13
General Offer of the bottle blowing and filling production line for the mineral water( plastic bottle, 500ml, 6,000BPH), including water treatment system. To: , Valid till June 30, 2019 from Ray, China, Phone NO. 0086-18602047233 skype id ray.lee2011 Thank you for your inquiry to our bottle blowing and filling machine. Note: This document is a generally preliminary plan for your information, after technical exchange should subject to technical and commercial aspects of the project configuration and modification. This project allocation and quotation list (including project proposal) is valid for three months from the date of submission.

General Offer of the bottle blowing and filling production ... · General Offer of the bottle blowing and filling production line for the mineral water( plastic bottle, 500ml, 6,000BPH),

  • Upload
    others

  • View
    9

  • Download
    3

Embed Size (px)

Citation preview

Page 1: General Offer of the bottle blowing and filling production ... · General Offer of the bottle blowing and filling production line for the mineral water( plastic bottle, 500ml, 6,000BPH),

General Offer of the bottle blowing and filling production line for the mineral water( plastic bottle, 500ml, 6,000BPH), including water treatment system. To: , Valid till June 30, 2019 from Ray, China, Phone NO. 0086-18602047233 skype id ray.lee2011 Thank you for your inquiry to our bottle blowing and filling machine.

Note: This document is a generally preliminary plan for your information, after technical exchange should subject to technical and commercial

aspects of the project configuration and modification. This project allocation and quotation list (including project proposal) is valid for three

months from the date of submission.

Page 2: General Offer of the bottle blowing and filling production ... · General Offer of the bottle blowing and filling production line for the mineral water( plastic bottle, 500ml, 6,000BPH),

CONTENT 1. Project Summarize 2. Configuration and Price 3. Manual Instruction 4. Payment Term/Package/Transportation 5. Acceptance Standard 6. Installation Debugging Training 7. Payment Term/Package/Transportation Chapter One Project Summarize The project is for 6000BPH (500ml) bottle water production line manufacturing, installation, debugging etc. According to users requirements, we take the customer's conditions into full consideration, such as geographical location, altitude, climate, products stability, automation, degree of difficulty for skilled operators, as well as installation, debugging, personnel training etc. We provide a full set of 6000 bottles/hour (500ml) of bottled water production line equipment and support installation, debugging, accessories (Attached equipment spare parts list). Meanwhile, we offer the bottle shape design and label design for customer for free. Production name: 6000BPH (500ml) bottle water production line Capacity: 6000BPH (500ml) (bottle mouth 30mm) Water source: pure water from RO water system Electric source: 220/380V , 3 phase 5 wires, it should have good ground connection Frequency: 50 ± 0.5HZ Plant size: filling machine should do the 100,000 grade clean workshops, each workshop should have good vent system,the wall and house

proof should have very good lighting and drainage system. Bottle design: not supply yet

Page 3: General Offer of the bottle blowing and filling production ... · General Offer of the bottle blowing and filling production line for the mineral water( plastic bottle, 500ml, 6,000BPH),

Bottle volume: 500ml, 1000ml, 1500ml Our advantages: our model BY 18/18/6 3-in-1 mono-block washing filling capping machine is digesting and absorbing foreign advanced

technology as the foundation, according to our country pure water drinks, mineral water filling process requirement, we innovate the design, develop it and now it becomes a domestic advanced level of bottled water production line.

Quality requirements of the project: 1. Meet customer's quality requirements, to achieve the leading level in the industry 2. The corresponding standards of quality acceptance criteria of national standards and tender regulations. The main materials and equipment are health approvals or compliance with the inspection report. Meet the standard Non-gas liquid filling 2005(QB/T 2747-2005) 3. The final technical parameters of the contract shall prevail. Chapter Two CP- -RO-5000L/H RO system and 6000BPH (500ml) bottle water production line Configuration and Price BY180702

ITEM NAME MODEL QTY PRICE

PICTURE (USD)

1 Water treatment system

CP-RO-5000L/H-BY

1 set 18,209

1.MITSUBISHI (JAPAN) PLC program control system; 2. Whole system SS304 material; 3.SEKO (ITALY) dosing system; 4. USA DOW RO membrane 8pcs BW30-365

Page 4: General Offer of the bottle blowing and filling production ... · General Offer of the bottle blowing and filling production line for the mineral water( plastic bottle, 500ml, 6,000BPH),

