLEDEPTH (ft)

WATERDEPTH (ft)

WATERELEV (ft)

(Continued Next Page)

LLPLGR

AP

HIC

LO

G

REMARKS: (1)Running sands encountered at 29 feet (2)Boring backfilled with bentonite chips, soil spoils drumed,pavement patched with quick set concrete

ST

RA

TU

M C

HA

NG

ED

EP

TH

/EL

(ft)

ATTERBERGS

US

CS

PI

BORING LOG

RE

MA

RK

S

WA

TE

R L

EV

EL

N V

ALU

E O

RC

OR

E R

QD

SA

MP

LE T

YP

EA

ND

NU

MB

ER

MATERIALDESCRIPTION

- #2

00

NM

C %

DE

PT

H (

ft)

5

10

15

20

25

30

35

PP

(ts

f)

SP

T B

LOW

S/6

"O

R R

EC

IN

/IN

%

PAGE 1 OF 2BORING B-1

11/2/1711/2/17

01.0

8.227.2 14.0

1:30 pm2:03 pm

35.0-1.0

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

NE

W G

EO

TE

CH

BH

LO

G 1

687

9-0

DC

A T

AX

IWA

Y B

HO

LD A

PR

ON

.GP

J R

OB

ER

T B

BA

LTE

R.G

DT

12/

29/1

7The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 11: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

35.5-22.5

(2)Terminated at 35.5 feet

14LLPLG

RA

PH

IC L

OG

REMARKS: (1)Running sands encountered at 29 feet (2)Boring backfilled with bentonite chips, soil spoils drumed,pavement patched with quick set concrete

ST

RA

TU

M C

HA

NG

ED

EP

TH

/EL

(ft)

ATTERBERGS

US

CS

PI

BORING LOG

RE

MA

RK

S

WA

TE

R L

EV

EL

N V

ALU

E O

RC

OR

E R

QD

SA

MP

LE T

YP

EA

ND

NU

MB

ER

MATERIALDESCRIPTION

- #2

00

NM

C %

DE

PT

H (

ft)

PP

(ts

f)

SP

T B

LOW

S/6

"O

R R

EC

IN

/IN

%

PAGE 2 OF 2BORING B-1

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

NE

W G

EO

TE

CH

BH

LO

G 1

687

9-0

DC

A T

AX

IWA

Y B

HO

LD A

PR

ON

.GP

J R

OB

ER

T B

BA

LTE

R.G

DT

12/

29/1

7The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 12: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

1.112.9

4.010.0

8.06.0

12.02.0

15.0-1.0

CL

CL-ML

CL-ML

MH

(1)

9

3

2

2

S1

S2

T1

S4

S5

Concrete/P-501 (13.5-inches)

Moist, Stiff, Brownish Gray Sandy CLAY (Fill)

Moist, Soft, Gray Silty CLAY (Fill)

Moist, Soft, Gray Silty CLAY (Possible Fill)

Moist, Soft, Gray Elastic SILT with Sand

Terminated at 15.0 feet

15

41

61

0.60

0.00

0.00

3-3-6

4-2-1

24 / 24

WOH-1-1

WOH-WOH-

2

COMPLETED 11/1/17DATE STARTED 11/1/17

DRILLER Dennis Strawderman

METHOD Hollow Stem Auger

WATER LEVELS

DATE

RIG Dietrich D-50 Truck AUTO? YesFALL: 30"

HELPER Dustin Hurd

SURFACE EL = 14.0 ft

ELAPSEDHOURS

SAMPLER: 2-in OD SS HAMMER: 140#

BULK SAMPLES

SITE DELAYS

TIME

LOCATION As Staked

REVIEWED BY Kristopher Crist

CASINGDEPTH (ft)

HOLEDEPTH (ft)

WATERDEPTH (ft)

WATERELEV (ft)

LLPLGR

AP

HIC

LO

G

REMARKS: (1)Drill spoils placed into drum, boring backfilled with bentonite chips, pavement patched with rapid-setconcrete

ST

RA

TU

M C

HA

NG

ED

EP

TH

/EL

(ft)

ATTERBERGS

US

CS

PI

BORING LOG

RE

MA

RK

S

WA

TE

R L

EV

EL

N V

ALU

E O

RC

OR

E R

QD

SA

MP

LE T

YP

EA

ND

NU

MB

ER

MATERIALDESCRIPTION

- #2

00

NM

C %

DE

PT

H (

ft)

5

10

15

PP

(ts

f)

SP

T B

LOW

S/6

"O

R R

EC

IN

/IN

%

PAGE 1 OF 1BORING B-3

11/1/17 0 12.5 11.7 2.3

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

NE

W G

EO

TE

CH

BH

LO

G 1

687

9-0

DC

A T

AX

IWA

Y B

HO

LD A

PR

ON

.GP

J R

OB

ER

T B

BA

LTE

R.G

DT

12/

29/1

7The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 13: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

5836

0.311.7

2.59.5

4.57.5

6.06.0

14.7-2.7

30.5-18.5

CL

SM

SM

MH

SP-SM

22

(1)(2)

(3)

2

13

6

5

0

2

3

6

4

S1

S2

S3

S4

S5

S6

S7

S8

S9

Bituminous Concrete/P-401 (4-inches)Aggregate Base / P-209 (~26-inches)

Moist, Very Soft to Stiff, Gray Silty CLAY (Fill)

Moist, Medium Dense, Gray Silty SAND (Fill)

Wet, Loose to Very Loose, Gray-Brown Silty SAND

Wet, Very Soft to Medium Stiff, Gray Elastic SILT withSand

Wet, Loose, Gray Poorly-Graded SAND with Silt andGravel

85

58

9

34

24

68

0.00

0.20

0.20

0.70

1-1-1

3-6-7

3-3-3

2-3-2

WOH-WOH-WOH

WOH-1-1

1-1-2

1-3-3

1-1-3

COMPLETED 10/30/17DATE STARTED 10/30/17

DRILLER Dennis Strawderman

METHOD Hollow Stem Auger

WATER LEVELS

DATE

RIG Dietrich D-50 Truck AUTO? YesFALL: 30"

HELPER Dustin Hurd

SURFACE EL = 12.0 ft

ELAPSEDHOURS

SAMPLER: 2-in OD SS HAMMER: 140#

BULK SAMPLES 1-5'

SITE DELAYS

TIME

LOCATION As Staked

REVIEWED BY Kristopher Crist

CASINGDEPTH (ft)

HOLEDEPTH (ft)

WATERDEPTH (ft)

WATERELEV (ft)

(Continued Next Page)

LLPLGR

AP

HIC

LO

G

REMARKS: (1)Water on Sampler at 6' (2)Boring caved higher than the encountered water level. (3)Drill spoils placed indrums. Boring backfilled with bentonite chips. Pavement patched with fast-setting concrete.

ST

RA

TU

M C

HA

NG

ED

EP

TH

/EL

(ft)

ATTERBERGS

US

CS

PI

BORING LOG

RE

MA

RK

S

WA

TE

R L

EV

EL

N V

ALU

E O

RC

OR

E R

QD

SA

MP

LE T

YP

EA

ND

NU

MB

ER

MATERIALDESCRIPTION

- #2

00

NM

C %

DE

PT

H (

ft)

5

10

15

20

25

30

35

PP

(ts

f)

SP

T B

LOW

S/6

"O

R R

EC

IN

/IN

%

PAGE 1 OF 2BORING B-4

10/30/17 0 7.2 Dry

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

NE

W G

EO

TE

CH

BH

LO

G 1

687

9-0

DC

A T

AX

IWA

Y B

HO

LD A

PR

ON

.GP

J R

OB

ER

T B

BA

LTE

R.G

DT

12/

29/1

7The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 14: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

35.5-23.5 Terminated at 35.5 feet

LLPLGR

AP

HIC

LO

G

REMARKS: (1)Water on Sampler at 6' (2)Boring caved higher than the encountered water level. (3)Drill spoils placed indrums. Boring backfilled with bentonite chips. Pavement patched with fast-setting concrete.

ST

RA

TU

M C

HA

NG

ED

EP

TH

/EL

(ft)

ATTERBERGS

US

CS

PI

BORING LOG

RE

MA

RK

S

WA

TE

R L

EV

EL

N V

ALU

E O

RC

OR

E R

QD

SA

MP

LE T

YP

EA

ND

NU

MB

ER

MATERIALDESCRIPTION

- #2

00

NM

C %

DE

PT

H (

ft)

PP

(ts

f)

SP

T B

LOW

S/6

"O

R R

EC

IN

/IN

%

PAGE 2 OF 2BORING B-4

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

NE

W G

EO

TE

CH

BH

LO

G 1

687

9-0

DC

A T

AX

IWA

Y B

HO

LD A

PR

ON

.GP

J R

OB

ER

T B

BA

LTE

R.G

DT

12/

29/1

7The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 15: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

45

50

29

32

1.010.0

5.06.05.35.7

8.52.5

27.0-16.0

33.0-22.0

CL

SM

ML

MH

SM

SW-SM

16

18 (1)

3

2

2

0

1

2

5

26

S1

S2

T1

S3

S4

S5

S6

S7

S8

Concrete / P-501 (12.5-inches)

Moist, Soft, Gray Silty CLAY (Fill)

Moist, Very Loose, Gray Silty SAND (Fill)Moist, Soft, Gray SILT (Fill)

Moist, Very Soft, Gray Elastic SILT, trace organics

Wet, Loose, Brown and Gray Silty SAND with Gravel, mgto cg

Wet, Medium Dense, Brown Well-Graded SAND with Siltand Gravel

97

98

54

55

0.50

3.00

0.20

0.10

0.20

1-2-1

WOH-1-1

24 / 24

WOH-1-1

WOH-WOH-WOH

WOH-WOH-

1

WOH-1-1

2-2-3

9-16-

COMPLETED 10/31/17DATE STARTED 10/31/17

DRILLER Dennis Strawderman

METHOD Hollow Stem Auger

WATER LEVELS

DATE

RIG Dietrich D-50 Truck AUTO? YesFALL: 30"

HELPER Dustin Hurd

SURFACE EL = 11.0 ft

ELAPSEDHOURS

SAMPLER: 2-in OD SS HAMMER: 140#

BULK SAMPLES

SITE DELAYS

TIME

LOCATION As Staked

REVIEWED BY Kristopher Crist

CASINGDEPTH (ft)

HOLEDEPTH (ft)

WATERDEPTH (ft)

WATERELEV (ft)

(Continued Next Page)

LLPLGR

AP

HIC

LO

G

REMARKS: (1)Drill spoils placed in drums. Boring backfilled with bentonite chips. Pavement patched with fast-settingconcrete.

ST

RA

TU

M C

HA

NG

ED

EP

TH

/EL

(ft)

ATTERBERGS

US

CS

PI

BORING LOG

RE

MA

RK

S

WA

TE

R L

EV

EL

N V

ALU

E O

RC

OR

E R

QD

SA

MP

LE T

YP

EA

ND

NU

MB

ER

MATERIALDESCRIPTION

- #2

00

NM

C %

DE

PT

H (

ft)

5

10

15

20

25

30

35

PP

(ts

f)

SP

T B

LOW

S/6

"O

R R

EC

IN

/IN

%

PAGE 1 OF 2BORING B-5

10/31/17 0 27.2 7.2 3.8

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

NE

W G

EO

TE

CH

BH

LO

G 1

687

9-0

DC

A T

AX

IWA

Y B

HO

LD A

PR

ON

.GP

J R

OB

ER

T B

BA

LTE

R.G

DT

12/

29/1

7The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 16: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

35.5-24.5 Terminated at 35.5 feet

10LLPLG

RA

PH

IC L

OG

REMARKS: (1)Drill spoils placed in drums. Boring backfilled with bentonite chips. Pavement patched with fast-settingconcrete.

ST

RA

TU

M C

HA

NG

ED

EP

TH

/EL

(ft)

ATTERBERGS

US

CS

PI

BORING LOG

RE

MA

RK

S

WA

TE

R L

EV

EL

N V

ALU

E O

RC

OR

E R

QD

SA

MP

LE T

YP

EA

ND

NU

MB

ER

MATERIALDESCRIPTION

- #2

00

NM

C %

DE

PT

H (

ft)

PP

(ts

f)

SP

T B

LOW

S/6

"O

R R

EC

IN

/IN

%

PAGE 2 OF 2BORING B-5

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

NE

W G

EO

TE

CH

BH

LO

G 1

687

9-0

DC

A T

AX

IWA

Y B

HO

LD A

PR

ON

.GP

J R

OB

ER

T B

BA

LTE

R.G

DT

12/

29/1

7The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 17: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

0.811.22.010.0

4.08.0

6.06.0

8.53.5

12.00.0

27.0-15.0

32.0-20.0

35.0

SM

CL-ML

SC-SM

SM

MH

SC

SC

(1)

10

4

3

6

2

2

3

2

28

S1

S2

S3

S4

S5

S6

S7

S8

S9

Bituminous Concrete / P-401 (9.5-inches)Aggregate Base / P-209 (15-inches)

Moist, Loose, Reddish Brown Silty SAND (Fill)

Moist, Soft, Gray Sandy, Silty CLAY with lenses of finesand (Fill)

Wet, Very Loose, Gray Silty, Clayey SAND, fg (PossibleFill)

Wet, Loose, Brown Silty SAND

Moist, Soft, Brownish Gray to Gray Elastic SILT withSand, trace organics and wood fragments

Moist, Very Loose, Gray Clayey SAND

Wet, Medium Dense, Gray Clayey SAND with Gravel

Terminated at 35.0 feet

0.50

5-6-4

12-3-1

1-1-2

2-3-3

1-1-1

WOH-1-1

1-1-2

2-1-1

15-15-13

COMPLETED 11/1/17DATE STARTED 11/1/17

DRILLER Dennis Strawderman

METHOD Hollow Stem Auger

WATER LEVELS

DATE

RIG Dietrich D-50 Truck AUTO? YesFALL: 30"

HELPER Dustin Hurd

SURFACE EL = 12.0 ft

ELAPSEDHOURS

SAMPLER: 2-in OD SS HAMMER: 140#

BULK SAMPLES

SITE DELAYS

TIME

LOCATION As Staked

REVIEWED BY Kristopher Crist

CASINGDEPTH (ft)

HOLEDEPTH (ft)

WATERDEPTH (ft)

WATERELEV (ft)

(Continued Next Page)

LLPLGR

AP

HIC

LO

G

REMARKS: (1)Drill spoils placed in drums. Boring backfilled with bentonite chips. Pavement patched with fast-settingconcrete

ST

RA

TU

M C

HA

NG

ED

EP

TH

/EL

(ft)

ATTERBERGS

US

CS

PI

BORING LOG

RE

MA

RK

S

WA

TE

R L

EV

EL

N V

ALU

E O

RC

OR

E R

QD

SA

MP

LE T

YP

EA

ND

NU

MB

ER

MATERIALDESCRIPTION

- #2

00

NM

C %

DE

PT

H (

ft)

5

10

15

20

25

30

35

PP

(ts

f)

SP

T B

LOW

S/6

"O

R R

EC

IN

/IN

%

PAGE 1 OF 2BORING B-6

11/1/17 0 7.3 7.2 4.8

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

NE

W G

EO

TE

CH

BH

LO

G 1

687

9-0

DC

A T

AX

IWA

Y B

HO

LD A

PR

ON

.GP

J R

OB

ER

T B

BA

LTE

R.G

DT

12/

29/1

7The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 18: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

-23.0LLPLG

RA

PH

IC L

OG

REMARKS: (1)Drill spoils placed in drums. Boring backfilled with bentonite chips. Pavement patched with fast-settingconcrete

ST

RA

TU

M C

HA

NG

ED

EP

TH

/EL

(ft)

ATTERBERGS

US

CS

PI

BORING LOG

RE

MA

RK

S

WA

TE

R L

EV

EL

N V

ALU

E O

RC

OR

E R

QD

SA

MP

LE T

YP

EA

ND

NU

MB

ER

MATERIALDESCRIPTION

- #2

00

NM

C %

DE

PT

H (

ft)

PP

(ts

f)

SP

T B

LOW

S/6

"O

R R

EC

IN

/IN

%

PAGE 2 OF 2BORING B-6

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

NE

W G

EO

TE

CH

BH

LO

G 1

687

9-0

DC

A T

AX

IWA

Y B

HO

LD A

PR

ON

.GP

J R

OB

ER

T B

BA

LTE

R.G

DT

12/

29/1

7The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 19: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

31171.210.81.610.4

4.37.7

6.06.0

8.04.0

15.5-3.5

SC

SM

MH

SM

14 (1)

(2)

(3)

(4)

10

13

2

5

5

S1

S2

S3

S4

S5

Bituminous Concrete / P-401 (14-inches)

Aggregate Base / P-209 (5-inches)Moist, Loose, Brown Clayey SAND with Gravel, slightchemical odor (Fill)

Moist, Medium Dense, Gray Silty SAND with RockFragments (Fill)

Wet, Very Soft, Dark Gray Clayey SILT, organic (Fill)

Wet, Loose, Gray to Brown Silty SAND

Terminated at 15.5 feet

2913

4.00

0.10

3-4-6

19-9-4

1-1-1

2-2-3

2-2-3

COMPLETED 10/25/17DATE STARTED 10/25/17

DRILLER Dennis Strawderman

METHOD Hollow Stem Auger

WATER LEVELS

DATE

RIG Dietrich D-50 Truck AUTO? YesFALL: 30"

HELPER Mike

SURFACE EL = 12.0 ft

ELAPSEDHOURS

SAMPLER: 2-in OD SS HAMMER: 140#

BULK SAMPLES 2-6'

SITE DELAYS

TIME

LOCATION 10' North

REVIEWED BY Kristopher Crist

CASINGDEPTH (ft)

HOLEDEPTH (ft)

WATERDEPTH (ft)

WATERELEV (ft)

LLPLGR

AP

HIC

LO

G

REMARKS: (1)Chemical odor present in P-209 layer. (2)Water encountered on sampler at 8' (3)Boring caved at depthhigher than the water levels (4)Drill spoils placed in drum. Boring backfilled with bentonite chips. Pavementpatched with fast-setting concrete.

