37
/ 18/04/18 1 Geosynthetics - A Network Rail Perspective Peter Musgrave Lead Track Bed Design Engineer IEng MICE FPWI Levente Nogy Senior Design Engineer CEng MICE FPWI

Geosynthetics - A Network Rail Perspective · Protect existing or new blanket and prevent migration of fines into the ballast Robust Separator (consists of two layers of geotextiles

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Geosynthetics - A Network Rail Perspective · Protect existing or new blanket and prevent migration of fines into the ballast Robust Separator (consists of two layers of geotextiles

/18/04/18 1

Geosynthetics - A Network Rail

Perspective

Peter Musgrave Lead Track Bed Design Engineer IEng MICE FPWI

Levente Nogy Senior Design EngineerCEng MICE FPWI

Page 2: Geosynthetics - A Network Rail Perspective · Protect existing or new blanket and prevent migration of fines into the ballast Robust Separator (consists of two layers of geotextiles

/

Geosynthetics A Network Rail Perspective

18/04/18 2

Geosynthetics Approval Process

Examples of Problem Sites

Subgrade Erosion Slurring Mechanism

Site Investigation & Modelling Techniques to Investigate &

Analyse Track Bed Problems

Geosynthetics used in Track Bed

Presentation Covers the Following:

Page 3: Geosynthetics - A Network Rail Perspective · Protect existing or new blanket and prevent migration of fines into the ballast Robust Separator (consists of two layers of geotextiles

/18/04/18 3

Geosynthetics used in Track Bed

Network Rail

Page 4: Geosynthetics - A Network Rail Perspective · Protect existing or new blanket and prevent migration of fines into the ballast Robust Separator (consists of two layers of geotextiles

/18/04/18 4

Page 5: Geosynthetics - A Network Rail Perspective · Protect existing or new blanket and prevent migration of fines into the ballast Robust Separator (consists of two layers of geotextiles

/18/04/18 5

Geosynthetic Types Criteria for Use

Normal Separator (can be woven, non-woven, needle punched, heat bonded)

Protect existing or new blanket and prevent migration of fines into the ballast

Robust Separator (consists of two

layers of geotextiles separated by mesh

grid or a very strong single layer material)

Coarse granular materials where there is a risk of abrasion and minor sub-grade erosion

Grid Reinforcement (Large aperture, bi-axial or tri-axial)

• All conditions where settlement / differential settlement is a problem• Where soft ground conditions are present

• Through level crossings (no shallow bedrock)• Where saturated formation which may behave like a soft formation is identified

• Transitions between structures and abutting plain line, with variable track stiffness

Sand Blanket Replacement

Geocomposite (10mm thick), or similar

Where sub-grade erosion is present or materials are susceptible to erosion

Geocells• Where extremely soft underlying conditions are present• Transitions to very stiff structures where the track stiffness needs to be

regulated

Types of Geosynthetics

Page 6: Geosynthetics - A Network Rail Perspective · Protect existing or new blanket and prevent migration of fines into the ballast Robust Separator (consists of two layers of geotextiles

/18/04/18 6

Impermeable Membranes

Page 7: Geosynthetics - A Network Rail Perspective · Protect existing or new blanket and prevent migration of fines into the ballast Robust Separator (consists of two layers of geotextiles

/18/04/18 7

Impermeable Membranes

Page 8: Geosynthetics - A Network Rail Perspective · Protect existing or new blanket and prevent migration of fines into the ballast Robust Separator (consists of two layers of geotextiles

/

Site Installation Geotextile separator

Page 9: Geosynthetics - A Network Rail Perspective · Protect existing or new blanket and prevent migration of fines into the ballast Robust Separator (consists of two layers of geotextiles

/

Site Installation Geotextile and Geogrid

Page 10: Geosynthetics - A Network Rail Perspective · Protect existing or new blanket and prevent migration of fines into the ballast Robust Separator (consists of two layers of geotextiles

/

Site Installation Sand Blanket

Page 11: Geosynthetics - A Network Rail Perspective · Protect existing or new blanket and prevent migration of fines into the ballast Robust Separator (consists of two layers of geotextiles

/

Drainage Design

Drain where Sand Blanket is installed

Drain where no Sand Blanket is installed

Page 12: Geosynthetics - A Network Rail Perspective · Protect existing or new blanket and prevent migration of fines into the ballast Robust Separator (consists of two layers of geotextiles

/

Geocell Installation Methodology

Page 13: Geosynthetics - A Network Rail Perspective · Protect existing or new blanket and prevent migration of fines into the ballast Robust Separator (consists of two layers of geotextiles

/18/04/18 13

Geosynthetics approval process in Network Rail

Geosynthetics

Approvals Process

Page 14: Geosynthetics - A Network Rail Perspective · Protect existing or new blanket and prevent migration of fines into the ballast Robust Separator (consists of two layers of geotextiles

/18/04/18 14

Geosynthetics Volumes Annually (estimated)

Sand Blanket Replacement Geocomposite 20 miles

Combination - GeoGrid + Separator 12 miles

Biaxial/Triaxial Grids 50 miles

Robust Separator 50 miles

Geotextile Separator 28 miles

Trench Liner Geotextile Filter 11 miles

GeoCell 5 miles

Page 15: Geosynthetics - A Network Rail Perspective · Protect existing or new blanket and prevent migration of fines into the ballast Robust Separator (consists of two layers of geotextiles

/18/04/18 15

Geosynthetics approval process in Network Rail

• Satisfy a trackbed improvement requirementBusiness

Need

• Certificate of Authority for Product Trial• Time and Site specific

• Trial Success Criteria to measure the results of the trial

Product Trials

• Written report to validate that the success criteria have been achieved

Full Acceptance

Page 16: Geosynthetics - A Network Rail Perspective · Protect existing or new blanket and prevent migration of fines into the ballast Robust Separator (consists of two layers of geotextiles