5. France Schneider electric system; 6.CHINA NO.1 NANFANG pump; 7.Including quartz sand/active carbon/Security filter/ozone generator

1.1 Sterilized water tank

Volume: 5000L 1pc

1.2 Ozone generator 10g/h 1pc

1.3 Ozone mixing pump

CHL4-40 Power: 0.55kw 1pc

1.4 UV sterilizer UV-5T 1pc

Page 5: General Offer of the bottle blowing and filling production ... · General Offer of the bottle blowing and filling production line for the mineral water( plastic bottle, 500ml, 6,000BPH),

2 Full automatic bottle blowing system

4 cavities 1.LS(Korea) PLC 2.LS(Korea) touch screen 3.OMRON(Japan) electric element 4.SMC(Japan) pneumatic valve 5.SMC(Japan) air cylinder 6.SBD(Germany) electric valve 7.SHANGAIR compressor 8.OMRON(Japan) proximity switch 9.Steel frame,SS304material 10.Four-stage filter system 11.Manual bottle feeding system(to avoid when blowing machine has fault/overhaul.

1 set 60,698

2.1 Full automatic bottle blowing machine

CP -A4L-BY 1 set

Page 6: General Offer of the bottle blowing and filling production ... · General Offer of the bottle blowing and filling production line for the mineral water( plastic bottle, 500ml, 6,000BPH),

2.2 High pressure air compressor

1.6m3/min 2 pcs

2.3 Water chiller 3.0 m3/min To balance the temperature of the mould, prolong life time

1 pc

2.4 Storage tank 600L 1 pc

2.5 Air dryer 5HP,3.0 m3/min To filter and freeze the cleaned air

1 pc

2.6 Security filter

2.0 m3/min Degree of Precision: First one:1μm Second one :0.01μm

1 pc

Page 7: General Offer of the bottle blowing and filling production ... · General Offer of the bottle blowing and filling production line for the mineral water( plastic bottle, 500ml, 6,000BPH),

2.7 Odor remover

Standard To remove the odor from the air

1 pc

2.8 Oil water separator

Standard To eliminate the oil, water from the air

1 pc

2.10 Bottle mold 500ml 1 set

2.11 Bottle mold 1000ml 1 set

2.12 Bottle mold 1500ml 1 set

3 3 in 1 bottle washing-filling-capping machine for

CP-18-18-6-BY 1 set 26,555 1.The newest technology, structure

2.Mitsubishi(Japan) PLC

Page 8: General Offer of the bottle blowing and filling production ... · General Offer of the bottle blowing and filling production line for the mineral water( plastic bottle, 500ml, 6,000BPH),

water 3.Mitsubishi(Japan) frequency 4.WEINVIEW(Taiwan) Touch screen 5.Schneider(France) electric NANFANG washing&filling pump(No.1 pump in China) 6.NSK(Japan)capping bearing 7.AUTONICS(Korea) sensors 8.Automatic lubrication system Easily maintenance. 9.Flushing pipes are all SS304 10.Germany joint venture all SS304 washing, filling, capping head 11.Capping head is adjustable

3.1 Automatic cap feeder

CP-L-B-BY 1 pc

3.2 Light inspection DJ-1-B 1 pc

Page 9: General Offer of the bottle blowing and filling production ... · General Offer of the bottle blowing and filling production line for the mineral water( plastic bottle, 500ml, 6,000BPH),

4 Labeling machine

CP-TB-BY 1 set

14,415

4.1 Steam generator 24KW 1 pc

4.2 Steam shrink tunnel

DH-1800 1 pc

5 Bottle dryer CG-01 1 set 2,276

6 Inkjet machine LT1000 1 pc 3,793

Page 10: General Offer of the bottle blowing and filling production ... · General Offer of the bottle blowing and filling production line for the mineral water( plastic bottle, 500ml, 6,000BPH),

7

Shrink wrapping machine

WD-150A 1.PANASONIC(Japan) PLC 2.WEINVIEW(Taiwan) touch screen Schneider(France) electric elements 3.SCHNEIDER(France) switches 4.AUTONICS(Korea) transducers 5.AUTONICS(Korea) photoelectric 6.OMRON(Japan) Relay and solenoid valve 7.AIRTAC(Taiwan) cylinders 8.SCHNEIDER(France) power LED 9.Special protection function:it will stop and alarm when has barrier 10.PID temperature controller (accurate and energy saving)