ST

RA

TU

M C

HA

NG

ED

EP

TH

/EL

(ft)

ATTERBERGS

US

CS

PI

BORING LOG

RE

MA

RK

S

WA

TE

R L

EV

EL

N V

ALU

E O

RC

OR

E R

QD

SA

MP

LE T

YP

EA

ND

NU

MB

ER

MATERIALDESCRIPTION

- #2

00

NM

C %

DE

PT

H (

ft)

5

10

15

PP

(ts

f)

SP

T B

LOW

S/6

"O

R R

EC

IN

/IN

%

PAGE 1 OF 1BORING B-7

10/25/17 0 8.0 Dry

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

NE

W G

EO

TE

CH

BH

LO

G 1

687

9-0

DC

A T

AX

IWA

Y B

HO

LD A

PR

ON

.GP

J R

OB

ER

T B

BA

LTE

R.G

DT

12/

29/1

7The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 20: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

0.610.41.29.9

4.56.5

6.05.0

17.0-6.0

22.0-11.0

27.0-16.0

32.0-21.0

35.0

SM

CL

SM

CL

CL

SM

SW-SM

(1)

(2)

4

1

2

2

3

5

4

16

S1

S2

T1

S3

S4

S5

S6

S7

S8

Bituminous Concrete / P-401 (6.75-inches)Aggregate Base / P-209 (7-inches)Moist, Loose, Gray-Brown Silty SAND, slight chemicalodor (Fill)

Wet, Very Soft, Gray Silty CLAY, little sand (Fill)

Wet, Very Loose, Gray Silty SAND (Fill)

Wet, Soft, Gray Silty CLAY, slight organic odor

Moist, Medium Stiff, Reddish Gray Silty CLAY with Sand,trace wood fragments

Wet, Very Loose, Gray Silty SAND with Gravel

Wet, Medium Dense, Gray-Brown Well-Graded SANDwith Silt and Gravel

Terminated at 35.0 feet

0.00

0.80

0.10

3-2-2

2-WOH-

1

0 / 24

1-1-1

WOH-1-1

WOH-1-2

1-1-4

1-1-3

5-5-11

COMPLETED 10/24/17DATE STARTED 10/24/17

DRILLER Dennis Strawderman

METHOD Hollow Stem Auger

WATER LEVELS

DATE

RIG Dietrich D-50 Truck AUTO? YesFALL: 30"

HELPER Andre Wills

SURFACE EL = 11.0 ft

ELAPSEDHOURS

SAMPLER: 2-in OD SS HAMMER: 140#

BULK SAMPLES

SITE DELAYS

TIME

LOCATION As Staked

REVIEWED BY Kristopher Crist

CASINGDEPTH (ft)

HOLEDEPTH (ft)

WATERDEPTH (ft)

WATERELEV (ft)

(Continued Next Page)

LLPLGR

AP

HIC

LO

G

REMARKS: (1)Strong chemical odor in P-209 layer. (2)Drill spoils placed in drums. Boring backfilled with bentonite chips.Pavement patched with fast-setting concrete.

ST

RA

TU

M C

HA

NG

ED

EP

TH

/EL

(ft)

ATTERBERGS

US

CS

PI

BORING LOG

RE

MA

RK

S

WA

TE

R L

EV

EL

N V

ALU

E O

RC

OR

E R

QD

SA

MP

LE T

YP

EA

ND

NU

MB

ER

MATERIALDESCRIPTION

- #2

00

NM

C %

DE

PT

H (

ft)

5

10

15

20

25

30

35

PP

(ts

f)

SP

T B

LOW

S/6

"O

R R

EC

IN

/IN

%

PAGE 1 OF 2BORING B-8

10/24/17 0 23.8 7.0 4.0

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

NE

W G

EO

TE

CH

BH

LO

G 1

687

9-0

DC

A T

AX

IWA

Y B

HO

LD A

PR

ON

.GP

J R

OB

ER

T B

BA

LTE

R.G

DT

12/

29/1

7The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 21: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

-24.0LLPLG

RA

PH

IC L

OG

REMARKS: (1)Strong chemical odor in P-209 layer. (2)Drill spoils placed in drums. Boring backfilled with bentonite chips.Pavement patched with fast-setting concrete.

ST

RA

TU

M C

HA

NG

ED

EP

TH

/EL

(ft)

ATTERBERGS

US

CS

PI

BORING LOG

RE

MA

RK

S

WA

TE

R L

EV

EL

N V

ALU

E O

RC

OR

E R

QD

SA

MP

LE T

YP

EA

ND

NU

MB

ER

MATERIALDESCRIPTION

- #2

00

NM

C %

DE

PT

H (

ft)

PP

(ts

f)

SP

T B

LOW

S/6

"O

R R

EC

IN

/IN

%

PAGE 2 OF 2BORING B-8

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

NE

W G

EO

TE

CH

BH

LO

G 1

687

9-0

DC

A T

AX

IWA

Y B

HO

LD A

PR

ON

.GP

J R

OB

ER

T B

BA

LTE

R.G

DT

12/

29/1

7The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 22: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

1.012.0

3.59.5

5.08.0

7.06.0

15.0-2.0

SM

CL

SM

(1)

14

6

1

2

2

S1

S2

S3

S4

S5

Bituminous Concrete / P-401 (12-inches)

Aggregate Base / P-209 (30-inches)

Moist, Loose, Brown Silty SAND (Fill)

Moist, Medium Stiff, Gray Silty CLAY, little sand (Fill)

Wet, Very Loose, Brown Silty SAND

Terminated at 15.0 feet

0.50

0.20

11-11-3

1-1-5

WOH-WOH-

1

WOH-1-1

WOH-1-1

COMPLETED 10/25/17DATE STARTED 10/25/17

DRILLER Dennis Strawderman

METHOD Hollow Stem Auger

WATER LEVELS

DATE

RIG Dietrich D-50 Truck AUTO? YesFALL: 30"

HELPER Mike

SURFACE EL = 13.0 ft

ELAPSEDHOURS

SAMPLER: 2-in OD SS HAMMER: 140#

BULK SAMPLES

SITE DELAYS

TIME

LOCATION As Staked

REVIEWED BY Kristopher Crist

CASINGDEPTH (ft)

HOLEDEPTH (ft)

WATERDEPTH (ft)

WATERELEV (ft)

LLPLGR

AP

HIC

LO

G

REMARKS: (1)Drill spoils placed in drum. Boring backfilled with bentonite chips. Pavement patched with fast-settingconcrete.

ST

RA

TU

M C

HA

NG

ED

EP

TH

/EL

(ft)

ATTERBERGS

US

CS

PI

BORING LOG

RE

MA

RK

S

WA

TE

R L

EV

EL

N V

ALU

E O

RC

OR

E R

QD

SA

MP

LE T

YP

EA

ND

NU

MB

ER

MATERIALDESCRIPTION

- #2

00

NM

C %

DE

PT

H (

ft)

5

10

15

PP

(ts

f)

SP

T B

LOW

S/6

"O

R R

EC

IN

/IN

%

PAGE 1 OF 1BORING B-9

10/25/17 0 8.0 7.5 5.5

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

NE

W G

EO

TE

CH

BH

LO

G 1

687

9-0

DC

A T

AX

IWA

Y B

HO

LD A

PR

ON

.GP

J R

OB

ER

T B

BA

LTE

R.G

DT

12/

29/1

7The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 23: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

3925

1.212.8

12.02.0

15.0-1.0

CL

MH

14

(1)

(2)

0

0

3

2

0

S1

S2

S3

S4

S5

Concrete / P-501 (14-inches)

Wet, Very Soft, Gray CLAY with Sand (Fill)

Wet, Very Soft, Gray Elastic SILT with Sand

Terminated at 15.0 feet

8443

42

50

0.00

0.60

0.00

1-WOH-WOHWOH-WOH-WOH-WOHWOH-

1-22-1-1

WOH-WOH-WOH

COMPLETED 10/20/17DATE STARTED 10/20/17

DRILLER Dennis Strawderman

METHOD Hollow Stem Auger

WATER LEVELS

DATE

RIG Dietrich D-50 Truck AUTO? YesFALL: 30"

HELPER Andre Wills

SURFACE EL = 14.0 ft

ELAPSEDHOURS

SAMPLER: 2-in OD SS HAMMER: 140#

BULK SAMPLES

SITE DELAYS

TIME

LOCATION As Staked

REVIEWED BY Kristopher Crist

CASINGDEPTH (ft)

HOLEDEPTH (ft)

WATERDEPTH (ft)

WATERELEV (ft)

LLPLGR

AP

HIC

LO

G

REMARKS: (1)Chemical odor noted just below pavement (2)Drill spoils placed in drums. Boring backfilled with bentonitechips. Pavement patched with fast-setting concrete.

ST

RA

TU

M C

HA

NG

ED

EP

TH

/EL

(ft)

ATTERBERGS

US

CS

PI

BORING LOG

RE

MA

RK

S

WA

TE

R L

EV

EL

N V

ALU

E O

RC

OR

E R

QD

SA

MP

LE T

YP

EA

ND

NU

MB

ER

MATERIALDESCRIPTION

- #2

00

NM

C %

DE

PT

H (

ft)

5

10

15

PP

(ts

f)

SP

T B

LOW

S/6

"O

R R

EC

IN

/IN

%

PAGE 1 OF 1BORING B-10

10/20/17 0 11.5 11.3 2.7

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

NE

W G

EO

TE

CH

BH

LO

G 1

687

9-0

DC

A T

AX

IWA

Y B

HO

LD A

PR

ON

.GP

J R

OB

ER

T B

BA

LTE

R.G

DT

12/

29/1

7The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 24: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

1.29.81.79.3

4.07.0

6.05.0

12.0-1.0

15.0-4.0

CL

SM

SM

SM

(1)

7

16

14

21

5

S1

S2

S3

S4

S5

Bituminous Concrete / P-401 (14-inches)

Aggregate Base / P-209 (6-inches)Moist, Medium Stiff, Brown Silty, Sandy CLAY, tracegravel (Fill)

Moist, Loose, Brown Silty SAND (Fill)

Wet, Medium Dense, Brown Silty SAND, little gravel

Wet, Loose, Brown Silty SAND, little gravel

Terminated at 15.0 feet

0.502-3-4

2-4-12

3-6-8

8-10-11

2-1-4

COMPLETED 10/25/17DATE STARTED 10/25/17

DRILLER Dennis Strawderman

METHOD Hollow Stem Auger

WATER LEVELS

DATE

RIG Dietrich D-50 Truck AUTO? YesFALL: 30"

HELPER Mike

SURFACE EL = 11.0 ft

ELAPSEDHOURS

SAMPLER: 2-in OD SS HAMMER: 140#

BULK SAMPLES

SITE DELAYS

TIME

LOCATION As Staked

REVIEWED BY Kristopher Crist

CASINGDEPTH (ft)

HOLEDEPTH (ft)

WATERDEPTH (ft)

WATERELEV (ft)

LLPLGR

AP

HIC

LO

G

REMARKS: (1)Drill spoils placed in drums. Boring backfilled with bentonite chips. Pavement patched with fast-settingconcrete.

ST

RA

TU

M C

HA

NG

ED

EP

TH

/EL

(ft)

ATTERBERGS

US

CS

PI

BORING LOG

RE

MA

RK

S

WA

TE

R L

EV

EL

N V

ALU

E O

RC

OR

E R

QD

SA

MP

LE T

YP

EA

ND

NU

MB

ER

MATERIALDESCRIPTION

- #2

00

NM

C %

DE

PT

H (

ft)

5

10

15

PP

(ts

f)

SP

T B

LOW

S/6

"O

R R

EC

IN

/IN

%

PAGE 1 OF 1BORING B-11

10/25/17 0 5.3 5.0 6.0

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

NE

W G

EO

TE

CH

BH

LO

G 1

687

9-0

DC

A T

AX

IWA

Y B

HO

LD A

PR

ON

.GP

J R

OB

ER

T B

BA

LTE

R.G

DT

12/

29/1

7The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 25: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

47

54

33

33

1.19.91.79.3

4.76.3

8.52.5

17.0-6.0

24.3-13.325.3-14.3

29.0-18.0

SM

ML

MH

MH

SM

SC

SM

14

21 (1)

17

2

0

1

3

4

13

41

S1

S2

T1

S3

S4

S5

S6

S7

S8

Bituminous Concrete / P-401 (13-inches)

Aggregate Base / P-209 (7-inches)Moist, Medium Dense to Very Loose, Gray Silty SAND(Fill)

Moist, Very Soft, Gray SILT with Sand (Fill)

Wet, Very Soft, Dark Gray Elastic SILT, organic

Wet, Soft, Gray Elastic SILT, slightly organic

Wet, Very Loose, Brown Silty SAND

Wet, Loose, Gray Brown Clayey SAND

Wet, Medium Dense to Very Dense, Brown Silty SANDwith Gravel

82

98

7

58

63

58

56

61

0.10

0.20

0.10

10-9-8

3-1-1

24 / 24

WOH-WOH-WOH

WOH-WOH-

1

WOH-1-2

WOH-2-2

3-8-5

10-18-

COMPLETED 10/24/17DATE STARTED 10/24/17

DRILLER Dennis Strawderman

METHOD Hollow Stem Auger

WATER LEVELS

DATE

RIG Dietrich D-50 Truck AUTO? YesFALL: 30"

HELPER Andre Wills

SURFACE EL = 11.0 ft

ELAPSEDHOURS

SAMPLER: 2-in OD SS HAMMER: 140#

BULK SAMPLES

SITE DELAYS

TIME

LOCATION As Staked

REVIEWED BY Kristopher Crist

CASINGDEPTH (ft)

HOLEDEPTH (ft)

WATERDEPTH (ft)

WATERELEV (ft)

(Continued Next Page)

LLPLGR

AP

HIC

LO

G

REMARKS: (1)Drill spoils placed in drums. Boring backfilled with bentonite chips. Pavement patched with fast-settingconcrete.

ST

RA

TU

M C

HA

NG

ED

EP

TH

/EL

(ft)

ATTERBERGS

US

CS

PI

BORING LOG

RE

MA

RK

S

WA

TE

R L

EV

EL

N V

ALU

E O

RC

OR

E R

QD

SA

MP

LE T

YP

EA

ND

NU

MB

ER

MATERIALDESCRIPTION

- #2

00

NM

C %

DE

PT

H (

ft)

5

10

15

20

25

30

35

PP

(ts

f)

SP

T B

LOW

S/6

"O

R R

EC

IN

/IN

%

PAGE 1 OF 2BORING B-12

10/24/17 0 26.6 10.5 0.5

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

NE

W G

EO

TE

CH

BH

LO

G 1

687

9-0

DC

A T

AX

IWA

Y B

HO

LD A

PR

ON

.GP

J R

OB

ER

T B

BA

LTE

R.G

DT

12/

29/1

7The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 26: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

35.5-24.5 Terminated at 35.5 feet

23LLPLG

RA

PH

IC L

OG

REMARKS: (1)Drill spoils placed in drums. Boring backfilled with bentonite chips. Pavement patched with fast-settingconcrete.