/18/04/18 16

Geosynthetics approval process in Network Rail

• Section 1 Acceptance process details

• Section 2 Compliance with standards and ownership

• Section 3 System safety

• Section 4 Product function

• Section 5 Product reliability • Section 6 Configuration data

• Section 7 Network Rail integration tasks

• Section 8 Authorisation, date and sign-off

The requirements are broadly grouped in sections covering:

Acceptance Requirements for Railway Infrastructure Products and Systems

Page 17: Geosynthetics - A Network Rail Perspective · Protect existing or new blanket and prevent migration of fines into the ballast Robust Separator (consists of two layers of geotextiles

/18/04/18 17

10kN/m2

Release Valve

Water

Tracktex

Examples of Test Apparatus

Page 18: Geosynthetics - A Network Rail Perspective · Protect existing or new blanket and prevent migration of fines into the ballast Robust Separator (consists of two layers of geotextiles

/

Extracts from NR Geosynthetics Specification

18/04/18 18

Page 19: Geosynthetics - A Network Rail Perspective · Protect existing or new blanket and prevent migration of fines into the ballast Robust Separator (consists of two layers of geotextiles

/18/04/18 19

Examples of Problem

Sites

Page 20: Geosynthetics - A Network Rail Perspective · Protect existing or new blanket and prevent migration of fines into the ballast Robust Separator (consists of two layers of geotextiles

/

Failed Site Examples

Page 21: Geosynthetics - A Network Rail Perspective · Protect existing or new blanket and prevent migration of fines into the ballast Robust Separator (consists of two layers of geotextiles

/

We can avoid all this!!!

Failed Site Examples

Page 22: Geosynthetics - A Network Rail Perspective · Protect existing or new blanket and prevent migration of fines into the ballast Robust Separator (consists of two layers of geotextiles

/

SUBGRADE EROSION

SLURRYING

MECHANISM

Page 23: Geosynthetics - A Network Rail Perspective · Protect existing or new blanket and prevent migration of fines into the ballast Robust Separator (consists of two layers of geotextiles

/

SLURRY – THE PROBLEM

Page 24: Geosynthetics - A Network Rail Perspective · Protect existing or new blanket and prevent migration of fines into the ballast Robust Separator (consists of two layers of geotextiles

/

SLURRY – THE BARRIER

Preventing Surry Pumping

Page 25: Geosynthetics - A Network Rail Perspective · Protect existing or new blanket and prevent migration of fines into the ballast Robust Separator (consists of two layers of geotextiles

/

SLURRY - PREVENTION

Preventing Slurry Pumping

Page 26: Geosynthetics - A Network Rail Perspective · Protect existing or new blanket and prevent migration of fines into the ballast Robust Separator (consists of two layers of geotextiles

/

Critical velocity – Case study

(Beattock Summit)

26

Page 27: Geosynthetics - A Network Rail Perspective · Protect existing or new blanket and prevent migration of fines into the ballast Robust Separator (consists of two layers of geotextiles

/

Critical velocity – Case study

(Glasgow St)

27

Page 28: Geosynthetics - A Network Rail Perspective · Protect existing or new blanket and prevent migration of fines into the ballast Robust Separator (consists of two layers of geotextiles

/

Case study (Willesden Hump’s)

28

Page 29: Geosynthetics - A Network Rail Perspective · Protect existing or new blanket and prevent migration of fines into the ballast Robust Separator (consists of two layers of geotextiles

/18/04/18 29

Site Investigation & Modelling Techniques to Investigate & Analyse Problem Sites

Page 30: Geosynthetics - A Network Rail Perspective · Protect existing or new blanket and prevent migration of fines into the ballast Robust Separator (consists of two layers of geotextiles

/

Finite Element Modelling

Page 31: Geosynthetics - A Network Rail Perspective · Protect existing or new blanket and prevent migration of fines into the ballast Robust Separator (consists of two layers of geotextiles

/

Finite Element Modelling (video)

SHORT VIDEOS

Page 32: Geosynthetics - A Network Rail Perspective · Protect existing or new blanket and prevent migration of fines into the ballast Robust Separator (consists of two layers of geotextiles

/

Ground Investigation Report Site Schematic

Page 33: Geosynthetics - A Network Rail Perspective · Protect existing or new blanket and prevent migration of fines into the ballast Robust Separator (consists of two layers of geotextiles

/Presentation Title: View > Header & Footer 33

Critical velocity – Case study

(Kintbury)

Page 34: Geosynthetics - A Network Rail Perspective · Protect existing or new blanket and prevent migration of fines into the ballast Robust Separator (consists of two layers of geotextiles

/

Track deflection

34

Page 35: Geosynthetics - A Network Rail Perspective · Protect existing or new blanket and prevent migration of fines into the ballast Robust Separator (consists of two layers of geotextiles

/

Failure Mechanism

High dynamic forces at

edge of the embankment

High stress in ballast

Ballast breakage

and voiding

Track settlement

Poor track drainage

Significant difference in

track stiffness

Page 36: Geosynthetics - A Network Rail Perspective · Protect existing or new blanket and prevent migration of fines into the ballast Robust Separator (consists of two layers of geotextiles

/Presentation Title: View > Header & Footer 36

Ballast stress

Stress on ballast &

subgrade is increased

by 2X

Page 37: Geosynthetics - A Network Rail Perspective · Protect existing or new blanket and prevent migration of fines into the ballast Robust Separator (consists of two layers of geotextiles

/ 37

Thank you !!