1 pc

10,622

8 Air supply chain 15m (Y-type device 6m for each, elbow 3m for each)

1 set 6,373

Page 11: General Offer of the bottle blowing and filling production ... · General Offer of the bottle blowing and filling production line for the mineral water( plastic bottle, 500ml, 6,000BPH),

9 Conveyor 40m (Y-type device 3m for each, elbow 2m for each)

1 set 10,319

11 Bottle blowing machine, filling machine and packing machine air piping are provided by user, wire related material provided by user

1 batch

12 What for free

1. Every machine has the basic spare part for free. 2. TDS water quality display pen, PH pen for free 3. Provide factory layout design drawing for free 4. 1 carton PP filter(25pcs) elements for free

Total FOB Guangzhou Price for Machinery: USD153,260.00

Installation material cost: USD15,150.00

Total FOB Guangzhou Price include installation material cost: USD168,410

Chapter Three Manual Instruction Electric source: 220V/380V , 3 phase 5 wires, it should have good ground connection Frequency: 50 ± 0.5HZ Installation condition: indoor installation, environment temperature: 5-45℃

Page 12: General Offer of the bottle blowing and filling production ... · General Offer of the bottle blowing and filling production line for the mineral water( plastic bottle, 500ml, 6,000BPH),

Chapter Four Payment Term/Package/Transportation 1. Payment Term: 40% T/T deposit, 60%T/T balance pay before shipment. 2. Price Term: FOB Guangzhou, buyer pay ocean shipping fee 3. Delivery time: 60 working days after receipt of deposit, buyer should supply data of the plant. 4. Packing: standard export wooden case, packing material not recyclable; wrapping plastic, not recyclable. Chapter Five Acceptance Standard 1. Seller provides all the product and components as per the contract’s quantity, brand, type. 2. Seller provides the product reach the agreed capacity and technical parameter. 3. Seller tests and runs the machines before delivery, and, the buyer can arrange the staff come to our factory for acceptance. 4. After installation and debugging the machine, both parties confirm the equipment are qualified, the acceptance finish. 5. Buyer should promise the installation place meet the requirement and provide the staff support the installation. Chapter Six Installation, Debugging, Training 1. If the seller arranges two experienced technicians assist the installation, debugging and staff training on buyer site, buyer should be responsible for technician’s round air tickets, visa, food, accommodation and safety, and buyer pay USD75 per day per technician as salary. 2. The seller should take full responsibility of our technicians safety from air port pick up and period stay in buyer country until finish project and send back to airport. 3. The buyer can arrange two staff come to our factory for training of installation, operation and debugging, supplier in charge of meals and accommodation in 7 days. 4. Plan: installation day 15 days, debugging day 15 days, training day 15 days.

Page 13: General Offer of the bottle blowing and filling production ... · General Offer of the bottle blowing and filling production line for the mineral water( plastic bottle, 500ml, 6,000BPH),

5. Training details are as follows: ●Basic theoretical knowledge the equipment ●Equipment structure ●Equipment operation and repair ● Equipment common faults and solve 6. Seller provides machine’s operation manual and relative technical documents. 7. On-site installation material is provided by buyer. 8. technicians salary should be paid before on-site installation, the actual amount will be over charged or refund. 9. If buyer not arrange our technicians for installation after 75 days of the shipment of the goods, or due to the electricity, water, plant, personnel etc. factor delayed the installation for 30 days, buyer should pay the 10% of the order balance, otherwise, seller has the right not to supply technical support or ask for compensation. Remark: Buyer should arrange technicians with electricity and mechanical experience to help and coordinate the installation, debugging and training. Chapter Seven Quality Assurance and After-sales Service 1 The equipment enjoys 12 months’ quality warranty since installation on the buyer site, or the warranty time is not more than 15 months since the equipment delivery from seller factory. 2 If the equipment failed to work within warranty time, seller provides the replace component and afford transport fee. 3 Seller can arrange the technician to buyer site to repair the equipment after negotiation with both parties if necessary. 4 The seller provides long-term after-sale service, free technical advice and training services and spare parts service, supplier will reply the buyer within 24 hours after receiving the information. 5 If buyer needs to extend the warranty time, buyer can negotiate with seller.