ST

RA

TU

M C

HA

NG

ED

EP

TH

/EL

(ft)

ATTERBERGS

US

CS

PI

BORING LOG

RE

MA

RK

S

WA

TE

R L

EV

EL

N V

ALU

E O

RC

OR

E R

QD

SA

MP

LE T

YP

EA

ND

NU

MB

ER

MATERIALDESCRIPTION

- #2

00

NM

C %

DE

PT

H (

ft)

PP

(ts

f)

SP

T B

LOW

S/6

"O

R R

EC

IN

/IN

%

PAGE 2 OF 2BORING B-12

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

NE

W G

EO

TE

CH

BH

LO

G 1

687

9-0

DC

A T

AX

IWA

Y B

HO

LD A

PR

ON

.GP

J R

OB

ER

T B

BA

LTE

R.G

DT

12/

29/1

7The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 27: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

1.211.81.711.3

4.18.95.17.96.07.0

8.05.0

15.5-2.5

SC-SM

CL

SM

ML

CL

(1)

8

7

3

3

3

S1

S2

S3

S4

S5

Bituminous Concrete / P-401 (14-inches)

Aggregate Base / P-209 (6-inches)Moist, Loose, Gray Silty, Clayey SAND (Fill)

Moist, Medium Stiff, Gray Silty CLAY (Fill)

Moist, Loose, Gray Silty SAND (Fill)Slightly Wet, Soft, Gray SILT with Sand

Moist, Soft, Gray Silty CLAY with thin layers of silty sand(1-2" thick)

Terminated at 15.5 feet

15

27

430.00

0.10

0.30

4-4-4

1-2-5

2-1-2

1-1-2

1-1-2

COMPLETED 10/31/17DATE STARTED 10/31/17

DRILLER Dennis Strawderman

METHOD Hollow Stem Auger

WATER LEVELS

DATE

RIG Dietrich D-50 Truck AUTO? YesFALL: 30"

HELPER Dustin Hurd

SURFACE EL = 13.0 ft

ELAPSEDHOURS

SAMPLER: 2-in OD SS HAMMER: 140#

BULK SAMPLES

SITE DELAYS

TIME

LOCATION As Staked

REVIEWED BY Kristopher Crist

CASINGDEPTH (ft)

HOLEDEPTH (ft)

WATERDEPTH (ft)

WATERELEV (ft)

LLPLGR

AP

HIC

LO

G

REMARKS: (1)Drill spoils placed into drums. Boring backfilled with bentonite chips. Pavement patched with fast-settingconcrete.

ST

RA

TU

M C

HA

NG

ED

EP

TH

/EL

(ft)

ATTERBERGS

US

CS

PI

BORING LOG

RE

MA

RK

S

WA

TE

R L

EV

EL

N V

ALU

E O

RC

OR

E R

QD

SA

MP

LE T

YP

EA

ND

NU

MB

ER

MATERIALDESCRIPTION

- #2

00

NM

C %

DE

PT

H (

ft)

5

10

15

PP

(ts

f)

SP

T B

LOW

S/6

"O

R R

EC

IN

/IN

%

PAGE 1 OF 1BORING B-13

10/31/17 0 13.3 13.0 0.0

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

NE

W G

EO

TE

CH

BH

LO

G 1

687

9-0

DC

A T

AX

IWA

Y B

HO

LD A

PR

ON

.GP

J R

OB

ER

T B

BA

LTE

R.G

DT

12/

29/1

7The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 28: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

1.29.8

4.66.4

8.03.0

14.9-3.915.0-4.0

SM

SM

SM

ML

(1)

(2)

37

16

11

6

4

S1

S2

S3

S4

S5

Concrete / P-501 (14-inches)

Moist, Dense, Brown Silty SAND with Broken Gravel,possible pavement aggregate base (Fill)

Slightly Wet, Medium Dense, Gray Silty SAND withGravel (Fill)slight organic odor at 6'

Wet, Loose, Gray Silty SAND with Gravel

Wet, Soft, Gray SILTTerminated at 15.0 feet

13-17-20

5-7-9

4-5-6

5-3-3

3-2-2

COMPLETED 10/20/17DATE STARTED 10/20/17

DRILLER Dennis Strawderman

METHOD Hollow Stem Auger

WATER LEVELS

DATE

RIG Dietrich D-50 Truck AUTO? YesFALL: 30"

HELPER Andre Wills

SURFACE EL = 11.0 ft

ELAPSEDHOURS

SAMPLER: 2-in OD SS HAMMER: 140#

BULK SAMPLES

SITE DELAYS

TIME

LOCATION 7' South

REVIEWED BY Kristopher Crist

CASINGDEPTH (ft)

HOLEDEPTH (ft)

WATERDEPTH (ft)

WATERELEV (ft)

LLPLGR

AP

HIC

LO

G

REMARKS: (1)Moved 7' South because of large 3-ft diameter storm drain at original location (2)Drill spoils placed in drums.Boring backfilled with bentonite chips. Pavement patched with fast-setting concrete.

ST

RA

TU

M C

HA

NG

ED

EP

TH

/EL

(ft)

ATTERBERGS

US

CS

PI

BORING LOG

RE

MA

RK

S

WA

TE

R L

EV

EL

N V

ALU

E O

RC

OR

E R

QD

SA

MP

LE T

YP

EA

ND

NU

MB

ER

MATERIALDESCRIPTION

- #2

00

NM

C %

DE

PT

H (

ft)

5

10

15

PP

(ts

f)

SP

T B

LOW

S/6

"O

R R

EC

IN

/IN

%

PAGE 1 OF 1BORING B-14

10/20/17 0 6.7 6.3 4.7

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

NE

W G

EO

TE

CH

BH

LO

G 1

687

9-0

DC

A T

AX

IWA

Y B

HO

LD A

PR

ON

.GP

J R

OB

ER

T B

BA

LTE

R.G

DT

12/

29/1

7The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 29: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

3326

0.812.3

6.07.0

8.05.0

15.0-2.0

SC

CL-ML

ML

7

(1)

15

7

2

1

1

S1

S2

S3

S4

S5

Bituminous Concrete / P-401 (9-inches)Moist, Medium Dense to Loose, Gray Silty, Clayey SAND(Fill)

Moist, Soft, Gray Sandy, Silty CLAY (Fill)

Moist, Very Soft, Brownish Gray Sandy SILT, littleorganics

Terminated at 15.0 feet

65

7

11

36

41

0.00

0.30

6-7-8

2-3-4

2-1-1

WOH-WOH-

1

WOH-WOH-

1

COMPLETED 11/1/17DATE STARTED 11/1/17

DRILLER Dennis Strawderman

METHOD Hollow Stem Auger

WATER LEVELS

DATE

RIG Dietrich D-50 Truck AUTO? YesFALL: 30"

HELPER Dustin Hurd

SURFACE EL = 13.0 ft

ELAPSEDHOURS

SAMPLER: 2-in OD SS HAMMER: 140#

BULK SAMPLES

SITE DELAYS

TIME

LOCATION As Staked

REVIEWED BY Kristopher Crist

CASINGDEPTH (ft)

HOLEDEPTH (ft)

WATERDEPTH (ft)

WATERELEV (ft)

LLPLGR

AP

HIC

LO

G

REMARKS: (1)Drill spoils placed in drums. Boring backfilled with bentonite chips. Pavement patched with fast-settingconcrete.

ST

RA

TU

M C

HA

NG

ED

EP

TH

/EL

(ft)

ATTERBERGS

US

CS

PI

BORING LOG

RE

MA

RK

S

WA

TE

R L

EV

EL

N V

ALU

E O

RC

OR

E R

QD

SA

MP

LE T

YP

EA

ND

NU

MB

ER

MATERIALDESCRIPTION

- #2

00

NM

C %

DE

PT

H (

ft)

5

10

15

PP

(ts

f)

SP

T B

LOW

S/6

"O

R R

EC

IN

/IN

%

PAGE 1 OF 1BORING B-15

11/1/17 0 12.7 12.0 1.0

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

NE

W G

EO

TE

CH

BH

LO

G 1

687

9-0

DC

A T

AX

IWA

Y B

HO

LD A

PR

ON

.GP

J R

OB

ER

T B

BA

LTE

R.G

DT

12/

29/1

7The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 30: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

26

NP

21

NP

1.29.8

4.07.0

14.7-3.715.5-4.5

SC-SM

SM

MH

5

NP

(1)

(2)

(3)

(4)

(5)

10

4

5

2

S1

T1

S2

S3

S4

Concrete / P-501 (14-inches)

Moist, Loose, Gray Silty, Clayey SAND, strong chemicalodor (Fill)

Moist, Loose, Gray Silty SAND with Gravel (Fill)

Wet, Soft, Gray Elastic SILT with SandTerminated at 15.5 feet

24

13

19

9

11

6-6-4

18 / 24

4-2-2

3-3-2

1-1-1

COMPLETED 10/30/17DATE STARTED 10/30/17

DRILLER Dennis Strawderman

METHOD Hollow Stem Auger

WATER LEVELS

DATE

RIG Dietrich D-50 Truck AUTO? YesFALL: 30"

HELPER Dustin Hurd

SURFACE EL = 11.0 ft

ELAPSEDHOURS

SAMPLER: 2-in OD SS HAMMER: 140#

BULK SAMPLES

SITE DELAYS

TIME

LOCATION As Staked

REVIEWED BY Kristopher Crist

CASINGDEPTH (ft)

HOLEDEPTH (ft)

WATERDEPTH (ft)

WATERELEV (ft)

LLPLGR

AP

HIC

LO

G

REMARKS: (1)PID Reading = 46.0 ppm (2)PID Reading = 347.0 ppm (3)Water encountered on sampler at 8.5'. Boringcaved higher than the water levels; PID reading = 71.0 ppm (4)PID Reading = 12.4 ppm (5)Drill spoils placedinto drums. Boring backfilled with bentonite chips. Pavement patched with fast-setting concrete.

ST

RA

TU

M C

HA

NG

ED

EP

TH

/EL

(ft)

ATTERBERGS

US

CS

PI

BORING LOG

RE

MA

RK

S

WA

TE

R L

EV

EL

N V

ALU

E O

RC

OR

E R

QD

SA

MP

LE T

YP

EA

ND

NU

MB

ER

MATERIALDESCRIPTION

- #2

00

NM

C %

DE

PT

H (

ft)

5

10

15

PP

(ts

f)

SP

T B

LOW

S/6

"O

R R

EC

IN

/IN

%

PAGE 1 OF 1BORING B-16

10/30/17 0 6.2 Dry

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

NE

W G

EO

TE

CH

BH

LO

G 1

687

9-0

DC

A T

AX

IWA

Y B

HO

LD A

PR

ON

.GP

J R

OB

ER

T B

BA

LTE

R.G

DT

12/

29/1

7The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 31: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

1.012.02.011.0

7.55.5

12.01.0

15.5-2.5

SM

SM

MH

(1)

(2)

22

14

10

2

2

S1

S2

S3

S4

S5

Bituminous Concrete / P-401 (12-inches)

Aggregate Base / P-209 (12-inches)

Moist, Medium Dense, Brown Silty SAND with Gravel(Fill)

Wet, Very Loose, Gray Silty SAND

Wet, Soft, Gray Elastic SILT with Sand

Terminated at 15.5 feet

2

3

6

0.00

11-11-11

5-6-8

6-6-4

4-1-1

WOH-1-1

COMPLETED 10/26/17DATE STARTED 10/26/17

DRILLER Dennis Strawderman

METHOD Hollow Stem Auger

WATER LEVELS

DATE

RIG Dietrich D-50 Truck AUTO? YesFALL: 30"

HELPER Kristopher Crist

SURFACE EL = 13.0 ft

ELAPSEDHOURS

SAMPLER: 2-in OD SS HAMMER: 140#

BULK SAMPLES

SITE DELAYS

TIME

LOCATION As Staked

REVIEWED BY Kristopher Crist

CASINGDEPTH (ft)

HOLEDEPTH (ft)

WATERDEPTH (ft)

WATERELEV (ft)

LLPLGR

AP

HIC

LO

G

REMARKS: (1)Chemical odor present in P-209 layer; PID = 14.1 ppm (2)Drill spoils placed in drums. Boring backfilled withbentonite chips. Pavement patched with fast-setting concrete.

ST

RA

TU

M C

HA

NG

ED

EP

TH

/EL

(ft)

ATTERBERGS

US

CS

PI

BORING LOG

RE

MA

RK

S

WA

TE

R L

EV

EL

N V

ALU

E O

RC

OR

E R

QD

SA

MP

LE T

YP

EA

ND

NU

MB

ER

MATERIALDESCRIPTION

- #2

00

NM

C %

DE

PT

H (

ft)

5

10

15

PP

(ts

f)

SP

T B

LOW

S/6

"O

R R

EC

IN

/IN

%

PAGE 1 OF 1BORING B-17

10/26/17 0 7.3 Dry

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

NE

W G

EO

TE

CH

BH

LO

G 1

687

9-0

DC

A T

AX

IWA

Y B

HO

LD A

PR

ON

.GP

J R

OB

ER

T B

BA

LTE

R.G

DT

12/

29/1

7The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 32: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

1.111.92.510.5

8.54.5

24.2-11.225.3-12.3

29.5-16.5

32.0-19.0

GM

SM

SM

CL

SP-SM

CL-ML

SM

(1)

(2)

(3)

(4)

29

15

18

15

4

6

13

5

19

S1

S2

S3

S4

S5

S6

S7

S8

S9

Concrete / P-501 (13.5-inches)

Aggregate Base / P-209 (16.5-inches)

Moist to Wet, Medium Dense, Gray to Tan Silty SAND,little broken gravel (Fill)

Wet, Medium Dense to Very Loose, Tan Silty SAND withGravel

Wet, Stiff, Gray Silty CLAY

Wet, Medium Dense, Gray Poorly-Graded SAND with Siltand Gravel

Wet, Medium Stiff, Brown Sandy, Clayey SILT, traceorganics

Wet, Medium Dense, Brown to Gray Silty SAND withGravel

14

6

11

12

9

0.20

4-15-14

4-7-8

6-9-9

7-8-7

1-1-3

2-3-3

1-5-8

1-1-4

9-7-12

COMPLETED 10/23/17DATE STARTED 10/23/17

DRILLER Dennis Strawderman

METHOD Hollow Stem Auger

WATER LEVELS

DATE

RIG Dietrich D-50 Truck AUTO? YesFALL: 30"

HELPER Andre Wills

SURFACE EL = 13.0 ft

ELAPSEDHOURS

SAMPLER: 2-in OD SS HAMMER: 140#

BULK SAMPLES

SITE DELAYS

TIME

LOCATION As Staked

REVIEWED BY Kristopher Crist

CASINGDEPTH (ft)

HOLEDEPTH (ft)

WATERDEPTH (ft)

WATERELEV (ft)

(Continued Next Page)

LLPLGR

AP

HIC

LO

G

REMARKS: (1)Water encountered on sampler at 6' (2)Running sands encountered from 14' to 24' (3)Possible Methane at29' (4)Drill spoils placed into drums. Boring backfilled with bentonite chips. Pavement patched with fast-settingconcrete.

ST

RA

TU

M C

HA

NG

ED

EP

TH

/EL

(ft)

ATTERBERGS

US

CS

PI

BORING LOG

RE

MA

RK

S

WA

TE

R L

EV

EL

N V

ALU

E O

RC

OR

E R

QD

SA

MP

LE T

YP

EA

ND

NU

MB

ER

MATERIALDESCRIPTION

- #2

00

NM

C %

DE

PT

H (

ft)

5

10

15

20

25

30

35

PP

(ts

f)

SP

T B

LOW

S/6

"O

R R

EC

IN

/IN

%

PAGE 1 OF 2BORING B-18

10/23/17 0 6.1 Dry

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

NE

W G

EO

TE

CH

BH

LO

G 1

687

9-0

DC

A T

AX

IWA

Y B

HO

LD A

PR

ON

.GP

J R

OB

ER

T B

BA

LTE

R.G

DT

12/

29/1

7The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 33: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

35.5-22.5 Terminated at 35.5 feet

LLPLGR

AP

HIC

LO

G

REMARKS: (1)Water encountered on sampler at 6' (2)Running sands encountered from 14' to 24' (3)Possible Methane at29' (4)Drill spoils placed into drums. Boring backfilled with bentonite chips. Pavement patched with fast-settingconcrete.

ST

RA

TU

M C

HA

NG

ED

EP

TH

/EL

(ft)

ATTERBERGS

US

CS

PI

BORING LOG

RE

MA

RK

S

WA

TE

R L

EV

EL

N V

ALU

E O

RC

OR

E R

QD

SA

MP

LE T

YP

EA

ND

NU

MB

ER

MATERIALDESCRIPTION

- #2

00

NM

C %

DE

PT

H (

ft)

PP

(ts

f)

SP

T B

LOW

S/6

"O

R R

EC

IN

/IN

%

PAGE 2 OF 2BORING B-18

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

NE

W G

EO

TE

CH

BH

LO

G 1

687

9-0

DC

A T

AX

IWA

Y B

HO

LD A

PR

ON

.GP

J R

OB

ER

T B

BA

LTE

R.G

DT

12/

29/1

7The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 34: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

1.210.81.710.3

4.08.0

8.04.0

12.00.0

15.5-3.5

CL

SM

SM

SM

(1)

16

7

3

4

S1

S2

T1

S3

S4

Concrete / P-501 (14-inches)

Aggregate Base / P-209 (6-inches)Moist, Medium Dense, Gray Sandy CLAY with RockFragments, slight chemical odor (Fill)

Moist, Loose, Gray Silty SAND, strong chemical odor

Wet, Very Loose, Brown Silty SAND

Wet, Loose, Gray Brown Silty SAND, fg

Terminated at 15.5 feet

12

6

4-5-11

4-4-3

24 / 24

3-2-1

2-2-2

COMPLETED 10/31/17DATE STARTED 10/31/17

DRILLER Dennis Strawderman

METHOD Hollow Stem Auger

WATER LEVELS

DATE

RIG Dietrich D-50 Truck AUTO? YesFALL: 30"

HELPER Dustin Hurd

SURFACE EL = 12.0 ft

ELAPSEDHOURS

SAMPLER: 2-in OD SS HAMMER: 140#

BULK SAMPLES

SITE DELAYS

TIME

LOCATION As Staked

REVIEWED BY Kristopher Crist

CASINGDEPTH (ft)

HOLEDEPTH (ft)

WATERDEPTH (ft)

WATERELEV (ft)

LLPLGR

AP

HIC

LO

G

REMARKS: (1)Drill spoils placed in drums. Boring backfilled with bentonite chips. Pavement patched with fast-settingconcrete.

ST

RA

TU

M C

HA

NG

ED

EP

TH

/EL

(ft)

ATTERBERGS

US

CS

PI

BORING LOG

RE

MA

RK

S

WA

TE

R L

EV

EL

N V

ALU

E O

RC

OR

E R

QD

SA

MP

LE T

YP

EA

ND

NU

MB

ER

MATERIALDESCRIPTION

- #2

00

NM

C %

DE

PT

H (

ft)

5

10

15

PP

(ts

f)

SP

T B

LOW

S/6

"O

R R

EC

IN

/IN

%

PAGE 1 OF 1BORING B-19

10/31/17 0 8.3 8.2 3.8

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

NE

W G

EO

TE

CH

BH

LO

G 1

687

9-0

DC

A T

AX

IWA

Y B

HO

LD A

PR

ON

.GP

J R

OB

ER

T B

BA

LTE

R.G

DT

12/

29/1

7The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 35: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

0.912.1

8.54.5

15.5-2.5

SM

SM

(1)

(2)

33

23

14

9

9

S1

S2

S3

S4

S5

Bituminous Concrete / P-401 (11-inches)Moist, Dense to Medium Dense, Brown Silty SAND withGravel (Fill)

Wet, Loose, Brown Silty SAND with Gravel

Terminated at 15.5 feet

12-18-15

10-10-13

5-7-7

7-5-4

8-4-5

COMPLETED 10/27/17DATE STARTED 10/27/17

DRILLER Dennis Strawderman

METHOD Hollow Stem Auger

WATER LEVELS

DATE

RIG Dietrich D-50 Truck AUTO? YesFALL: 30"

HELPER Kristopher Crist

SURFACE EL = 13.0 ft

ELAPSEDHOURS

SAMPLER: 2-in OD SS HAMMER: 140#

BULK SAMPLES 1-5'

SITE DELAYS

TIME

LOCATION 15' North

REVIEWED BY Kristopher Crist

CASINGDEPTH (ft)

HOLEDEPTH (ft)

WATERDEPTH (ft)

WATERELEV (ft)

LLPLGR

AP

HIC

LO

G

REMARKS: (1)Water encountered at 8.5 feet on the sampler. Boring caved higher than the water levels identified (2)Drillspoils placed into drums. Boring backfilled with bentonite chips. Pavement patched with fast-setting concrete.

ST

RA

TU

M C

HA

NG

ED

EP

TH

/EL

(ft)

ATTERBERGS

US

CS

PI

BORING LOG

RE

MA

RK

S

WA

TE

R L

EV

EL

N V

ALU

E O

RC

OR

E R

QD

SA

MP

LE T

YP

EA

ND

NU

MB

ER

MATERIALDESCRIPTION

- #2

00

NM

C %

DE

PT

H (

ft)

5

10

15

PP

(ts

f)

SP

T B

LOW

S/6

"O

R R

EC

IN

/IN

%

PAGE 1 OF 1BORING B-20

10/27/17 0 4.0 Dry

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

NE

W G

EO

TE

CH

BH

LO

G 1

687

9-0

DC

A T

AX

IWA

Y B

HO

LD A

PR

ON

.GP

J R

OB

ER

T B

BA

LTE

R.G

DT

12/

29/1

7The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 36: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

NPNP

1.210.8

5.36.76.06.0

8.53.5

13.7-1.7

17.0-5.0

22.0-10.0

28.0-16.0

34.1-22.1

SM

SM

GM

CL

SP-SM

CL

SM

CL

SM

NP

(1)

(2)

(3)

26

8

14

4

9

10

7

4

21

S1

S2

S3

S4

S5

S6

S7

S8

S9

Concrete / P-501 (14-inches)

Moist, Medium Dense to Loose, Gray Silty SAND withRock Fragments, possible aggregate base layer (Fill)

Moist, Loose, Gray Silty SAND (Fill)Mosit, Medium Dense, Gray GRAVEL with Silty SAND

Slightly Wet, Soft, Dark Gray Silty CLAY (Fill)

Wet, Loose, Gray Poorly-Graded SAND with Silt, littlerock fragments

Wet, Stiff, Gray Silty CLAY

Wet, Loose, Gray-Brown Silty SAND, little gravel, mg tocg

Wet, Soft to Stiff, Gray Silty CLAY, little organics andwood fragments

Wet, Medium Dense, Gray-Brown Silty SAND with GravelTerminated at 35.0 feet

127

10

67

33

61

0.50

0.20

10-13-13

5-4-4

6-7-7

1-2-2

2-3-6

5-6-4

3-3-4

1-2-2

5-11-10

COMPLETED 10/23/17DATE STARTED 10/23/17

DRILLER Dennis Strawderman

METHOD Hollow Stem Auger

WATER LEVELS

DATE

RIG Dietrich D-50 Truck AUTO? YesFALL: 30"

HELPER Andre Wills

SURFACE EL = 12.0 ft

ELAPSEDHOURS

SAMPLER: 2-in OD SS HAMMER: 140#

BULK SAMPLES 2-6'

SITE DELAYS

TIME

LOCATION As Staked

REVIEWED BY Kristopher Crist

CASINGDEPTH (ft)

HOLEDEPTH (ft)

WATERDEPTH (ft)

WATERELEV (ft)

(Continued Next Page)

LLPLGR

AP

HIC

LO

G

REMARKS: (1)Water encountered at 8.5'. Boring caved higher than the water table. (2)Running sands encountered at 18'(3)Drill spoils placed into drums. Boring backfilled with bentonite chips. Pavement patched with fast-settingconcrete.

ST

RA

TU

M C

HA

NG

ED

EP

TH

/EL

(ft)

ATTERBERGS

US

CS

PI

BORING LOG

RE

MA

RK

S

WA

TE

R L

EV

EL

N V

ALU

E O

RC

OR

E R

QD

SA

MP

LE T

YP

EA

ND

NU

MB

ER

MATERIALDESCRIPTION

- #2

00

NM

C %

DE

PT

H (

ft)

5

10

15

20

25

30

35

PP

(ts

f)

SP

T B

LOW

S/6

"O

R R

EC

IN

/IN

%

PAGE 1 OF 2BORING B-21

10/23/17 0 4.0 Dry

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

NE

W G

EO

TE

CH

BH

LO

G 1

687

9-0

DC

A T

AX

IWA

Y B

HO

LD A

PR

ON

.GP

J R

OB

ER

T B

BA

LTE

R.G

DT

12/

29/1

7The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 37: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

35.0-23.0

LLPLGR

AP

HIC

LO

G

REMARKS: (1)Water encountered at 8.5'. Boring caved higher than the water table. (2)Running sands encountered at 18'(3)Drill spoils placed into drums. Boring backfilled with bentonite chips. Pavement patched with fast-settingconcrete.

ST

RA

TU

M C

HA

NG

ED

EP

TH

/EL

(ft)

ATTERBERGS

US

CS

PI

BORING LOG

RE

MA

RK

S

WA

TE

R L

EV

EL

N V

ALU

E O

RC

OR

E R

QD

SA

MP

LE T

YP

EA

ND

NU

MB

ER

MATERIALDESCRIPTION

- #2

00

NM

C %

DE

PT

H (

ft)

PP

(ts

f)

SP

T B

LOW

S/6

"O

R R

EC

IN

/IN

%

PAGE 2 OF 2BORING B-21

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

NE

W G

EO

TE

CH

BH

LO

G 1

687

9-0

DC

A T

AX

IWA

Y B

HO

LD A

PR

ON

.GP

J R

OB

ER

T B

BA

LTE

R.G

DT

12/

29/1

7The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 38: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

2718

0.512.6

2.310.7

6.07.0

12.01.0

14.8-1.815.5-2.5

SP-SC

SP-SM

CL

SM

9

(1)

(2)

15

22

12

7

6

S1

S2

S3

S4

S5

Bituminous Concrete / P-401 (5.5-inches)Aggregate Base / P-209 (22-inches)

Moist, Medium Dense, Gray Poorly-Graded SAND withClay and Gravel (Fill)

Moist to Wet, Medium Dense to Loose, GrayPoorly-Graded SAND with Silt, little gravel

Wet, Medium Stiff, Gray Silty CLAY

Wet, Loose, Gray Silty SANDTerminated at 15.5 feet

1297-8-7

6-8-14

8-5-7

3-3-4

2-3-3

COMPLETED 11/2/17DATE STARTED 11/2/17

DRILLER Dennis Strawderman

METHOD Hollow Stem Auger

WATER LEVELS

DATE

RIG Dietrich D-50 Truck AUTO? YesFALL: 30"

HELPER Andre Wills

SURFACE EL = 13.0 ft

ELAPSEDHOURS

SAMPLER: 2-in OD SS HAMMER: 140#

BULK SAMPLES 2-6'

SITE DELAYS

TIME

LOCATION 17' South; 18' West

REVIEWED BY Kristopher Crist

CASINGDEPTH (ft)

HOLEDEPTH (ft)

WATERDEPTH (ft)

WATERELEV (ft)

LLPLGR

AP

HIC

LO

G

REMARKS: (1)Water encountered on sampler at 8.5' (2)Drill spoils placed in drums. Boring backfilled with bentonite chips.Pavement patched with fast-setting concrete.

ST

RA

TU

M C

HA

NG

ED

EP

TH

/EL

(ft)

ATTERBERGS

US

CS

PI

BORING LOG

RE

MA

RK

S

WA

TE

R L

EV

EL

N V

ALU

E O

RC

OR

E R

QD

SA

MP

LE T

YP

EA

ND

NU

MB

ER

MATERIALDESCRIPTION

- #2

00

NM

C %

DE

PT

H (

ft)

5

10

15

PP

(ts

f)

SP

T B

LOW

S/6

"O

R R

EC

IN

/IN

%

PAGE 1 OF 1BORING B-22

11/2/17 0 8.6 Dry

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

NE

W G

EO

TE

CH

BH

LO

G 1

687

9-0

DC

A T

AX

IWA

Y B

HO

LD A

PR

ON

.GP

J R

OB

ER

T B

BA

LTE

R.G

DT

12/

29/1

7The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 39: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

NPNP

0.812.21.111.9

4.58.5

7.06.0

15.5-2.5

SM

CL

SM

NP

(1)

(2)

49

11

9

8

S1

S2

S3

S4

Bituminous Concrete / P-401 (10-inches)Cement Treated BaseMosit, Dense to Medium Dense, Brown Silty SAND (Fill)

Moist, Stiff, Brown Silty CLAY (Fill)

Wet, Loose, Gray-Brown Silty SAND

Terminated at 15.5 feet

145

16

66-29-20

4-5-6

5-4-5

4-3-5

COMPLETED 11/2/17DATE STARTED 11/2/17

DRILLER Dennis Strawderman

METHOD Hollow Stem Auger

WATER LEVELS

DATE

RIG Dietrich D-50 Truck AUTO? YesFALL: 30"

HELPER Andre Wills

SURFACE EL = 13.0 ft

ELAPSEDHOURS

SAMPLER: 2-in OD SS HAMMER: 140#

BULK SAMPLES 2-6'

SITE DELAYS

TIME

LOCATION As Staked

REVIEWED BY Kristopher Crist

CASINGDEPTH (ft)

HOLEDEPTH (ft)

WATERDEPTH (ft)

WATERELEV (ft)

LLPLGR

AP

HIC

LO

G

REMARKS: (1)Water encountered on sampler at 8.5' (2)Drill spoils placed into drums. Boring backfilled with bentonitechips. Pavement patched with fast-setting concrete

ST

RA

TU

M C

HA

NG

ED

EP

TH

/EL

(ft)

ATTERBERGS

US

CS

PI

BORING LOG

RE

MA

RK

S

WA

TE

R L

EV

EL

N V

ALU

E O

RC

OR

E R

QD

SA

MP

LE T

YP

EA

ND

NU

MB

ER

MATERIALDESCRIPTION

- #2

00

NM

C %

DE

PT

H (

ft)

5

10

15

PP

(ts

f)

SP

T B

LOW

S/6

"O

R R

EC

IN

/IN

%

PAGE 1 OF 1BORING B-23

11/2/17 0 7.0 Dry

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

NE

W G

EO

TE

CH

BH

LO

G 1

687

9-0

DC

A T

AX

IWA

Y B

HO

LD A

PR

ON

.GP

J R

OB

ER

T B

BA

LTE

R.G

DT

12/

29/1

7The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 40: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

1.011.01.110.9

4.77.36.06.0

9.03.0

12.00.0

15.5-3.5

SM

CL

SP-SM

CL

ML

(1)

23

10

11

3

3

S1

S2

S3

S4

S5

Bituminous Concrete / P-401 (12-inches)

Aggregate Base / P-209 (1-inch)Moist, Medium Dense, Brown Silty SAND with RockFragments (Fill)

Moist, Stiff, Gray Silty CLAY with Rock Fragments (Fill)

Moist to Wet, Medium Dense to Loose, GrayPoorly-Graded SAND with Silt

Wet, Soft, Gray Silty CLAY

Wet, Soft, Gray SILT with Sand

Terminated at 15.5 feet

0.20

10-13-10

4-3-7

4-5-6

1-2-1

2-1-2

COMPLETED 10/30/17DATE STARTED 10/30/17

DRILLER Dennis Strawderman

METHOD Hollow Stem Auger

WATER LEVELS

DATE

RIG Dietrich D-50 Truck AUTO? YesFALL: 30"

HELPER Dustin Hurd

SURFACE EL = 12.0 ft

ELAPSEDHOURS

SAMPLER: 2-in OD SS HAMMER: 140#

BULK SAMPLES

SITE DELAYS

TIME

LOCATION As Staked

REVIEWED BY Kristopher Crist

CASINGDEPTH (ft)

HOLEDEPTH (ft)

WATERDEPTH (ft)

WATERELEV (ft)

LLPLGR

AP

HIC

LO

G

REMARKS: (1)Drill spoils placed into drums. Boring backfilled with bentonite chips. Pavement patched with fast-settingconcrete.

ST

RA

TU

M C

HA

NG

ED

EP

TH

/EL

(ft)

ATTERBERGS

US

CS

PI

BORING LOG

RE

MA

RK

S

WA

TE

R L

EV

EL

N V

ALU

E O

RC

OR

E R

QD

SA

MP

LE T

YP

EA

ND

NU

MB

ER

MATERIALDESCRIPTION

- #2

00

NM

C %

DE

PT

H (

ft)

5

10

15

PP

(ts

f)

SP

T B

LOW

S/6

"O

R R

EC

IN

/IN

%

PAGE 1 OF 1BORING B-24

10/30/17 0 8.7 8.6 3.4

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

NE

W G

EO

TE

CH

BH

LO

G 1

687

9-0

DC

A T

AX

IWA

Y B

HO

LD A

PR

ON

.GP

J R

OB

ER

T B

BA

LTE

R.G

DT

12/

29/1

7The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 41: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

20

39

58

14

28

39

0.57.5

4.04.0

7.50.5

9.5-1.5

19.6-11.6

SM

CL

ML

SM

MH

6

11

19

(1)

16

30

16

11

6

2

3

2

2

S1

S2

S3

S4

T1

S5

S6

S7

S8

S9

Bituminous Concrete (P-401)Moist, Medium Dense, Brown Silty SAND (FILL)

Moist, Stiff, Gray Sandy CLAY with Gravel (FILL)

Slightly Wet, Stiff, Gray SILT

Wet, Loose, Gray Silty SAND

Wet, Soft, Gray to Dark Gray Elastic SILT

organics (ie, wood fragments) at 29'

41

98

87

11

10

12

48

46

71

1.10

0.20

0.30

0.30

1-4-12

8-17-13-12

5-5-11-8

5-6-5-5

18 / 24

2-1-5

WOH-1-1

1-2-1

1-1-1

WOH-

COMPLETED 3/15/18DATE STARTED 3/15/18

DRILLER Dennis Strawderman

METHOD Hollow Stem Auger

WATER LEVELS

DATE

RIG Dietrich D-50 Truck AUTO? YesFALL: 30"

HELPER John Rogers

SURFACE EL = 8.0 ft

ELAPSEDHOURS

SAMPLER: 2-in OD SS HAMMER: 140#

BULK SAMPLES 0.5-2'

SITE DELAYS

TIME

LOCATION As Staked

REVIEWED BY Kristopher Crist

CASINGDEPTH (ft)

HOLEDEPTH (ft)

WATERDEPTH (ft)

WATERELEV (ft)

(Continued Next Page)

LLPLGR

AP

HIC

LO

G

REMARKS: (1)Drill spoils placed into sealed 55-gallon drums. Boring backfilled with bentonite at completion. Pavementpatched with concrete.

ST

RA

TU

M C

HA

NG

ED

EP

TH

/EL

(ft)

ATTERBERGS

US

CS

PI

BORING LOG

RE

MA

RK

S

WA

TE

R L

EV

EL

N V

ALU

E O

RC

OR

E R

QD

SA

MP

LE T

YP

EA

ND

NU

MB

ER

MATERIALDESCRIPTION

- #2

00

NM

C %

DE

PT

H (

ft)

5

10

15

20

25

30

35

PP

(ts

f)

SP

T B

LOW

S/6

"O

R R

EC

IN/IN

%

PAGE 1 OF 2BORING B-25

3/15/18 0 9.7 7.2 0.8

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

NE

W G

EO

TE

CH

BH

LO

G 1

6879

-0 D

CA

TA

XIW

AY

B H

OLD

AP

RO

N.G

PJ

RO

BE

RT

B B

ALT

ER

.GD

T 4

/18

/18

The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 42: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

35.5-27.5 Terminated at 35.5 feet

1-1LLPLG

RA

PH

IC L

OG

REMARKS: (1)Drill spoils placed into sealed 55-gallon drums. Boring backfilled with bentonite at completion. Pavementpatched with concrete.

ST

RA

TU

M C

HA

NG

ED

EP

TH

/EL

(ft)

ATTERBERGS

US

CS

PI

BORING LOG

RE

MA

RK

S

WA

TE

R L

EV

EL

N V

ALU

E O

RC

OR

E R

QD

SA

MP

LE T

YP

EA

ND

NU

MB

ER

MATERIALDESCRIPTION

- #2

00

NM

C %

DE

PT

H (

ft)

PP

(ts

f)

SP

T B

LOW

S/6

"O

R R

EC

IN/IN

%

PAGE 2 OF 2BORING B-25

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

NE

W G

EO

TE

CH

BH

LO

G 1

6879

-0 D

CA

TA

XIW

AY

B H

OLD

AP

RO

N.G

PJ

RO

BE

RT

B B

ALT

ER

.GD

T 4

/18

/18

The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 43: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

1. No water encountered

2. Drill Rig used: AckerAD-2

3. Pavement corecollected; bag samplecollected at 1.5'-4'.

4. DCP Test performed.

5. Test boring backfilledwith excess augercuttings mixed withOrdinary PortlandCement upto the depth2.0-ft below grade andpatched with highstrength early settingstructural concrete,quickcrete in the top24-inches

11" of P-401 HOT MIX ASPHALTCONCRETE (HMAC)

7" of P-209 CRUSHEDAGGREGATE BASE COURSEBrown, moist, loose to dense, silty,clayey SAND, with gravel (FILL),(USCS: SC-SM)

Brown, moist, soft, sandy CLAY,with trace gravel

Bottom of Boring at 10.0 ft

0.9

1.5

7.5

10.0

11-17-14

9-11-12

2-3-2

1-2-2

DS

DS

DS

DS

1

2

3

4

I/D

I/D

I/D

I

14

14

8

12

14.2

13.6

7.6

5.1

140 lb

30 in

SAMPLER TYPE

BORING & SAMPLENOTES

Hammer Drop

Hammer Wt.

SAMPLE CONDITIONS

Hole Diameter

Spoon Size Boring Method

Rock Core Dia.

----

HSA

RECORD OF SOIL / ROCK EXPLORATION

N/A

8 in

SAMPLER

DISINTEGRATEDINTACTUNDISTURBEDLOST

----

DRIVEN SPLIT SPOONPRESSED SHELBY TUBECONTINUOUS FLIGHT AUGERROCK CORE

SAMPLE

DIUL

2 in

DSPTCARC

STANDARD PENETRATION TEST DRIVING 2" OD SAMPLER 1' WITH 140# HAMMER FALLING 30": COUNT MADE AT 6" INTERVALS

5

10

15

20

DE

PT

HS

CA

LE

SO

ILS

YM

BO

L

2/12/15Date Started

Datum15.1 ft

HRS.

7.7

ftft

ftft

Dry

AFTER 24 HRS.AFTERAT COMPLETION

CAVED AT

STRADEPTH

(ft)

SOIL DESCRIPTIONColor, Moisture, Density, Plasticity, Size

Proportions

Surf. Elev.

Date Completed

Inspector

ForemanE. Mathew

2/12/15

T.Mancuso

HSACFADCMD

GROUNDWATER DEPTH BORING METHOD----

HOLLOW STEM AUGERSCONTINUOUS FLIGHT AUGERSDRIVING CASINGMUD DRILLING

Page 1 of 1

Job #

Boring #

Location

Project Name

Contracted With C-24

14-00034

Crawford Murphy and Tilly, Inc

MWAA 1-07-C266: Taxiways K, P and B Rehabilitation

Ronald Reagan Washington National Airport (DCA), Washington, DC

ELEV.(ft)

RE

CO

RD

OF

SO

IL E

XP

LOR

AT

ION

- W

SS

C B

OR

ING

LO

GS

.GP

J P

RO

JEC

T.G

DT

4/3

0/15

Blows/6" TypeNo. Rec(in)Cond

Attachment 2, Page 55 of 211

Page 44: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

The Robert B. Balter Company 16879-0 rpt_r2

APPENDIX B

LABORATORY TEST RESULTS

Page 45: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

0

10

20

30

40

50

60

0 20 40 60 80 100

ML

CL

MH

CH

Specimen Identification

CL-ML

PLASTICITY

INDEX

LIQUID LIMIT

ATTERBERG LIMITS' RESULTS

77

84

82

98

65

24

13

12

12

14

85

97

98

29

Gray SILT with Sand (ML)

Gray CLAY with Sand (CL) (Fill)

Gray SILT with Sand (ML) (Fill)

Dark Gray Elastic SILT (MH)

Brownish Gray Sandy SILT (ML)

Gray Silty, Clayey SAND (SC-SM) (Fill)

Gray Silty SAND with Gravel (SM) (Fill)

Brown Gray Silty SAND with Rock Fragments (SM) (Fill)

Gray Poorly Graded SAND with Clay and Gravel (SP-SC) (Fill)

Brown Silty SAND (SM) (Fill)

Gray Elastic SILT with Sand (MH)

Gray SILT (ML) (Fill)

Gray Elastic SILT (MH)

Brown Clayey SAND with Gravel (SC) (Fill)

Fines ClassificationLL PIPL

30

25

33

33

26

21

NP

NP

18

NP

36

29

32

17

TEST METHOD ASTM D4318

B-1, S-5 @ 14.0' - 15.5',

B-10, S-1 @ 1.5' - 3.0',

B-12, T-1 @ 6.0' - 8.0',

B-12, S-4 @ 14.0' - 15.5',

B-15, S-4 @ 8.0' - 9.5',

B-16, BULK @ 1.0' - 6.0',

B-16, T-1 @ 4.0' - 6.0',

B-21, BULK @ 2.0' - 6.0',

B-22, BULK @ 2.0' - 6.0',

B-23, BULK @ 2.0' - 6.0',

B-4, S-5 @ 14.0' - 15.5',

B-5, T-1 @ 6.0' - 8.0',

B-5, S-4 @ 14.0' - 15.5',

B-7, BULK @ 1.0' - 6.0',

37

39

47

54

33

26

NP

NP

27

NP

58

45

50

31

7

14

14

21

7

5

NP

NP

9

NP

22

16

18

14

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

AT

TE

RB

ER

G L

IMIT

S 1

6879

-0 D

CA

TA

XIW

AY

B H

OLD

AP

RO

N.G

PJ

RO

BE

RT

B B

ALT

ER

.GD

T 1

2/29

/17

The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 46: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

0

10

20

30

40

50

60

0 20 40 60 80 100

CL-ML

PLASTICITY

INDEX

LIQUID LIMIT

Dark Yellowish Brown SILTY, CLAYEY SAND(SC-SM) {A-4, GI=0}

Brown SILT(ML) {A-6, GI=13}

Very Dark Gray ELASTIC SILT(MH) {A-7-5, GI=22}

ML

CL

ATTERBERG LIMITS' RESULTS

41

98

87

Fines ClassificationLL PIPL

TEST METHOD ASTM D4318

B-25, BULK @ 0.0' - 5.5',

B-25, T-1 @ 8.0' - 10.0',

B-25, S-8 @ 29.0' - 30.5',

20

39

58

6

11

19

MH

CH

Specimen Identification

14

28

39

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA DATE TESTEDPROJECT NUMBER 16879-0: VA

AT

TE

RB

ER

G A

ST

M A

AS

HT

O

1687

9-0

DC

A T

AX

IWA

Y B

HO

LD A

PR

ON

.GP

J M

TA

RE

DLI

NE

.GD

T

3/27

/18

The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 47: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

0

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

0.0010.010.1110100

PLLL

730

B-1, S-5 @ 14.0' - 15.5',

%Clay%Silt%Sand%GravelD10D30

1 2006 10 501.5 8 14

GRAIN SIZE DISTRIBUTION

COBBLESGRAVEL

PE

RC

EN

T F

INE

R B

Y W

EIG

HT

3 10024 16 30

SAND

GRAIN SIZE IN MILLIMETERS

coarse

D100 D6076.9

fine coarseSILT OR CLAY

finemedium

1403 4 20 406 60

Classification Cu

4.75 0.0 23.1

CcPI

1/2HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS

37

Specimen Identification

Specimen Identification

3/4 3/8

B-1, S-5 @ 14.0' - 15.5', Gray SILT with Sand (ML)

TEST METHOD ASTM D422

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

GR

AIN

SIZ

E 1

6879

-0 D

CA

TA

XIW

AY

B H

OLD

AP

RO

N.G

PJ

RO

BE

RT

B B

ALT

ER

.GD

T 1

2/29

/17

The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 48: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

0

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

0.0010.010.1110100

PLLL

1425

B-10, S-1 @ 1.5' - 3.0',

%Clay%Silt%Sand%GravelD10D30

1 2006 10 501.5 8 14

GRAIN SIZE DISTRIBUTION

COBBLESGRAVEL

PE

RC

EN

T F

INE

R B

Y W

EIG

HT

3 10024 16 30

SAND

GRAIN SIZE IN MILLIMETERS

coarse

D100 D6084.2

fine coarseSILT OR CLAY

finemedium

1403 4 20 406 60

Classification Cu

4.75 0.0 15.8

CcPI

1/2HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS

39

Specimen Identification

Specimen Identification

3/4 3/8

B-10, S-1 @ 1.5' - 3.0', Gray CLAY with Sand (CL) (Fill)

TEST METHOD ASTM D422

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

GR

AIN

SIZ

E 1

6879

-0 D

CA

TA

XIW

AY

B H

OLD

AP

RO

N.G

PJ

RO

BE

RT

B B

ALT

ER

.GD

T 1

2/29

/17

The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 49: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

0

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

0.0010.010.1110100

PLLL

1433

B-12, T-1 @ 6.0' - 8.0',

%Clay%Silt%Sand%GravelD10D30

1 2006 10 501.5 8 14

GRAIN SIZE DISTRIBUTION

COBBLESGRAVEL

PE

RC

EN

T F

INE

R B

Y W

EIG

HT

3 10024 16 30

SAND

GRAIN SIZE IN MILLIMETERS

coarse

D100 D6081.6

fine coarseSILT OR CLAY

finemedium

1403 4 20 406 60

Classification Cu

4.75 0.0 18.4

CcPI

1/2HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS

47

Specimen Identification

Specimen Identification

3/4 3/8

B-12, T-1 @ 6.0' - 8.0', Gray SILT with Sand (ML) (Fill)

TEST METHOD ASTM D422

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

GR

AIN

SIZ

E 1

6879

-0 D

CA

TA

XIW

AY

B H

OLD

AP

RO

N.G

PJ

RO

BE

RT

B B

ALT

ER

.GD

T 1

2/29

/17

The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 50: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

0

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

0.0010.010.1110100

PLLL

2133

B-12, S-4 @ 14.0' - 15.5',

%Clay%Silt%Sand%GravelD10D30

1 2006 10 501.5 8 14

GRAIN SIZE DISTRIBUTION

COBBLESGRAVEL

PE

RC

EN

T F

INE

R B

Y W

EIG

HT

3 10024 16 30

SAND

GRAIN SIZE IN MILLIMETERS

coarse

D100 D6097.7

fine coarseSILT OR CLAY

finemedium

1403 4 20 406 60

Classification Cu

2 0.0 2.3

CcPI

1/2HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS

54

Specimen Identification

Specimen Identification

3/4 3/8

B-12, S-4 @ 14.0' - 15.5', Dark Gray Elastic SILT (MH)

TEST METHOD ASTM D422

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

GR

AIN

SIZ

E 1

6879

-0 D

CA

TA

XIW

AY

B H

OLD

AP

RO

N.G

PJ

RO

BE

RT

B B

ALT

ER

.GD

T 1

2/29

/17

The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 51: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

0

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

0.0010.010.1110100

PLLL

726

B-15, S-4 @ 8.0' - 9.5',

%Clay%Silt%Sand%GravelD10D30

1 2006 10 501.5 8 14

GRAIN SIZE DISTRIBUTION

COBBLESGRAVEL

PE

RC

EN

T F

INE

R B

Y W

EIG

HT

3 10024 16 30

SAND

GRAIN SIZE IN MILLIMETERS

coarse

D100 D6065.0

fine coarseSILT OR CLAY

finemedium

1403 4 20 406 60

Classification Cu

4.75 0.0 35.0

CcPI

1/2HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS

33

Specimen Identification

Specimen Identification

3/4 3/8

B-15, S-4 @ 8.0' - 9.5', Brownish Gray Sandy SILT (ML)

TEST METHOD ASTM D422

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

GR

AIN

SIZ

E 1

6879

-0 D

CA

TA

XIW

AY

B H

OLD

AP

RO

N.G

PJ

RO

BE

RT

B B

ALT

ER

.GD

T 1

2/29

/17

The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 52: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

0

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

0.0010.010.1110100

0.459

PLLL

521

B-16, BULK @ 1.0' - 6.0',

%Clay%Silt%Sand%GravelD10D30

1 2006 10 501.5 8 14

GRAIN SIZE DISTRIBUTION

COBBLESGRAVEL

PE

RC

EN

T F

INE

R B

Y W

EIG

HT

3 10024 16 30

SAND

GRAIN SIZE IN MILLIMETERS

coarse

D100 D6024.2

fine coarseSILT OR CLAY

finemedium

1403 4 20 406 60

Classification Cu

19 0.133 7.8 68.0

CcPI

1/2HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS

26

Specimen Identification

Specimen Identification

3/4 3/8

B-16, BULK @ 1.0' - 6.0', Gray Silty, Clayey SAND (SC-SM) (Fill)

TEST METHOD ASTM D422

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

GR

AIN

SIZ

E 1

6879

-0 D

CA

TA

XIW

AY

B H

OLD

AP

RO

N.G

PJ

RO

BE

RT

B B

ALT

ER

.GD

T 1

2/29

/17

The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 53: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

0

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

0.0010.010.1110100

0.501

PLLL

NPNP

B-16, T-1 @ 4.0' - 6.0',

%Clay%Silt%Sand%GravelD10D30

1 2006 10 501.5 8 14

GRAIN SIZE DISTRIBUTION

COBBLESGRAVEL

PE

RC

EN

T F

INE

R B

Y W

EIG

HT

3 10024 16 30

SAND

GRAIN SIZE IN MILLIMETERS

coarse

D100 D6013.4

fine coarseSILT OR CLAY

finemedium

1403 4 20 406 60

Classification Cu

37.5 0.247 13.0 73.6

CcPI

1/2HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS

NP

Specimen Identification

Specimen Identification

3/4 3/8

B-16, T-1 @ 4.0' - 6.0', Gray Silty SAND with Gravel (SM) (Fill)

TEST METHOD ASTM D422

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

GR

AIN

SIZ

E 1

6879

-0 D

CA

TA

XIW

AY

B H

OLD

AP

RO

N.G

PJ

RO

BE

RT

B B

ALT

ER

.GD

T 1

2/29

/17

The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 54: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

0

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

0.0010.010.1110100

4.959

PLLL

NPNP

B-21, BULK @ 2.0' - 6.0',

%Clay

96.11

%Silt%Sand%GravelD10D30

1 2006 10 501.5 8 14

GRAIN SIZE DISTRIBUTION

COBBLESGRAVEL

PE

RC

EN

T F

INE

R B

Y W

EIG

HT

3 10024 16 30

SAND

GRAIN SIZE IN MILLIMETERS

coarse

D100 D6012.1

fine coarseSILT OR CLAY

finemedium

1403 4 20 406 60

Classification Cu

37.5 0.419 41.0 46.9

CcPI

1/2HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS

NP

Specimen Identification

Specimen Identification

3/4 3/8

B-21, BULK @ 2.0' - 6.0', 0.69Brown Gray Silty SAND with Rock Fragments (SM) (Fill)

TEST METHOD ASTM D422

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

GR

AIN

SIZ

E 1

6879

-0 D

CA

TA

XIW

AY

B H

OLD

AP

RO

N.G

PJ

RO

BE

RT

B B

ALT

ER

.GD

T 1

2/29

/17

The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 55: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

0

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

0.0010.010.1110100

1.061

PLLL

918

B-22, BULK @ 2.0' - 6.0',

%Clay

23.38

%Silt%Sand%GravelD10D30

1 2006 10 501.5 8 14

GRAIN SIZE DISTRIBUTION

COBBLESGRAVEL

PE

RC

EN

T F

INE

R B

Y W

EIG

HT

3 10024 16 30

SAND

GRAIN SIZE IN MILLIMETERS

coarse

D100 D6012.0

fine coarseSILT OR CLAY

finemedium

1403 4 20 406 60

Classification Cu

50 0.445 27.9 60.1

CcPI

1/2HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS

27

Specimen Identification

Specimen Identification

3/4 3/8

B-22, BULK @ 2.0' - 6.0', 4.11Gray Poorly Graded SAND with Clay and Gravel (SP-SC) (Fill)

TEST METHOD ASTM D422

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

GR

AIN

SIZ

E 1

6879

-0 D

CA

TA

XIW

AY

B H

OLD

AP

RO

N.G

PJ

RO

BE

RT

B B

ALT

ER

.GD

T 1

2/29

/17

The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 56: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

0

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

0.0010.010.1110100

0.731

PLLL

NPNP

B-23, BULK @ 2.0' - 6.0',

%Clay%Silt%Sand%GravelD10D30

1 2006 10 501.5 8 14

GRAIN SIZE DISTRIBUTION

COBBLESGRAVEL

PE

RC

EN

T F

INE

R B

Y W

EIG

HT

3 10024 16 30

SAND

GRAIN SIZE IN MILLIMETERS

coarse

D100 D6013.5

fine coarseSILT OR CLAY

finemedium

1403 4 20 406 60

Classification Cu

19 0.319 12.8 73.7

CcPI

1/2HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS

NP

Specimen Identification

Specimen Identification

3/4 3/8

B-23, BULK @ 2.0' - 6.0', Brown Silty SAND (SM) (Fill)

TEST METHOD ASTM D422

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

GR

AIN

SIZ

E 1

6879

-0 D

CA

TA

XIW

AY

B H

OLD

AP

RO

N.G

PJ

RO

BE

RT

B B

ALT

ER

.GD

T 1

2/29

/17

The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 57: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

0

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

0.0010.010.1110100

PLLL

2236

B-4, S-5 @ 14.0' - 15.5',

%Clay%Silt%Sand%GravelD10D30

1 2006 10 501.5 8 14

GRAIN SIZE DISTRIBUTION

COBBLESGRAVEL

PE

RC

EN

T F

INE

R B

Y W

EIG

HT

3 10024 16 30

SAND

GRAIN SIZE IN MILLIMETERS

coarse

D100 D6084.6

fine coarseSILT OR CLAY

finemedium

1403 4 20 406 60

Classification Cu

4.75 0.0 15.4

CcPI

1/2HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS

58

Specimen Identification

Specimen Identification

3/4 3/8

B-4, S-5 @ 14.0' - 15.5', Gray Elastic SILT with Sand (MH)

TEST METHOD ASTM D422

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

GR

AIN

SIZ

E 1

6879

-0 D

CA

TA

XIW

AY

B H

OLD

AP

RO

N.G

PJ

RO

BE

RT

B B

ALT

ER

.GD

T 1

2/29

/17

The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 58: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

0

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

0.0010.010.1110100

PLLL

1629

B-5, T-1 @ 6.0' - 8.0',

%Clay%Silt%Sand%GravelD10D30

1 2006 10 501.5 8 14

GRAIN SIZE DISTRIBUTION

COBBLESGRAVEL

PE

RC

EN

T F

INE

R B

Y W

EIG

HT

3 10024 16 30

SAND

GRAIN SIZE IN MILLIMETERS

coarse

D100 D6097.1

fine coarseSILT OR CLAY

finemedium

1403 4 20 406 60

Classification Cu

2 2.9

CcPI

1/2HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS

45

Specimen Identification

Specimen Identification

3/4 3/8

B-5, T-1 @ 6.0' - 8.0', Gray SILT (ML) (Fill)

TEST METHOD ASTM D422

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

GR

AIN

SIZ

E 1

6879

-0 D

CA

TA

XIW

AY

B H

OLD

AP

RO

N.G

PJ

RO

BE

RT

B B

ALT

ER

.GD

T 1

2/29

/17

The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 59: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

0

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

0.0010.010.1110100

PLLL

1832

B-5, S-4 @ 14.0' - 15.5',

%Clay%Silt%Sand%GravelD10D30

1 2006 10 501.5 8 14

GRAIN SIZE DISTRIBUTION

COBBLESGRAVEL

PE

RC

EN

T F

INE

R B

Y W

EIG

HT

3 10024 16 30

SAND

GRAIN SIZE IN MILLIMETERS

coarse

D100 D6098.1

fine coarseSILT OR CLAY

finemedium

1403 4 20 406 60

Classification Cu

2 0.0 1.9

CcPI

1/2HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS

50

Specimen Identification

Specimen Identification

3/4 3/8

B-5, S-4 @ 14.0' - 15.5', Gray Elastic SILT (MH)

TEST METHOD ASTM D422

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

GR

AIN

SIZ

E 1

6879

-0 D

CA

TA

XIW

AY

B H

OLD

AP

RO

N.G

PJ

RO

BE

RT

B B

ALT

ER

.GD

T 1

2/29

/17

The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 60: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

0

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

0.0010.010.1110100

0.716

PLLL

1417

B-7, BULK @ 1.0' - 6.0',

%Clay%Silt%Sand%GravelD10D30

1 2006 10 501.5 8 14

GRAIN SIZE DISTRIBUTION

COBBLESGRAVEL

PE

RC

EN

T F

INE

R B

Y W

EIG

HT

3 10024 16 30

SAND

GRAIN SIZE IN MILLIMETERS

coarse

D100 D6028.7

fine coarseSILT OR CLAY

finemedium

1403 4 20 406 60

Classification Cu

19 0.089 19.0 52.3

CcPI

1/2HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS

31

Specimen Identification

Specimen Identification

3/4 3/8

B-7, BULK @ 1.0' - 6.0', Brown Clayey SAND with Gravel (SC) (Fill)

TEST METHOD ASTM D422

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

GR

AIN

SIZ

E 1

6879

-0 D

CA

TA

XIW

AY

B H

OLD

AP

RO

N.G

PJ

RO

BE

RT

B B

ALT

ER

.GD

T 1

2/29

/17

The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 61: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

0

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

0.0010.010.1110100

Cu

47.610.90.22619

CcPIPL

HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS1.54 16 30

%Clay%Silt%Sand%GravelD10D30

41.5

1 2006 10 501/2 8

Classification

COBBLESGRAVEL

PE

RC

EN

T F

INE

R B

Y W

EIG

HT

143 1002

finemedium

1403 4 20 406 60

61420

Specimen Identification

Specimen Identification

3/4

SAND

GRAIN SIZE IN MILLIMETERS

coarse

D100 D60

fine coarseSILT OR CLAY

LL

3/8

TEST METHOD ASTM D422GRAIN SIZE DISTRIBUTION

Dark Yellowish Brown SILTY, CLAYEY SAND(SC-SM) {A-4, GI=0}B-25, BULK

B-25, BULK

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA DATE TESTEDPROJECT NUMBER 16879-0: VA

CO

PY

OF

GR

AIN

SIZ

E A

ST

M A

ND

AA

SH

TO

16

879

-0 D

CA

TA

XIW

AY

B H

OLD

AP

RO

N.G

PJ

MT

A R

ED

LIN

E.G

DT

3/

27/1

8The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 62: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

0

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

0.0010.010.1110100

Cu

2.20.02

CcPIPL

HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS1.54 16 30

%Clay%Silt%Sand%GravelD10D30

97.8

1 2006 10 501/2 8

Classification

COBBLESGRAVEL

PE

RC

EN

T F

INE

R B

Y W

EIG

HT

143 1002

finemedium

1403 4 20 406 60

112839

Specimen Identification

Specimen Identification

3/4

SAND

GRAIN SIZE IN MILLIMETERS

coarse

D100 D60

fine coarseSILT OR CLAY

LL

3/8

TEST METHOD ASTM D422GRAIN SIZE DISTRIBUTION

Brown SILT(ML) {A-6, GI=13}B-25, T-1

B-25, T-1

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA DATE TESTEDPROJECT NUMBER 16879-0: VA

CO

PY

OF

GR

AIN

SIZ

E A

ST

M A

ND

AA

SH

TO

16

879

-0 D

CA

TA

XIW

AY

B H

OLD

AP

RO

N.G

PJ

MT

A R

ED

LIN

E.G

DT

3/

27/1

8The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 63: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

0

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

0.0010.010.1110100

Cu

13.10.04.75

CcPIPL

HYDROMETERU.S. SIEVE OPENING IN INCHES U.S. SIEVE NUMBERS1.54 16 30

%Clay%Silt%Sand%GravelD10D30

86.9

1 2006 10 501/2 8

Classification

COBBLESGRAVEL

PE

RC

EN

T F

INE

R B

Y W

EIG

HT

143 1002

finemedium

1403 4 20 406 60

193958

Specimen Identification

Specimen Identification

3/4

SAND

GRAIN SIZE IN MILLIMETERS

coarse

D100 D60

fine coarseSILT OR CLAY

LL

3/8

TEST METHOD ASTM D422GRAIN SIZE DISTRIBUTION

Very Dark Gray ELASTIC SILT(MH) {A-7-5, GI=22}B-25, S-8

B-25, S-8

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA DATE TESTEDPROJECT NUMBER 16879-0: VA

CO

PY

OF

GR

AIN

SIZ

E A

ST

M A

ND

AA

SH

TO

16

879

-0 D

CA

TA

XIW

AY

B H

OLD

AP

RO

N.G

PJ

MT

A R

ED

LIN

E.G

DT

3/

27/1

8The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 64: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

95

97

99

101

103

105

107

109

111

113

115

117

119

121

123

125

127

129

131

133

135

137

139

141

143

145

0 5 10 15 20 25 30

MOISTURE-DENSITY RELATIONSHIP

LL PL

DR

Y D

EN

SIT

Y,

pcf

WATER CONTENT, %

ATTERBERG LIMITS

Curves of 100% Saturationfor Specific Gravity Equal to:

2.80

2.70

2.60

16879-0-004

18.5 %

132.1

8.5

2126PI5

Test Method AASHTO T-180 Method D

PCF

%

Source of Material

Description of Material

Curve Number

TEST RESULTS

Maximum Dry Density

Optimum Water ContentNatural Water Content

Gray Silty, Clayey SAND (SC-SM) (Fill)

B-16, BULK @ 1.0' - 6.0',

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

CO

MP

AC

TIO

N 1

6879

-0 D

CA

TA

XIW

AY

B H

OLD

AP

RO

N.G

PJ

RO

BE

RT

B B

ALT

ER

.GD

T 1

2/29

/17

The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 65: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

95

97

99

101

103

105

107

109

111

113

115

117

119

121

123

125

127

129

131

133

135

137

139

141

143

145

0 5 10 15 20 25 30

MOISTURE-DENSITY RELATIONSHIP

LL PL

DR

Y D

EN

SIT

Y,

pcf

WATER CONTENT, %

ATTERBERG LIMITS

Curves of 100% Saturationfor Specific Gravity Equal to:

2.80

2.70

2.60

16879-0-003

6.8 %

139.9

5.4

NPNPPINP

Test Method AASHTO T-180 Method D

PCF

%

Source of Material

Description of Material

Curve Number

TEST RESULTS

Maximum Dry Density

Optimum Water ContentNatural Water Content

Brown Gray Silty SAND with Rock

Fragments (SM) (Fill)

B-21, BULK @ 2.0' - 6.0',

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

CO

MP

AC

TIO

N 1

6879

-0 D

CA

TA

XIW

AY

B H

OLD

AP

RO

N.G

PJ

RO

BE

RT

B B

ALT

ER

.GD

T 1

2/29

/17

The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 66: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

95

97

99

101

103

105

107

109

111

113

115

117

119

121

123

125

127

129

131

133

135

137

139

141

143

145

0 5 10 15 20 25 30

MOISTURE-DENSITY RELATIONSHIP

LL PL

DR

Y D

EN

SIT

Y,

pcf

WATER CONTENT, %

ATTERBERG LIMITS

Curves of 100% Saturationfor Specific Gravity Equal to:

2.80

2.70

2.60

16879-0-001

8.9 %

133.9

7.0

1827PI9

Test Method AASHTO T-180 Method D

PCF

%

Source of Material

Description of Material

Curve Number

TEST RESULTS

Maximum Dry Density

Optimum Water ContentNatural Water Content

Gray Poorly Graded SAND with Clay and

Gravel (SP-SC) (Fill)

B-22, BULK @ 2.0' - 6.0',

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

CO

MP

AC

TIO

N 1

6879

-0 D

CA

TA

XIW

AY

B H

OLD

AP

RO

N.G

PJ

RO

BE

RT

B B

ALT

ER

.GD

T 1

2/29

/17

The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 67: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

95

97

99

101

103

105

107

109

111

113

115

117

119

121

123

125

127

129

131

133

135

137

139

141

143

145

0 5 10 15 20 25 30

MOISTURE-DENSITY RELATIONSHIP

LL PL

DR

Y D

EN

SIT

Y,

pcf

WATER CONTENT, %

ATTERBERG LIMITS

Curves of 100% Saturationfor Specific Gravity Equal to:

2.80

2.70

2.60

16879-0-002

4.9 %

132.6

7.5

NPNPPINP

Test Method AASHTO T-180 Method D

PCF

%

Source of Material

Description of Material

Curve Number

TEST RESULTS

Maximum Dry Density

Optimum Water ContentNatural Water Content

Brown Silty SAND (SM) (Fill)

B-23, BULK @ 2.0' - 6.0',

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

CO

MP

AC

TIO

N 1

6879

-0 D

CA

TA

XIW

AY

B H

OLD

AP

RO

N.G

PJ

RO

BE

RT

B B

ALT

ER

.GD

T 1

2/29

/17

The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 68: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

95

97

99

101

103

105

107

109

111

113

115

117

119

121

123

125

127

129

131

133

135

137

139

141

143

145

0 5 10 15 20 25 30

MOISTURE-DENSITY RELATIONSHIP

LL PL

DR

Y D

EN

SIT

Y,

pcf

WATER CONTENT, %

ATTERBERG LIMITS

Curves of 100% Saturationfor Specific Gravity Equal to:

2.80

2.70

2.60

16879-0-005

13.0 %

134.4

8.2

1731PI14

Test Method AASHTO T-180 Method D

PCF

%

Source of Material

Description of Material

Curve Number

TEST RESULTS

Maximum Dry Density

Optimum Water ContentNatural Water Content

Brown Clayey SAND with Gravel (SC) (Fill)

B-7, BULK @ 1.0' - 6.0',

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

CO

MP

AC

TIO

N 1

6879

-0 D

CA

TA

XIW

AY

B H

OLD

AP

RO

N.G

PJ

RO

BE

RT

B B

ALT

ER

.GD

T 1

2/29

/17

The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 69: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

75

80

85

90

95

100

105

110

115

120

125

130

135

140

145

150

0 5 10 15 20 25 30 35 40 45

MOISTURE-DENSITY RELATIONSHIP

LL PL

DR

Y D

EN

SIT

Y,

pcf

WATER CONTENT, %

ATTERBERG LIMITS

Curves of 100% Saturationfor Specific Gravity Equal to:

2.80

2.70

2.60

16879-0-006

11.0 %

130.0

8.5

1420PI6

Test Method AASHTO T-180 Method C

PCF

%

Source of Material

Description of Material

Curve Number

TEST RESULTS

Maximum Dry Density

Optimum Water ContentNatural Water Content

Dark Yellowish Brown SILTY, CLAYEY

SAND(SC-SM)

B-25, BULK @ 0.0' - 5.5',

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA DATE TESTEDPROJECT NUMBER 16879-0: VA

CO

MP

AC

TIO

N 1

6879

-0 D

CA

TA

XIW

AY

B H

OLD

AP

RO

N.G

PJ

MT

A R

ED

LIN

E.G

DT

3/2

7/1

8The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 70: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

BEARING RATIO TEST REPORTASTM D 1883-07

BEARING RATIO TEST REPORT

The Robert B. Balter Company

Project No: 16879-0 MD

Project: Taxiway B HOLD Apron Reconstruction

Source of Sample: CBR Depth: 1.0' - 6.0'

Sample Number: B-7

Date:

Dark Brown Clayey SAND with Gravel

Test Description/Remarks:

AASHTO T 180 Method DThree Point Soaked CBR

Figure

134.4 8.2 31 14SC

Material DescriptionUSCS

Max.

Dens.

(pcf)

Optimum

Moisture

(%)

LL PI

Molded

Density

(pcf)

Percent of

Max. Dens.

Moisture

(%)

Soaked

Density

(pcf)

Percent of

Max. Dens.

Moisture

(%)

CBR (%)

0.10 in. 0.20 in.

Linearity

Correction

(in.)

Surcharge

(lbs.)

Max.

Swell

(%)

1 133.8 99.6 8.2 133.4 99.2 8.9 76.2 72.6 0.029 10 0.4

2 129.0 96 8.2 128.8 95.8 10.7 52.7 51.8 0.020 10 0.2

3 121.2 90.2 8.2 120.8 89.9 12.7 12.8 11.8 0.003 10 0.3

Pen

etr

ati

on

Resis

tan

ce (

psi)

0

300

600

900

1200

1500

Penetration Depth (in.)

0 0.1 0.2 0.3 0.4 0.5

Sw

ell (

%)

0

0.1

0.2

0.3

0.4

0.5

Elapsed Time (hrs)

0 24 48 72 96

CB

R (

%)

0

25

50

75

100

Molded Density (pcf)

116 120 124 128 132 136

65 blows

30 blows

10 blows

CBR at 95% Max. Density = 46.2%

for 0.10 in. Penetration

Page 71: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

BEARING RATIO TEST REPORTASTM D 1883-07

BEARING RATIO TEST REPORT

The Robert B. Balter Company

Project No: 16879-0 MD

Project: Taxiway B HOLD Apron Reconstruction

Source of Sample: CBR Depth: 1.0' - 6.0'

Sample Number: B-16

Date:

Brown Silty, Clayey SAND

Test Description/Remarks:

AASHTO T-180 Method CThree Point soaked CBR

Figure

132.1 8.5 26 5SC-SM

Material DescriptionUSCS

Max.

Dens.

(pcf)

Optimum

Moisture

(%)

LL PI

Molded

Density

(pcf)

Percent of

Max. Dens.

Moisture

(%)

Soaked

Density

(pcf)

Percent of

Max. Dens.

Moisture

(%)

CBR (%)

0.10 in. 0.20 in.

Linearity

Correction

(in.)

Surcharge

(lbs.)

Max.

Swell

(%)

1 133.0 100.7 8.4 132.5 100.3 9.2 66.0 82.8 0.065 10 0.4

2 127.2 96.3 8.5 127.1 96.2 8.6 42.3 51.4 0.029 10 0.2

3 119.2 90.2 8.4 118.8 90 12.1 14.0 13.8 0.007 10 0.3

Pen

etr

ati

on

Resis

tan

ce (

psi)

0

300

600

900

1200

1500

Penetration Depth (in.)

0 0.1 0.2 0.3 0.4 0.5

Sw

ell (

%)

0

0.1

0.2

0.3

0.4

0.5

Elapsed Time (hrs)

0 24 48 72 96

CB

R (

%)

0

25

50

75

100

Molded Density (pcf)

115 120 125 130 135 140

65 blows

30 blows

10 blows

CBR at 98% Max. Density = 51.2%

for 0.10 in. Penetration

Page 72: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

BEARING RATIO TEST REPORTASTM D 1883-07

BEARING RATIO TEST REPORT

The Robert B. Balter Company

Project No: 16879-0 MD

Project: Taxiway B HOLD Apron Reconstruction

Source of Sample: CBR Depth: 2.0' - 6.0'

Sample Number: B-21

Date:

Brown Silty SAND with Gravel

Test Description/Remarks:

AASHTO T 180 Method DThree Point Soaked CBR

Figure

139.9 5.4 NP NPSM

Material DescriptionUSCS

Max.

Dens.

(pcf)

Optimum

Moisture

(%)

LL PI

Molded

Density

(pcf)

Percent of

Max. Dens.

Moisture

(%)

Soaked

Density

(pcf)

Percent of

Max. Dens.

Moisture

(%)

CBR (%)

0.10 in. 0.20 in.

Linearity

Correction

(in.)

Surcharge

(lbs.)

Max.

Swell

(%)

1 125.0 89.3 5.3 124.6 89.1 10.0 8.1 8.0 0.006 10 0.3

2 132.4 94.6 5.3 132.3 94.6 7.3 34.7 40.8 0.011 10 0

3 134.7 96.3 5.4 134.7 96.3 7.1 46.8 63.7 0.041 10 0

Pen

etr

ati

on

Resis

tan

ce (

psi)

0

300

600

900

1200

1500

Penetration Depth (in.)

0 0.1 0.2 0.3 0.4 0.5

Sw

ell (

%)

0

0.1

0.2

0.3

0.4

0.5

Elapsed Time (hrs)

0 24 48 72 96

CB

R (

%)

0

15

30

45

60

Molded Density (pcf)

124 127 130 133 136 139

10 blows

30 blows

65 blows

CBR at 95% Max. Density = 37.2%

for 0.10 in. Penetration

Page 73: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

BEARING RATIO TEST REPORTASTM D 1883-07

BEARING RATIO TEST REPORT

The Robert B. Balter Company

Project No: 16879-0 MD

Project: Taxiway B HOLD Apron Reconstruction

Source of Sample: CBR Depth: 2.0' - 6.0'

Sample Number: B-22

Date:

Dark Brownish Gray Poorly Graded SAND with Clay and Gravel

Test Description/Remarks:

Figure

133.9 7.0 27 9SP-SC

Material DescriptionUSCS

Max.

Dens.

(pcf)

Optimum

Moisture

(%)

LL PI

Molded

Density

(pcf)

Percent of

Max. Dens.

Moisture

(%)

Soaked

Density

(pcf)

Percent of

Max. Dens.

Moisture

(%)

CBR (%)

0.10 in. 0.20 in.

Linearity

Correction

(in.)

Surcharge

(lbs.)

Max.

Swell

(%)

1 120.1 89.7 6.8 120.0 89.6 11.7 11.7 10.7 0.022 10 0.1

2 129.3 96.6 7.3 129.2 96.5 9.2 43.6 50.5 0.010 10 0.1

3 135.8 101.4 7.0 135.8 101.4 6.7 67.0 82.1 0.061 10 0

Pen

etr

ati

on

Resis

tan

ce (

psi)

0

300

600

900

1200

1500

Penetration Depth (in.)

0 0.1 0.2 0.3 0.4 0.5

Sw

ell (

%)

0

0.1

0.2

0.3

0.4

0.5

Elapsed Time (hrs)

0 24 48 72 96

CB

R (

%)

0

20

40

60

80

Molded Density (pcf)

115 120 125 130 135 140

10 blows

30 blows

65 blows

CBR at 95% Max. Density = 36.2%

for 0.10 in. Penetration

Page 74: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

BEARING RATIO TEST REPORTASTM D 1883-07

BEARING RATIO TEST REPORT

The Robert B. Balter Company

Project No: 16879-0 MD

Project: Taxiway B HOLD Apron Reconstruction

Source of Sample: CBR Depth: 2.0' - 6.0'

Sample Number: B-23

Date:

Grayish Brown Silty SAND

Test Description/Remarks:

AASHTO T 180 Method CThree Point Soaked CBR

Figure

132.6 NP NPSM

Material DescriptionUSCS

Max.

Dens.

(pcf)

Optimum

Moisture

(%)

LL PI

Molded

Density

(pcf)

Percent of

Max. Dens.

Moisture

(%)

Soaked

Density

(pcf)

Percent of

Max. Dens.

Moisture

(%)

CBR (%)

0.10 in. 0.20 in.

Linearity

Correction

(in.)

Surcharge

(lbs.)

Max.

Swell

(%)

1 117.0 88.2 7.5 117.0 88.2 14.4 5.3 7.0 0.000 10 0

2 124.6 94 7.2 124.6 94 10.6 31.5 39.8 0.018 10 0

3 130.2 98.2 6.0 130.2 98.2 9.1 60.3 76.9 0.020 10 0

Pen

etr

ati

on

Resis

tan

ce (

psi)

0

300

600

900

1200

1500

Penetration Depth (in.)

0 0.1 0.2 0.3 0.4 0.5

CB

R (

%)

0

20

40

60

80

Molded Density (pcf)

110 115 120 125 130 135

10 blows

35 blows

75 blows

CBR at 95% Max. Density = 37.8%

for 0.10 in. Penetration

Page 75: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

B-1 4.0' - 5.5' S-2 56.7

B-1 6.0' - 7.5' S-3 47.0

B-1 8.5' - 10.0' S-4 65.4

B-1 14.0' - 15.5' S-5 37 30 7 4.75 77 ML 52.0

B-10 1.5' - 3.0' S-1 39 25 14 4.75 84 CL 42.5

B-10 3.0' - 5.0' S-2 41.7

B-10 6.0' - 7.5' S-3 49.9

B-12 2.0' - 3.5' S-1 7.1

B-12 4.0' - 5.5' S-2 57.5

B-12 6.0' - 8.0' T-1 47 33 14 4.75 82 ML 62.8

B-12 8.0' - 9.5' S-3 57.9

B-12 14.0' - 15.5' S-4 54 33 21 2 98 MH 56.1

B-12 19.0' 61.4

B-13 2.0' - 3.5' S-1 14.6

B-13 4.0' - 5.5' S-2 27.0

B-13 6.0' - 7.5' S-3 42.9

B-15 2.0' - 3.5' S-1 7.0

B-15 4.0' - 5.5' S-2 11.1

B-15 6.0' - 7.5' S-3 36.5

B-15 8.0' - 9.5' S-4 33 26 7 4.75 65 ML 40.7

B-16 1.0' - 6.0' BULK 26 21 5 19 24 SC-SM 18.5 132.1 8.5

B-16 2.0' - 3.5' S-1 8.8

B-16 4.0' - 6.0' T-1 NP NP NP 37.5 13 SM 11.2

B-17 2.0' - 3.5' S-1 2.4

B-17 4.0' - 5.5' S-2 3.2

B-17 6.0' - 7.5' S-3 6.2

B-18 2.0' - 3.5' S-1 13.5

B-18 4.0' - 5.5' S-2 5.6

B-18 6.0' - 7.5' S-3 10.7

B-18 8.5' - 10.0' S-4 11.5

B-18 14.0' - 15.5' S-5 9.1

B-19 2.0' - 3.5' S-1 12.2

B-19 4.0' - 5.5' S-2 6.0

B-19 6.0' - 8.0' T-1

B-21 2.0' - 6.0' BULK NP NP NP 37.5 12 SM 6.8 139.9 5.4

B-21 6.0' - 7.5' S-3 9.8

B-21 8.5' - 10.0' S-4 66.7

B-21 13.5' - 15.0' S-5 33.2

B-21 19.0' 61.4

B-22 2.0' - 6.0' BULK 27 18 9 50 12 SP-SC 8.9 133.9 7.0

B-23 2.0' - 6.0' BULK NP NP NP 19 14 SM 4.9 132.6 7.5

B-23 4.0' - 5.5' S-2 16.1

B-3 2.0' - 3.5' S-1 15.2

SampleNumber

LiquidLimit

PAGE 1 OF 2

WaterContent

(%)

Class-ification

%<#200Sieve

MaximumSize(mm)

PlasticityIndexBorehole

SUMMARY OF LABORATORY RESULTS

OptimumMoisture

(%)

PlasticLimitDepth CBR

Value

Max DryDensity

(pcf)

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

RK

&K

LA

B S

UM

MA

RIE

S 1

6879

-0 D

CA

TA

XIW

AY

B H

OLD

AP

RO

N.G

PJ

RO

BE

RT

B B

ALT

ER

.GD

T 1

2/29

/17

The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 76: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

B-3 4.0' - 5.5' S-2 40.8

B-3 6.0' - 8.0' T-1

B-3 8.0' - 9.5' S-4 60.9

B-4 2.0' - 3.5' S-1 58.4

B-4 4.0' - 5.5' S-2 8.7

B-4 6.0' - 7.5' S-3 33.6

B-4 8.0' - 9.5' S-4 24.1

B-4 14.0' - 15.5' S-5 58 36 22 4.75 85 MH 68.3

B-5 6.0' - 8.0' T-1 45 29 16 2 97 ML 54.4

B-5 14.0' - 15.5' S-4 50 32 18 2 98 MH 54.9

B-7 1.0' - 6.0' BULK 31 17 14 19 29 SC 13.0 134.4 8.2

SampleNumber

LiquidLimit

PAGE 2 OF 2

WaterContent

(%)

Class-ification

%<#200Sieve

MaximumSize(mm)

PlasticityIndexBorehole

SUMMARY OF LABORATORY RESULTS

OptimumMoisture

(%)

PlasticLimitDepth CBR

Value

Max DryDensity

(pcf)

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA PROJECT NUMBER 16879-0: VA

RK

&K

LA

B S

UM

MA

RIE

S 1

6879

-0 D

CA

TA

XIW

AY

B H

OLD

AP

RO

N.G

PJ

RO

BE

RT

B B

ALT

ER

.GD

T 1

2/29

/17

The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 77: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

B-25 0.0' - 5.5' BULK 20 6 19 41 A-4 SC-SM 11.0 130.0 8.5

B-25 2.0' - 4.0' S-2 9.8

B-25 4.0' - 6.0' S-3 12.0

B-25 6.0' - 8.0' S-4 48.5

B-25 8.0' - 10.0' T-1 39 11 2 98 A-6 ML 45.9

B-25 29.0' - 30.5' S-8 58 19 4.75 87 A-7-5 MH 71.3

SampleNumber

LiquidLimit

PAGE 1 OF 1

WaterContent

(%)Borehole

MaximumSize(mm)

%<#200Sieve

Max DryDensity

(pcf)

SUMMARY OF LABORATORY RESULTS

OptimumMoisture

(%)Depth CBR

ValuePlasticity

IndexAASHTOClassification

ASTMClassification

CLIENT CH2M PROJECT NAME Taxiway B Hold Apron Reconstruction

PROJECT LOCATION DCA DATE TESTEDPROJECT NUMBER 16879-0: VA

LAB

SU

MM

AR

Y M

OD

IFIE

D A

ST

M A

AS

HT

O

1687

9-0

DC

A T

AX

IWA

Y B

HO

LD A

PR

ON

.GP

J M

TA

RE

DLI

NE

.GD

T

3/27

/18

The Robert B. Balter CompanyGeotechnical and Environmental EngineersMaterials and Construction Inspection and TestingTelephone No. (410) 363-1555www.balterco.com

Page 78: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous
Page 79: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous
Page 80: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

CONSOLIDATION TEST DATA

Project: Taxiway B Hold Apron Location: Project No.: 16879-0 Boring No.: B-5 Tested By: J. Taylor Checked By: A. BartolomSample No.: T-1 Test Date: 11/09/2017 Depth: 6.0'-8.0'Test No.: 1 Sample Type: Undisturbed Elevation:

Soil Description: Very Dark Grayish Brown SILT (ML)Remarks: ASTM D2435. Location: B-5 / T-1 (6.0' - 8.0') 32 TSF w/ NO Unload-Reload

Measured Specific Gravity: 2.69 Liquid Limit: 45 Initial Height: 1.01 inInitial Void Ratio: 1.44 Plastic Limit: 29 Specimen Diameter: 2.50 inFinal Void Ratio: 0.75 Plasticity Index: 16

Before Consolidation After Consolidation Trimmings Specimen+Ring Specimen+Ring Trimmings

Container ID RR RING RING RING

Wt. Container + Wet Soil, gm 158.38 246.67 226.03 226.03Wt. Container + Dry Soil, gm 114.8 200.57 200.57 200.57Wt. Container, gm 24.81 109.86 109.86 109.86Wt. Dry Soil, gm 89.99 90.71 90.71 90.71Water Content, % 48.43 50.82 28.07 28.07Void Ratio --- 1.44 0.75 ---Degree of Saturation, % --- 95.42 100.90 ---Dry Unit Weight, pcf --- 69.081 96.158 ---

Page 81: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

CONSOLIDATION TEST DATA

Project: Taxiway B Hold Apron Location: Project No.: 16879-0 Boring No.: B-5 Tested By: J. Taylor Checked By: A. BartolomSample No.: T-1 Test Date: 11/09/2017 Depth: 6.0'-8.0'Test No.: 1 Sample Type: Undisturbed Elevation:

Soil Description: Very Dark Grayish Brown SILT (ML)Remarks: ASTM D2435. Location: B-5 / T-1 (6.0' - 8.0') 32 TSF w/ NO Unload-Reload

Applied Final Void Strain T50 Fitting Coefficient of Consolidation Stress Displacement Ratio at End Sq.Rt. Log Sq.Rt. Log Ave. tsf in % min min ft^2/sec ft^2/sec ft^2/sec

1 0.25 0.03165 1.359 3.12 7.7 0.0 7.42e-007 0.00e+000 7.42e-007 2 0.5 0.0538 1.306 5.30 9.1 0.0 5.90e-007 0.00e+000 5.90e-007 3 1 0.09148 1.216 9.01 9.7 0.0 5.24e-007 0.00e+000 5.24e-007 4 2 0.1402 1.099 13.82 8.8 0.0 5.27e-007 0.00e+000 5.27e-007 5 4 0.1927 0.973 18.99 5.6 0.0 7.31e-007 0.00e+000 7.31e-007 6 8 0.2429 0.853 23.93 5.1 0.0 7.17e-007 0.00e+000 7.17e-007 7 16 0.2928 0.733 28.84 4.2 0.0 7.56e-007 0.00e+000 7.56e-007 8 32 0.3415 0.616 33.65 3.6 0.0 7.68e-007 0.00e+000 7.68e-007 9 16 0.335 0.632 33.01 1.0 0.0 2.75e-006 0.00e+000 2.75e-006 10 8 0.3274 0.650 32.26 2.0 0.0 1.31e-006 0.00e+000 1.31e-006 11 4 0.3189 0.670 31.42 3.4 0.0 8.10e-007 0.00e+000 8.10e-007 12 2 0.3096 0.693 30.50 7.4 0.0 3.77e-007 0.00e+000 3.77e-007 13 1 0.3015 0.712 29.70 8.9 0.0 3.22e-007 0.00e+000 3.22e-007 14 0.5 0.2939 0.730 28.96 12.5 0.0 2.36e-007 0.00e+000 2.36e-007 15 0.25 0.2858 0.750 28.16 14.3 0.0 2.10e-007 0.00e+000 2.10e-007

Page 82: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous
Page 83: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous
Page 84: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

CONSOLIDATION TEST DATA

Project: Taxiway B Hold Apron Location: Project No.: 16879-0 Boring No.: B-12 Tested By: J. Taylor Checked By: A. BartolomSample No.: T-1 Test Date: 11/14/2017 Depth: 6.0'-8.0'Test No.: 1 Sample Type: Undisturbed Elevation:

Soil Description: Very Dark Grayish Brown SILT with Sand (ML)Remarks: ASTM D2435. Location: B-12 / T-1 (6.0' - 8.0') 32 TSF w/ NO Unload-Reload

Measured Specific Gravity: 2.57 Liquid Limit: 47 Initial Height: 1.01 inInitial Void Ratio: 1.76 Plastic Limit: 33 Specimen Diameter: 2.50 inFinal Void Ratio: 0.73 Plasticity Index: 14

Before Consolidation After Consolidation Trimmings Specimen+Ring Specimen+Ring Trimmings

Container ID 257 RING RING RING

Wt. Container + Wet Soil, gm 114.55 237.12 209.35 209.35Wt. Container + Dry Soil, gm 81.28 186.06 186.06 186.06Wt. Container, gm 31.68 109.9 109.9 109.9Wt. Dry Soil, gm 49.6 76.16 76.16 76.16Water Content, % 67.08 67.04 30.58 30.58Void Ratio --- 1.76 0.73 ---Degree of Saturation, % --- 97.71 107.27 ---Dry Unit Weight, pcf --- 58.058 92.597 ---

Page 85: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

CONSOLIDATION TEST DATA

Project: Taxiway B Hold Apron Location: Project No.: 16879-0 Boring No.: B-12 Tested By: J. Taylor Checked By: A. BartolomSample No.: T-1 Test Date: 11/14/2017 Depth: 6.0'-8.0'Test No.: 1 Sample Type: Undisturbed Elevation:

Soil Description: Very Dark Grayish Brown SILT with Sand (ML)Remarks: ASTM D2435. Location: B-12 / T-1 (6.0' - 8.0') 32 TSF w/ NO Unload-Reload

Applied Final Void Strain T50 Fitting Coefficient of Consolidation Stress Displacement Ratio at End Sq.Rt. Log Sq.Rt. Log Ave. tsf in % min min ft^2/sec ft^2/sec ft^2/sec

1 0.25 0.03765 1.661 3.71 8.2 0.0 6.90e-007 0.00e+000 6.90e-007 2 0.5 0.07213 1.567 7.11 14.5 0.0 3.62e-007 0.00e+000 3.62e-007 3 1 0.1309 1.407 12.91 13.6 13.9 3.50e-007 3.43e-007 3.47e-007 4 2 0.1961 1.229 19.34 12.4 13.0 3.33e-007 3.17e-007 3.25e-007 5 4 0.2598 1.055 25.62 8.9 10.0 3.97e-007 3.51e-007 3.73e-007 6 8 0.323 0.883 31.86 7.5 0.0 3.97e-007 0.00e+000 3.97e-007 7 16 0.3766 0.737 37.14 6.3 0.0 3.99e-007 0.00e+000 3.99e-007 8 32 0.426 0.603 42.01 5.8 0.0 3.68e-007 0.00e+000 3.68e-007 9 16 0.4221 0.613 41.63 1.0 0.0 1.94e-006 0.00e+000 1.94e-006 10 8 0.4162 0.629 41.04 4.7 0.0 4.30e-007 0.00e+000 4.30e-007 11 4 0.4095 0.647 40.39 8.2 0.0 2.52e-007 0.00e+000 2.52e-007 12 2 0.4007 0.671 39.52 15.2 13.4 1.40e-007 1.58e-007 1.48e-007 13 1 0.3915 0.696 38.61 19.1 0.0 1.14e-007 0.00e+000 1.14e-007 14 0.5 0.3856 0.713 38.03 17.2 0.0 1.30e-007 0.00e+000 1.30e-007 15 0.25 0.3782 0.733 37.30 17.4 0.0 1.31e-007 0.00e+000 1.31e-007

Page 86: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous
Page 87: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous
Page 88: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

CONSOLIDATION TEST DATA

Project: DCA Glycol Tank Location: Project No.: 16879-0Boring No.: B-25 Tested By: J. Taylor Checked By: A BartolomeSample No.: T-1 Test Date: 03/22/2018 Depth: 8.0'-10.0'Test No.: 1 Sample Type: Undisturbed Elevation:

Soil Description: Brown SILT (ML)Remarks: ASTM D2435. Location: B-25 / T-1 (8.0' - 10.0') 32 TSF w/NO Unload/Reload

Estimated Specific Gravity: 2.79 Liquid Limit: 39 Initial Height: 1.02 inInitial Void Ratio: 1.19 Plastic Limit: 28 Specimen Diameter: 2.50 inFinal Void Ratio: 0.81 Plasticity Index: 11

Before Consolidation After Consolidation Trimmings Specimen+Ring Specimen+Ring Trimmings

Container ID 19 RING RING RING

Wt. Container + Wet Soil, gm 81.1 256.38 244.67 244.67Wt. Container + Dry Soil, gm 59.91 214.33 214.33 214.33Wt. Container, gm 10.3 109.88 109.88 109.88Wt. Dry Soil, gm 49.61 104.45 104.45 104.45Water Content, % 42.71 40.26 29.05 29.05Void Ratio --- 1.19 0.81 ---Degree of Saturation, % --- 94.30 99.91 ---Dry Unit Weight, pcf --- 79.494 96.166 ---

Page 89: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

CONSOLIDATION TEST DATA

Project: DCA Glycol Tank Location: Project No.: 16879-0Boring No.: B-25 Tested By: J. Taylor Checked By: A BartolomeSample No.: T-1 Test Date: 03/22/2018 Depth: 8.0'-10.0'Test No.: 1 Sample Type: Undisturbed Elevation:

Soil Description: Brown SILT (ML)Remarks: ASTM D2435. Location: B-25 / T-1 (8.0' - 10.0') 32 TSF w/NO Unload/Reload

Applied Final Void Strain T50 Fitting Coefficient of Consolidation Stress Displacement Ratio at End Sq.Rt. Log Sq.Rt. Log Ave. tsf in % min min ft^2/sec ft^2/sec ft^2/sec

1 0.125 0.006783 1.177 0.66 1.9 0.0 3.15e-006 0.00e+000 3.15e-006 2 0.25 0.01205 1.165 1.18 1.8 0.0 3.35e-006 0.00e+000 3.35e-006 3 0.5 0.02079 1.147 2.03 4.1 0.0 1.41e-006 0.00e+000 1.41e-006 4 1 0.03767 1.110 3.68 6.1 0.0 9.26e-007 0.00e+000 9.26e-007 5 2 0.06261 1.057 6.12 5.2 0.0 1.03e-006 0.00e+000 1.03e-006 6 4 0.09606 0.985 9.39 4.6 0.0 1.11e-006 0.00e+000 1.11e-006 7 8 0.1349 0.902 13.18 4.5 0.0 1.05e-006 0.00e+000 1.05e-006 8 16 0.1758 0.814 17.19 3.6 0.0 1.18e-006 0.00e+000 1.18e-006 9 32 0.2233 0.713 21.83 3.7 0.0 1.04e-006 0.00e+000 1.04e-006 10 16 0.2183 0.723 21.34 0.9 0.0 3.98e-006 0.00e+000 3.98e-006 11 8 0.2138 0.733 20.90 3.5 0.0 1.08e-006 0.00e+000 1.08e-006 12 4 0.208 0.746 20.33 5.6 0.0 6.75e-007 0.00e+000 6.75e-007 13 2 0.2022 0.758 19.77 8.4 0.0 4.52e-007 0.00e+000 4.52e-007 14 1 0.1955 0.772 19.11 12.6 0.0 3.07e-007 0.00e+000 3.07e-007 15 0.5 0.1889 0.786 18.46 10.6 0.0 3.73e-007 0.00e+000 3.73e-007 16 0.25 0.184 0.797 17.99 5.9 0.0 6.83e-007 0.00e+000 6.83e-007 17 0.125 0.1774 0.811 17.34 14.5 0.0 2.79e-007 0.00e+000 2.79e-007

Page 90: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

SPECIFIC GRAVITY (ASTM D 854)

PROJECT:

DATE:

CLIENT:

Contract No.:

Boring No. B-5 B-12

Sample No. T-1 T-1

Depth 6.0' - 8.0' 6.0' - 8.0'

Organic Content (%)

Specific Gravity 2.695 2.570

DCA Taxiway B HOLD Apron Recontruction

The Robert B. Balter CompanyGeotechnical Engineers

16879-0 VA

DCA Taxiway B HOLD Apron Recontruction

CH2M

December 7, 2017

Page 91: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous
Page 92: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

November 20, 2017 Kristopher M. Crist, PG, PE The Robert B. Balter Company 18 Music Fair Road Owings Mills, Maryland 21117 Subject: Laboratory Report on Soil Sample Testing

Project 16879-0 Reference: RCC Project Number: 159428.00 Dear Mr. Crist: Russell Corrosion Consultants, Inc. has completed the laboratory testing of the four (4) soil samples provided to us. The samples are identified as follows: Sample #1: B-5, S-3 Sample #2 B-8, S-3 Sample #3: B-9, S-2 Sample #4: B-24, S-1 The samples are tested for the following characteristics in accordance with the referenced ASTM Standards:

1. pH - ASTM G-51 2. Resistivity - ASTM G-57 2. Chloride Content - ASTM D-512 3. Sulfate Content - ASTM D-516 4. Redox - ASTM D 1498 5. Presence of Sulfides

The laboratory test results are included in the attached Table 1. Please call us if you have any questions or require additional information. Sincerely, RUSSELL CORROSION CONSULTANTS, LLC

Yaofu Zhang Project Manager (attachments) www.RussellCorrosion.com

Page 93: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

TABLE 1

Soil Sample (Laboratory) Data

Identification Depth As-Is Resistivity"Wetted" Resistivity Chloride Sulfate Redox Presence

Number (ft) (ohm-cm) (ohm-cm) pH (ppm) (ppm) (mV) of Sulfides

B5-S3 8.5-10.0 2,300 2,200 6.9 68 169 -119 PositiveB8-S3 8.5-10.0 7,800 7,800 7.0 45 0 -86 NegativeB9-S2 4.0-5.5 2,400 2,300 6.2 91 306 379 NegativeB24-S1 2.0-3.5 86,000 22,000 6.0 45 0 409 Negative

MAXIMUM 86,000 22,000 7.0 91 306 409MINIMUM 2,300 2,200 6.0 45 0 -119AVERAGE 24,625 8,575 6.5 62 119 146MEDIAN 5,100 5,050 6.6 57 85 147

Page 94: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

18 Music Fair Rd., Owings Mills, MD 21117 Phone: 410.363.1555 Fax: 410.363.8073

Unit Weight of Soil

Project: Taxiway B HOLD Apron Reconstruction Client: CH2M

Contract No.: 16879-0 Date: November 16, 2017

Boring No.: B-3 Sample No.: T-1

Depth: 6.0’ – 8.0’

Material Description: Gray Silty CLAY (CL-ML) (Fill)

LL: N/A PL: N/A PI: N/A

Initial Weight: 299.67 gms.

Average Diameter: 1.879”

Average Height: 4.140”

Natural Moisture: 66.0 %

Wet Unit Weight: 99.33 PCF

Dry Unit Weight: 59.82 PCF

Alberto R. Bartolome Alberto R. Bartolome, PG Laboratory Supervisor

Page 95: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

18 Music Fair Rd., Owings Mills, MD 21117 Phone: 410.363.1555 Fax: 410.363.8073

Unit Weight of Soil

Project: Taxiway B HOLD Apron Reconstruction Client: CH2M

Contract No.: 16879-0 Date: November 16, 2017

Boring No.: B-5 Sample No.: T-1

Depth: 6.0’ – 8.0’

Material Description: Gray SILT (ML)

LL: 45 PL: 29 PI: 16

Initial Weight: 1045.2 gms.

Average Diameter: 2.874”

Average Height: 6.054”

Natural Moisture: 59.5 %

Wet Unit Weight: 101.27 PCF

Dry Unit Weight: 63.48 PCF

Alberto R. Bartolome Alberto R. Bartolome, PG Laboratory Supervisor

Page 96: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

18 Music Fair Rd., Owings Mills, MD 21117 Phone: 410.363.1555 Fax: 410.363.8073

Unit Weight of Soil

Project: Taxiway B HOLD Apron Reconstruction Client: CH2M

Contract No.: 16879-0 Date: November 16, 2017

Boring No.: B-12 Sample No.: T-1

Depth: 6.0’ – 8.0’

Material Description: Gray SILT with Sand (ML) (Fill)

LL: 47 PL: 33 PI: 14

Initial Weight: 1006.67 gms.

Average Diameter: 2.870”

Average Height: 5.861”

Natural Moisture: 60.2 %

Wet Unit Weight: 101.0 PCF

Dry Unit Weight: 63.07 PCF

Alberto R. Bartolome Alberto R. Bartolome, PG Laboratory Supervisor

Page 97: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

18 Music Fair Rd., Owings Mills, MD 21117 Phone: 410.363.1555 Fax: 410.363.8073

Unit Weight of Soil

Project: Taxiway B HOLD Apron Reconstruction Client: CH2M

Contract No.: 16879-0 Date: November 16, 2017

Boring No.: B-16 Sample No.: T-1

Depth: 4.0’ – 6.0’

Material Description: Gray Silty SAND with Gravel (SM) (Fill)

LL: NP PL: NP PI: NP

Initial Weight: 1006.67 gms.

Average Diameter: 1.852”

Average Height: 3.960”

Natural Moisture: 10.18 %

Wet Unit Weight: 108.26 PCF

Dry Unit Weight: 98.25 PCF

Alberto R. Bartolome Alberto R. Bartolome, PG Laboratory Supervisor

Page 98: GEOTECHNICAL EVALUATION TAXIWAY B HOLD APRON … · 2018-07-24 · 9.0 5.2 7.8 12.0 1.0 27.0-14.0 33.0-20.0. SC CL ML SM SM 7 (1) 12 3 2 1 1 2 3 11 27 S1 S2 S3 S4 S5 S6 S7 S8 S9 Bituminous

18 Music Fair Rd., Owings Mills, MD 21117 Phone: 410.363.1555 Fax: 410.363.8073

Unit Weight of Soil

Project: Taxiway B HOLD Apron Reconstruction Client: CH2M

Contract No.: 16879-0 Date: November 16, 2017

Boring No.: B-19 Sample No.: T-1

Depth: 6.0’ – 8.0’

Material Description: Gray Silty SAND (SM)

LL: N/A PL: N/A PI: N/A

Initial Weight: 330.1 gms.

Average Diameter: 1.864”

Average Height: 4.013”

Natural Moisture: 29.9 %

Wet Unit Weight: 114.8PCF

Dry Unit Weight: 88.37 PCF

Alberto R. Bartolome Alberto R. Bartolome, PG Laboratory Supervisor